RATIFIED   Minutes of M.No.49/10 held on 09.03.2010 of Norms Committee (NC­I) (DES.I Section)     The  meeting  No.  49/10  of  the  Norms  Committee  (NC­I)  for  the  licensing  year  2009­2010  was  held  on  09.03.2010  under  the Chairmanship of Shri A. Komu, Addl. Director General of Foreign Trade to consider the applications under Duty Exemption / Remission Schemes (Chapter­4) of Foreign Trade Policy 2004–2009 / Handbook of Procedure Volume­I.  The following Members of the Committee were present in the meeting: ­   Sl.No Name  of  the  representatives  &  their Designation Room No. Telephone No. Deptt. 1. Sh B. C. Nayak. D.O. 429A 23063321 Extn.3318 DHI, U.B. 2. Sh  S.K. Jain,  D.O. 429A 23063321 Extn.3318 DIPP, U.B. 3. Sh. K.K. Funda, Asstt. Dir. (Mech) 736A   DC(MSME),N.B. 4. Sh. Krishan Kumar, DDG & Convener NC­I 302 23061562 Ext.380 DGFT, U.B. 5. Sh. Ramavatar Meena, FTDO 404 23061562 Ext.265 DGFT, U.B.   The Committee considered the individual cases of the agenda of this meeting generated through the online system of NIC and some manual cases and the decision taken thereon were as under: ­    1

Case No.:2/14/80­ALC2/2008

Party Name:MACMET INDIA LIMITED Meet No/Date:49/80­ALC2/2009 09.03.2010 Status:Case deferred HQ File :01/80/050/00478/AM09/ RLA File :02/24/040/00030/AM09/ Lic.No/Date:0210113456 11.06.2008 Defer Date: 27.04.2010 Decision : The representative of DHI present in the meeting informed the Committee that they received the firm’s application and case was under their study. The Committee, therefore, decided to defer the consideration and to re­list the case on 27.04.2010.   2

Case No.:7/40/80­ALC2/2008

Party Name:SANDVIK ASIA LIMITED 09.03.2010 HQ File :01/80/050/01611/AM09/ RLA File :31/24/040/00236/AM09/ Lic.No/Date:3110036574 22.12.2008 Defer Date: 27.04.2010 Decision : The Committee, noted that the copy of firm’s application has been forwarded to DIPP for examination and submission of comments. The case may be re­listed on 27.04.2010.

3

Case No.:28/42/80­ALC2/2008

Party Name:THERMAX LTD., 09.03.2010 HQ File :01/80/050/01652/AM09/ RLA File :31/21/040/00319/AM09/ Lic.No/Date:3110036852 02.01.2009 Defer Date: 27.04.2010 Decision  :  The  representative  of  DHI,  present  in  the  meeting,  informed  the  Committee  that  they  have  not  received  the  copy  of  firm’s application.  The Committee, accordingly, handed over the copy of firm’s application to DHI for examination and submission of comments. The case may be relisted on 27.04.2010.   4

Case No.:7/50/80­ALC2/2008

Party Name:TRANTER INDIA PRIVATE LIMITED 09.03.2010 HQ File :01/80/050/01805/AM09/ RLA File :31/21/040/00356/AM09/ Lic.No/Date:3110037423 20.02.2009 Defer Date: 27.04.2010 Decision : The Committee, noted that the copy of firm’s application has been received and handed­over the case file to the technical authority for examination and submission of comments. The case may be re­listed on 27.04.2010.   5

Case No.:14/14/80­ALC2/2009

Party Name:BHARAT HEAVY ELECTRICALS LIMITED 09.03.2010 HQ File :01/80/050/00184/AM10/ RLA File :61/24/040/00012/AM10/ Lic.No/Date:6110000320 19.06.2009 Defer Date: 27.04.2010 Decision : The representative of DHI present in the meeting informed the Committee that they received the firm’s reply and case was under their study. The Committee, therefore, decided to defer the consideration and to re­list the case on 27.04.2010.   6

