IN FORCE Norms Committee — Engineering (Gr B / NC-I) Advance Authorisation 2010-03-23

DGFT Committee Minutes

Document text

RATIFIED   Minutes of M.No.51/10 held on 23.03.2010 of Norms Committee (NC­I) (DES.I Section)     The  meeting  No.  51/10  of  the  Norms  Committee  (NC­I)  for  the  licensing  year  2009­2010  was  held  on  23.03.2010  under  the Chairmanship of Shri A. Komu, Addl. Director General of Foreign Trade to consider the applications under Duty Exemption / Remission Schemes (Chapter­4) of Foreign Trade Policy 2004–2009 / Handbook of Procedure Volume­I.  The following Members of the Committee were present in the meeting: ­   Sl.No Name  of  the  representatives  &  their Designation Room No. Telephone No. Deptt. 1. Sh B. C. Nayak. D.O. 429A 23063321 Extn.3318 DHI, U.B. 2. Sh  S.K. Jain,  D.O. 429A 23063321 Extn.3318 DIPP, U.B. 3. Sh. K.K. Funda, Asstt. Dir. (Mech) 736A   DC(MSME),N.B. 4. Sh. A.K. Mishra, Asstt. IA     MOS, U.B. 4. Sh. Krishan Kumar, DDG & Convener NC­I 302 23061562 Ext.380 DGFT, U.B. 5. Sh. Ramavatar Meena, FTDO 404 23061562 Ext.265 DGFT, U.B.   The Committee considered the individual cases of the agenda of this meeting generated through the online system of NIC and some manual cases and the decision taken thereon were as under: ­    1

Case No.:38/51/80­ALC2/2009

Party Name:WALVOIL FLUID POWER (INDIA) PVT.LTD, Meet No/Date:51/80­ALC2/2009 23.03.2010 Status:Case deferred HQ File :01/80/050/00829/AM10/ RLA File :07/21/040/00394/AM10/ Lic.No/Date:0710066108 23.07.2009 Defer Date: 11.05.2010 Decision :The Committee noted that the Regional Authority neither forwarded the hardcopy of firm’s application nor reported the status of the case.  The Committee, therefore, decided to remind RA with a copy to firm to forward the firm’s application at the earliest and on receipt forward the same to technical authority i.e. DHI for examination and submission of comments. The case may be relisted on 11.05.2010.    

Case No.:2/51/80­ALC2/2009

Party Name:ABB LIMITED 23.03.2010 Status:Case reverted back to RA HQ File :01/80/050/00793/AM10/ RLA File :07/24/040/00279/AM10/ Lic.No/Date:0710068009 04.11.2009

2 Decision : The Committee noted that firm’s application has not been received so far.  However, according to online data, items of import appear to  be  covered  in  GN­4  for  the  Engineering  Products.  The  Committee  accordingly  decided  to  revert  back  the  case  to  concerned  Regional Authority without any examination for taking appropriate decision in terms of Policy Circular No. 20 dt. 05.12.2007. The Regional Authority may take necessary action accordingly.   3

Case No.:34/51/80­ALC2/2009

Party Name:HONEYWELL AUTOMATION INDIA LIMITED 23.03.2010 Status:Case reverted back to RA HQ File :01/80/050/00825/AM10/ RLA File :31/21/040/00210/AM10/ Lic.No/Date:3110040641 12.11.2009   Decision :The Committee noted that firm’s application has not been received so far.  However, according to online data, items of import appear to  be  covered  in  GN­4  for  the  Engineering  Products.  The  Committee  accordingly  decided  to  revert  back  the  case  to  concerned  Regional Authority without any examination for taking appropriate decision in terms of Policy Circular No. 20 dt. 05.12.2007.   4

Case No.:1/51/80­ALC2/2009

Party Name:NISHOTECH SYSTEMS PVT.LTD. 23.03.2010 Status:Case approved HQ File :01/80/050/00792/AM10/ RLA File :03/95/040/00580/AM10/ Lic.No/Date:0310549676 08.12.2009   Decision : The representative of the DIPP present in the meeting recommended the case. The Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject advance authorization on net­to­net basis as applied for by the firm.     5

