MINUTES OF 13th MEETING OF EPCG COMMITTEE HELD UNDER THE CHAIRMANSHIP OF SHRI SATYAN SHARDA, ADDITIONAL DIRECTOR GENERAL OF FOREIGN TRADE AT 11.00AM ON 06.03.2020 IN COMMITTEE ROOM NO. 11, H WING, UDYOG BHAWAN, NEW DELHI.
I. Following officers attended the meeting:
i.
Shri Vaibhav Bhatnagar, OSD, Department of Revenue
ii.
Shri Randheep Thakur, Deputy Director General of Foreign Trade, DGFT
II. Minutes of the last Meeting held on14.02.2020 were confirmed.
III. The Committee deliberated upon all the cases and following decisions were taken:
Sl.
No.
Firm’s Name
and Numbers
EPCG
Authorisation
No.
Subject
Decision of the Committee
1.
M/s. A.I
Enterprises(P)
Ltd, Chennai
01/36/218/238
/AM-
20/EPCG
0430010452
dated
31.10.2011
Request for
re-fixation of
annual
average EO.
The party has requested for re-fixation of Annual
Average EO against EPCG Authorisation No.
0430010452 dated 31.10.2011 on the basis of past
three years export performance of main export
product “Woven Garments” falling under Chapter
62 and not taking past performance of alternate
export product “Knitted Garments" under Chapter
61.
The party has stated that the :-
(i) Specific export obligation to be fulfilled as per condition sheet of the subject EPCG Authorisation is for the readymade garments of ITCHS Code 62063000. At the time of applying for EPCG authorization, the party had submitted past performance of main export product “Woven Garments” and alternate export product “Knitted Garments”.
- At the time of applying for EPCG authorization, the party had submitted past performance of main export product “Woven Garments” and alternate export product “Knitted Garments”.
(ii) The Chapter 62 is for Woven Garments and the Chapter 61 is for Knitted Garments. The Woven Garments are manufactured from basic raw material of Fabric whereas Knitted Garments are manufactured from basic stage of knitting of thread. Both have no nexus with regard to manufacturing activity.
(iii) Annual EO should only be fixed for same / similar export product of “Woven
Garments” falling under Chapter 62 which has nexus withmanufacturing of export product in the unit at K 24, 25, 26 Sipcot Industrial Growth Centre, Perundural, Perundurai Block, Perundurai Taluka, Erode Distt. (Tamil Nadu) endorsed on the condition sheet of Authorisation and where the Capital Goods imported under the EPCG authorisation have been installed. The alternate export product of Knitted Garments falls under Chapter 61 which is not manufactured in this unit but in other unit.
(iv) The two export products of woven Garments falling under Chapter 62 are entirely different in terms of manufacturing process from Knitted Garments falling under Chapter 61. The Annual average EO should be for Woven Garments falling under Chapter 62 which only has nexus with reference to manufacturing process.
ss from Knitted Garments falling under Chapter 61. The Annual average EO should be for Woven Garments falling under Chapter 62 which only has nexus with reference to manufacturing process.
The Committee deliberated upon the case and decided to remand the case back to RA to consider the request of the party for re-fixation of the Annual Average Export Obligation on the basis of past export performance of “Woven Garments” under ITCHS Chapter 62, as per the applicable policy provisions. 2. M/s. Tata Steel Limited, New Delhi
01/36/218/226
/AM-
20/EPCG
0230013486
dated
21.01.2019
Extension of
time for
submission
of
installation
certificate till
November,
2020
The Committee took into account the submission
of the party that they are setting up a 5 MTPA
steel plant at Kalinganagar, Odisha as a Phase-2
project. The installation of the Capital Goods
imported under the subject EPCG authorization
for Coke Oven Phase-2 project was required to be
completed by August 2019. But installation of the
item could not be completed because of following
reasons :-
(i) Due to extreme hot summer, the civil & construction work was not done between 11.00 am to 3.00 pm as per rule from Odisha government.
(ii) Delay in sequential erection of equipment.
Due to extreme hot summer, the civil & construction work was not done between 11.00 am to 3.00 pm as per rule from Odisha government.
(ii) Delay in sequential erection of equipment.
The firm requests approval for extension in time for submission of installation certificate by November, 2020.
decided to recommend to DG for relaxation under Para 2.58 of FTP 2015-20 to allow condonation of delay in submission of installation certificate till 30.11.2020, subject to payment of composition fee of Rs. 5000/- and submission of installation certificate. RA to verify that no ECA/DRI/Customs action is pending. This has the approval of DG. 3. M/s. Ganga Acrowools Limited, Ludhiana
01/36/218/224
/AM-
20/EPCG
3030015360
dated
22.03.2016
Request
for
condonation
of delay in
payment
of
excess
duty
utilization
The party has requested to allow regularization of
late payment of additional fee to cover excess
imports. The Committee noted that in this regard,
para 5.16 (a) of HBP 2015-20, as amended,
provides that if authorization issued has
beenutilized for import of goods in excess of
duty saved amount indicated on the authorization
by not more than 10%, the RA may accept
additional fee to cover excess imports effected, in
terms of duty saved amount, even beyond one
month butwithin two years of the excess
import taking place, subject to payment of
composition fee of Rs. 5000/- per authorization.
under Para 2.58 of FTP 2015-20 for condonation of procedural lapse of delay of more than a month in payment of fee for excess duty saved amount as envisaged in the para 5.16(a) of HBP 2015-20, subject to payment of composition fee of Rs. 5000/- and to the condition that the excess utilization is not more than 10% of Duty Saved mentioned in the subject EPCG authorisation. 4. M/s. Indo Autotech Limited, CLA New Delhi
01/36/218/114
/AM-
20/EPCG
i.0530154539
dated
14.01.2011
ii. 0530154896
dated
28.02.2011
iii.0530155518
dated
19.05.2011
Request
for
condonation
of procedural
lapse
of
mentioning
wrong
authorisation
number
on
shipping
The Committee observed that the case was
deferred in its meeting held on 11.10.2019 for
calling a report from RA.
The Committee took into account the submission of the party that at the time of filing of application for redemption they came to know that due to clerical mistake the had mentioned wrong EPCG authorization nos. in the shipping bills instead of
the party that at the time of filing of application for redemption they came to know that due to clerical mistake the had mentioned wrong EPCG authorization nos. in the shipping bills instead of
iv.
0530153399
dated
14.09.2010
v. 0530154900
dated
01.03.2011
vi.
