DGFT Minutes
In force — no superseding record on file.
MINUTES OF 1st EPCG COMMITTEE MEETING HELD UNDER THE CHAIRMANSHIP OF SHRI SATYAN SHARDA, ADDITIONAL DIRECTOR GENERAL OF FOREIGN TRADE AT 11.00 AM ON 24.05.2019.
Following officers attended the meeting:
1
Vaibhav Bhatnagar, OSD, Department of Revenue
2
Shri Rajbir Sharma, Joint Director General of Foreign Trade, DGFT
3
Shri Randheep Thakur, Deputy Director General of Foreign Trade, DGFT
II. Minutes of the last Meeting held on 29.03.2019 were confirmed.
III. The Committee deliberated upon all the cases and following decisions were taken:
Sl.
No.
Firm’s Name
and Numbers
EPCG
Authorisation
No.
Subject
Decision of the Committee
1.
M/s.
Sri
Kumarswamy
Mineral
Exports,
Bangalore
01/37/218/371 /AM- 18/EPCG-II i.0730006486 dated 07.01.2008 ii.0730006499 dated 09.01.2008 Request for condonation of maintenance of annual average and regularization/ closure of 02 EPCG authorizations . The Committee observed that the case was first placed in its meeting held on 29.11.2019 and it was decided to defer the matter for examination of the issue on file.
The Committee noted that the party has stated the following:
i. They were regularly exporting "Iron Ore Fines" to China & other countries but due to ban on mining in Karnataka, imposed by the Hon'ble Supreme Court, they were forced to stop all export activities and, therefore, could not maintain Annual Average in respect of the subject EPCG authorisations.
ii.
ataka, imposed by the Hon'ble Supreme Court, they were forced to stop all export activities and, therefore, could not maintain Annual Average in respect of the subject EPCG authorisations.
ii. Para 5.20 of HBP stipulates that whenever a ban/restriction is imposed on export of any product, export obligation period in respect of EPCG authorisations already issued prior to imposition of ban on such export products would stand automatically extended for a period equivalent to duration of such ban, without any composition fee & authorisation holder would not be required to maintain average E.O. as well for the ban period.
iii. Therefore, their AEO be condoned.
The Committee observed that there was no general ban on export of iron ore from the country. The Committee took into account
the report of Department of Mines and Geology, Government of Karnataka, that the Government of Karnataka had initiated several measures to curb the illegal mining and imposed ban on export of iron ore from 10 small ports of Karnataka and subsequently, prohibited issuing mineral despatch permits for Iron ore for the purpose of export. Subsequently, the Hon’ble Supreme Court of India had suspended the mining operations in Bellary and extended the ban to Chitradurga and Tumkur districts.
The Committee noted that the matter has already been examined in consultation with DoR pertaining to request of M/s.MSPL Limited, Hospet, Karnataka. In this connection, DoR vide OM dated 24.10.2018 has stated as following:
Para 5.11 of HBP 2009-14 provides for
automatic extension of export obligation period equivalent to the duration of the ban/restriction imposed on export of any product. In the present case, there appears to be no ban on export of Iron Ore pellets/fines from India except in case of iron ore produced in Karnataka from the mines which were subject matter of SC judgment cited by the petitioner.
The Committee deliberated upon the case
and decided to call from the party the
details regarding location of their mines in
Karnataka, specific and average EO fulfilled
before imposition of the ban.
2.
M/s.
Top
Gear
Garments,
Ludhiana
01/60/162/30/ AM- 20/PRC/EPC G 3030009676 dated 11.06.2012 Condonation for installation certificate issued from Chartered Engineer instead of Central Excise Authority. The Committee took into account submission of the party that they are no longer registered with Central Excise Authority and hence they have obtained installation certificate from the Chartered Engineer instead of Central Excise Authority.
The Committee noted that the party has now submitted the installation certificate from the Chartered Engineer. As per installation certificate, the BOE is dated 15.06.2012 and
cise Authority.
The Committee noted that the party has now submitted the installation certificate from the Chartered Engineer. As per installation certificate, the BOE is dated 15.06.2012 and
date of installation is 10.11.2012.
and noted that the current FTP allows that the Authorization holder can produce the installation certificate from the jurisdictional customs authority or an independent Chartered Engineer, at the option of the authorisation holder and further that where the authorisation holder opts for independent Chartered Engineer’s certificate, he shall send a copy of the certificate to the jurisdictional Customs Authority for intimation/ record.
The Committee decided to recommend to DG for relaxation under Para 2.58 of FTP 2015-20 to allow acceptance of installation certificate from Chartered Engineer, subject to intimation to the Jurisdictional Customs Authority and subject to payment of Rs.5000/- against the Authorisation. Further, RA to verify that no ECA/DRI/Customs action against the party is pending. This has the approval of DG. 3. M/s. Katco Food & Research Laboratory, Ludhiana
01/36/218/149 /AM- 19/EPCG-I i.3030006165 dated 07.01.2010 ii.3030006272 dated 08.02.2010 iii.3030006717 dated 19.05.2010 iv.3030006389 dated 04.03.2010 v.3030006312 dated 18.02.2010 vi.3030006939 dated 02.07.2010 Request for review of the rejection of their request for extension in EOP.
dated 19.05.2010 iv.3030006389 dated 04.03.2010 v.3030006312 dated 18.02.2010 vi.3030006939 dated 02.07.2010 Request for review of the rejection of their request for extension in EOP. The Committee observed that the case was rejected in its meeting held on 24.01.2019 on the ground that the party has not fulfilled any EO in their Zero Duty EPCG authorisations even after three years of expiry of EOP. The extended EOP of Zero Duty EPCG authorisations, if granted, would also have expired by May, 2018.
The Committee noted that in their request for review of the decision taken in its meeting held on 24.01.2019 the party has submitted that the subject EPCG authorisations are under 3% EPCG Scheme having export obligation of 8 years instead of 6 years.
and decided to recommend to DG for relaxation under Para 2.58 of FTP 2015- 20 to allow:
a) extension of block-wise EOP as the
party could not apply to RA within the prescribed time period. This shall be subject to payment of 2% composition fee on duty saved amount in proportion to the shortfall at the end of first block in terms of the provisions of Para 5.8.3 of HBP 2009-14.
This shall be
subject to payment of 2% composition
fee
on
duty
saved
amount
in
proportion to the shortfall at the end of
first block in terms of the provisions
of Para 5.8.3 of HBP 2009-14.
b) extension of EOP on payment of
composition fee equal to 2% of
proportionate duty saved amount on
unfulfilled export obligation or an
enhancement in EO imposed to the
extent of 10% of total EO imposed
at the choice of exporter, for each year
of extension sought in terms of
provisions contained in Para 5.11 (a)
of HBP 2009-14, as the party
could not apply to RA within the
prescribed time period.