Case No.:35/51/80­ALC2/2009

Party Name:THERMAX LTD., 23.03.2010 HQ File :01/80/050/00826/AM10/ RLA File :31/24/040/00153/AM10/ Lic.No/Date:3110040979 08.12.2009 Defer Date: 11.05.2010 Decision : The representative of the DHI informed the Committee that they received the firm’s application and case was under their study. The Committee, therefore, decided to defer the consideration and to relist the case on 11.05.2010.   6

Case No.:10/51/80­ALC2/2009

Party Name:HIND HIGH VACUUM COMPANY PVT LTD. 23.03.2010 HQ File :01/80/050/00801/AM10/ RLA File :07/21/040/00942/AM10/ Lic.No/Date:0710069368 11.01.2010 Defer Date: 11.05.2010

Decision : The Committee noted that the Regional Authority neither forwarded the hardcopy of firm’s application nor reported the status of the case.  The Committee, therefore, decided to remind RA with a copy to firm to forward the firm’s application at the earliest and on receipt forward the same to technical authority i.e. DIPP for examination and submission of comments. The case may be relisted on 11.05.2010.   7

Case No.:22/51/80­ALC2/2009

Party Name:BHARAT HEAVY ELECTRICALS LIMITED 23.03.2010 HQ File :01/80/050/00813/AM10/ RLA File :09/24/040/00412/AM10/ Lic.No/Date:0910040591 12.01.2010 Defer Date: 11.05.2010 Decision  :  On  the  recommendation  of  the  representative  of  DHI  present  in  the  meeting,  it  was  decided  by  the  Committee  to  call  for  the following information/clarification from the firm and to re­list the case on 11.05.2010:­   1. Input Weight of each casting/ forging/flange and corresponding finished weight. 3. Use of each component proposed for import in the manufacture of export product 4. Break up of different types of plates at item no 56 of import. 5. Serial no 4,5,6 ,9 & 11 of SDL export product wise.     8

Case No.:6/51/80­ALC2/2009

Party Name:SYSTEMS & COMPONENTS (I) PVT. LTD., 23.03.2010 Status:Case approved HQ File :01/80/050/00797/AM10/ RLA File :03/95/040/00631/AM10/ Lic.No/Date:0310555003 13.01.2010   Decision : The representative of the DIPP present in the meeting recommended the case. The Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject advance authorization as per General Note No.4 for Engineering Product.   9

Case No.:9/51/80­ALC2/2009

Party Name:BHARAT HEAVY ELECTRICALS LIMITED 23.03.2010 HQ File :01/80/050/00800/AM10/ RLA File :07/21/040/00933/AM10/ Lic.No/Date:0710069461 19.01.2010 Defer Date: 11.05.2010 Decision : The Committee noted that firm’s application has been referred to DHI whereas the case pertain to DIT.  The Committee, accordingly, decided to refer the copy of firm’s application to DIT for examination and submission of comments. The case may be relisted on 11.05.2010.  

Case No.:21/51/80­ALC2/2009

Party Name:VIGEL MANUFACTURING TECHNOLOGIES PVT.LTD. 23.03.2010 Status:Case approved HQ File :01/80/050/00812/AM10/ RLA File :03/95/040/00707/AM10/ Lic.No/Date:0310556754 25.01.2010

10 Decision :  The Committee noted that data of the authorization was not available in the on line agenda and the case was considered as per information available in firm’s application.    The Committee  decided  to  report  this  problem  to  NIC  and  observed  that  according  to  firm’s application, items of import appear to be covered in GN­4 for the Engineering Products. The Committee therefore decided to ratify norms as per GN­4 for the engineering products.     11

Case No.:15/51/80­ALC2/2009

Party Name:BHARAT HEAVY ELECTRICALS LIMITED 23.03.2010 HQ File :01/80/050/00806/AM10/ RLA File :11/24/040/00042/AM10/ Lic.No/Date:1110021676 28.01.2010 Defer Date: 11.05.2010 Decision  :  On  the  recommendation  of  the  representative  of  DHI  present  in  the  meeting,  it  was  decided  by  the  Committee  to  call  for  the following information/clarification from the firm and to re­list the case on 11.05.2010: ­   1.            Specific quantity of each export product with details of the accessories, spares and their weight separately. 2.            Input Weight of each casting/ forging and corresponding finished weight. 3.            Use of each component proposed for import in the manufacture of export product. 4.            Serial no 5 & 11 of SDL export product wise. 5.            Break up of item no 6 of import in to different grades of steel such as SS,AS and non alloy.   12