Case No.:1/17/80­ALC2/2009

Party Name:GEA BGR ENERGY SYSTEM INDIA LIMITED 09.03.2010 HQ File :01/80/050/00224/AM10/ RLA File :04/24/040/00079/AM10/ Lic.No/Date:0410106106 14.07.2009 Defer Date: 27.04.2010 Decision : The representative of DHI present in the meeting informed the Committee that they received the firm’s reply and case was under their study. The Committee, therefore, decided to defer the consideration and to re­list the case on 27.04.2010.   7

Case No.:10/49/80­ALC2/2009

Party Name:ALSTOM PROJECTS INDIA LIMITED, 09.03.2010 HQ File :01/80/050/00779/AM10/ RLA File :02/24/040/00176/AM10/ Lic.No/Date:0210136339 11.01.2010 Defer Date: 27.04.2010 Decision  :  On  the  recommendation  of  the  representative  of  DHI  present  in  the  meeting,  it  was  decided  by  the  Committee  to  call  for  the following information/clarification from the firm and to re­list the case on 27.04.2010: ­

1. Details of accessories proposed to be exported with quantity in number & weight. 2. Manufacturing process involved in the export product as the export product & import product are same. 3. Information in respect of Sl.No.4,5,6 & 11 of the Standard Deficiency Format.   8

Case No.:11/49/80­ALC2/2009

Party Name:HAWA VALVES (INDIA) PVT. LTD. 09.03.2010 HQ File :01/80/050/00780/AM10/ RLA File :03/94/040/00968/AM10/ Lic.No/Date:0310559366 09.02.2010 Defer Date: 27.04.2010 Decision : On the recommendation of the representative of DC(MSME) present in the meeting, it was decided by the Committee to call for the following information/clarification from the firm and to re­list the case on 27.04.2010: ­   1. Information in respect of Sl.No.8 & 9 of the Standard Deficiency Format.   9

Case No.:12/49/80­ALC2/2009

Party Name:BLUE STAR LTD. 09.03.2010 HQ File :01/80/050/00781/AM10/ RLA File :03/94/040/00886/AM10/ Lic.No/Date:0310559418 10.02.2010 Defer Date: 27.04.2010 Decision : On the recommendation of the representative of DIPP  present in the meeting, it was decided by the Committee to call for the following information/clarification from the firm and to re­list the case on 27.04.2010: ­   1.                  Information in respect of S.No. 4 & 5 of Standard Deficiency Letter – export product­wise. 2.                  Specifications of import item at Sl. No. 32 (Cable) alongwith its length in meters.   10

Case No.:1/49/80­ALC2/2009

Party Name:KIDDE INDIA LIMITED 09.03.2010 HQ File :01/80/050/00770/AM10/ RLA File :03/94/040/00925/AM10/ Lic.No/Date:0310560868 18.02.2010 Defer Date: 27.04.2010 Decision : The Committee noted that hardcopy of firm’s application has not been received so far from concerned Regional Authority.  The Committee, therefore, decided to remind RA to forward the firm’s application at the earliest and on receipt forward the same to technical authority i.e DIPP for examination and submission of comments. The case may be re­listed on 27.04.2010.   11

Case No.:2/49/80­ALC2/2009

Party Name:INSTRUMENTATION LTD. 09.03.2010 HQ File :01/80/050/00771/AM10/ RLA File :10/24/040/00127/AM10/ Lic.No/Date:1010037238 18.02.2010 Defer Date: 27.04.2010

Decision : The Committee handed over a copy of firm’s application to the representative of DHI for examination and submission of comments. The case may be re­listed on 27.04.2010.   12

Case No.:3/49/80­ALC2/2009

Party Name:INSTRUMENTATION LTD. 09.03.2010 HQ File :01/80/050/00772/AM10/ RLA File :10/24/040/00131/AM10/ Lic.No/Date:1010037240 18.02.2010 Defer Date: 27.04.2010 Decision : The Committee handed over a copy of firm’s application to the representative of DHI for examination and submission of comments. The case may be re­listed on 27.04.2010.   13

