DGFT Minutes
In force — no superseding record on file.
Government of India Ministry of Commerce and Industry Department of Commerce Directorate General of Foreign Trade (EPCG-Section)
MINUTES OF 3rd MEETING OF AM-22 OF THE EPCG COMMITTEE HELD UNDER THE CHAIRMANSHIP OF SHRI S.B.S. REDDY, ADDITIONAL DIRECTOR GENERAL OF FOREIGN TRADE AT 3.00 PM ON 04.08.2021 Third meeting for AM-22 of the EPCG Committee was held at 3.00 pm on 04.08.2021 (originally scheduled on 30.7.2021) under the chairmanship of Shri S.B.S. Reddy, Additional Director General of Foreign Trade through Video Conferencing on Cisco webex cyber meeting app due to Covid-19 restrictions (Meeting Number: 170 674 9705). Following officers attended the meeting : i. Shri Chandan Kumar, OSD, Department of Revenue ii. Shri Indrajeet Yadav, DIA, Ministry of Steel iii. Shri Randheep Thakur, Joint Director General of Foreign Trade, DGFT iv. Shri Shobhit Gupta, Deputy Director General of Foreign Trade, DGFT v. Shri Satish Oza, Foreign Trade Development Officer, DGFT
ii. The Committee deliberated upon all the cases as per agenda and took following decisions:
Sl. No. Firm’s Name and file Numbers EPCG Authorisatio n no. Subject Decision of the Committee 1. Sunrise Industries (India) Ltd, Vado dara
01/36/218/342/AM -20/EPCG i.3430002289 dated 03.12. 2012 ii.343000224 4 dated 21.09 .2012
Request for grant of EODC without installation of capital goods in respect of EPCG authorisation No.3430002289 dt. 03.12.2012 and No.3430002244 dt. 21.09.2012.
43000224 4 dated 21.09 .2012
Request for grant of EODC without installation of capital goods in respect of EPCG authorisation No.3430002289 dt. 03.12.2012 and No.3430002244 dt. 21.09.2012. The party has requested for grant of EODC without installation of capital goods in respect of EPCG authorisation nos. The applicant in its representation stated that it could not, however, install the "Continuous Filament Winding Plant ND 300MM-3000MM with Sleeve Grooving Machine" imported under EPCG authorisation because of unforeseen difficulties in implementing the expansion project due to land acquisition problems that surfaced after the initial agreements to purchase. The imported machines are kept intact packed at factory premises. However, it has completed 100% export obligation, by utilising existing machinery. The Committee observed that Capital goods are allowed under the EPCG scheme on actual user condition. As per policy, CGs should be installed within six months of the date of import. There is no provision for issue of EODC without installation of CGs. Accordingly, the Committee decided to reject the case as there is no merit in the request. The Committee advised the applicant to pay applicable Customs duties along with interest for regularisation. 2.
ngly, the Committee decided to reject the case as there is no merit in the request. The Committee advised the applicant to pay applicable Customs duties along with interest for regularisation. 2. Simar International ., Ludhiana
30300008596 dated 12.08.2011 Request for Condonation of block wise EO (1 st block) , EOP Extension and late submission of installation The Committee deliberated upon the case and decided to call comments of RA before taking a decision in the matter.
01/36/218/174/AM -20/EPCG certificate in respect of 3% EPCG authorisation No.30300008596 dated 12.08.2011.
The case stands deferred. 3. Amba River Coke Ltd., Mumbai
01/36/218/169/AM -21/EPCG 0330036918 dated 30.09.2013 Request for inclusion of item Hot/Cold Rolled Steel /coils in the list of export item allowed for fulfillment of EO in EPCG License No. 0330036918 dt. 30.09.2013 under 0% concessional duty-reg. The Committee heard the representatives of the applicant during personal hearing. They informed the Committee that they obtained EPCG Authorisation for production of Met Coke and Iron Ore Pallets which are used in manufacture Steel. Their company is 100% subsidiary of JSW Steel Limited (JSWSL) and their 100% sales are to JSWSL only. The Plant is also located in the same complex wherein integrated Steel facility of JSWSL exists.
They further stated that they manufactured COKE & PELLET and supplied the same to steel making facility of JSWSL. These products were used by JSWSL as intermediate products and ultimately exported.
hey further stated that they manufactured COKE & PELLET and supplied the same to steel making facility of JSWSL. These products were used by JSWSL as intermediate products and ultimately exported. Hence, they have already completed exports by export of Steel items on provisional basis.