This shall be subject to payment of composition fee of Rs.5000/- against each authorisation. Further, RA to verify that no ECA/DRI/Customs action is pending against the EPCG authorisation. 4. M/s. Replica Packarts Pvt Ltd, Pune
01/37/218/296 /AM- 17/EPCG-II
3130005601 dated 22.03.2011 Clarification sought by RA, Pune regarding addition of new export product and extension of block and EO period. RA, Pune, vide letter dated 20.02.2019, has requested to issue instructions with regard to the firm's request for extension of block wise EOP/export obligation period with prospective effect for the period during which the issue was pending with DGFT office.
The Committee has noted the following: i.
for extension of block wise EOP/export obligation period with prospective effect for the period during which the issue was pending with DGFT office.
The Committee has noted the following: i. The party’s request for addition of alternate products in respect of EPCG authorisation No.3130005601 dated 22.03.2011 was
rejected in EPCG Committee meeting held on 31.05.2017 on the ground that the party tried to get EO discharged through third party endorsements in unconnected third party shipping bills and on the basis of alert from DRI .
ii. The request of the party for review of the decision of the EPCG Committee meeting held on 31.05.2017, for withdrawal
of their request for addition of alternate product and application for addition of alternate product for fulfillment of EO afresh was taken up in its meeting held on 04.10.2017 and it was decided to maintain its earlier decision as the party had submitted no new facts.
iii. Subsequently, the EPCG committee
again took up the party’s request for
review of the decision taken in EPCG
committee meeting held on 04.10.2017 in its
meeting held on 05.06.2018 and directed
RA, Pune to examine the request of the firm
based on the nexus certificate issued by
chartered engineer for prospective exports
and with remarks that final redemption
will be subject to DRI enquiry report.
iv.
st of the firm
based on the nexus certificate issued by
chartered engineer for prospective exports
and with remarks that final redemption
will be subject to DRI enquiry report.
iv. RA, Pune vide DO letter dated 18.09.2018 stated that EOP extension and block extension cannot be allowed as per PN35 & PN36 as they stipulate that no extension shall be granted wherever cases are pending with investigative agencies. Now DRI, Bangalore has vide letter dated 14.12.2018 informed that they do not propose to register any offence in this case.
v. DRI, Mangalore has vide their letter
dated 14.12.2018 informed that they do not
propose to register any offence case in the
matter.
and decided to defer it with the direction to seek the current status of DRI enquiry from RA, Pune, particularly to know that whether the DRI has dropped the investigation altogether or they are not registering any offence in this case for the time being. 5. M/s. Madura Coasts Pvt Limited, Bangalore
01/36/218/246 /AM- 3530003618 dated 16.03.2009 Request for condonation of procedural lapse of non – mentioning of supporting manufacturer’ The request of the party is for condonation of procedural lapse of non-mentioning of supporting manufacturer’s name in the shipping bills in respect of EPCG authorisation.
The Committee noted that the capital goods
for condonation of procedural lapse of non-mentioning of supporting manufacturer’s name in the shipping bills in respect of EPCG authorisation.
The Committee noted that the capital goods
19/EPCG-I
s name in the
shipping bills.
imported
under
the
subject
EPCG
authorisation were initially installed at
party’s own manufacturing unit mentioned in
EPCG
authorisation
at
Waterraill,
Papavmasam Mills Post, Ambasraudram.
However, the party has shifted one machine
to their Supporting Manufacturer, viz., M/s.
S & P Thread, 16/2 Mathura Road,
Faridabad-121002 in November 2013 and
another machine to their own unit at Panoli
in Dec 2011 without taking prior permission
from concerned RA.
and decided to reject it as there is no merit in the request for favourable consideration. 6. M/s. S.L.V. Spinning Mills Limited, Bangalore
01/37/218/142 /AM- 19/EPCG-II i.0730005824 dated 11.07.2007 ii.0730005441 dated 27.03.2007 iii.0730005319 dated 28.02.2007 iv.0730005852 dated 18.07.2007 i. Extension of block-wise EOP. ii. Condonation of delay in installation of capital goods and, iii. Condonation of procedural lapse of wrong mention of EPCG authorisation number in shipping bills. The party has requested for condonation of block-wise EO extension, condonation of delay in installation of capital goods and export product description mismatch between license and shipping bills in respect of subject EPCG authorizations.
k-wise EO extension, condonation of delay in installation of capital goods and export product description mismatch between license and shipping bills in respect of subject EPCG authorizations.
The Committee noted that the party has not made any exports even after about four years of expiry of the EOP. The Committee deliberated upon the case and decided to reject it as there is no merit in the request.
M/s. RSB India Limited, Kolkata
01/37/218/197 /AM- 19/EPCG-II 0230000515 dated 03.03.2004 Request for regularisation of shifting of capital goods to new premises on the basis of verification report from Central Excise and installation of imported The Committee noted that the party has claimed to have fulfilled entire EO and submitted the application for redemption to RA on 15.05.2017.
The Committee took into account submission of the party that due to closure of their old unit they have shifted capital goods to the new premises but these are still not installed due to their obsolescence and non- availability of new machinery to make the plant functional. Therefore, the party has requested for acceptance of verification
but these are still not installed due to their obsolescence and non- availability of new machinery to make the plant functional. Therefore, the party has requested for acceptance of verification
capital goods at the new factory premises. certificate issued by Central Excise verifying the existence of capital goods at new premises.
and decided to call a report from the RA including the details of the EO fulfillment by the party. 8. M/s. KSV Cotton Mills (P) Ltd, Tamil Nadu
01/36/218/158 /AM- 18/EPCG-I i.3230008685 dated 22.12.2006 ii.3230008997 dated 05.02.2007 iii.3230009069 dated 12.02.2007 Extension of EOP to 4 years (i.e. 2+2 years) and adjustment of Bank Guarantee enchased in respect of 03 EPCG authorizations . and decided to defer it for calling RA’s comments. 9. M/s. Shyamrai Ecopack Inc., New Delhi
01/37/218/179 /AM- 19/EPCG-II 0530151422 dated 04.03.2010 i. Addition of Woven Fabrics, Made UPS & Readymade Garments with ITCH Codes,
ii.
Extension
of block-wise
EO
and
extension
of
EOP.
and decided to defer it for calling RA’s
report.
10.
M/s.
Rukshmani
Syntex
Pvt
Ltd, Mumbai
01/37/218/177 /AM- 19/EPCG-II i.0330022881 dated 04.05.2009 ii.0330024063 dated 23.10.2009 iii.0330024997 dated 22.01.2010 iv.0330019363 dated 10.03.2008 Request for acceptance of installation certificate issued by Chartered Engineer instead of Central Excise.
d 23.10.2009 iii.0330024997 dated 22.01.2010 iv.0330019363 dated 10.03.2008 Request for acceptance of installation certificate issued by Chartered Engineer instead of Central Excise. The Committee took into account submission of the party that due to procedural lapse they could not obtain installation certificate from Central Excise authorities.