Case No.:8/51/80­ALC2/2009

Party Name:BHARAT HEAVY ELECTRICALS LIMITED 23.03.2010 HQ File :01/80/050/00799/AM10/ RLA File :07/21/040/01035/AM10/ Lic.No/Date:0710069725 01.02.2010 Defer Date: 11.05.2010 Decision :The Committee noted that the Regional Authority neither forwarded the hardcopy of firm’s application nor reported the status of the case.  The Committee, therefore, decided to remind RA with a copy to firm to forward the firm’s application at the earliest and on receipt forward the same to technical authority i.e. DIT for examination and submission of comments. The case may be relisted on 11.05.2010.   13

Case No.:13/51/80­ALC2/2009

Party Name:VULCAN INDUSTRIAL ENGINEERING CO.LTD. 23.03.2010 HQ File :01/80/050/00804/AM10/ RLA File :34/24/040/00189/AM10/ Lic.No/Date:3410026224 02.02.2010 Defer Date: 11.05.2010 Decision  :  On  the  recommendation  of  the  representative  of  DHI  present  in  the  meeting,  it  was  decided  by  the  Committee  to  call  for  the following information/clarification from the firm and to re­list the case on 11.05.2010: ­   1. Information in respect of Sl.No.9 & 11 of the Standard Deficiency Format.

2. Net weight & gross weight of 4 to 8 of import.     14

Case No.:11/51/80­ALC2/2009

Party Name:PRANITA ENGINEERING SOLUTIONS PRIVATE LIMITED, 23.03.2010 HQ File :01/80/050/00802/AM10/ RLA File :07/24/040/00392/AM10/ Lic.No/Date:0710069986 11.02.2010 Defer Date: 11.05.2010 Decision : The representative of the DIPP informed the Committee that they received the firm’s application and case was under their study. The Committee, therefore, decided to defer the consideration and to relist the case on 11.05.2010.   15

Case No.:12/51/80­ALC2/2009

Party Name:TIMKEN INDIA LTD. 23.03.2010 Status:Case approved HQ File :01/80/050/00803/AM10/ RLA File :02/24/040/00222/AM10/ Lic.No/Date:0210138078 17.02.2010   Decision : The representative of the DIPP present in the meeting recommended that norms of the subject authorization may be ratified on repeat basis as per norms of Advance Authorization No.0210135991 dated 1.1.2010 ratified in NC Meeting No.48/80 dated 02.03.2010.  The Committee, accordingly, decided to ratify the norms in respect of the subject advance authorization on repeat basis as under:­   1. Total net export weight of  33.03 MT may be specified with the quantity of export product. 2. Quantity of import item may be allowed as  60444  Kgs. inclusive of 83% wastage after 20 % recovery.   16

Case No.:26/51/80­ALC2/2009

Party Name:CAMFIL FARR AIR FILTRATION INDIA LTD 23.03.2010 Status:Case approved HQ File :01/80/050/00817/AM10/ RLA File :05/23/040/00191/AM10/ Lic.No/Date:0510258771 17.02.2010   Decision : The representative of the DC(MSME) present in the meeting recommended the case. The Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject advance authorization with following modifications:­   After taking clue from SION at S.No. C­1799, quantities of import items may be allowed as 1.02 kg./ kg. content in the export product.      