They further stated that GoI has a policy to discourage
export of low value items like Iron Ore and Coke etc.
and in the present case, there is no revenue loss in
present case . Earlier in FTP , fulfillment of Export
Obligation against export of value-added products was
also allowed. Vide Policy Circular No. 21/(RE 98)
dated 10/07/1998, DGFT clarified that such further
processing to added value can be done by other than
EPCG Licence holder also. In 2004-09 policy,
fulfillment
of
Export
obligation
up
to
100%
through
export
of
even
other
goods
manufactured or services provided by the same Licence
holder
or
their
group
companies
was
allowed.
However,
earlier
provision
which
allowed
export
of
value
added
products
manufactured by other companies was missed out
in notification dated 18/4/2013. In a similar matter
earlier, EPCG authorisations were obtained by JSWSL
and name of our company was disclosed as supporting
manufacturer. Export obligation fulfilment by export of
steel items had been allowed by EPCG Committee its
meeting held on 26/10/2015 (Case no 41).
The representatives requested to consider the case
favorably as the products supplied by it were further
processed by JSWSL.
lowed by EPCG Committee its meeting held on 26/10/2015 (Case no 41). The representatives requested to consider the case favorably as the products supplied by it were further processed by JSWSL. They were also willing to undertake enhanced export obligation. The matter was discussed at length in the meeting. The Committee observed that the policy of exporting same or similar products through Group company was discontinued in 2013 before the issuance of the subject EPCG Authorisation. Hence, the Committee did not find any merit in the case and accordingly decided to reject the request.
Ahill Knit Exports , Coimbatore
01/36/218/210/AM -21/EPCG 3230027257 dated 17.09. 2018 Request for waiver of maintenance of AEO in respect of EPCG authorization no. 3230027257 dt.17.09.2018. The party seeks waiver of maintenance of AEO in the period between 2020-21 against the subject EPCG authorization issued under 0% concessional duty due to Covid-19 pandemic and complete lockdown of their units during the months of March, April and May 2020. The Committee decided to defer the case for detailed examination.
American Precoat Specialty Pvt. Ltd. (formerly known a s Sriram Compoun d Pvt. Ltd.)
01/36/218/166/AM -21/EPCG 0530151751 dated 06.04.2010 Request for re-fixation of Average Export Obligation in respect of their EPCG Authorization No. 0530151751 dt. 06.04.2010. The Committee noted the request of the party.
1751 dated 06.04.2010 Request for re-fixation of Average Export Obligation in respect of their EPCG Authorization No. 0530151751 dt. 06.04.2010. The Committee noted the request of the party. The representative of DoR stated that this is not a policy relaxation related matter and DGFT can take a decision on such requests as per prevailing policy/guidelines/practices.
Accordingly, the Committee decided to defer the case for further examination on file. 6. Arcelor Mittal Ni ppon Steel India Li mited (AM/NS)(fo rmerly Essar Steel India Limited) Ha zira, Surat
01/36/218/208/A M-21/EPCG N.A. Request for issue of EPCG Authorization for import of spares required for their Sinter Plant and import of Wheel Loaders. The Committee noted that the applicant applied for issue of EPCG Authorization for import of spares required for their Sinter Plant and import of Wheel Loaders to reclaim slag generated in the steel making process. However, RA, Mumbai rejected the application on grounds that, the Capital Goods sought to be importing fall within the negative list notified under Appendix 5F. RA has intimated that as per Appendix 5F, Truck/Tippers/Dumpers are allowed only for Mining Section and All construction equipments viz Cranes are permitted only for providing services.
After due deliberation, the Committee decided to refer the matter to M/o Steel and DoR for their comments. The case stands deferred.
Highland Produce Co.
d only for providing services.
After due deliberation, the Committee decided to refer the matter to M/o Steel and DoR for their comments. The case stands deferred.
Highland Produce Co. Ltd., Cochin, Kerala
01/36/218/88/AM-
21/EPCG
1030001279
dated 09.01.2
008
Request for review of decision taken
in the EPCG Committee Meeting da
ted 25.11.2020.
The
party
has
requested
for
considering alternate product exported by their group
company for fulfilment of EO. Earlier, the matter was
examined by EPCG Committee in its meeting held on
25.11.2020. The decision of the Committee as under:
“The party has requested for considering alternate
product exported by their group company for fulfilment
of EO. The Committee deliberated upon the case and
decided to reject it as there is no merit in the request.”