The Committee noted that the party has now submitted the installation certificate from the Chartered Engineer. As per installation certificate issued by Chartered Engineer the capital goods have been installed in stipulated time.
and noted that the current FTP allows that the Authorization holder can produce the
installation certificate from the jurisdictional
customs
authority
or
an
independent
Chartered Engineer, at the option of the
authorisation holder and further that where
the
authorisation holder opts for independent Chartered Engineer’s certificate, he shall send a copy of the certificate to the jurisdictional Customs Authority for intimation/ record.
The Committee decided to recommend to DG for relaxation under Para 2.58 of FTP 2015-20 to allow acceptance of installation certificate from Chartered Engineer, subject to intimation to the Jurisdictional Customs Authority and subject to payment of Rs.5000/- against each Authorisation. Further, RA to verify that no ECA/DRI/Customs action against the party is pending. 11. M/s.
sdictional Customs Authority and subject to payment of Rs.5000/- against each Authorisation. Further, RA to verify that no ECA/DRI/Customs action against the party is pending. 11. M/s. Manjeet Hotels Pvt Ltd, Mumbai
01/36/218/364 /AM- 18/EPCG-I i.0330019008 dated 11.02.2008 ii.0330018138 dated 19.11.2007 Re-fixation of Average Export Obligation in view or force majeure and appropriation of excess foreign exchange earned towards average Export Obligation. The request of the party is for re-fixation of annual average EO in respect of EPCG authorisations issued on 11.02.2008 and 19.11.2007.
The Committee observed that earlier, the request of the party for waiver of annual average was taken up in the EPCG Committee meeting held on 03.01.2019 and was rejected.
and decided that since no new facts have
emerged, the request for re-fixation is
rejected.
12.
M/s.
YSI
Automotive
Pvt
Ltd,
Tamil Nadu
01/37/218/349 /AM- 18/EPCG-II i.0430005407 dated 25.09.2007 ii.0430005560 dated 21.11.2007 iii.0430007277 dated 08.04.2009 iv.0430008225 dated 19.02.2010 v.0430009951 dated 08.06.2011 vi.0430010184 dated 16.08.2011 vii.0430010892 dated 24.02.2012 Request for allowing for fulfilment of EO through third party export and shipping bills of third party exporter towards redemption. The Committee noted that the party has requested for allowing for fulfillment of EO through third party, i.e., M/s.Glovis India Pvt Ltd.
ping bills of third party exporter towards redemption. The Committee noted that the party has requested for allowing for fulfillment of EO through third party, i.e., M/s.Glovis India Pvt Ltd. The third party shipping bills are neither endorsed with the EPCG Authorisations nos. and date, nor is endorsed with M/s.YSI Automotive Pvt Ltd as supporting manufacturer at the time of export.
The Committee further noted that as per RA’s report the party has not submitted complete export documents to RA.
viii.0430012957 dated 24.02.2013
and decided to reject the request as there is no merit in accepting such shipping bills towards export obligation fulfillment. 13. M/s. Sanyo Koreatex Pvt Ltd, New Delhi
01/37/218/06/ AM- 19/EPCG-II i.0530150187 dated 28.10.2009 ii.0530149687 dated 21.08.2009 Request for acceptance of installation certificate from Chartered Engineer instead of Central Excise authority. The Committee observed that the case is being placed second time before the EPCG Committee. The case deferred in EPCG Committee meeting held on 29.08.2018 for RA’s report.
The
Committee
took
into
account
submission of the party that they had
imported capital goods during 2003 when
they was registered under EOU and also with
Central Excise Authority but due to lack of
knowledge, installation certificate was taken
from Chartered Engineer. After surrender of
EOU during AM-10 the registration with
Central Excise was also withdrawn.
Authority but due to lack of knowledge, installation certificate was taken from Chartered Engineer. After surrender of EOU during AM-10 the registration with Central Excise was also withdrawn.
and noted that the current FTP allows that
the Authorization holder can produce the
installation certificate from the jurisdictional
customs
authority
or
an
independent
Chartered Engineer, at the option of the
authorisation holder and further that where
the
authorisation holder opts for independent Chartered Engineer’s certificate, he shall send a copy of the certificate to the jurisdictional Customs Authority for intimation/ record.
The Committee decided to recommend to
DG for relaxation under Para 2.58 of FTP
2015-20 to allow acceptance of installation
certificate from Chartered Engineer, subject
to intimation to the Jurisdictional Customs
Authority and subject to payment of
Rs.5000/-
against
each
Authorisation.
Further,
RA
to
verify
that
no
ECA/DRI/Customs action against the party
is pending.
14.
M/s.
Inter
Globe
Aviation Ltd,
0530146185
dated 23.05.2008
Request
to
regularization
of shifting of
The Committee observed that the case is
being placed second time before the EPCG
Committee. The case was first placed in its
0146185 dated 23.05.2008 Request to regularization of shifting of The Committee observed that the case is being placed second time before the EPCG Committee. The case was first placed in its
New Delhi
01/36/218/279
/AM-
18/EPCG-I
capital goods.
meeting held on 28.09.2018 and was
deferred for examination on file and also
to call from the party as to whether
shifting of the capital good to Mumbai
airport was brought to the knowledge of the
jurisdictional central excise authority or
not, and if not, what were the reasons.
The representative of the party appeared for the PH and presented his case.
The Committee took into account submission of representative of the party that InterGlobe Aviation Limited (IndiG) is the largest airline in India and fliers to 39 domestic and 7 international destinations. The capital goods “Aircraft Pushback Tractor” imported were supposed to be installed at Bangalore and Hyderabad airports. However, at the time of import there was an urgent requirement of one aircraft pushback tractor at Mumbai airport. Therefore, instead of being used at Hyderabad, one Pushback Tractor was shifted to the Mumbai airport. They got the said location added in their IEC in 2010 and in RCMC in 2019.
ai airport. Therefore, instead of being used at Hyderabad, one Pushback Tractor was shifted to the Mumbai airport. They got the said location added in their IEC in 2010 and in RCMC in 2019.
and decided to recommend to DG for 20 to grant ex-post facto approval regarding shifting of capital goods from Hyderabad airport to Mumbai airport, subject to condition that new address is mentioned in the IEC and RCMC and any investigation/adjudication proceeding by DR I/Customs/ ECA action is not pending in respect of the subject EPCG authorisation. Further the party will give intimation to Jurisdictional Customs Authority about the new address and deposit composition fee of Rs.5000/- to RA.