0530153235
dated
31.08.2010
bills.
correct Authorization number.
The Committee deliberated upon the case and decided to recommend to DG for relaxation under Para 2.58 of FTP 2015-20 to allow consideration
of wrongly mentioned/excess Shipping Bills on EPCG Nos towards fulfillment of Specific EO in respect of the 06 EPCG Authorizations as per the following details :
(i) Wrong mention of EPCG authorisation No. 0530157471 dated 24.01.2012 on Shipping Bill No. 6982290 dated 16.08.2013 instead of EPCG authorisation No. 0530154896 dated 28.02.2011.
(ii) Wrong mentioning of EPCG authorisation
no. 0530156869 dated 03.11.2011 on
shipping
bill
No.
3938028
dated
12.02.2013
instead of EPCG authorization No. 0530155518 dated 19.05.2011.
(iii) Wrong mentioning of EPCG authorisation
no. 0530153802 dated 25.10.2010 on
shipping
bill
No.
6349575
dated
22.11.2011 instead of EPCG authorisation
no. 0530153399 dated 14.09.2010.
(iv) Wrong mentioning of EPCG authorisation
No. 0530153802 dated 25.10.2010 on
shipping bill No.7302112 dated
27.01.2012 instead of EPCG authorisation
no. 0530153399 dated 14.09.2010.
(v) Wrong mentioning of EPCG authorisation
no. 0530156869 dated 03.11.2011 on
shipping
bill
No.
No.7302112 dated 27.01.2012 instead of EPCG authorisation no. 0530153399 dated 14.09.2010.
(v) Wrong mentioning of EPCG authorisation
no. 0530156869 dated 03.11.2011 on
shipping
bill
No.
4337815
dated
07.03.2013
instead of EPCG authorisation no. 0530154900 dated 01.03.2011 .
(vi) Wrong mentioning of EPCG authorisation
No.0530153802 dated 25.10.2010 on
shipping
bill
No.
6601748
dated
09.12.2011
instead of EPCG authorisation no. 0530153235 dated 31.08.2010.
(vii) Wrong mentioning of EPCG authorisation
No. 0530152377 dated 08.06.2010 on
shipping
bill
No.
8006101
dated
14.03.2012 instead of EPCG authorization
no. 0530153235 dated 31.08.2010.
(viii) Wrong mentioning of EPCG authorisation
no. 0530157471 dated 24.01.2012 on
shipping
bill
No.
5772033
dated
04.06.2013 instead of EPCG authorisation
no. 0530154539 dated 14.01.2011.
The above recommendation is subject to the condition that:
(i)
The Company had not submitted the
shipping bills to be counted to the RA for
redemption of EPCG Authorization. RA
to verify this aspect carefully.
(ii) The EPCG authorisations have not been
redeemed.
(iii)
These are not free shipping bills.
(iv) All the EPCG Authorisations under
consideration have the same export
product.
(v) All the EPCG Authorisations
under consideration are issued in the same
Policy period.
(vi) The specific export obligation that was to
be fulfilled within the Block and within
the EOP has been fulfilled within the
valid EOP.
nsideration are issued in the same
Policy period.
(vi) The specific export obligation that was to
be fulfilled within the Block and within
the EOP has been fulfilled within the
valid EOP.
(vii)
There is no double counting of
exports. These Shipping Bills have not
been/shall not be considered towards
the discharge of E.O. against any
other EPCG Authorisation.
(viii)
Annual Average EO, if imposed, has to
be maintained in respect of the EPCG
Authorisations.
(ix) Payment of a composition fee of Rs. 200/-
per export document is to be made by the
party.
(x)
Any
investigation/adjudication
proceeding by DRI/ Customs/ ECA action
is not pending in respect of the subject
EPCG authorisations.
M/s. Essar Steel India Limited, Surat
01/36/218/20/
AM-
18/EPCG-I
0330022216
dated
09.01.2009
Request for:
(i) condonation of delay in installation of Capital Goods ;
(ii) allowing alternate export products to be exported beyond 50% under EPCG Scheme
The Committee noted that the request of the party for condonation of delay in installation of Capital Goods and allowing alternate export products to be exported beyond 50% under EPCG Scheme was taken up in its meeting held on 27.09.2018. The Committee had decided to condone the delay in installation of capital goods, subject to payment of Rs. 5000/- against the authorisation.
Scheme was taken up in its meeting held on 27.09.2018. The Committee had decided to condone the delay in installation of capital goods, subject to payment of Rs. 5000/- against the authorisation. The Committee also decided that the request of allowing fulfillment of the remaining EO by export of alternate product upto100% cannot be accepted as the party has not put forward any meritorious reasons.
The Committee noted that the original export product endorsed on the authorisation was Hot Metal Pig Iron/ Slab and the alternate product exported by the party is HR/CR/CG/CC.
The party has filed a review against the decision of the EPCG Committee in not acceding to the request for permitting fulfillment of EO against the subject EPCG authorization by export of alternate product upto 100%.
In its request for review, the party has stated that process wise, Pig Iron is an input for steel making. Iron ore, coking coal, and limestone are the raw materials which are added into the Blast Furnace process to get the output of Pig iron. This Pig Iron is then converted to Steel in the Electric Arc Furnace. The majority of the pig iron/slabs manufactured by them are being used for captive consumption, i.e., for making various steel products. Since, steel is made out of Pig Iron, in a way Pig Iron is exported; though not in the 'as it is' form but in the 'converted' form.
decided to maintain the decision of rejection
taken in its earlier meeting as the party has not
put forward any new meritorious reasons in its
review petition.
6.
M/s.
he 'converted' form.
decided to maintain the decision of rejection
taken in its earlier meeting as the party has not
put forward any new meritorious reasons in its
review petition.
6.
M/s.