The Committee noted that the applicant obtained EPCG
Authorizations for export of Wooden Panels & Boards
and wants to complete export obligation by exporting
alternative products through their group company. It was
further noted that they had not factored export of
alternate product at the time of applying for the EPCG
Authorization
The Committee observed that the applicant did not make
any concerted efforts to fulfill the export obligation
within the original and extended export obligation period
that ended on 08.01.2018 and could export only to the
t the applicant did not make any concerted efforts to fulfill the export obligation within the original and extended export obligation period that ended on 08.01.2018 and could export only to the
tune of 25.89% of the EO.
The Committee deliberated upon the case and observed
that there is provision to export through group company
at the time of issue of Authorization. However,
committee felt that it is not possible to allow alternative
products at this stage as EO period is already expired
and no proof has been submitted to DGFT that group
company has exported goods against subject EPCG
authorisations by filing EPCG scheme shipping bills.
Therefore committee found no merit in the request of the
applicant. Accordingly, the Committee decided to
maintain the rejection.
8.
Jain Amar Clothin
g Private Ltd., Lud
hiana
01/36/218/175/AM -21/EPCG 3030016648 dated 9.6.2017 Request for re-fixation of average EO in respect of EPCG Authorization no. 3030016648 dated 9.6.2017. The Committee noted the request of the party. The representative of DoR stated that this is not a policy relaxation related matter and DGFT can take a decision on such requests as per prevailing policy/guidelines/practices. Accordingly, the Committee decided to defer the case for further examination on file.
r and DGFT can take a decision on such requests as per prevailing policy/guidelines/practices. Accordingly, the Committee decided to defer the case for further examination on file.
Mohan Mutha Pol ytech Pvt Ltd, Chit oor
01/36/218/317/AM
-20/EPCG
i.0430013313
dated
29.01.2014
ii.043001675
7
dated
27.04.2017
Request for condonation of delay in
furnishing
installation
certificate
within stipulated period to Regional
Authority.
The party has requested for condonation of delay in
furnishing installation certificate within stipulated
period to RA, Chennai. The firm has stated that the
capital goods were installed in factory premises of
MMPPL within stipulated period of 6 (six) months
from the date of completion of import and to this
effect, the installation certificates were also obtained
from concerned office of Central Excise within
stipulated period. But, the firm could not submit
installation certificate within stipulated period to
Regional Authority.
The Committee deliberated upon the case and
decided to recommend to DG for relaxation
under Para 2.58 of FTP 2015-20 to allow
condonation of delay in submission of installation
certificate, subject to payment of composition fee
of
Rs.
5000/- and submission
of installation
certificate. RA to verify that no ECA/DRI/Customs
action is pending.
This has the approval of DG.
10.
, subject to payment of composition fee
of
Rs.
5000/- and submission
of installation
certificate. RA to verify that no ECA/DRI/Customs
action is pending.
This has the approval of DG.
10.
Paragon Industries
Ltd., New Delhi
01/36/218/133/AM
-21/EPCG
i.0530163231
dated 22.08.
2014
ii.053016527
8 dated 26.06
.2015
iii.053017094
3 dated 04.0
9.2017
iv.053017140
7 dated 08.12
.2017
v. 053017136
Request for Re-fixation of Average
Export Obligation in respect of
EPCG
Authorization
Nos.
0530163231
dt.
22.08.2014,
0530165278
dt.
26.06.2015,
0530170943
dt.
04.09.2017,
0530171407
dt.
08.12.2017,
0530171369 dt. 06.12.2017.
The Committee noted the request of the party. The
representative of DoR stated that this is not a policy
relaxation related matter and DGFT can take a decision
on
such
requests
as
per
prevailing
policy/guidelines/practices.
Accordingly, the Committee decided to defer the case for further examination on file.
tter and DGFT can take a decision on such requests as per prevailing policy/guidelines/practices.
Accordingly, the Committee decided to defer the case for further examination on file.