M/s. AP Refinery Pvt Ltd, Ludhiana 3030007619 dated 10.12.2010 Review of the decision taken in EPCG The Committee observed that the request for extension in EOP was first placed in its meeting held on 13.02.2019 and was rejected
0007619 dated 10.12.2010 Review of the decision taken in EPCG The Committee observed that the request for extension in EOP was first placed in its meeting held on 13.02.2019 and was rejected
01/36/218/198
/AM-
19/EPCG-I
Committee
meeting dated
13.02.2019
regarding
extension
of
block-wise
EOP
and
extension
of
EOP
for
2
years.
as the party has not made any exports even
in the 8 years of EOP and did not
approach concerned RA to avail
benefit of Public
Notice
No.35
and
36/2015-20 dated 25.10.2017.
and decided to defer it to call RA’s report regarding status of EO fulfilment. 16. M/s. Rattha Somerset Greenways Pvt Ltd, Chennai
01/37/218/216 /AM- 19/EPCG-II i.0430005892 dated 29.02.2008 ii.0430005960 dated 19.03.2008 iii.0430006107 dated 06.05.2008 iv.0430006227 dated 11.06.2008 v.0430006426 dated 24.07.2008 vi.0430006441 dated 31.07.2008 vii.0430006456 dated 07.08.2008 viii.0430006564 dated 27.08.2008 ix.0430006754 dated 22.10.2008 x.0430006755 dated 22.10.2008 xi.0430006763 dated 22.10.2008 xii.0430006824 dated 10.11.2008 xiii.0430006825 dated 10.11.2008 xiv.0430006882 dated 24.11.2008 xv.0430006934 dated 11.12.2008 xvi.0430006951 dated 16.12.2008 xvii.0430006993 dated 30.12.2008 xviii.0430007064 dated 21.01.2009 xix.0430007102 dated 03.02.2009 xx.0430007217 dated 24.03.2009 Condonation for delay in submission of installation certificate.
30006993 dated 30.12.2008 xviii.0430007064 dated 21.01.2009 xix.0430007102 dated 03.02.2009 xx.0430007217 dated 24.03.2009 Condonation for delay in submission of installation certificate. The Committee took into account submission of the party that their project was proposed to be completed by 2009, but it was delayed due to financial crisis and economic recession and also increased budget in cost of construction.
The Committee noted that as per details of installation certificate submitted by the party the import of capital goods has been done during the period from 26.04.2008 to 22.06.2009 and installation of capital goods has completed during the period from 20.05.2011 to 30.04.2012, a delay of more than 18 months in all authorisations.
and decided to recommend to DG for
20 to allow condonation of delay in
installation of capital goods, subject to
payment of composition fee of Rs. 5000/- to
concerned RA against each authorisation
and
to
the
condition
that
no
ECA/DRI/Customs action has been initiated
against the subject EPCG authorisations.
M/s Pragati Transmission Pvt Ltd, 0730004339 dated 11.07.2006 i. Request for extension in EOP. and decided to defer it with the direction to call RA’s report.
authorisations.
M/s Pragati Transmission Pvt Ltd, 0730004339 dated 11.07.2006 i. Request for extension in EOP. and decided to defer it with the direction to call RA’s report.
Bangalore
01/37/218/242 /AM- 19/EPCG-II ii. Regularizatio n of shifting of capital goods and; iii. Acceptance of installation certificate from chartered engineer instead of central excise. 18. M/s. Aqeel Leathers, Chennai
01/36/218/107 /AM- 15/EPCG-I 0430003704 dated 11.05.2006 Request for counting of exports made by Group company for fulfilment of EO. The representative of the party appeared for the PH and presented his case.
The Committee observed that the request of the party for condonation of EO fulfilled by third party export with alternate product case was taken up in EPCG Committee meeting held on 01.11.2019 and the Committee decided to reject it as exports of alternate product which are manufactured by third party are not permitted for fulfilment of export obligation under EPCG Scheme.
The Committee noted that now the party has requested for counting of exports made by M/s. Mohib Shoes Pvt Ltd, a Group Company of M/s. Aqeel leathers, Chennai, which is a partnership firm.
and decided to defer if for further
examination.
19.
M/s.
Vipra
Closures Pvt
Ltd, Mumbai
01/60/162/928 /AM- 19/PRC/EPC G 0330029963 dated 08.07.2011 Request for condonation of delay in payment of excess utilization fee.
mination.
19.
M/s.
Vipra
Closures Pvt
Ltd, Mumbai
01/60/162/928 /AM- 19/PRC/EPC G 0330029963 dated 08.07.2011 Request for condonation of delay in payment of excess utilization fee. The Committee noted that in the case of the party, the authorisation was utilised for import of goods in excess of duty saved amount by more than 10% by customs authority as per para 5.16 of HBP of FTP 2015-20. They have fulfilled the export obligation and submitted the documents for redemption to the RA and the request is to allow regularisation of late payment of additional fee to cover excess imports.
The Committee took into account the
deficiency letter raised by RA, advising the party to approach EPCG committee for condonation of delay in submission to the request to the RA.
and decided to recommend to DG for relaxation under Para 2.58 of FTP 2015-20 for condonation of procedural lapse of delay in payment of fee for excess duty saved amount as envisaged in Para 5.16(a) of HBP 2015-20. 20. M/s. Xindia Steel Limited, Bangalore
01/37/218/11/ AM- 16/EPCG-II i.0730008401 dated 27.11.2009 ii.0730008402 dated 27.11.2009 iii.0730008512 dated 05.01.2010 iv.0730008541 dated 19.01.2010 v.0730010074 dated 04.05.2011 vi.0730011384 dated 26.06.2012 vii.0730013381 dated 01.05.2014 Request for automatic extension in EOP during the ban period under Para 5.11.3 of HBP 2009-14. The Committee observed that the case is being placed third time before the EPCG Committee.
Request for automatic extension in EOP during the ban period under Para 5.11.3 of HBP 2009-14. The Committee observed that the case is being placed third time before the EPCG Committee. The case was first taken up in EPCG Committee meeting held on 29.08.2018 and it was decided to defer the case with the direction for further examination by DoR. The case was again taken up in EPCG Committee meeting held on 29.11.2018 and following decision was taken:
The Committee noted that the party’s
submission is for automatic EO extension
in the event of ban of export of Iron Ore
in the state of Karnataka. The Committee
observed that there was no general ban on
export of iron ore from the country. The
Committee took into account the report of
Department
of
Mines
and
Geology,
Government of Karnataka stating that the
Government of Karnataka had initiated
several measures to curb the illegal mining
and imposed ban on export of iron ore from
10
small
ports
of
Karnataka
and
subsequently, prohibited issuing mineral
despatch permits for Iron ore for the
purpose
of
export.
Subsequently, the
Hon‟ble Supreme Court of India had
suspended the mining operations in Bellary
and extended the ban to Chitradurga and
Tumkur districts.
The matter has already been examined in consultation with DoR pertaining to M/s.MSPL Limited, Hospet, Karnataka. In
ns in Bellary and extended the ban to Chitradurga and Tumkur districts.