Jaiprakash
Associates
Limited,
Noida
49 EPCG Licenses (List enclosed) Relaxation in Policy procedure for not being able to submit The party has requested for condonation from submission of original documents. The party has stated that they have fulfilled EO against all the EPCG authorisations within the EOP but have lost all the documents required to be submitted for redemption of the above EPCG licenses. All
01/60/162/490 /AM20/PRC original documents as prescribed in Exim Policy and procedures for redemption of the 49 EPCG Licenses. Licenses were issued 10 to 15 years back and they are finding it very difficult to retrieve / reconstruct the documents required to be submitted for redemption. decided to reject the request, being devoid of any meritorious reasons. The party may approach the concerned RA to consider their request as per the applicable policy provisions. 7. M/s. American Precoat Speciality Pvt Ltd, New Delhi
01/36/218/365 /AM- 18/EPCG-I
0530151751
dated
06.04.2010
Request
for
acceptance
of
installation
certificate
from
Chartered
Engineer
instead
of
Central
excise
The party has stated that they had installed the
capital goods within 6 months from the date of
import and obtained the installation certificate
from the Chartered Engineer.
of
Central
excise
The party has stated that they had installed the
capital goods within 6 months from the date of
import and obtained the installation certificate
from the Chartered Engineer. They could not
intimate Jurisdictional Central Excise Authority at
the time of import of capital goods. Later when
they applied for the same the department refused
to entertain their application stating that as it is an
old case they cannot issue the Installation
Certificate.
The Committee decided to recommend to DG for relaxation under Para 2.58 of FTP 2015-20 to allow acceptance of installation certificate from Chartered Engineer, subject to intimation to the Jurisdictional Customs Authority and subject to payment of Rs. 5000/- against the Authorisation. Further, RA to verify that no ECA/DRI/Customs action against the party is pending. 8. M/s. Perfect Dyeing Finishing Industries, Ludhiana
01/36/218/257
/AM-
20/EPCG
3030014530
dated
14.08.2015
Request
for
condonation
of delay in
payment
of
excess
utilisation
fee.
The party has requested to allow regularization oflate payment of additional fee to cover excess imports.
2015 Request for condonation of delay in payment of excess utilisation fee.
The party has requested to allow regularization
oflate payment of additional fee to cover excess
imports. The Committee noted that in this
regard,Para 5.16 (a) of HBP 2015-20, as amended,
provides that if authorization issued has
beenutilized for import of goods in excess of
duty saved amount indicated on the authorization
by not more than 10%, the RA may accept
additionalfee to cover excess imports effected, in
terms of duty saved amount, even beyond one
month butwithin two years of the excess
import taking place, subject to payment of
composition fee of Rs. 5000/- per authorization.
under Para 2.58 of FTP 2015-20 for condonation
of procedural lapse of delay of more than a month in payment of fee for excess duty saved amount as envisaged in the para 5.16(a) of HBP 2015-20, subject to payment of composition fee of Rs. 5000/-, and to the condition that the excess utilization is not more than 10% of Duty Saved mentioned in the subject EPCG authorisation. 9. M/s. S.S Motor Industries, Ludhiana
01/36/218/261
/AM-
20/EPCG
3030007788
dated
27.01.2011
Request
for
second
extension in
EOP
in
respect
of
zero
duty
EPCG
authorization
.
The party has requested for second extension in
Export Obligation Period (EOP) in respect of
zero
duty
EPCG
authorisation issued
on
27.01.2011.
The Committee heard the submission made by the representative of the party in personal hearing before it.
ion Period (EOP) in respect of zero duty EPCG authorisation issued on 27.01.2011.
The Committee heard the submission made by the representative of the party in personal hearing before it.
The Committee noted that the party has not made any exports till date.
decided to reject it as the party has not made any export even after expiry of the extended EOP and there is no meritorious reason given by the party for further extension in EOP. 10. M/s. Surya Alloy Industries Limited, Kolkata
01/36/218/253
/AM-
20/EPCG
0230003681
dated
30.09.2008
Request
for
acceptance
of
installation
certificate
issued
by
Chartered
Engineer
instead
of
Central
Excise
The Committee took into account submission of
the party that they had obtained the installation
certificate from Chartered Engineer. They had
approached Central Excise Authority for getting
installation certificate but now since the excise
department is closed they request for allowing to
redeem EPCG authorisation with installation
certificate issued by Chartered Engineer instead of
central excise.
noted that the current FTP allows that the Authorization holder can produce the installation certificate from the jurisdictional customs authority or an independent Chartered Engineer, at the option of the authorisation holder and further that where the authorisation holder opts for independent Chartered Engineer‟s certificate, he shall send a copy of the certificate to the jurisdictional Customs Authority for intimation/ record.
that where the authorisation holder opts for independent Chartered Engineer‟s certificate, he shall send a copy of the certificate to the jurisdictional Customs Authority for intimation/ record.
The Committee decidedto recommend to DG for
relaxation under Para 2.58 of FTP 2015-20 to allow acceptance of installation certificate from Chartered Engineer, subject to intimation to the Jurisdictional Customs Authority and subject to payment of Rs. 5000/- against the Authorisation. Further, RA to verify that no ECA/DRI/Customs action against the party is pending. 11. M/s. Green Apple Knitwear, Ludhiana
01/36/218/263
/AM-
20/EPCG
3030014038
dated
08.05.2015
Request
for
condonation
of delay in
payment
of
excess
utilization
fee
The party has requested to allow regularization of
late payment of additional fee to cover excess
imports.
The Committee noted that in this regard, Para 5.16
(a) of HBP 2015-20, as amended, provides that if
authorization issued has been utilized for
import of goods in excess of duty saved
amount indicated on the authorization by not more
than 10%, the RA may accept additional fee to
cover excess imports effected, in terms of duty
saved amount, even beyond one month but within
two years of the excess import taking place,
5000/- per authorization.
subject to payment of composition fee of Rs. 5000/-, and to the condition that the excess utilization is not more than 10% of Duty Saved mentioned in the subject EPCG authorisation. 12. M/s.
subject to payment of composition fee of Rs. 5000/-, and to the condition that the excess utilization is not more than 10% of Duty Saved mentioned in the subject EPCG authorisation. 12. M/s. Ginni Filaments Limited, Noida
01/36/218/237
/AM-
20/EPCG
0530162831
dated
30.04.2014
Request
for
condonation
of utilization
of duty saved
amount
beyond 10.00
%
without
prior
approval
The request of the party is for condonation of
utilization of duty saved amount in excess of 10%
without prior approval of RA. The party has stated
that if the Customs had pointed out that they
cannot utilize the license for more than 10% or
Customs had refused to clear the shipments
without the endorsement from RA, they would
have approached the RA at that time for necessary
endorsement.
The Committee noted that para 5.16(a) of HBP 2015-20 allows automatic enhancement upto10% duty saved amount if authorization issued has been utilized for import of goods in excess of duty
ent.
