DGFT Minutes
In force — no superseding record on file.
1
F.No. 01/36/218/63/AM-21/EPCG
MINUTES OF 4th MEETING OF AM-21 OF THE EPCG COMMITTEE HELD UNDER THE CHAIRMANSHIP OF SHRI SATYAN SHARDA, ADDITIONAL DIRECTOR GENERAL OF FOREIGN TRADE AT 12.00 NOON 11.09.2020
I. The meeting was held on 11.9.2020 through Video Conferencing Mode on Cisco webex cyber meeting app due to Covid-19 restrictions (Meeting number: 170 510 2039)
II. Following officers attended the meeting:
i. Shri Rajbir Sharma, Joint Director General of Foreign Trade, DGFT
ii. Shri Paramjeet Singh, Additional I.A, Ministry of Steel
iii. Shri Vaibhav Bhatnagar, OSD, Department of Revenue
iv. Shri Randheep Thakur, Deputy Director General of Foreign Trade, DGFT
III. The Committee deliberated upon all the cases and following decisions were taken:
Sl.
No.
Firm’s
Name and
Numbers
EPCG
Authorisation
No.
Subject
Decision of the Committee
M/s. G.G Automotive Gears Ltd., Bhopal
01/60/162/81 0/AM-20/PR C 1130002343 dated 20.12.2011 Request for second extension in EOP against zero dutyauthoris ation. The party has sought second extension in the export obligation period for 2 years from the date of endorsement against zero duty EPCG authorization.
The Committee noted that even after more than eight years of obtaining subject EPCG authorisation the party has not made any exports.
The Committee deliberated upon the case and decided to reject it as there is no merit in the request.
t years of obtaining subject EPCG authorisation the party has not made any exports.
The Committee deliberated upon the case and decided to reject it as there is no merit in the request.
M/s.Quadron Business Park, Bangalore
01/36/218/39 1/AM-20/EP CG 147 EPCG authorisations Request for transfer of 147 EPCG authorisation s and change in name from M/s. Embassy One Developers Pvt Ltd to M/s. Quadron Business Park.
case and decided to defer the case for calling for a report from the RA in the matter.
2
M/s.TGV SRAAC Limited, Hyderabad
18/152/AM- 20/P-5 0930014050 dated 26.04.2019 Request for clarification regarding eligibility of Transformer s Rectifier System under EPCG scheme. The Committee observed that a clarification has been sought by the RA, Hyderabad upon the application of M/s. TGV SRAAC Limited, Hyderabad to import Transformer Rectifier System under the EPCG Scheme with export product being Caustic Soda/Potash Flakes.
case and noted that the request is not for relaxation of any provision of FTP but a clarification on admissibility of import of the capital goods under the EPCG Scheme.
The Committee, therefore, decided to withdraw the case for examination on file.
M/s Chandra Polyplast Pvt. Ltd, Aurangabad
01/36/218/32
/AM-21/EPC
G
P-CG011091
8
dated
11.08.1999
Request for
year
wise
and
overall
extension of
EOP
against
EP
CG License
No.P-CG-01
10918 dated
11thAugust,
1999 under
10% EPCG
Scheme.
/AM-21/EPC
G
P-CG011091
8
dated
11.08.1999
Request for
year
wise
and
overall
extension of
EOP
against
EP
CG License
No.P-CG-01
10918 dated
11thAugust,
1999 under
10% EPCG
Scheme.
The party has stated that due to
adverse financial position and bad
international market conditions for
their product they faced hardships and
could not make any exports in first
four years of EOP. They completed
60% EO in 5th year and 40% in
6th year.
The party has sought following relaxations :-
(i) To condone the condition of fulfillment of EO to the extent of 10%, 20% and 30% for the 2nd, 3rd and 4th year respectively (block-wise extension in EOP). (ii) To allow one year extension in EOP from August 2004 to August 2005 to regularise and close their case.
case and decided to reject it as there is no merit in the request.
M/s. Bharat Silks, Bangalore
01/36/218/38
7/AM-20/EP
CG
i. 0730009874
dated
25.02.2011
ii.
0730009
969
dated
05.03.2020
Request
for
change of IEC
from
0788000446
to
3999001160
in the EPCG
authorisation
case and decided to defer the case for
calling for a report from the RA in the
matter.
9 dated 05.03.2020 Request for change of IEC from 0788000446 to 3999001160 in the EPCG authorisation case and decided to defer the case for calling for a report from the RA in the matter.