The matter has already been examined in consultation with DoR pertaining to M/s.MSPL Limited, Hospet, Karnataka. In
this connection, DoR vide OM dated
24.10.2018 has stated as following:
“Para 5.11 of HBP 2009-14 provides for
automatic extension of export obligation
period equivalent to the duration of the
ban/restriction imposed on export of any
product. In the present case, there appears to
be no ban on export of Iron ore pellets/fines
from India except in case of iron ore
produced in Karnataka from the mines
which were subject matter of SC judgment
cited by the petitioner. Therefore, the
provision regarding automatic extension of
EO period does not appear to be applicable
in this case”.
and decided to defer the matter for examination of the issue on file. 21. M/s. Farm Implements (India) Pvt Lt, Chennai
01/36/218/57/ AM- 18/EPCG-I 0430005497 dated 31.10.2007 i. Extension of EOP for 2 years, and ii. Inclusion of alternate product and iii. Condonation of delay in installation of capital goods. The party has requested for (i) Extension of EOP for 2 years, (ii) Inclusion of alternate product and (iii) Condonation of delay in installation of capital goods.
The Committee took into account submission of the party that they could not fulfil EO in stipulated time due to world wise recession.
Condonation of delay in installation of capital goods.
The Committee took into account submission of the party that they could not fulfil EO in stipulated time due to world wise recession. However, they have export orders in hand for export of alternate product, i.e., Baler and Soil Testing equipment and are hopeful of fulfilling EO in the extended EOP.
The Committee noted that as per installation certificate submitted by the party the capital goods have been imported vide BOE dated 31.10.2007 and installed on 19.09.2010, after more than three years of import.
and decided to recommend to DG for
20 to allow condonation of delay in
installation of capital goods, subject to
payment of composition fee of Rs. 5000/- to concerned RA against each authorisation and to the condition that no ECA/DRI/Customs action has been initiated against the subject EPCG authorisations.
The party may approach concerned RA for
their request for extension in EOP. RA may
examine the request in terms of provisions
of Public Notice No.36/2015-20 dated
25.10.2017 read with the Public Notice
No.78/2015-20 dated 11.03.2019, on merit.
The request for allowing export of Baler and
soil Testing equipment as an alternate
product may also be considered by RA on
the basis of nexus certificate and relevant
provisions of the FTP.
22.
M/s.
Dr.
for allowing export of Baler and
soil Testing equipment as an alternate
product may also be considered by RA on
the basis of nexus certificate and relevant
provisions of the FTP.
22.
M/s.
Dr.
Reddy’s
Laboratories,
Hyderabad
01/36/218/157 /AM- 19/EPCG-I i.0930004100 dated 12.06.2018 ii.0930004154 dated 26.06.2008 iii.0930004555 dated 21.112008 iv.0930005065 dated 12.08.2009 v.0930005274 dated 30.10.2009 vi.0930007816 dated 04.01.2012 vii.0930008499 dated 24.08.2012 viii.0930008703 dated 29.10.2012 ix.0930009543 dated 05.08.2013 x.0930009704 dated 11.10.2013 xi.0930010014 dated 05.02.2014 xii.0930010104 dated 11.03.2014 xiii.0930010199 dated 22.04.2014 xiv.0930010494 dated 01.08.2014 xv.0930010516 dated 07.08.2014 xvi.0930010677 dated 10.10.2014 xvii.0930003506 dated 04.10.2007 xviii.0930004088 Request for acceptance of installation certificate issued by chartered Engineer instead of Central Excise Authority. The Committee noted that the party has failed to obtain installation certificate from Jurisdictional Central Excise Authority due to procedural lapse at their end and has now submitted the same from the Chartered Engineer.
party has failed to obtain installation certificate from Jurisdictional Central Excise Authority due to procedural lapse at their end and has now submitted the same from the Chartered Engineer.
and noted that the current FTP allows that the Authorization holder can produce the installation certificate from the jurisdictional Customs authority or an independent Chartered Engineer, at the option of the authorisation holder and further that where the authorisation holder opts for independent Chartered Engineer’s certificate, he shall send a copy of the certificate to the jurisdictional Customs Authority for intimation/ record.
The Committee decided to recommend to
DG for relaxation under Para 2.58 of
FTP 2015-20 to allow acceptance of
installation
certificate
from
Chartered
Engineer, subject to intimation to the
Jurisdictional Customs Authority and
subject to payment of composition fee of
Rs.5000/-
against
each
Authorisation.
Further,
RA
to
verify
that
no
ECA/DRI/Customs is pending.
to the
Jurisdictional Customs Authority and
subject to payment of composition fee of
Rs.5000/-
against
each
Authorisation.
Further,
RA
to
verify
that
no
ECA/DRI/Customs is pending.
dated 06.06.2008 xix.0930004958 dated 25.06.2009 xx.0930006369 dated 01.11.2010 xxi.0930006950 dated 25.03.2011 xxii.0930006953 dated 29.03.2011 xxiii.0930008544 dated 05.09.2012 xxiv.0930008949 dated 08.01.2013 xxv.0930009038 dated 07.02.2013 xxvi.0930009253 dated 14.05.2013 xxvii.0930009291 dated 24.05.2013 xxviii.0930009606 dated 30.08.2013 xxix.0930009698 dated 09.10.2013 xxx.0930010103 dated 11.03.2014 xxxi.0930010276 dated 13.05.2014 xxxii.0930010317 dated 28.05.2014 xxxiii.0930010444 dated 14.07.2014 xxxiv.0930010659 dated 30.09.2014 xxxv.0930010913 dated 19.01.2015 xxxvi.0930011058 dated 24.03.2015
M/s. Okay Paper Products Pvt Ltd, Thane
01/37/218/241 /AM- 19/EPCG-II i.0330040347 dated 01.12.2014 ii.0330027904 dated 25.11.2010 Request for permission of regularization of excess DSV. The Committee noted that in the case of the party, the authorisation was utilised for import of goods in excess of duty saved amount by more than 10% by customs authority as per para 5.16 of HBP of FTP 2015-20. They have fulfilled the export obligation and submitted the documents for redemption to the RA and the request is to allow regularisation of late payment of additional fee to cover excess imports.
hey have fulfilled the export obligation and submitted the documents for redemption to the RA and the request is to allow regularisation of late payment of additional fee to cover excess imports.
The Committee took into account the deficiency letter raised by RA, advising the party to approach EPCG committee for condonation of delay in submission to the request to the RA.
and decided to recommend to DG for 20 for condonation of procedural lapse of delay in payment of fee for excess duty saved amount as envisaged in Para 5.16(a) of HBP 2015-20. 24. M/s Novares India Automotive Pvt Ltd, Tamil Nadu
01/60/162/813 /AM-19/PRC 0430010566 dated 29.11.2011 Acceptance of supplies to private bonded warehouse for fulfilment of EO in respect of EPCG authorisation. and decided to defer it for further examination. 25. Tata Steel Ltd, New Delhi
01/37/218/19/
AM-
18/EPCG-II
023000995 dated
10.11.2014
Acceptance of
installation
certificate
issued
by
Chartered
Engineer
instead
of
Central
Excise
The
Committee
took
into
account
submission of the party that due to business
exigency some of the capital goods imported
vide BOE dated 10.12.2014 were urgently
required to be deployed at their projects at
Joda for use for which they have obtained
permission from RA, Kolkata. However,
despite regular follow up Central Excise
authority
has
not
issued
installation
certificate.
their projects at Joda for use for which they have obtained permission from RA, Kolkata. However, despite regular follow up Central Excise authority has not issued installation certificate.
and noted that the current FTP allows that
the Authorization holder can produce the
installation certificate from the jurisdictional
customs
authority
or
an
independent
Chartered Engineer, at the option of the
authorisation holder and further that where
the
authorisation holder opts for independent Chartered Engineer’s certificate, he shall send a copy of the certificate to the jurisdictional Customs Authority for intimation/ record.