The Committee noted that para 5.16(a) of HBP 2015-20 allows automatic enhancement upto10% duty saved amount if authorization issued has been utilized for import of goods in excess of duty
saved amount indicated on the authorization by not more than 10%, and that para 5.16(b) of HBP 2015-20 provides that if excess of duty saved amount indicated on the authorization is by more than 10%, the RA concerned, as per its delegated powers, may allow enhancement in duty saved amount of the EPCG authorization. The Authorisation holder shall furnish additional BG/LUT to the Customs Authority.
noted that party has erred only to the extent of not approaching the RA concerned under para 5.16(b) of HBP 2015-20 and customs also did not stop clearance of shipment on this ground.
The Committee decided to recommend to DG for relaxation under Para 2.58 of FTP 2015-20 to allow enhancement in duty saved amount of the subject EPCG authorization as per the conditions of para 5.16(b) of HBP 2015-20, subject to payment of composition fee of Rs. 5000/- and also on the condition that the Authorisation holder shall furnish additional BG/LUT to the Customs Authority. 13. M/s. Sun Pharmaceutica l Industries Ltd, Vadodara
01/36/218/240
/AM-
20/EPCG
i.0530164863
dated
08.05.2015
ii.0530164842
dated
06.05.2015
iii.0530164892
dated
12.05.2015
Request
for
condonation
of procedural
lapse
for
delay
in
payment
of
enhancement
fee
The party has requested to allow regularization
oflate payment of additional fee to cover excess
imports.
st
for
condonation
of procedural
lapse
for
delay
in
payment
of
enhancement
fee
The party has requested to allow regularization
oflate payment of additional fee to cover excess
imports.
The Committee noted that in this regard,Para 5.16
(a) of HBP 2015-20, as amended, provides that if
authorization issued has beenutilized for
import of goods in excess of duty saved
than 10%, the RA may accept additionalfee to
saved amount, even beyond one month butwithin
subject to payment of composition fee of Rs.
5000/- per authorization, and to the condition that the excess utilization is not more than 10% of Duty Saved mentioned in the subject EPCG authorisation. 14. M/s. Natraj Creation., Ludhiana
01/60/162/666
/AM20/PRC
3030014585
dated
25.08.2015
Request
for
condonation
for delay to
submit
original
installation
certificate
and
condonation
of delay in
payment
of
fees
for
excess
utilization.
The party has requested for condonation for delay
to submit original installation certificate and
condonation of delay in payment of fees for
excess utilization.
The Committee noted that the capital goods procured vide BOE dated 09.09.2015 were installed on 11.09.2015 and, therefore, covered under the provisions of DGFT Public Notice No. 37/2015-20 dated 25.10.2017 read with the provisions of Public Notice No. 55/2015-20 dated 03.01.2020.
stalled on 11.09.2015 and, therefore, covered under the provisions of DGFT Public Notice No. 37/2015-20 dated 25.10.2017 read with the provisions of Public Notice No. 55/2015-20 dated 03.01.2020.
The Committee further noted that in this
regard,Para 5.16 (a) of HBP 2015-20, as amended,
provides that if authorization issued has been
utilized for import of goods in excess of duty
saved amount indicated on the authorization by
not more than 10%, the RA may accept
additionalfee to cover excess imports effected, in
terms of duty saved amount, even beyond one
month butwithin two years of the excess
import taking place, subject to payment of
composition fee of Rs. 5000/- per authorization.
decided that the party may approach concerned RA for their request for delay in submission of installation certificate in terms of provisions of Public Notice No. 37/2015-20 dated 25.10.2017 read with the provisions of Public Notice No. 55/2015-20 dated 03.01.2020. RA may examine the request on merit.
The Committee also decided to recommend to DG for relaxation under Para 2.58 of FTP 2015-20 for condonation of procedural lapse of delay of more than a month in payment of fee for excess duty saved amount as envisaged in the para 5.16(a) of HBP 2015-20, subject to payment of composition fee of Rs. 5000/-, and to the condition that the excess utilization is not more than 10% of Duty Saved mentioned in the subject EPCG authorisation.
HBP 2015-20, subject to payment of composition fee of Rs. 5000/-, and to the condition that the excess utilization is not more than 10% of Duty Saved mentioned in the subject EPCG authorisation.
M/s. Stretch Bands (Gujarat) P. Ltd, Gujarat
01/60/162/565
/AM20/PRC
0330010965
dated
07.02.2006
Acceptance
of
Exports
made
by
group
company
towards
fulfillment of
annual
average
export
obligation.
The request of the party is for acceptance of
exports from Group Company towards fulfillment
of average exports on the ground of common
director of both companies.
decided to reject it as there is no merit in the request.
M/s. Shalimar Floorings Pvt Ltd, Jammu
18/20/AM-
20/P-5
1830000018
dated
04.01.2010
Request
for
reduced
Export
Obligation
extended
to
J&K through
Annual
Supplement
2013-14
to
FTP 2009-14
dated
18.04.2013
and
waiver
of interest on
duty
saved
for closure of
EPCG
authorization
No.1830000018
dated
04.01.2010.
The request of the party is for reduced Export
Obligation in terms of provisions of para 5.12 of
FTP 2009-14 extended to J&K through Annual
Supplement 2013-14 to FTP 2009-14 dated
18.04.2013 and waiver of interest on duty saved
for closure of EPCG authorisation
The Committee heard the submission made by the representative of the party in personal hearing before it.
The Committee noted that para 5.12 of FTP 2009- 14 provides reduced Export Obligation of 25% for the units in the North East Region.
presentative of the party in personal hearing before it.
The Committee noted that para 5.12 of FTP 2009- 14 provides reduced Export Obligation of 25% for the units in the North East Region. This provision was also extended for the units located in Jammu & Kashmir vide DGFT Notification No.01 (RE-2013)/2009-14 dated 18.04.2013. This provision is applicable prospectively. The facility of reduced specific EO of 25% is available for all the EPCG authorisations issued w.e.f. 18.04.2013 irrespective of the fact whether the unit was in an existence prior to the date of notification (18.04.2013) or after the notification.
decided to defer it for further examination. 17. M/s. PLR Systems Pvt Ltd, New Delhi
01/36/218/233
/AM-
20/EPCG
0530168774
dated
01.03.2017
Request
for
condonation
of delay in
payment
of
fees
for
excess
utilization.
The party has requested to allow regularization
oflate payment of additional fee to cover excess
imports.