Case No.:4/49/80­ALC2/2009

Party Name:THERMAL SYSTEMS (HYDERABAD) P.LTD., 09.03.2010 HQ File :01/80/050/00773/AM10/ RLA File :09/24/040/00458/AM10/ Lic.No/Date:0910040992 18.02.2010 Defer Date: 27.04.2010 Decision : The Committee noted that hardcopy of firm’s application has not been received so far from concerned Regional Authority.  The Committee, therefore, decided to remind RA to forward the firm’s application at the earliest and on receipt forward the same to technical authority i.e DHI for examination and submission of comments. The case may be re­listed on 27.04.2010.   14

Case No.:5/49/80­ALC2/2009

Party Name:KIDDE INDIA LIMITED 09.03.2010 Status:Case reverted back to RA HQ File :01/80/050/00774/AM10/ RLA File :03/94/040/01014/AM10/ Lic.No/Date:0310561122 19.02.2010   Decision : The Committee noted that firm’s application has not been received so far.  However, according to online data, items of import appear to  be  covered  in  GN­4  for  the  Engineering  Products.  The  Committee  accordingly  decided  to  revert  back  the  case  to  concerned  Regional Authority without any examination for taking appropriate decision in terms of Policy Circular No. 20 dt. 05.12.2007. The Regional Authority may take necessary action accordingly.   15

Case No.:6/49/80­ALC2/2009

Party Name:WEATHERFORD DRILLING & PRODUCTION SERVICES(I)P.LTD 09.03.2010 Status:Case reverted back to RA HQ File :01/80/050/00775/AM10/ RLA File :34/24/040/00201/AM10/ Lic.No/Date:3410026437 19.02.2010   Decision : The Committee noted that firm’s application has not been received so far.  However, according to online data, items of import appear to  be  covered  in  GN­4  for  the  Engineering  Products.  The  Committee  accordingly  decided  to  revert  back  the  case  to  concerned  Regional Authority without any examination for taking appropriate decision in terms of Policy Circular No. 20 dt. 05.12.2007.

The Regional Authority may take necessary action accordingly.   16

Case No.:7/49/80­ALC2/2009

Party Name:OHSUNG ELECTRONICS INDIA PRIVATE LIMTIED 09.03.2010 HQ File :01/80/050/00776/AM10/ RLA File :31/24/040/00229/AM10/ Lic.No/Date:3110042047 19.02.2010 Defer Date: 27.04.2010 Decision : The Committee noted that hardcopy of firm’s application has not been received so far from concerned Regional Authority.  The Committee, therefore, decided to remind RA to forward the firm’s application at the earliest and on receipt forward the same to technical authority i.e DIPP for examination and submission of comments. The case may be re­listed on 27.04.2010.   17

Case No.:8/49/80­ALC2/2009

Party Name:ZINSER TEXTILE SYSTEMS PVT. LTD. 09.03.2010 Status:Case reverted back to RA HQ File :01/80/050/00777/AM10/ RLA File :03/95/040/00770/AM10/ Lic.No/Date:0310561198 22.02.2010   Decision : The Committee noted that firm’s application has not been received so far.  However, according to online data, it appears that items of import may be cleared on net to net basis. The Committee accordingly decided to revert back the case to concerned Regional Authority without any examination for taking appropriate decision in terms of Policy Circular No. 20 dt. 05.12.2007. The Regional Authority may take necessary action accordingly.   18

Case No.:9/49/80­ALC2/2009

Party Name:WEATHERFORD DRILLING & PRODUCTION SERVICES(I)P.LTD 09.03.2010 HQ File :01/80/050/00778/AM10/ RLA File :34/24/040/00200/AM10/ Lic.No/Date:3410026452 22.02.2010 Defer Date: 27.04.2010 Decision : The Committee noted that hardcopy of firm’s application has not been received so far from concerned Regional Authority.  The Committee, therefore, decided to remind RA to forward the firm’s application at the earliest and on receipt forward the same to technical authority i.e DHI for examination and submission of comments. The case may be re­listed on 27.04.2010.   19

Case No.:13/49/80­ALC2/2009

Party Name:MIKROTEK MACHINES LTD., 09.03.2010 HQ File :01/80/050/00782/AM10/ RLA File :07/24/040/00443/AM10/ Lic.No/Date:0710070171 23.02.2010 Defer Date: 27.04.2010 Decision : The Committee noted that hardcopy of firm’s application has not been received so far from concerned Regional Authority.  The Committee, therefore, decided to remind RA to forward the firm’s application at the earliest and on receipt forward the same to technical authority i.e DHI for examination and submission of comments. The case may be re­listed on 27.04.2010.