9 dated 06.1 2.2017 11. Quadron Busines s Park, Bangalore
01/36/218/391/AM -20/EPCG 147 EPCG authorization s Request for transfer of EPCG author isation and change from M/s. Embas sy One Developers Pvt Ltd to M/s. Quadron Business Park in respect of 147 EPCG authorizations. The Committee noted the contention of the applicant that the subject authorizations were obtained by Embassy One Developers Pvt Ltd (IEC # 0708010075), Bangalore. Now Quadron Business Park (IEC # 0307010813), Bangalore has taken over the Hotel project from Embassy One Developers Pvt Ltd. as per agreement under Section 2(42C) of the Income Tax Act, 1961 and both the parties have entered into the Business Transfer Agreement (BTA). Further, this transaction has been done in full compliance of section 180(1)(a) of the Companies Act, 2013 and the necessary resolutions of the share holders and Board of Directors were passed in compliance with law.
After the BTA, Quadron Business Park Private
Limited has taken over all the assets and liabilities of the Hotel project added plant address of Embassy One Developers Pvt Ltd. in its IEC under branch code by adding the plant address. Now, EO against the above authorisations would be fulfilled by Quadron Business Park.
The Committee deliberated upon the request of M/s.
its IEC under branch code by adding the plant address. Now, EO against the above authorisations would be fulfilled by Quadron Business Park.
The Committee deliberated upon the request of M/s. Quadron Business Park, Bangalore for endorsement of its name in the said EPCG Authorisations and decided to recommend to DG for relaxation under
Para 2.58 of FTP 2015-20, to allow the name change in
EPCG authorizations without any other change in
EPCG authorisations. This is further subjected to a
condition that Average export obligation (AEO) shall be
re-fixed by adding AEO of Quadron Business park for
same and similar service on date of acquisition to the
exiting AEO. Quadron Business park also shall execute
necessary Bond and Bank Guarantees with Customs
Authorities for fulfilment of Export Obligation.
This has the approval of DG.
12.
Rajasthali Resorts
& Studios Ltd.,
Jaipur
01/36/218/146/AM
-21/EPCG
i.133000263
8 dated 23.06
.2010
ii.133000282
6 dated26.11.
2010
iii.133000283
5 dated
03.12.2010
Request for extension of EOP in
respect of EPCG Authorization
nos.
1330002638
dt.
23.06.2010,1330002826 dt. 26.11.10
and 1330002835 dt. 03.12.2010
under 3% concessional duty.
The party seeks extension in export obligation period
against the subject EPCG authorisations issued under
3% concessional duty EPCG Scheme on the grounds
that their exports have been adversely affected by
Covid-19 pandemic.
The Committee decided to defer the case for further examination on file.
Pundrik Textile Mi lls Pvt. Ltd, Ludhia na
01/37/218/44/AM- 17/EPCG-II 3030001750 dated 26.05.2006 Request for acceptance of exports made by readymade garments or extension of EOP. The Committee noted the contention of the applicant that it obtained EPCG Authorisation No. 3030001750 dated 26.05.2006 under 5% EPCG duty scheme for import of yarn machinery.
tension of EOP. The Committee noted the contention of the applicant that it obtained EPCG Authorisation No. 3030001750 dated 26.05.2006 under 5% EPCG duty scheme for import of yarn machinery. However, it could not fulfill export obligation by exporting yarn due to lack of yarn export orders. It has a composite unit for
manufacturing of cotton yarn, blended yarns and readymade garments. It fulfilled 100% EO by exporting the Readymade Garments. It requested to consider acceptance of export of readymade garments as export products.
The matter was discussed in the meeting. The Committee decided to ask the RA to submit an inspection report, after visiting the Unit, on the facilities/machines available in the factory premises of the applicant before deciding the matter. The case stands deferred.
IND Synergy Ltd., Raigarh, Chattisga rh
01/36/218/122/AM
-21/EPCG
i.0330017266
dated 28.8.2
007
ii.033002196
6 dated 05.12
.2008
Request for extension of EOP.
The Committee noted that the matter was referred to
DoR for their comments. However, the same are still
awaited. The representative of DoR stated that the
matter is under examination and would furnish their
comments soon.
Hence, the Committee decided to defer the case for
consideration in the next EPCG committee meeting.
15.
Dharampal Satyap
al Ltd
01/36/218/159/AM -21/EPCG N.A.
h their
comments soon.
Hence, the Committee decided to defer the case for
consideration in the next EPCG committee meeting.
15.