3
Nos. 0730009874 dated 25.02.2011 and 0730009969 dated 24.03.2011.
M/s.Fab Texere India Pvt. Ltd, Ludhiana
01/36/218/13
/AM-21/EPC
G
3030008942
dated
14.11.2011
Request for
condonation
of
procedural
lapse
of
mentioning
wrong
EPCG
authorization
number
in
20 Shipping
bills.
The request of the party is for
condonation of wrong mentioning of
EPCG
authorisation
Nos.
3030007333 dated 01.07.2010 and
30300017227 dated 27.08.2018 in
place of correct EPCG authorization
No. 3030008942 dated 14.11.2011 in
20 shipping bills which the party
intends to count for fulfillment of EO.
case and it was decided to defer it
with the direction to call a report from
RA which may verify that the
shipping bills in question are not free
shipping
bills;
the
EPCG
Authorisations in question have not
already been redeemed and EO has
been fulfilled within the original or
extended EOP endorsed by the RA.
M/s. Texas Hosiery Mills, Ludhiana
01/36/218/18 4/AM-19/EP CG 3030012456 dated 07.05.2014 Request for condonation of delay in payment of excess utilization fee in respect of EPCG authorisation No. 3030012456 dated 07.05.2014. The party has requested to allow regularization of late payment of additional fee to cover excess imports.
tion
fee
in
respect
of
EPCG
authorisation
No.
3030012456
dated
07.05.2014.
The party has requested to allow
regularization of late payment of
additional
fee
to
cover
excess
imports. The Committee noted that in
this regard, para 5.16 (a) of HBP
2015-20, as amended, provides that
if authorization issued has been
utilized for import of goods in
excess of duty saved amount
indicated on the authorization by not
more than 10%, the RA may accept
additional fee to cover excess imports
effected, in terms of duty saved
amount, even beyond one month but
within two years of the excess
import taking place, subject to
payment of composition fee of Rs.
5000/- per authorization.
case and decided to recommend to DG for relaxation under Para 2.58 of FTP 2015-20 for condonation of procedural lapse of delay of more than a month in payment of fee for
4
excess duty saved amount as envisaged in the para 5.16(a) of HBP 2015-20, subject to payment of composition fee of Rs. 5000/- and to the condition that the excess utilization is not more than 10% of duty saved mentioned in the subject EPCG authorisation. This has the approval of DG. 8. M/s. Metalman Auto Pvt. Ltd, Waluj, Dist. Aurangabad
01/36/218/30 1/AM-20/EP CG 0330043208 dated 11.12.2015 Request for condonation of delay in payment of fee for excess utilisation in respect of EPCG authorization No.0330043 208 dated 11.12.2015.
1/AM-20/EP CG 0330043208 dated 11.12.2015 Request for condonation of delay in payment of fee for excess utilisation in respect of EPCG authorization No.0330043 208 dated 11.12.2015. additional fee to cover excess
excess duty saved amount as the condition that the excess EPCG authorisation. 9. M/s. Thermosol Glass Pvt. Ltd., Gujarat
01/60/162/95 2/AM-20/PR C/EPCG
0830004541 dated 30.11.2011 Request for extension of EOP for further 4 years’ time period in respect of EPCG Authorizatio n No. 0830004541 dated The Committee noted that the request of the party for extension in export obligation period (EOP) for a period of 2 years was earlier taken up by the EPCG Committee on 24.01.2020 and rejected being devoid of merit for the reason that in the allocated EOP party has not made any exports.
request for extension in EOP for a period of 4 years and decided to
5
30.11.2011. maintain rejection it as there is no new ground or merit in the request. 10. M/s. Jiger Impex, Mumbai
01/60/162/95 3/AM20/EP CG 0330045105 dated 17.08.2016 Request for regularisatio n of excess duty credit utilized within 10% on EPCG Licence No. 0330045105 dated 17.08.2016
additional fee to cover excess
excess duty saved amount as the condition that the excess EPCG authorisation. 11. M/s.
n 10% on EPCG Licence No. 0330045105 dated 17.08.2016
additional fee to cover excess
excess duty saved amount as the condition that the excess EPCG authorisation. 11. M/s. Vimala Note Book, Madurai
01/60/162/73
/AM21/PRC
i.3530004371
dated
10.02.2011
ii.3530004328
dated
24.12.2010
Review
of
the decision
taken in the
EPCG
Committee
held
on
10.06.2020
for extension
of EOP in
respect
of
zero
duty
EPCG
authorisation
s.