20

Case No.:14/49/80­ALC2/2009

Party Name:MIKROTEK MACHINES LTD., 09.03.2010 HQ File :01/80/050/00783/AM10/ RLA File :07/24/040/00400/AM10/ Lic.No/Date:0710070172 23.02.2010 Defer Date: 27.04.2010 Decision : The Committee noted that hardcopy of firm’s application has not been received so far from concerned Regional Authority.  The Committee, therefore, decided to remind RA to forward the firm’s application at the earliest and on receipt forward the same  to  technical authority i.e DHI for examination and submission of comments. The case may be re­listed on 27.04.2010.   21

Case No.:15/49/80­ALC2/2009

Party Name:MILINDIA LTD. 09.03.2010 HQ File :01/80/050/00784/AM10/ RLA File :05/24/040/00530/AM09/ Lic.No/Date:0510259187 23.02.2010 Defer Date: 27.04.2010 Decision : The Committee noted that hardcopy of firm’s application has not been received so far from concerned Regional Authority.  The Committee, therefore, decided to remind RA to forward the firm’s application at the earliest and on receipt forward the same to technical authority i.e DIPP for examination and submission of comments. The case may be re­listed on 27.04.2010.   22

Case No.:16/49/80­ALC2/2009

Party Name:GODREJ & BOYCE MFG. CO. LTD., 09.03.2010 HQ File :01/80/050/00785/AM10/ RLA File :03/94/040/00986/AM10/ Lic.No/Date:0310561988 25.02.2010 Defer Date: 27.04.2010 Decision : The Committee noted that hardcopy of firm’s application has not been received so far from concerned Regional Authority.  The Committee, therefore, decided to remind RA to forward the firm’s application at the earliest and on receipt forward the same to technical authority i.e DHI for examination and submission of comments. The case may be re­listed on 27.04.2010.   23

Case No.:17/49/80­ALC2/2009

Party Name:MACAWBER BEEKAY PVT.LTD. 09.03.2010 Status:Case  reverted back to RA HQ File :01/80/050/00786/AM10/ RLA File :05/24/040/00497/AM10/ Lic.No/Date:0510259475 25.02.2010   Decision : The Committee noted that firm’s application has not been received so far.  However, according to online data, items of import appear to  be  covered  in  GN­4  for  the  Engineering  Products.  The  Committee  accordingly  decided  to  revert  back  the  case  to  concerned  Regional Authority without any examination for taking appropriate decision in terms of Policy Circular No. 20 dt. 05.12.2007. The Regional Authority may take necessary action accordingly.

24

Case No.:18/49/80­ALC2/2009

Party Name:THE SARASWATI INDUSTRIAL SYNDICATE LTD. 09.03.2010 HQ File :01/80/050/00787/AM10/ RLA File :05/24/040/00492/AM10/ Lic.No/Date:0510259473 25.02.2010 Defer Date: 27.04.2010 Decision : The Committee noted that hardcopy of firm’s application has not been received so far from concerned Regional Authority.  The Committee, therefore, decided to remind RA to forward the firm’s application at the earliest and on receipt forward the same to technical authority i.e DIPP for examination and submission of comments. The case may be re­listed on 27.04.2010.   25

Case No.:19/49/80­ALC2/2009

Party Name:MICRON INSTRUMENTS PVT LTD 09.03.2010 HQ File :01/80/050/00788/AM10/ RLA File :05/24/040/00498/AM10/ Lic.No/Date:0510259619 26.02.2010 Defer Date: 27.04.2010 Decision :The Committee noted that hardcopy of firm’s application has not been received so far from concerned Regional Authority.  The Committee, therefore, decided to remind RA to forward the firm’s application at the earliest and on receipt forward the same to technical authority i.e DIPP for examination and submission of comments. The case may be re­listed on 27.04.2010.   26