The Committee noted that in this regard, Para 5.16
(a) of HBP 2015-20, as amended, provides that if
authorization issued has beenutilized for
import of goods in excess of duty saved
than 10%, the RA may accept additionalfee to
.16
(a) of HBP 2015-20, as amended, provides that if
authorization issued has beenutilized for
import of goods in excess of duty saved
than 10%, the RA may accept additionalfee to
saved amount, even beyond one month butwithin
5000/-, and to the condition that the excess utilization is not more than 10% of Duty Saved mentioned in the subject EPCG authorisation. 18. M/s. Eden Exports Company, Vellore
01/36/218/193
/AM-
20/EPCG
0430002080
dated
04.11.2004
Condonation
of delay in
submission
of
installation
Certificate
after shifting
of
Capital
Goods
in
respect
of
EPCG
authorization
The Committee took into account the submission
of the party that on the basis of approval from RA,
Chennai
they
shifted the
machines
to
the new premises and the installation certificate
was obtained. Later, they realized that after
shifting the Installation certificate had to be
submitted to the authority within six months of the
installation. The party has submitted that it was a
genuine mistake committed in ignorance and
oversight, which has resulted in the non-
submission of Installation certificate in time.
under Para 2.58 of FTP 2015-20 to allow
condonation
of
delay
in
submission
of
installation certificate to the RA after shifting of
capital goods, subject to payment of composition
fee of Rs. 5000/-. RA to verify that no
ECA/DRI/Customs action is pending.
19.
M/s.
n of installation certificate to the RA after shifting of capital goods, subject to payment of composition fee of Rs. 5000/-. RA to verify that no ECA/DRI/Customs action is pending. 19. M/s. Birladp Carpets Pvt Ltd., Mumbai
01/60/162/835
/AM20/PRC
0330017476
dated
14.09.2007
Request
for
extension of
EOP against
the
EPCG
authorization
The request of the party is for extension in EOP
for four years till the end of September, 2021.
The party has stated that they could not fulfill EO due to global slowdown and competition which made it very difficult for them to make entry for their products and they waited for considerable period to settle down.
The Committee noted that EOP of the subject EPCG authorization issued on 14.09.2007 was valid till 14.09.2015. The extended EOP of two
plus two years also expired on 14.09.2019. The party seeks further extension in EOP beyond 02 + 02 years permissible in the HBP for which there is no provision in the policy.
decided to reject as there is no merit in the request. 20. M/s. Aggarwal Textiles Traders., Amritsar
01/60/162/664
/AM20/PRC
1230001122
dated
06.05.2014
Request
for
condonation
for delay in
payment
of
fees
for
excess
utilization of
duty
saved
Amount.
The party has requested to allow regularization
oflate payment of additional fee to cover excess
imports. The party has stated that the due to
fluctuation in exchange rate, authorisation was
utilized for import of goods in excess of duty
saved amount by more than 10%.
nal fee to cover excess imports. The party has stated that the due to fluctuation in exchange rate, authorisation was utilized for import of goods in excess of duty saved amount by more than 10%.
The Committee noted that para 5.16(a) of HBP 2015-20 allows automatic enhancement upto 10% duty saved amount if authorization issued has been utilized for import of goods in excess of duty saved amount indicated on the authorization by not more than 10%, and that para 5.16(b) of HBP 2015-20 provides that if excess of duty saved amount indicated on the authorization is by more than 10%, the RA concerned, as per its delegated powers, may allow enhancement in duty saved amount of the EPCG authorization. The Authorisation holder shall furnish additional BG/LUT to the Customs Authority.
noted that party has erred only to the extent of not approaching the RA concerned under para 5.16(b) of HBP 2015-20.
The Committee decided to recommend to DG for
relaxation under Para 2.58 of FTP 2015-20 to
allow enhancement in duty saved amount of the
subject EPCG authorization as per the conditions
of para 5.16(b) of HBP 2015-20, subject to
payment of composition fee of Rs. 5000/- and
also on the condition that the Authorisation holder
shall furnish additional BG/LUT to the Customs
Authority.
21.
M/s. Temple
Packaging Pvt
Ltd, Mumbai
01/36/218/272
0330041660
dated
12.05.2015
Request
for
condonation
of delay in
payment
of
excess
The party has requested to allow regularization
oflate payment of additional fee to cover excess
imports.
30041660
dated
12.05.2015
Request
for
condonation
of delay in
payment
of
excess
The party has requested to allow regularization
oflate payment of additional fee to cover excess
imports. The party has stated that due to
fluctuation in exchange rate prevailing the
authorisation was utilised for import of goods in
/AM-
20/EPCG
utilization
fee
excess of duty saved amount by more than 10%.
The Committee noted that para 5.16(a) of HBP 2015-20 allows automatic enhancement upto 10% duty saved amount if authorization issued has been utilized for import of goods in excess of duty saved amount indicated on the authorization by not more than 10%, and that para 5.16(b) of HBP 2015-20 provides that if excess of duty saved amount indicated on the authorization is by more than 10%, the RA concerned, as per its delegated powers, may allow enhancement in duty saved amount of the EPCG authorization. The Authorisation holder shall furnish additional BG/LUT to the Customs Authority.
noted that party has erred only to the extent of not
approaching the RA concerned under para 5.16(b)
of HBP 2015-20. The Committee decided to
recommend to DG for relaxation under Para
2.58 of FTP 2015-20 to allow enhancement in
duty saved amount of the subject EPCG
authorization as per the conditions of para 5.16(b)
of HBP 2015-20, subject to payment of
composition fee of Rs. 5000/- and also on the
condition that the Authorisation holder shall
furnish additional BG/LUT to the Customs
Authority.
22.
M/s. Mahesh
Engg.
, subject to payment of
composition fee of Rs. 5000/- and also on the
condition that the Authorisation holder shall
furnish additional BG/LUT to the Customs
Authority.
22.
M/s. Mahesh
Engg. Works,
Ludhiana
01/36/218/291
/AM-
20/EPCG
3030008633
dated
24.08.2011
Request
for
condonation
of delay in
payment
of
excess
utilization
fee
The party has requested to allow regularization of
late payment of additional fee to cover excess
imports.
The Committee noted that para 5.16(a) of HBP 2015-20 allows automatic enhancement upto 10% duty saved amount if authorization issued has been utilized for import of goods in excess of duty saved amount indicated on the authorization by not more than 10%, and that para 5.16(b) of HBP 2015-20 provides that if excess of duty saved amount indicated on the authorization is by more than 10%, the RA concerned, as per its delegated powers, may allow enhancement in duty saved amount of the EPCG authorization. The Authorisation holder shall furnish additional BG/LUT to the Customs Authority.
ed, as per its delegated powers, may allow enhancement in duty saved amount of the EPCG authorization. The Authorisation holder shall furnish additional BG/LUT to the Customs Authority.