The case was listed before Committee
on 10.06.2020 wherein the following
decision was taken :-
“The party has requested for second extension in Export Obligation Period (EOP) in respect of zero duty EPCG authorisation issued on 24.12.2010 and 10.02.2011.
The Committee noted that the party has not made any exports till date.
case and decided to reject it as the party has not made any export even after expiry of the extended EOP and there is no meritorious reason given
he party has not made any exports till date.
case and decided to reject it as the party has not made any export even after expiry of the extended EOP and there is no meritorious reason given
6
by the party for further extension in EOP. ”
review application and noted that the firm is stating that they have confirmed export order for export of Note Books and can fulfil EO within one year from the date of endorsement.
review application and noted that there is no new ground or merit in accepting the request. Therefore, it was decided to maintain the rejection.
M/s. Precision Bearings Pvt. Ltd., Mumbai
01/60/162/64
/AM21/EPC
G
i.0830007059
dated
11.03.2015
ii.083000652
9
dated
21.08.2014
iii.
0830007529
dated
15.09.2015
Request for
waiver
of
shortfall
in
AEP
The party has requested for waiver of
shortfall in the annual average export
obligation due to recession in the
international market and an increase
in the number of international
suppliers
which
made
a
huge
difference in the exports.
case and decided to reject it as there is no merit in the case. 13. M/s. Cella Space Ltd. (formerly Sree Sakthi Paper Mills Ltd.), Cochin
01/60/162/49 /AM21/PRC 1030001844 dated 19.11.2010.
Request for waiver of partial Annual Average Export Obligation The party has stated that it could not fulfil annual average export obligation due to frequent power cut and load shedding, industrial disputes with labour union and pollution problem.
ation The party has stated that it could not fulfil annual average export obligation due to frequent power cut and load shedding, industrial disputes with labour union and pollution problem. It has been requested to waive off partial annual average EO.
case and decided to reject it as there is no merit in the case. 14. M/s. Dream Bake Pvt. Ltd, Kolkata
01/36/218/37
5/AM-20/EP
CG
i. 02300046
89
dated
27.11.2009
ii. 02300048
60
dated
22.01.2010
Request for
second
extension of
EOP for two
years.
The party has requested for second
extension of EOP for two years
against two licences issued under the
3% duty EPCG Scheme.
case and decided to remand the case to RA to examine the request on merit in terms of provisions of the Public Notice No. 1/2015-20 dated 07.04.2020.
M/s. Sai Impex, Mumbai 0330041615 dated 05.05.2015 Request for condonation of delay in additional fee to cover excess
7
01/36/218/47 /AM-21/EPC G submission of additional fee to cover excess imports affected by not more than 10% in terms of duty saved amount.
excess duty saved amount as the condition that the excess EPCG authorisation. 16. M/s. Patiala Cotspin Ltd., Ludhiana
01/36/218/38 /AM-21/EPC G 3030007635 dated 15.12.2010 Request for condonation of delay in payment of excess utilization fee. additional fee to cover excess
tspin Ltd., Ludhiana
01/36/218/38 /AM-21/EPC G 3030007635 dated 15.12.2010 Request for condonation of delay in payment of excess utilization fee. additional fee to cover excess
8
excess duty saved amount as the condition that the excess EPCG authorisation. 17. M/s. Ove Farm Pvt. Ltd., Odisha
01/36/218/09
/AM-21/EPC
G
i.2330001153
dated
01.07.2016
ii.
2330001157
dated
07.07.2016
Request for
exemption
of
block
wise
EO
fulfillment
in respect of
EPCG
Licence Nos
2330001153
dt.
01.07.2016
and
2330001157
dt.
07.07.2016.
The
party
has
requested
for
exemption
from
fulfillment
of
block-wise EO due to :-
(i) Policy changes in the importing countries, the party had to get certifications from importing countries which took considerable time. (ii) Frequent outbreaks of Bird flu, import of poultry products are banned from India by most importing countries.
case and decided to reject it as there is no merit in the case.