Dharampal Satyap
al Ltd
01/36/218/159/AM -21/EPCG N.A. Request for the import items pertaining to “Green House Plant & its Foundation material”, “Live Trees” & “Pots” The Committee noted that the applicant applied to RA Panipat for issuing EPCG Authorization for import of following 24 items in Agriculture Sector :
Sl.No
.
Name of items
1
Greenhouse retractable roof : Cravo “Flat Roof”
Retractable Roof Cooling house Accessory
2-9
Blueberry
Plants:,
BILOXT,ATLASBLUE
JEWEL STAR,VENTURA 38, VENTURA Ltr
Pot
10-23 Foundation Material for greenhouse: Hollow
section pipes, galvanized piles, stainless steel
wires, screw pile/helical anchor, hot dip, round
tube, packaging coil.
24
Plastic Pots : Right Pot with Bottom Plate &
Screw.
However, RA, Panipat rejected the application stating that the items proposed to be imported by the firm fall under Appendix 5F and alive plants are not allowed for import under EPCG Scheme.
The applicant contended that the rejection letter does not specifically mention the serial number of Appendix 5F. The items sought to be imported are ‘Capital Goods’ as per Para 9.08 of FTP-2015-20.
The matter was deliberated in the meeting. The Committee observed that Import items at S.No.1 and 10 to 23 are not permitted for import under EPCG in terms of S.No. 9 of Appendix 5 F.
Further, items at S.No. 2 to 9 are live plants and not
ommittee observed that Import items at S.No.1 and 10 to 23 are not permitted for import under EPCG in terms of S.No. 9 of Appendix 5 F.
Further, items at S.No. 2 to 9 are live plants and not
Capital goods. These items do not fall under the purview of the EPCG Scheme.
After due deliberation, the Committee decided to reject the request of the applicant. 16. Sanjeev Knitwears, Mumbai
01/36/218/149/AM -21/EPCG 3030007984 dated 18.03.2011 Request for regularisation of excess duty credit utilized more than 10% on EPCG Licence No. 3030007984 dt. 18.03.2011 under 3% concessional duty. The party has requested to allow regularization of late payment of additional fee to cover excess imports. The Committee noted that para 5.16 (a) of HBP 2015-20, as amended, provides that if authorization issued has been utilized for import of goods in excess of duty saved amount indicated on the authorization by not more than 10%, the RA may accept additional fee to cover excess imports effected, in terms of duty saved amount, even beyond one month but within two years of the excess import taking place, subject to payment of composition fee of Rs. 5000/- per authorization.
The Committee deliberated upon the case and decided to recommend to DG for relaxation under Para 2.58 of FTP 2015-20 for condonation of procedural lapse of delay of more than a month in payment of fee for excess duty saved amount as envisaged in the para 5.16(a) of HBP 2015-20, subject to payment of composition fee of Rs.
tion of procedural lapse of delay of more than a month in payment of fee for excess duty saved amount as envisaged in the para 5.16(a) of HBP 2015-20, subject to payment of composition fee of Rs. 5000/- per year per authorisation and to the condition that the excess utilization is not more than 10% of duty saved mentioned in the subject EPCG authorisations. The party is also required to pay an additional composition fee of Rs. 5,000/- per authorisation for each year of delay beyond the expiry of the period of two years of the excess import taking place.
This has the approval of DG. 17. Vani Spinners Pvt. Ltd
01/37/218/128/AM -18/EPCG-II 3030006613 dated 28.04.2010 Civil Writ Petition No. 22023 of 2020 This case is court matter and DoR comments are required in this matter. DoR was requested to expedite their comments.
The Committee decided to defer the case
[DGFT= Directorate General of Foreign Trade, DG = Director General, FTP = Foreign Trade Policy, HBP v1 = Handbook of Procedure Vol. I, EO = Export Obligation, EODC = Export Obligation Discharge Certificate, EOP = Export Obligation Period, B.O.E.=Bill of Entry,EPCG = Export Promotion Capital Goods, RA = Regional Authority, BG = Bank Guarantee, FFE = Free Foreign Exchange, IEC = Importer-Exporter Code, DoR = Department of Revenue, IEM = Industrial Entrepreneurs Memorandum, RCMC = Registration-cum-Membership-Certificate.]
The meeting ended with a vote of thanks to the Chair.
[Issued from F.No. 01/36/218/38/AM-22/EPCG]
Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.
No analysis generated for this document yet (analysis runs over brief docs + on-demand). Run build_analysis.py --ids 6433 --apply.