Case No.:30/51/80­ALC2/2009

Party Name:SHAKTI PUMPS (INDIA) LTD.,

17 23.03.2010 HQ File :01/80/050/00821/AM10/ RLA File :11/24/040/00045/AM10/ Lic.No/Date:1110021828 19.02.2010 Defer Date: 11.05.2010 Decision : The representative of the DHI informed the Committee that they received the firm’s application and case was under their study. The Committee, therefore, decided to defer the consideration and to relist the case on 11.05.2010.   18

Case No.:14/51/80­ALC2/2009

Party Name:BGR ENERGY SYSTEMS LIMITED, 23.03.2010 HQ File :01/80/050/00805/AM10/ RLA File :04/24/040/00301/AM10/ Lic.No/Date:0410111751 22.02.2010 Defer Date: 11.05.2010 Decision : On the recommendation of the representative of DIPP  present in the meeting, it was decided by the Committee to call for the following information/clarification from the firm and to re­list the case on 11.05.2010:­   1. Information in respect of Sl.No.3,4,5 & 11 of the Standard Deficiency Format export product wise.   19

Case No.:27/51/80­ALC2/2009

Party Name:GODREJ & BOYCE MFG. CO. LTD., 23.03.2010 HQ File :01/80/050/00818/AM10/ RLA File :03/94/040/01010/AM10/ Lic.No/Date:0310561529 23.02.2010 Defer Date: 11.05.2010 Decision : On the recommendation of the representative of DIPP present in the meeting, it was decided by the Committee to call for the following information/clarification from the firm and to re­list the case on 11.05.2010:­   1. Information in respect of Sl.No.4,5,11 & 13 of the Standard Deficiency Format export product wise.   20

Case No.:25/51/80­ALC2/2009

Party Name:AKSH TECHNOLOGIES LTD.((A WHOLLY OWNED SUBSIDIARY 23.03.2010 HQ File :01/80/050/00816/AM10/ RLA File :05/23/040/00188/AM10/ Lic.No/Date:0510259390 24.02.2010 Defer Date: 11.05.2010 Decision : The Committee observed that the comments called for from DIT are yet to be received.  The Committee, therefore,  decided  to remind them for expediting their comments. The case may be re­listed on 11.05.2010.    

Case No.:23/51/80­ALC2/2009

Party Name:CHEMICO SYNTHETICS LTD., 23.03.2010 HQ File :01/80/050/00814/AM10/ RLA File :05/23/040/00179/AM10/

21 Lic.No/Date:0510259450 25.02.2010 Defer Date: 11.05.2010 Decision : The Committee noted that firm’s application has been referred to DIPP whereas the case pertain to M/o Mines.  The Committee, accordingly, decided to refer the copy of firm’s application to M/o Mines for examination and submission of comments. The case may be relisted on 11.05.2010.   22

Case No.:20/51/80­ALC2/2009

Party Name:ZENITH PRECISION PVT LTD ., 23.03.2010 HQ File :01/80/050/00811/AM10/ RLA File :07/24/040/00459/AM10/ Lic.No/Date:0710070262 26.02.2010 Defer Date: 11.05.2010 Decision  :  The  Committee  noted  that  firm’s  application  has  been  referred  to  DHI  whereas  the  case  pertain  to  DGCA  as  the  firm  is manufacturing aerospace components.  The Committee, accordingly, decided to refer the copy of firm’s application to DGCA for examination and submission of comments. The case may be relisted on 11.05.2010.   23

Case No.:24/51/80­ALC2/2009

Party Name:FRONTLINE PRECISIONS PVT LTD 23.03.2010 HQ File :01/80/050/00815/AM10/ RLA File :07/24/040/00414/AM10/ Lic.No/Date:0710070258 26.02.2010 Defer Date: 11.05.2010 Decision : The representative of the DIPP informed the Committee that they received the firm’s application and case was under their study. The Committee, therefore, decided to defer the consideration and to relist the case on 11.05.2010.   24

Case No.:28/51/80­ALC2/2009

Party Name:BHARAT HEAVY ELECTRICALS LIMITED 23.03.2010 HQ File :01/80/050/00819/AM10/ RLA File :04/24/040/00290/AM10/ Lic.No/Date:0410112044 02.03.2010 Defer Date: 11.05.2010 Decision  :  The  Committee  noted  that  firm’s  application  has  been  referred  to  DHI  whereas  the  case  pertain  to  DIPP.    The  Committee, accordingly, decided to refer the copy of firm’s application to DIPP for examination and submission of comments. The case may be relisted on 11.05.2010.     25

Case No.:3/51/80­ALC2/2009

Party Name:MIKROTEK MACHINES LTD., 23.03.2010 HQ File :01/80/050/00794/AM10/ RLA File :07/24/040/00458/AM10/ Lic.No/Date:0710070360 04.03.2010 Defer Date: 11.05.2010 Decision : The Committee noted that the Regional Authority neither forwarded the hardcopy of firm’s application nor reported the status of the case.  The Committee, therefore, decided to remind RA with a copy to firm to forward the firm’s application at the earliest and on receipt forward the same to technical authority i.e. DHI for examination and submission of comments. The case may be relisted on 11.05.2010.