M/s. Swastik Value Addition Pvt. Ltd., Surat
01/36/218/37 /AM-21/EPC G 5230017476 dated 15. 07.2015 Request for regularisatio n of excess duty credit utilized within 10%. additional fee to cover excess
excess duty saved amount as
8/37 /AM-21/EPC G 5230017476 dated 15. 07.2015 Request for regularisatio n of excess duty credit utilized within 10%. additional fee to cover excess
excess duty saved amount as
9
the condition that the excess EPCG authorisation. 19. M/s. Sun Pharmaceuti cal industries Ltd, Mumbai
01/36/218/36 /AM-20/EPC G 0330040265 dated 21.11.2014 Request for condonation of procedural lapse and acceptance of enhancement fees for redemption of EO. additional fee to cover excess
excess duty saved amount as the condition that the excess EPCG authorisation. 20. M/s Kawasaki Manufacturi ng (India) Pvt. Ltd., Bangalore
01/36/218/52
/AM-21/EPC
G
i.043001453
2
dated20.03.2
015
ii.
0730014364
dated31.03.2
015
Request
to
amend
EPCG
License Nos.
0430014532
dt.
20.03.2015
and
0730014364
dt.
31.03.2015
by including
additional
export
products
in
The party has requested for an
amendment to the two EPCG licences
by
including
additional
export
products. It has been stated that the
HSN code was already part of the
export items in the licenses and only
the product description of the same
needs to be included.
case and decided to remand the case to RA for examination of the request for addition of export products in the subject EPCG authorizations, as per the applicable policy provisions.
included.
case and decided to remand the case to RA for examination of the request for addition of export products in the subject EPCG authorizations, as per the applicable policy provisions.
10
the license bearing same HSN code as other items.
M/s. Vedanta Limited, Kalahand
01/36/218/22 /AM-21/EPC G 34 numbers EPCG Authorizatio ns
Request for exemptio n from installation of CG against 34 EPCG Authorizatio ns.
The party has claimed that it has fulfilled 100% export obligation against the subject 34 EPCG Authorizations (as per the list). Further, the party has stated in its letter dated 18.05.2020 that due to various reasons beyond their control, the installation of the capital goods could not be completed. The party has requested for grant of EODC and waiver from submission of installation certificate. The party has stated that since primary objective of the Scheme, i.e., compliance of fulfillment of export obligation has been done by them pending installation of the capital goods, the same may be waived of. The Party has confirmed that all the capital goods are lying in their factory and to that effect they have also submitted installation certificate from Central Excise Department.
The Committee considered the request of the party and decided to remand the case to RA. RA may verify the EODC applications and related documents (since party claims that 100% export obligation has been completed) except installation certificate.
ecided to remand the case to RA. RA may verify the EODC applications and related documents (since party claims that 100% export obligation has been completed) except installation certificate. RA may grant EODC post actual installation and submission of installation certificate.
M/s. Ganga Roller Flour Mills Pvt. Ltd., Delhi
01/60/162/94 4/AM20/PR C 0530163424 dated 22.09.2014 Request for waiver/relax ation in deposit of Notional Custom Duty issued against the EPCG Authorizatio n no. 0530163424 dated 22.09.2014. case and decided to defer the case for calling for a report from the RA in the matter.
11
M/s. Satia Industries Ltd., Ludhiana
01/36/218/57 /AM-21/EPC G 3030010808 dated 12.04.2013 Request for regularisatio n of excess duty credit utilized within 10% on EPCG License.
additional fee to cover excess
excess duty saved amount as the condition that the excess EPCG authorisation. 24. M/s. Honda Cars India Ltd., Noida
01/36/218/56 /AM-21/EPC G 0530170994 dated 13.09.2017 Request for regularisatio n of excess duty credit utilized within 10% on EPCG License. additional fee to cover excess
ida
01/36/218/56 /AM-21/EPC G 0530170994 dated 13.09.2017 Request for regularisatio n of excess duty credit utilized within 10% on EPCG License. additional fee to cover excess
12
excess duty saved amount as the condition that the excess EPCG authorisation. 25. M/s. Sun Pharmaceuti cals Industries Ltd., Mumbai
01/36/218/24 0/AM-20/EP CG i.0330041326 dated 25.03.2015 ii.033004103 0 dated 20.02.2015 iii.033004105 1 dated 24.02.2015 iii. 03300410 30 dated 20.02.2015 v.0330040402 dated 08.12.2014 vi.033004054 9 dated 23.12.2014 vii.03300413 31 dated 25.03.2015 viii.03300405 57 dated 23.12.2014 ix.033004126 0 dated 17.03.2015 x.0330039689 dated 05.09.2014 xi.033003971 4 dated 10.09.2014
Request for condonation of procedural lapse for delay in submission of enhancement fee. additional fee to cover excess
excess duty saved amount as composition fee of Rs. 5000/- per authorisation and to the condition that the excess utilization is not more than 10% of duty saved mentioned in the subject EPCG authorisations. 26. M/s. Toolcomp Systems Pvt. Ltd., Bangalore
01/36/218/39 /AM-21/EPC G 0730005348 dated 08.03.2007 Request for re-fixation of Annual Average Export Obligation and consequentia l issuance of case and decided to defer the case for calling for a report from the RA in the matter.