5000/-, and to the condition that the excess utilization is not more than 10% of Duty Saved mentioned in the subject EPCG authorisation. 23. M/s. Prabhu Engineers, Bangalore
01/60/162/761
/AM20/PRC
0730003160
dated
12.08.2005
Request
for
condonation
of
non-
fulfillment of
specific
export
obligation
The party has requested for condonation of non-
fulfillment of specific export obligation.
The party has stated that they indigenously procured the Capital Goods under the EPCG authorization for producing of Borewell Bits and Mining equipments from the said machines and supply the product to EOU Units. However, the EOU units have not given any Borewell Bits and Mining Equipment orders to them. They did not receive any orders from EOU to cover their specific export amount (against actual duty saved amount) in respect of EPCG authorization.
decided to reject it as there is no merit in the request. 24. M/s. India Pistons Ltd, Chennai
01/36/218/110
/AM-
19/EPCG-I
0430003348
dated
18.01.2006
Request
for
condonation
of delay in
installation
of
capital
goods
decided to defer it with the direction to call for a
copy of the installation certificate from the party.
25.
M/s.
.2006
Request
for
condonation
of delay in
installation
of
capital
goods
decided to defer it with the direction to call for a
copy of the installation certificate from the party.
25.
M/s. Pritul
Machines,
Panipat
01/37/218/48/
AM-
19/EPCG-II
3330001681
dated
18.05.2010
Court
case-
CWP
1213/2018-
redemption
of
EPCG
authorization
The case was deferred in the EPCG Committee
meeting held on 30.08.2019. The case was again
deferred on 10.11.2019 with the direction that RA
may call a report from Jurisdictional Custom
Authority to see whether Adjudication Order has
been passed in the matter or not.
The Committee heard the submission made by the representative of the party in personal hearing before it.
The Committee noted that there is a Hon‟ble High Court Order dated 03.07.2019 directing the DGFT to complete the redemption proceedings in respect of EPCG Authorisation No. 3330001681 dated
18.05.2010 issued to the petitioner within three months.
The Committee also noted that RA, vide email dated 19.08.2019, has requested for guidance on the following two points: (i) From the submitted documents it has been observed that firm has made third party exports to fulfil the specific EO. Whereas in the condition sheet, export item indicated was 'Bakery Machines' ITC 84381010 and the firm has made export of worth USD 176465 under the above ITC HS that too with the description as 'Bakery Equipment'. And rest of the exports worth USD 283758 have been made under the ITC HS and description that does not match with condition sheet.
bove ITC HS that too with the description as 'Bakery Equipment'. And rest of the exports worth USD 283758 have been made under the ITC HS and description that does not match with condition sheet. (ii) Originally the Invoices and Agreement (of Third Party exports as required under Para 5.10) submitted by the Party did not contain the EPCG license no. The party has submitted a revised invoice duly incorporating the License No. on it stating that amendment in invoice is duly allowed in GST law. Regarding mentioning the EPCG license no. on agreement, they submitted that they have been issued only one EPCG license from DGFT till date. As no other EPCG license is issued to them, mentioning of EPCG license on agreement may be condoned.
decided that it is not a case of any relaxation of the provision of the policy and/or procedure but of clarification sought by the RA for regularizing the case. The Committee, therefore, decided to remand the case back to the RA with direction that if the ITC HS Code of 'Bakery Equipment'and „Bakery Machines' is the same, it may be accepted but where the ITC HS Code and description of export product do not match with what has been endorsed on the Authorisation, such exports cannot be accepted. The Committee also decided that the other issue that originally the Invoices and Agreement (of Third Party exports) as required under Para 5.10 of HBP submitted by the Party did not contain the EPCG license no. and that the party has submitted a revised invoice duly incorporating the License No.
Party exports) as required under Para 5.10 of HBP submitted by the Party did not contain the EPCG license no. and that the party has submitted a revised invoice duly incorporating the License No. on it stating that amendment in invoice is duly allowed in GST law, is purely a procedure matter for regularizing/redeeming a case which the RA
should handle at its level as per the applicable
policy.
26.
M/s. Precision
Bearings Pvt
Ltd, Mumbai
01/36/218/266
/AM-
20/EPCG
i.0830007059
dated
11.03.2015
ii.0830006529
dated
21.08.2014
iii.0830007529
dated
15.09.2015
Request for waiver of shortfall in annual average EO in respect of EPCG authorization s. The request of the party is for waiver of shortfall in annual average EO in respect of EPCG authorizations.
The party has stated that they could not complete Annual Average Export Obligationdue to a recession in the international market and the increase in the number of international suppliers which made a huge difference in their exports. For these reasons, a drastic decrease in demand was a big obstacle in maintaining the stipulated Annual Average Export Obligation. As their exports against specific export obligation was concluded in the 4th year from the date of issue of authorization they had to maintain Average Export Performance for 4 years. During these periods they could not maintain AEP. Therefore, they could not keep the momentum and the level of exports they contributed in the earlier periods.
age Export Performance for 4 years. During these periods they could not maintain AEP. Therefore, they could not keep the momentum and the level of exports they contributed in the earlier periods.
decided to reject it as there is no merit in the request. 27. M/s.Finproject India Pvt. Ltd, Jaipur
01/36/218/384
/AM-
14/EPCG-I
i.1330003044
dated
05.10.2011
ii.1330003046
dated
14.06.2011
Request
for
amendment
of place of
installation
in respect of
EPCG
authorization
The party has stated that they have been issued
subject EPCG Authorizations for import of capital
goods for installation in their rental premises i.e.
F-1292, 3rd Phase RIICO industrial area,
Sitapura, Jaipur. Later on they shifted machines to
SP-1013 RIICO industrial area, Sitapura, Jaipur
which they have already informed to RA, Jaipur.
decided to defer it with the direction to call a report from RA. 28. M/s. Varroc Engineering Limited, Aurangabad
01/36/218/216
/AM-
20/EPCG
0330032172
dated
20.03.2012
Request
for
condonation
of delay in
payment
of
excess
duty
saved
amount.
The party has requested to allow regularization of
late payment of additional fee to cover excess
imports.