26

Case No.:4/51/80­ALC2/2009

Party Name:MIKROTEK MACHINES LTD., 23.03.2010 HQ File :01/80/050/00795/AM10/ RLA File :07/24/040/00457/AM10/ Lic.No/Date:0710070361 04.03.2010 Defer Date: 11.05.2010 Decision : The Committee noted that the Regional Authority neither forwarded the hardcopy of firm’s application nor reported the status of the case.  The Committee, therefore, decided to remind RA with a copy to firm to forward the firm’s application at the earliest and on receipt forward the same to technical authority i.e. DHI for examination and submission of comments. The case may be relisted on 11.05.2010.   27

Case No.:5/51/80­ALC2/2009

Party Name:INGERSOLL­RAND (INDIA) LIMITED 23.03.2010 Status:Case approved HQ File :01/80/050/00796/AM10/ RLA File :03/94/040/01041/AM10/ Lic.No/Date:0310562955 04.03.2010   Decision : The representative of the DIPP present in the meeting recommended the case. The Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject advance authorization as per General Note No.4 for Engineering Product.     28

Case No.:7/51/80­ALC2/2009

Party Name:MICRON INSTRUMENTS PVT LTD 23.03.2010 HQ File :01/80/050/00798/AM10/ RLA File :05/24/040/00503/AM10/ Lic.No/Date:0510259916 05.03.2010 Defer Date: 11.05.2010 Decision : The Committee noted that the Regional Authority neither forwarded the hardcopy of firm’s application nor reported the status of the case.  The Committee, therefore, decided to remind RA with a copy to firm to forward the firm’s application at the earliest and on receipt forward the same to technical authority i.e. DIPP for examination and submission of comments. The case may be relisted on 11.05.2010.   29

Case No.:16/51/80­ALC2/2009

Party Name:PERMANENT MAGNETS LIMITED 23.03.2010 Status:Case approved HQ File :01/80/050/00807/AM10/ RLA File :03/95/040/00798/AM10/ Lic.No/Date:0310563286 08.03.2010   Decision : The representative of the DIPP present in the meeting recommended the case. The Committee, after deliberating upon the case, decided to ratify the norms in respect of the subject advance authorization with following modifications:­   1.      Words “ 0.36 mm Thk” may be suffixed with the description of import item. 2.      Quantity of import item may be allowed as applied for i.e. 8704.64  Kgs inclusive of 85.6% wastage after 1/3rd recovery.

  30

Case No.:17/51/80­ALC2/2009

Party Name:GODREJ & BOYCE MFG. CO. LTD., 23.03.2010 HQ File :01/80/050/00808/AM10/ RLA File :03/94/040/01032/AM10/ Lic.No/Date:0310563636 09.03.2010 Defer Date: 11.05.2010 Decision :On  the  recommendation  of  the  representative  of  DIPP  present  in  the  meeting,  it  was  decided  by  the  Committee  to  call  for  the following information/clarification from the firm and to re­list the case on 11.05.2010:­   1. Information in respect of Sl.No.3,4,5,11 & 13 of the Standard Deficiency Format.     31

Case No.:18/51/80­ALC2/2009

Party Name:ABB LIMITED 23.03.2010 Status:Case reverted back to RA HQ File :01/80/050/00809/AM10/ RLA File :07/24/040/00466/AM10/ Lic.No/Date:0710070460 10.03.2010   Decision :The Committee noted that firm’s application has not been received so far.  However, according to online data, items of import appear to  be  covered  in  GN­4  for  the  Engineering  Products.  The  Committee  accordingly  decided  to  revert  back  the  case  to  concerned  Regional Authority without any examination for taking appropriate decision in terms of Policy Circular No. 20 dt. 05.12.2007.   32