The Committee decided to recommend to DG for relaxation under Para 2.58 of FTP 2015-20 to allow acceptance of installation certificate from Chartered Engineer, subject to intimation to the Jurisdictional Customs Authority and subject to payment of composition fee of Rs.5000/- against the
w acceptance of installation certificate from Chartered Engineer, subject to intimation to the Jurisdictional Customs Authority and subject to payment of composition fee of Rs.5000/- against the
Authorisation. Further, RA to verify that no
ECA/DRI/Customs action against the party
is pending.
26.
Tata
Steel
Ltd,
New
Delhi
01/37/218/05/
AM-20/EPCG
0230009213
dated 06.12.2013
Extension
in
time for re-
export of part
of machinery
for repair
The
Committee
took
into
account
submission of the party that they have set up
a Welding laboratory in collaboration with
Ministry of Steel in Brownfield environment
at
Jamshedpur
and
have
imported
Microscope with Nano Indenter under the
subject EPCG authorisation. The import was
completed in December, 2013 and the capital
goods were installed in October, 2015.
Subsequently, one of the parts (Nano
Indentation Head) of Nano Indenter has
become non-functional. The supplier has
agreed to repair the part for which it is to be
sent to their factory at Switzerland. Since
the time period of 3 years has expired the
party has requested to allow extension in
time for re-export of part of the equipment to
foreign supplier at Switzerland for repair and
re-import again against the EPCG licence no.
0230009213 dated 06-12-13
and decided to recommend to DG for 20 to allow re-export of the equipment to supplier, subject to the condition that the equipment will be re-imported within 6 months of posting of minutes of this meeting on the DGFT‟s website.
0 to allow re-export of the equipment to supplier, subject to the condition that the equipment will be re-imported within 6 months of posting of minutes of this meeting on the DGFT‟s website. RA shall re-fix the EO as per para 5.25 (c) of HBP 2015-20. 27. M/s. Uttam Galva Metallics Limited, Mumbai
01/37/218/15/ AM- 20//EPCG i. 0330026093 dated 21.05.2010 ii.0330030839 dated 14.10.2011 iii. 0330032098 dated 14.03.2012 Request for regularization of Group Company Exports. The Committee took into account the submission of the party that due to delay in installation and commissioning of the steel plant they could not fulfil EO in stipulated time. However, they have fulfilled 50% EO through their Group Company, i.e., M/s. Uttam Galva Steels Limited and have applied for regularisation of exports made by them. Further, the RA has stated that as per Company Secretary’s declaration, majority of the Directors of both the companies are common and M/s. Uttam Galva Steel Limited is their Group company.
hem. Further, the RA has stated that as per Company Secretary’s declaration, majority of the Directors of both the companies are common and M/s. Uttam Galva Steel Limited is their Group company.
and decided to remand the case to RA who may deal with the request as per the applicable provisions of the Policy. 28. M/s. Ceeyes Engineering Industries Pvt. Ltd, Tamil Nadu
01/36/218/240 /AM- 19//EPCG-I
i.0430006196
dated 04.06.2008
ii.
0430006195
dated 04.06.2008
iii. 0430005835
dated 21.02.2008
iv. 0430005089
dated 20.06.2007
i. waiver of
the
maintenance
of
Annual
Average
exports
which is not
the same and
similar Nexus
product.
ii.
Consideration
of
Group
Company
exports
for
fulfilment of
Annual
Average.
The request of the party is for (i) waiver of
the maintenance of Annual Average exports
which is not the same and similar nexus
product or (ii) consideration of Group
Company exports for fulfilment of Annual
Average.
The Committee took into account submission
of the party that their company had 2
manufacturing facilities, one at Trichy for the
manufacture of 'Cam Shafts' and the other at
Chennai for the manufacture of 'Refrigerant
Pumps'. At the time of submitting application,
they have submitted the past export details of
'Refrigerant Pump's done by their Chennai unit
on which the Annual average is fixed by the
Licensing authority whereas the nexus product
of export is 'Cam Shafts', which is totally
different from the product of past exports.
This is happened by mistake.
Annual average is fixed by the
Licensing authority whereas the nexus product
of export is 'Cam Shafts', which is totally
different from the product of past exports.
This is happened by mistake.
Subsequently, due to bifurcation of the Chennai unit as a separate company the annual average could not be maintained though they fulfilled Specific Export Obligation by exporting the nexus product 'Cam Shaft'.
and decided to reject the request for consideration of Group Company exports for fulfilment of Annual Average as there is no merit in the request.
The request of the party for waiver of the
maintenance of Annual Average exports
which is not the same and similar Nexus
product is remanded back to RA to examine
the request on the basis of nexus certificate
and relevant provisions of the FTP.
M/s Kumaragiri Electronic 0430002924 dated 12.05.2005 Condonation of procedural lapse for not- The Committee observed that the request of the party was placed before the EPCG Committee meeting held on 26.09.2016
ronic 0430002924 dated 12.05.2005 Condonation of procedural lapse for not- The Committee observed that the request of the party was placed before the EPCG Committee meeting held on 26.09.2016
Ltd., Chennai
01/36/218/61/ AM- 15/EPCG-I mentioning the name and authorization number in third party shipping bill no. 3884210 dt. 03.02.2013. wherein committee allowed counting of the shipping bill no. 3884210 dated 03.02.2013 for fulfilment of EO in respect of said authorization.
Subsequently,
in
response
to
EPCG
Committee decision dated 26.09.2016, RA,
Chennai vide their e-mail dated 18.11.2016
pointed out that the shipping bill mentioned
in the decision of the Committee is a third
party shipping bill, and the name of
manufacturer and the EPCG authorization
no. was not indicated in the shipping bill.
The said decision of EPCG Committee does
not cover the lapse relating to mention of
third party in the shipping bill. This may
require a specific decision of EPCG
Committee.
The case was again taken up in the EPCG Committee meeting held on 29.03.2017.
The representative of DoR stated that they need to get the ARE-1 verified from the concerned Jurisdictional Central Excise authority. Therefore, the Committee decided to defer the case and advised RA, Chennai to take no further action till the verification report is received and further decision is taken.