The Committee noted that in this regard, Para
5.16 (a) of HBP 2015-20, as amended, provides
that if authorization issued has been utilized
for import of goods in excess of duty saved
than 10%, the RA may accept additional fee to
saved amount, even beyond one month butwithin
at if authorization issued has been utilized
for import of goods in excess of duty saved
than 10%, the RA may accept additional fee to
saved amount, even beyond one month butwithin
5000/-, and to the condition that the excess utilization is not more than 10% of Duty Saved mentioned in the subject EPCG authorisation. 29. M/s.TTK Prestige Limited, Bangalore
01/36/218/48/
AM-20/EPCG
i.0330018954
dated
04.02.2008
ii.0330019632
dated
28.03.2008
iii.0330019983
dated
12.05.2008,
iv.0330020178
dated
03.06.2008
v.0330020357
dated
13.06.2008,
vi.0330020533
dated
02.07.2008
vii.0330020655
dated
11.07.2008
viii.0330021200
dated
05.09.2008
ix. 0330021267
dated
11.09.2008
Request
for
counting
of
exports made
from
a
different
plant towards
fulfillment of
EO
against
„Drawback
Shipping
Bills‟
The request of the party is for counting of exports
made from a different plant towards fulfilment of
EO against „Drawback shipping Bills‟ in respect
of the 09 EPCG authorisations.
The Committee noted that the party has stated that:
(i) M/s. Triveni Bialetti Industries Private Limited (TBI), a subsidiary of Bialetti Industries S.P.A, had set-up a factory in 2007-08 at Thane, Maharashtra. TBI had obtained EPCG licenses in 2008 to import plant and machinery for manufacture and export of aluminium and stainless steel cookware, kitchen tools etc. to the European market. The imported machinery was installed in the said factory in 2008.
nd machinery for manufacture and export of aluminium and stainless steel cookware, kitchen tools etc. to the European market. The imported machinery was installed in the said factory in 2008.
(ii) However, due to due to business
exigency, TBI filed a Company Scheme
Petition No. 307/2014 with the Hon'ble
Bombay High Court for demerger of their
kitchen appliances division along-with its
assets, liabilities, and licenses (including
EPCG licenses) and vesting of the same
in TTK Prestige Ltd. from 01.04.2012.
(iii) TTK's scheme petition (No. 333 of
2013) as a transferee was sanctioned by
the Hon'ble Madras High Court vide
Order dated 13.12.2013, with the vesting
date being 01.04.2012 and effected on
17.03.2017 only after the NCLT's Order
dated 08.03.2017 was made available.
(iv) As per the Hon'ble High Court Order
and the Scheme of demerger, the
Kitchen Appliances Division with all
assets and liabilities, including the EPCG
licenses issued to TBI stand transferred to
TTK Prestige Ltd. with the vesting date
being 01.04.2012.
(v) Subsequently, TTK made an application
dated 10.05.2017 with the RA, Mumbai
for endorsement of TTK as transferee on
the EPCG licenses and endorsement to
include
CTH
73239310,
73239390,
73239490, 76151011, 76151021 and
76151029 which are the correct CTH
under which the description of goods
mentioned in the Condition Sheet are
covered.
clude
CTH
73239310,
73239390,
73239490, 76151011, 76151021 and
76151029 which are the correct CTH
under which the description of goods
mentioned in the Condition Sheet are
covered.
(vi) RA, Mumbai vide letter dated 27.07.2018
clarified that export products falling under
the
CTH
73239310,
73239390,
73239490, 76151011, 76151021 and
76151029 already form part of the
export items covered under the
condition sheet and, therefore, no special
endorsement is required.
(vii) RA, Mumbai has also incorporated the
changes in License sheet and endorsed the
9 licenses in TTK‟s name. The RA,
Mumbai has also revised the export
obligation and enhanced the EOP from 8
to 10 years.
The Committee, therefore, decided that based on the above facts, and particularly owing to the action taken by the RA, Mumbai as outlined at points (vi) and (vii) above, RA, Mumbai may consider the request of the party for counting of exports made from a different plant towards fulfillment of EO against „Drawback Shipping Bills‟ to meet the export obligation in respect of 09 EPCG authorisations, subject to the conditions laid down in the FTP including the conditions that
(i) CA certificate be obtained from the party that in cases where the Shipping Bills do not contain EPCG Authorization Number and Date, an Affidavit from the authorization holder has been obtained that the exports accounted for fulfillment
in cases where the Shipping Bills do not contain EPCG Authorization Number and Date, an Affidavit from the authorization holder has been obtained that the exports accounted for fulfillment
of specific EO against the subject EPCG authorizations have not been/shall not be taken into account for fulfillment of either specific or average EO of any other EPCG authorization,
(ii) CA certificate be obtained from the party that the shipping bills mentioned in the Affidavit are not Third party shipping Bills/Free Shipping Bills, and
(iii) The average Export Obligation of M/s. Triveni Bialetti Industries Private Limited imposed shall also be maintained by TTK company including their own annual average export. 30. M/s. Ultimate Flexipack Ltd, Delhi
01/36/218/271
/AM-
20/EPCG
0530156548
dated
21.09.2011
Request
for
condonation
of delay in
payment
of
excess
utilization
fee.
The party has requested to allow regularization of
late payment of additional fee to cover excess
imports.
The Committee noted that in this regard, Para 5.16
(a) of HBP 2015-20, as amended, provides that if
authorization issued has beenutilized for
import of goods in excess of duty saved
than 10%, the RA may accept additionalfee to
saved amount, even beyond one month butwithin
5000/- and to the condition that the excess utilization is not more than 10% of Duty Saved mentioned in the subject EPCG authorisation. 31. M/s.
saved amount, even beyond one month butwithin
5000/- and to the condition that the excess utilization is not more than 10% of Duty Saved mentioned in the subject EPCG authorisation. 31. M/s. Skylark proteins Pvt Ltd., Haryana
01/60/162/602 /AM-
Permission to import SILOs machinery under 0% EPCG decided to defer it for examination on file.
20/PRC/EPC G Scheme. 32. M/s. Reliance Industries Limited., Mumbai
01/37/218/27/
AM-
19/EPCG-II
i.330040284
dated
25.11.2014
ii.330040506
dated
18.12.2014
iii.330044120
dated
02.04.2016
Request
for
extension in
installation
period
for
EPCG
licenses-
delay
in
project
completion.