Case No.:19/51/80­ALC2/2009

Party Name:ROCKWELL AUTOMATION INDIA PRIVATE LIMITED 23.03.2010 Status:Case reverted back to RA HQ File :01/80/050/00810/AM10/ RLA File :05/24/040/00505/AM10/ Lic.No/Date:0510260190 10.03.2010   Decision : The Committee noted that firm’s application has not been received so far.  However, according to online data, items of import appear to  be  covered  in  GN­4  for  the  Engineering  Products.  The  Committee  accordingly  decided  to  revert  back  the  case  to  concerned  Regional Authority without any examination for taking appropriate decision in terms of Policy Circular No. 20 dt. 05.12.2007.   33

Case No.:36/51/80­ALC2/2009

Party Name:MARKS PRYOR MARKING TECHNOLOGY PRIVATE LIMITED 23.03.2010 HQ File :01/80/050/00827/AM10/ RLA File :31/24/040/00213/AM10/ Lic.No/Date:3110042306 10.03.2010 Defer Date: 11.05.2010

Decision : The Committee noted that the Regional Authority neither forwarded the hardcopy of firm’s application nor reported the status of the case.  The Committee, therefore, decided to remind RA with a copy to firm to forward the firm’s application at the earliest and on receipt forward the same to technical authority i.e. DIPP for examination and submission of comments. The case may be relisted on 11.05.2010.     34

Case No.:29/51/80­ALC2/2009

Party Name:PIONEER FRICTION LTD., 23.03.2010 HQ File :01/80/050/00820/AM10/ RLA File :02/24/040/00236/AM10/ Lic.No/Date:0210139134 11.03.2010 Defer Date: 11.05.2010 Decision : The Committee noted that the Regional Authority neither forwarded the hardcopy of firm’s application nor reported the status of the case.  The Committee, therefore, decided to remind RA with a copy to firm to forward the firm’s application at the earliest and on receipt forward the same to technical authority i.e. DHI for examination and submission of comments. The case may be relisted on 11.05.2010.   35

Case No.:31/51/80­ALC2/2009

Party Name:LARSEN & TOUBRO LIMITED 23.03.2010 HQ File :01/80/050/00822/AM10/ RLA File :03/95/040/00774/AM10/ Lic.No/Date:0310564113 11.03.2010 Defer Date: 11.05.2010 Decision : The Committee noted that the Regional Authority neither forwarded the hardcopy of firm’s application nor reported the status of the case.  The Committee, therefore, decided to remind RA with a copy to firm to forward the firm’s application at the earliest and on receipt forward the same to technical authority i.e. DIPP for examination and submission of comments. The case may be relisted on 11.05.2010.   36

Case No.:32/51/80­ALC2/2009

Party Name:LARSEN & TOUBRO LIMITED 23.03.2010 HQ File :01/80/050/00823/AM10/ RLA File :03/95/040/00808/AM10/ Lic.No/Date:0310564122 11.03.2010 Defer Date: 11.05.2010 Decision : The Committee noted that the Regional Authority neither forwarded the hardcopy of firm’s application nor reported the status of the case.  The Committee, therefore, decided to remind RA with a copy to firm to forward the firm’s application at the earliest and on receipt forward the same to technical authority i.e. DHI for examination and submission of comments. The case may be relisted on 11.05.2010.     37

Case No.:33/51/80­ALC2/2009

Party Name:RMG AUTOMETERS GAS TECHNOLOGIES LIMITED 23.03.2010 Status:Case reverted back to RA HQ File :01/80/050/00824/AM10/ RLA File :05/24/040/00439/AM10/ Lic.No/Date:0510260346 12.03.2010

Decision : The Committee noted that firm’s application has not been received so far.  However, according to online data, items of import appear to  be  covered  in  GN­4  for  the  Engineering  Products.  The  Committee  accordingly  decided  to  revert  back  the  case  to  concerned  Regional Authority without any examination for taking appropriate decision in terms of Policy Circular No. 20 dt. 05.12.2007.   38