Case No.:20/49/80­ALC2/2009

Party Name:ZENITH PRECISION PVT LTD ., 09.03.2010 HQ File :01/80/050/00789/AM10/ RLA File :07/24/040/00460/AM10/ Lic.No/Date:0710070294 01.03.2010 Defer Date: 27.04.2010 Decision : The Committee noted that hardcopy of firm’s application has not been received so far from concerned Regional Authority.  The Committee, therefore, decided to remind RA to forward the firm’s application at the earliest and on receipt forward the same to technical authority i.e DHI for examination and submission of comments. The case may be re­listed on 27.04.2010.   27

Case No.:21/49/80­ALC2/2009

Party Name:LUBI SUBMERSIBLES LTD 09.03.2010 HQ File :01/80/050/00790/AM10/ RLA File :08/24/040/00330/AM10/ Lic.No/Date:0810086954 03.03.2010 Defer Date: 27.04.2010 Decision : The Committee noted that hardcopy of firm’s application has not been received so far from concerned Regional Authority.  The Committee, therefore, decided to remind RA to forward the firm’s application at the earliest and on receipt forward the same to technical authority i.e DIPP for examination and submission of comments. The case may be re­listed on 27.04.2010.   28

Case No.:22/49/80­ALC2/2009

Party Name:ULTRA ENGINEERS 09.03.2010 HQ File :01/80/050/00791/AM10/ RLA File :31/24/040/00234/AM10/ Lic.No/Date:3110042181 03.03.2010 Defer Date: 27.04.2010

Decision : The Committee noted that hardcopy of firm’s application has not been received so far from concerned Regional Authority.  The Committee, therefore, decided to remind RA to forward the firm’s application at the earliest and on receipt forward the same to technical authority i.e DHI for examination and submission of comments. The case may be re­listed on 27.04.2010.  

Case No.A/R­168

M/s.  Godrej & Boyce Mfg.  Co.  Ltd., Mumbai HQ F.No.01/80/050/00850/AM09/DES­I Lic. No. & Date NC Meeting No. 49/10 RLA No.03/94/040/00445/AM09   0310482136 dt.11.08.2008 Dated 09.03.2010 Ratification of norms The representative of the DHI informed the Committee that they received the firm’s representation and case was under their study. The Committee, therefore, decided to defer the consideration and to re­list the case on 27.04.2010.  

Case No.A/R­169

M/s.    Macmet  India Ltd. HQ F.No.01/80/050/00480/AM09/DES­I Lic. No. & Date NC Meeting No. 49/10 RLA No.02/24/040/0032/AM09  0210113458 dt.11.06.2008 Dated 09.03.2010 Ratification of norms The representative of the DHI informed the Committee that they received the firm’s representation and case was under their study. The Committee, therefore, decided to defer the consideration and to re­list the case on 27.04.2010.   S.No.263

Case No.A/R­170

M/s.    Bharat  Heavy Electricals  Ltd., Hyderabad HQ F.No.01/80/050/01675/AM09/DES­I Lic. No. & Date Meeting No. 49/10 RLA No.09/24/040/00369/AM09   0910036679 dt.12.01.2009 Date: 09.03.2010 Ratification of norms The representative of the DHI informed the Committee that they received the firm’s representation and case was under their study. The Committee, therefore, decided to defer the consideration and to re­list the case on 27.04.2010.   S.No.263

Case No.C­34

M/s.    Apple International, Thane HQ F.No.01/80/162/01187/AM10/DES­I   Meeting No. 49/10     Date: 09.03.2010 Ratification of wastage norms The committee considered the case for ratification of wastage norms for the applicant firm which is a 100% EOU. On the recommendation of the representative of DIPP present in the meeting, it was decided by the Committee to call for the following information/clarification from the firm and to re­list the case on 27.04.2010: ­   1.      Width of G.P. Sheet Coil. 2.      Sheet layout diagram indicating the wastage during shearing/blanking.­export product wise.         (B. C. Nayak D.O., DHI)  Member      (S.K. Jain, D.O., DIPP)      Member

(K.K.Funda, Asstt. Dir.,DC(MSME) Member        (Krishan Kumar, Dy. DGFT)       Convener               (A. Komu) Chairman