8.03.2007 Request for re-fixation of Annual Average Export Obligation and consequentia l issuance of case and decided to defer the case for calling for a report from the RA in the matter.
13
EODC. 27. M/s. Shree Balaji Processors, Ludhiana
01/36/218/51 /AM-21/EPC G 3030008496 dated 20.07.2011 Request for regularizatio n of excess duty credit utilized within 10% on EPCG License no. 3030008496 dated 20.07.2011. additional fee to cover excess
excess duty saved amount as the condition that the excess EPCG authorisation. 28. M/s. National Textile Corporation Ltd/Algappa Textiles (Cochin) Mills
01/60/162/92 7/AM20/PR C
1030001036
dated
15.11.2006
Request for
fixation
of
Average
Export
Obligation in
respect
of
EPCG
Authorizatio
n.
case and decided to defer the case for
calling for a report from the RA in the
matter.
29.
M/s.
National
Textiles
Corporation
Ltd/Kerala
Lakshmi
1030001059
dated
16.01.2007
Request for
re-fixation of
Average
Export
Obligation in
respect
of
case and decided to defer the case for
calling for a report from the RA in the
matter.
hmi 1030001059 dated 16.01.2007 Request for re-fixation of Average Export Obligation in respect of case and decided to defer the case for calling for a report from the RA in the matter.
14
Mills, Thrissur
01/60/162/92 8/AM20/PR C
EPCG Authorizatio n. 30. M/s. Wadpack Pvt. Ltd.
01/60/162/83 7/AM-20/PR C
i.0730013863
dated
15.10.2014
ii.073001261
2
dated07.08.20
13.
Request for
accounting
their
supplies
to
SEZ units for
which
consideratio
n is realized
in
Indian
Rupees,
towards
fulfillment
of
EO
obtained
under
Zero
Duty
payment.
case and decided to defer the case for calling for a report from the RA in the matter. 31. M/s. Reliance Industries Ltd., Mumbai
01/36/218/66 /AM-21/EPC G 0330049225 dated 16.05.2018 Request to condone the delay in re-exporting defective capital goods spares on replacement in respect of EPCG Authorizatio n No. 0330049225 dated 16.05.2018. The Committee took into account the submission of the party that they had imported “Spares for Extruder package – Unbalance Drive/Vibrator” under the subject authorization vide BOE dated 10.08.2018. The spares have been found defective and unfit for use. The time period of two years for export of defective capital goods as per the para 5.25(b) of HBP, 2015-20 has expired on 09.8.2020 as they were in the process of negotiating with the supplier for replacement of these spares.
ort of defective capital goods as per the para 5.25(b) of HBP, 2015-20 has expired on 09.8.2020 as they were in the process of negotiating with the supplier for replacement of these spares. Hence, the party seeks condonation of delay to re-export the capital goods spares on replacement basis before 31.12.2020.
of FTP 2015-20 to allow export of the Capital Goods spares imported under EPCG Authorisation No. 0330049225 dated 16.05.2018 up to 31.12.2020 subject to the conditions laid down in Para 5.25(b) of HBP, 2015-20 that while allowing export, the Customs shall credit the duty
15
benefit availed which can be debited again at the time of import of such replaced Capital Goods.
DGFT = Directorate General of Foreign Trade, DG = Director General, FTP = Foreign Trade Policy,
HBP v1 = Handbook of Procedure Vol. I, EO = Export Obligation, EODC = Export Obligation
Discharge Certificate, EOP = Export Obligation Period, B.O.E.=Bill of Entry, EPCG = Export
Promotion Capital Goods, RA = Regional Authority, BG = Bank Guarantee, FFE = Free Foreign
Exchange, IEC = Importer-Exporter Code, DoR = Department of Revenue, IEM = Industrial
Entrepreneurs Memorandum, RCMC = Registration-cum-Membership-Certificate.
Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.
No analysis generated for this document yet (analysis runs over brief docs + on-demand). Run build_analysis.py --ids 6426 --apply.