Case No.:37/51/80­ALC2/2009

Party Name:THE SARASWATI INDUSTRIAL SYNDICATE LTD. 23.03.2010 HQ File :01/80/050/00828/AM10/ RLA File :05/24/040/00517/AM10/ Lic.No/Date:0510260519 15.03.2010 Defer Date: 11.05.2010 Decision : The Committee noted that the Regional Authority neither forwarded the hardcopy of firm’s application nor reported the status of the case.  The Committee, therefore, decided to remind RA with a copy to firm to forward the firm’s application at the earliest and on receipt forward the same to technical authority i.e. DIPP for examination and submission of comments. The case may be relisted on 11.05.2010.    

Case No.  A/R­171

M/s.  GEA  BGR  Energy System  India  Ltd., Chennai HQ F.No.01/80/50/00505/AM09/DES.I Lic.No. & Date Meeting No.51/10 RA F.No.04/24/040/00077/AM09 0410096594 dt.18.06.2008 Date: 23.03.2010 Ratification of norms The Committee reviewed this case as the firm has furnished their reply. The representative of the DHI informed the Committee that they received the firm’s  representation  and  case  was  under  their  study.  The  Committee,  therefore,  decided  to  defer  the  consideration  and  to  relist  the  case  on 11.05.2010.      

Case No.  A/R­172

M/s.  Delphi­TVS  Diesel Systems Ltd., Chennai HQ F.No.01/80/50/00618/AM09/DES.I Lic.No. & Date Meeting No.51/10 RA F.No.04/24/040/00409/AM08 0410096031 dt.26.05.2008 Date: 23.03.2010 Ratification of norms The Committee reviewed this case as the firm has furnished their reply. The Committee however noted that firm has still not submitted the point wise replies to all the query raised by the NC.  Therefore it was decided by the Committee to advise the firm to appear before the NC to explain their case in person along with point wise specific replies and full facts of the case. The case may be relisted on 11.05.2010.      

Case No.  A/R­173

M/s.  The  Saraswati Industrial Syndicate LTd., HQ F.No.01/80/50/00344/AM09/DES.I Lic.No. & Date Meeting No.51/10 RA F.No.05/24/040/00539/AM08 0510210113 dt.05.10.2007 Date: 23.03.2010 Revision of norms The Committee considered the firm’s request to restore the import item no. 34 which was earlier deleted by the NC.  The representative of the DHI informed the Committee that they received the firm’s representation and case was under their study. The Committee, therefore, decided to defer the

consideration and to relist the case on 11.05.2010.    

Case No.  A/R­174

M/s.  The  Saraswati Industrial Syndicate LTd., HQ F.No.01/80/50/01200/AM08/DES.I Lic.No. & Date Meeting No.51/10 RA F.No.05/24/040/00817/AM08 0510215372 dt.24.01.2008 Date: 23.03.2010 Revision of norms The Committee considered the firm’s request to delete the word “painted” form the description of the export product and disallow import of paint at Sl.No. 13 as they have sourced this item indigenously. The firm also mentioned that they had exported the product before ratification. The firm has also requested to change the weight of import item No.2 as 14.109 MT instead of 14.1 MT.  The Committee after deliberating upon the case decided to  accept  both  the  requests  of  the  firm.    Accordingly,  following  changes  are  recommended  in  the  norms  earlier  norms  of  the  subject  advance authorization :­   1.      The word “painted” may be deleted form the description of the export product and import of paint at Sl.No. 13 may be disallowed as the same have been sourced indigenously.  2.      The weight of import item No.2  may be changed as 14.109 MT instead of 14.1 MT.   Regional Authority may take necessary action accordingly.    

Case No.  A/R­175

M/s.  GEA  BGR  Energy System  India  Ltd., Chennai HQ F.No.01/80/50/01098/AM08/DES.I Lic.No. & Date Meeting No.51/10 RA F.No.04/24/040/00324/AM08 0410092979 dt.02.01.2008 Date: 23.03.2010 Ratification of norms The Committee reviewed this case as the firm has furnished their reply.  The representative of the DHI informed the Committee that they received the firm’s reply and case was under their study. The Committee, therefore, decided to defer the consideration and to relist the case on 11.05.2010.      