DoR, vide email dated 20.05.2019 has stated that upon perusal it is noticed that the EPCG Authorisation No. is not mentioned on the ARE1.
ion report is received and further decision is taken.
DoR, vide email dated 20.05.2019 has stated that upon perusal it is noticed that the EPCG Authorisation No. is not mentioned on the ARE1. This fact may be brought to the notice of EPCG Committee for further examination of the petitioner's request during the meeting.
and decided to reject it as there is no merit in the request for favourable consideration.
M/s.
Assam
Carbon
Products
i.0230001033
dated 16.06.2005
ii.
0230001133
Condonation
of procedural
lapse
for
The
Committee
noted
that
the
EPCG
authorisation
No.0230000747
dated
15.10.2004 from which excess exports are
intended to be taken for redemption of other
Limited, Guwahati
dated 02.09.2005 iii. 0230001332 dated 08.02.2006 mentioning wrong EPCG authorisation number in Shipping Bills EPCG authorisations has already been redeemed on 30.01.2017. However, the party has requested for counting of shipping bills dated after 31.01.2017 in which EPCG authorisation No.0230000747 dated 15.10.2004 was continued to be mentioned by mistake.
The Committee deliberated upon the case and decided to recommend to DG for relaxation under Para 2.58 of FTP 2015-20 to allow condonation of wrong mentioning of the EPCG Authorisation No.0230000747 dated 15.10.2004 in the Shipping Bills dated after 15.10.2004 (details of SBs to be considered will be sent to the RA separately).
tion of wrong mentioning of the EPCG Authorisation No.0230000747 dated 15.10.2004 in the Shipping Bills dated after 15.10.2004 (details of SBs to be considered will be sent to the RA separately).
RA to facilitate EODC/closure of cases subject to the condition that:
(i) Conditions of clubbing as well as
EODC are met with;
(ii) No free shipping bills/third party
exports are to be counted;
(iii) There is no double counting of exports
and payment of a composition fee of
Rs.200/- per export document is made
by the party; and
(iv) The excess shipping bills, i.e., on
which the already redeemed EPCG
Authorisation No. 0230000747 dated
15.10.2004 is mentioned and which are
to be counted/utilised towards the EO
fulfilment
of
other
EPCG
authorisation, were not submitted to
the RA for redemption of EPCG
Authorisation No. 0230000747 dated
15.10.2004. If these shipping bills had
already been submitted to RA at the
time of application of redemption of
the said EPCG Authorisation, even if
in excess, they should not be now
considered for redemption of other
Authorisations.
31.
M/s. Shiv Shakti
Thermo
Pvt.
Ltd,
Kantkabirnagar
1530000683 dated 07.03.2011 Request for acceptance of FIRE in lieu of E BRC for The Committee noted that the party has made exports to Nepal by road and stated that as their export document is bill of export, and not shipping bill, they have not
FIRE in lieu of E BRC for The Committee noted that the party has made exports to Nepal by road and stated that as their export document is bill of export, and not shipping bill, they have not
01/37/218/121/
AM-19/EPCG-
II
grant
of
EODC.
been issued e-BRC and instead they have
FIRC which may be accepted for EODC.
The Committee decided to call for a report
from RA on these issues.
32.
M/s.
Volkswagen
India Pvt. Ltd,
Pune
01/60/162/23/
AM-
20/PRC/EPC
G
NA
Request
for
exemption
from
maintenance
of
average
level of export
achieved
under EPCG
scheme.
The Committee noted that the party is
manufacturing passenger cars on "PQ"
manufacturing platform since the year
2008 and intend to discontinue the current
car models on PQ manufacturing platform
and launch new models on "MQB-AD"
manufacturing platform, which is more
advanced than the existing technology and
that from the year 2021 onwards the new car
models cannot be manufactured with the old
technology. The company seeks waiver of
annual average export obligation as it will be
fixed on the basis of products manufactured
on old platform which the company intends
to discontinue.
and decided to reject it as there is no merit
in the request.
33.
M/s.
PI
Cottex,
Ludhiana
01/36/218/08/ AM-20/EPCG
3030014695 dated 16.09.2015 Request for condonation of delay in payment of excess duty saved amount.
merit
in the request.
33.
M/s.
PI
Cottex,
Ludhiana
01/36/218/08/ AM-20/EPCG
3030014695 dated 16.09.2015 Request for condonation of delay in payment of excess duty saved amount. The Committee noted that in the case of the party, the authorisation was utilised for import of goods in excess of duty saved amount by more than 10% by customs authority as per para 5.16 of HBP of FTP 2015-20. They have fulfilled the export obligation and submitted the documents for redemption to the RA and the request is to allow regularisation of late payment of additional fee to cover excess imports.
The Committee took into account the deficiency letter raised by RA, advising the party to approach EPCG committee for condonation of delay in submission to the request to the RA.
and decided to recommend to DG for 20 for condonation of procedural lapse of delay in payment of fee for excess duty saved amount as envisaged in Para 5.16(a) of HBP 2015-20.
uest to the RA.
and decided to recommend to DG for 20 for condonation of procedural lapse of delay in payment of fee for excess duty saved amount as envisaged in Para 5.16(a) of HBP 2015-20.
M/s. Shri Jagannath Steels & Power Ltd, Keonjhar.
01/37/218/166 /AM- 18/EPCG-II 2330001011 dated 05.06.2014 Review of the decision taken in EPCG Committee meeting held on 03.01.2019 regarding condonation of delay in submission of installation certificate. The representative of the party appeared for the PH and presented his case.
The Committee observed that the request was taken up in the EPCG Committee meeting held on 18.04.2018 it was decided to defer the case for seeking comments from DoR.
The case was again taken up in its meeting held on 12.07.2018 and deferred again as the report from DoR was not received.
In its meeting held on 03.01.2019 it was decided that there was no need to wait for the report from DoR as there is no merit in the justification of the party in installing the machinery after a gap of three years. Therefore, the Committee decided to reject the case.
The Committee deliberated upon the review petition and decided to defer it to examine the DRI notice issued to the party. 35. M/s. Indian Immunologica ls Limited (ILL), Hyderabad
01/36/218/04/ AM-20/EPCG 0930005681 dated 18.03.2010 Condonation of delay in installation of capital goods The Committee noted that the party has claimed to have completed EO in stipulated time.