The Committee observed that in the EPCG
Committee meeting heldon 05.06.2018 extension
in installation of capital goods in respect of the
12 EPCG authorisations was allowed till
31.12.2019.
The Committee took into account the submission
of the party that out of the 12 licences they have
successfully installed all capital goods imported
under 9 EPCG licences. They have imported
capital goods worth Rs. 44.53Crs under the
remaining 3 licences and successfully installed
goods worth Rs. 41.35Crs and expect to install the
balance goods worth Rs. 3.17 Crs by September,
2020. Hence they request to extend the installation
period till 30.09.2020 as apart from these 4 items
rest all items imported under these 3 EPCG
licences have already been installed.
September, 2020. Hence they request to extend the installation period till 30.09.2020 as apart from these 4 items rest all items imported under these 3 EPCG licences have already been installed.
under Para 2.58 of FTP 2015-20 to allow
extension in period of installation of capital
goods up to 30.09.2020, subject to payment of
composition fee of Rs. 5000/- against each
authorization and submission of installation
certificate.
33.
M/s. S.G.
Print-N-Pack
Industries,
Jharkhand
01/36/218/274
/AM-
17/EPCG-II
3130000134
dated
02.12.2011
Request
for
second
extension of
block-wise
EOP.
The party has requested for second extension in
EOP in respect of zero duty EPCG authorisation
issued on 02.12.2011. The reasons mentioned for
non-fulfillment
of
EO
in
the
EOP
are
computerization and general recession.
decided to reject it as there is no merit in the
request.
34.
M/s. Kiran
Knitwears,
Ludhiana
01/36/218/209
/AM-
19/EPCG-I
3030014390
dated
21.07.2015
Request
for
regularizatio
n of block
wise
EO
extension
and
condonation
of delay in
payment
of
excess
utilization
The party has requested for permission for block-
wise EO extension and to allow regularization of
late payment of additional fee to cover excess
imports.
The Committee noted that the request for block wise extension is covered under the provisions of DGFT Public Notice No. 35/2015-20 dated 25.10.2017 read with the provisions of Public Notice No. 55/2015-20 dated 03.01.2020.
request for block wise extension is covered under the provisions of DGFT Public Notice No. 35/2015-20 dated 25.10.2017 read with the provisions of Public Notice No. 55/2015-20 dated 03.01.2020.
fee in respect
of
EPCG
authorization
.
The Committee noted that Para 5.16 (a) of HBP
2015-20, as amended, provides that if
authorization issued has been utilized for
import of goods in excess of duty saved
than 10%, the RA may accept additional fee to
saved amount, even beyond one month but within
subject to payment of composition fee of Rs. 5000/-, and to the condition that the excess utilization is not more than 10% of Duty Saved mentioned in the subject EPCG authorisation.
The request for extension in EOP may be examined by RA on merit in terms of provisions of DGFT Public Notices No. 35/2015-20 dated 25.10.2017 read with the provisions of Public Notice no. 55/2015-20 dated 03.01.2020. 35. M/s. M.K. Aggarwal Hosiery Pvt Ltd, Ludhiana
01/36/218/267
/AM-
20/EPCG-I
i.3030016005
dated
07.09.2016
ii.3030015872
dated
02.08.2016
iii.3030013410
dated
29.012.2014
Condonation
for delay in
installation
of
capital
goods
and
delay
in
payment
of
excess
duty
utilization
fee.
The party has requested for condonation of delay
in installation of capital goods and to allow
regularization of late payment of additional fee to
cover excess imports.
The Committee noted that the party has stated that due to oversight and by mistake, they could not submit the installation certificate to RA in time.
of additional fee to cover excess imports.
The Committee noted that the party has stated that due to oversight and by mistake, they could not submit the installation certificate to RA in time.
The Committee also noted that Para 5.16 (a) of
HBP 2015-20, as amended, provides that if
authorization issued has been utilized for
import of goods in excess of duty saved
than 10%, the RA may accept additional fee to
saved amount, even beyond one month but within
under Para 2.58 of FTP 2015-20 for
(i) condonation of procedural lapse of delay of more than a month in payment of fee for excess duty saved amount as envisaged in the para 5.16(a) of HBP 2015-20, subject to payment of composition fee of Rs. 5000/- per authorization, and to the condition that the excess utilization is not more than 10% of Duty Saved mentioned in the subject EPCG authorisation and
(ii) condonation of procedural lapse of delay of submission of installation certificate subject to payment of composition fee of Rs. 5000/- per authorization and also subject to the condition that RA to verify that no ECA/DRI/Customs action is pending. 36. M/s. Trident Limited.,Ludh iana
01/36/218/242
/AM-
20/EPCG
i.3030012803
dated
11.07.2014
ii.3030013872
dated
30.03.2015
iii.3030014223
dated
16.06.2015
iv.3030015022
dated
28.12.2015
v.3030015033
dated
30.12.2015
vi.3030015391
dated
29.03.2016
Request
for
condonation
of delay in
payment
of
fee
for
excess
utilization.
6.06.2015
iv.3030015022
dated
28.12.2015
v.3030015033
dated
30.12.2015
vi.3030015391
dated
29.03.2016
Request
for
condonation
of delay in
payment
of
fee
for
excess
utilization.
The party has requested to allow regularization of
late payment of additional fee to cover excess
imports.
The Committee noted that in this regard, Para 5.16
(a) of HBP 2015-20, as amended, provides that if
authorization issued has been utilized for
import of goods in excess of duty saved
than 10%, the RA may accept additionalfee to
saved amount, even beyond one month butwithin
5000/- per authorization, and to the condition that the excess utilization is not more than 10% of Duty Saved mentioned in the subject EPCG authorisation.
DGFT = Directorate General of Foreign Trade, DG = Director General, FTP = Foreign Trade Policy, HBPv1 = Handbook of Procedure Vol. I, EO = Export Obligation, EODC = Export Obligation Discharge Certificate, EOP = Export Obligation Period, B.O.E.=Bill of Entry, EPCG = Export Promotion Capital Goods, RA = Regional Authority, BG = Bank Guarantee, FFE = Free Foreign Exchange, IEC = Importer-Exporter Code, DoR = Department of Revenue, IEM = Industrial Entrepreneurs Memorandum, RCMC = Registration-cum-Membership-Certificate.
Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.
No analysis generated for this document yet (analysis runs over brief docs + on-demand). Run build_analysis.py --ids 6422 --apply.