Case No.  A/R­176

M/s.  Bharat  Heavy Electricals  Ltd., Tiruchirapalli HQ F.No.01/80/50/00033/AM10/DES.I Lic.No. & Date Meeting No.51/10 RA F.No.04/24/040/00236/AM09 0410101783 dt.22.01.2009 Date: 23.03.2010 Revision of norms The DHI furnished written comments in this case vide their U.O. No.  3(109)/09­TSW(B)/133 dated 17/03/2010 recommending the norms. Text of DHI comments are re­produced below:­ Ministry of Heavy Industries & Public Enterprises Department of Heavy Industry TSW(B) Section

Subject: Application of M/S BHEL, Trichy for ratification of norms of licence no 041010101783 dtd 22­01­09.

  DES­I, DGFT may kindly refer to the above mentioned licence of M/S BHEL, Trichy. The firm has now submitted reply vide their letter of dated 13­02­ 10. This Office recommends the following on per set basis. Export 1. The total weight of export product for two sets is 44970 MT & the same may be incorporated in the licence. Import per unit

3. Item no 1­ The item may be allowed at 745.7 MT with 3% wastage. 4. Item no 2­ The item may be allowed at 200.8 MT with 3% wastage. 5. Item no 3 to 5­ The item may be allowed as applied with 2% wastage 6. Item no 6­ The item consists of pipes & hollows. Pipes may be allowed at 1597.2MT with 2% wastage. Hollows may be allowed at 916.3 MT with 10% wastage. 7.  Item no 7­ The item consists of pipes & blooms. Pipes may be allowed at 1310.7 MT with 2% wastage. Blooms may be allowed at 301 MT with 30% wastage. 8. Item no 8­ The item may be allowed at 335.6 with 2% wastage 9. Item no 9­The weight of the import product is 63 MT & the same may be incorporated in the licence. 10. Item no 10­ Welding material & this may be allowed as applied for. 11.  Item no 11to 13­ These are components & may be allowed under GN­4. 12. Item no 14,25,18­ May be deleted as these are instruments & not part of the export product. 13. Item no 20 to 22 & 24­ may be deleted as these appears to be capital goods. 14. All other items up to item no 41 are components & may be allowed under GN­4. 15. Item no 42 to 72 are spares & may be allowed under spares policy. The above issues with the approval of JS(B). B.C.Nayak Development Officer Shri Ramavtar Meena, FTDO, DES­I Deptt. of HI, UO No 3(109)/09­TSW(B)               dated   The Committee, after deliberating upon the DHI comments, decided to ratify the norms in respect of the subject advance authorization in accordance with their written comments.      

Case No.  C ­ 35

M/s.  Electromech  Material Handling  Systems  (I)  Pvt. Ltd., HQ F.No.01/80/162/01767/AM10/DES.I Meeting No.51/10 Date: 23.03.2010 Modification in SION Sl. No. C­1899 for the export product  “E. O. T. Crane” The Committee noted that SION is already available for “E.O.T. crane” at Sl.No. C­1899 and the exporter requested to incorporate some additional components as inputs under this SION.  The Committee noted that according to provision  of General Note 4 for the engineering items in Handbook of Procedures Vol.II, where SION do not provide import of components or where additional components in addition to those allowed in norms are sought,  the  components  as  an  input  can  be  allowed  for  import  on  net­to­net  basis  without  any  wastage  with  accountability  clause  by  RA   Accordingly, Committee opined that there is no need to incorporate components as addl. inputs under this SION entry and decided to advise the exporter to approach concerned RA for allowing import of components in addition to the inputs allowed under the SION on net­to­net basis.   The firm may be informed accordingly.

(B. C. Nayak D.O., DHI)  Member      (S.K. Jain, D.O., DIPP)      Member                   (K.K.Funda, Asstt. Dir.,DC(MSME) Member        (A.K. Mishra, Asstt. IA, MOS)       Member               (Krishan Kumar, Dy. DGFT) Convener     (A. Komu)     Chairman

Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.

Analysis

No analysis has been generated for this document yet.

Citation copied