6/218/04/ AM-20/EPCG 0930005681 dated 18.03.2010 Condonation of delay in installation of capital goods The Committee noted that the party has claimed to have completed EO in stipulated time. The Committee took into account submission of the party that the delay in installation of capital goods occurred due to non-readiness of Plant and Building. However, the party has obtained the installation certificate from jurisdictional Central Excise Authorities on 09.07.2013 which was after 3 years 12 days. RA Hyderabad, has issued them a deficiency letter dated 12.03.2019 advising them to approach DGFT HQ New Delhi for condonation of delay. The capital goods have been imported vide BOE dated 28.06.2010 and installed on 09.07.2015.
and decided to recommend to DG for
20 to allow condonation of delay in
installation of capital goods, subject to
payment of composition fee of Rs.5000/- to
concerned RA against each authorisation and to the condition that no ECA/DRI/Customs action has been initiated against the subject EPCG authorisations. 36. M/s. Sankalp Engineering & Services Pvt. Ltd, Pune
01/37/218/153 /AM- 19/EPCG-II i.3130002952 dated 08.02.2008 ii.
action has been initiated against the subject EPCG authorisations. 36. M/s. Sankalp Engineering & Services Pvt. Ltd, Pune
01/37/218/153
/AM-
19/EPCG-II
i.3130002952
dated 08.02.2008
ii.
3130003180
dated 05.06.2008
iii.3130004216
dated 05.10.2009
iv.3130004888
dated 18.06.2010
v.3130006787
dated 10.08.2012
vi.3130006569
dated
07.05.2012
vii.3130006271
dated 11.12.2008
viii.3130006937
dated 15.10.2012
ix.3130007127
dated 11.01.2013
x.3130007252
dated 14.03.2013
xi.3130007251
dated 14.03.2013
Condonation
of procedural
lapse
of
mentioning
incorrect
authorization
number
in
shipping bills.
The Committee noted that there are a large
number of shipping bills with procedural
lapse.
and decided to defer it for calling a detailed report from RA. 37. M/s. Rampal Scientific Dyers, Ludhiana
01/37/218/103 /AM- 18/EPCG-II 3030004818 dated 17.12.2008 Condonation of procedural lapse of not mentioning the manufacture’s name on shipping bill The Committee observed that the case was deferred in its meeting held on 03.01.2019 to examine the request on file.
The Committee noted that the party has requested for condonation of procedural lapse of not mentioning the supporting manufacture’s name on third party shipping bill.
and decided to reject as there is no merit in the request.
M/s.
ondonation of procedural lapse of not mentioning the supporting manufacture’s name on third party shipping bill.
and decided to reject as there is no merit in the request.
M/s. Balkrishna Industries Ltd, Mumbai 0330045003 dated 04.08.2016 Request for waiver from submission of installation The Committee noted that the subject EPCG authorisation issued on 04.08.2016 is valid till 04.08.2019. The three years period for installation of spares is also valid.
01/36/218/167 /AM- 19//EPCG-I certificate in respect of spare parts.
and decided that the request is premature as no cause of action has arisen as of now. 39. M/s. Goan Hotels & Reality Pvt. Ltd, Mumbai
01/60/162/934 /AM-19 0330022589 dated 09.03.2009 Request for condonation of delay in installation of capital goods. The Committee took into account submission of the party that their labour unrest at construction site of a Five Star Hotel Project resulted in the delayed installation of capital goods.
The Committee noted that RA, Mumbai vide Deficiency letter dated 24.11.2017 stated that “the installation is beyond 18 months from the date of imports, hence it cannot be covered under Public Notice No.37/2015-20 dated 25.10.2017.
and decided to recommend to DG for
20 to allow condonation of delay in
installation of capital goods, subject to
payment of composition fee of Rs.
otice No.37/2015-20 dated 25.10.2017.
and decided to recommend to DG for
20 to allow condonation of delay in
installation of capital goods, subject to
payment of composition fee of Rs. 5000/- to
concerned RA against each authorisation
and
to
the
condition
that
no
ECA/DRI/Customs action has been initiated
against the subject EPCG authorisations.
40.
M/s Jiwan Polycot, Haridwar
01/36/218/164
/AM-
15/EPCG-I
0530141250
dated 08.06.2006
Review of the
decision
of
EPCG
Committee
meeting held
on 13.02.2019
for extension
in
EOP
beyond 2+ 2
years/waiver
of applicable
interest
The Committee observed that party has
obtained block wise extension in EOP and
extension in EOP for two years in EPCG
Committee meeting held on 22.01.2015. The
party has also obtained second extension in
EOP for two years in EPCG Committee
meeting held on 19.12.2016. Their request
for further extension in EOP beyond 2+2
already granted was taken up in the EPCG
Committee meeting held on 13.02.2019 and
was rejected as there was no merit in the
request.
and decided to reject it as the party has not
submitted new facts and circumstances that
warrant review of the earlier decision.
41.
M/s.
Sri
Jayajothi
Textile Mills
(P) Ltd, Tamil
i.3530002091
dated 31.10.2006
ii.
3530002090
dated 31.10.2006
Review of the
decision taken
in
EPCG
committee
meeting
held
The Committee observed that the request of
the party was rejected in its meeting held on
29.11.2018 as there was no merit in the
claims of the party.
on taken in EPCG committee meeting held The Committee observed that the request of the party was rejected in its meeting held on 29.11.2018 as there was no merit in the claims of the party.
Nadu
iii. 3530001982
dated 05.09.2006
iv. 3530001906
dated 26.07.2006
on
29.11.2018 re
garding
(i)
condonation of
procedural
lapse
of
mentioning
different
EPCG
authorization
number,
(ii).
non-
mentioning of
EPCG
authorization
number in the
shipping bills
and for
(iii)
accounting
third
party
shipping bills
assessed under
drawback
scheme for EO
fulfilment
Now, the party has requested for review of the decision taken in EPCG committee meeting held on 29.11.2018 regarding (i)condonation of procedural lapse of mentioning different EPCG authorization number, (ii).non-mentioning of EPCG authorization number in the shipping bills and (iii) accounting third party shipping bills assessed under drawback scheme for EO fulfilment.
and decided to reject it as the party has not submitted new facts and circumstances that warrant review of the earlier decision. 42. M/s.VVF Limited, Mumbai
01/37/218/267 / AM- 16/EPCG- II 03/36/021/00109 /AM-00 & 18 others as per Appendix- 5 (Page 6) of the enclosed booklet with letter dated 28.4.2017 of the firm.
/s.VVF Limited, Mumbai
01/37/218/267 / AM- 16/EPCG- II 03/36/021/00109 /AM-00 & 18 others as per Appendix- 5 (Page 6) of the enclosed booklet with letter dated 28.4.2017 of the firm. Request for condonation of various procedural deficiencies as per summary of RA letters for 19 EPCG authorizations at Appendix 5 (Page 6) with brief summary of issues at Appendix – 6 (Pages 7 – 10) and authorization- wise details of issues/request s for 19 EPCG and decided to defer it for further examination on file.
authorizations at Appendices – 10A (1) to 10A (19) and Appendix 10B (Pages 31 to 142) of the enclosed booklet with letter dated 28.4.2017 of the firm. 43. M/s. Sundaram Textiles Ltd, Madurai
01/37/218/99/ AM- 19/EPCG-II Applied for EPCG Authorisation Writ Appeal Nos. 2421 to 2425 of 2010
M/s.
Sundaram
Textiles Ltd.
vs. Union of
India
and
others - High
Court
of
Madras
judgment
dated
01.08.2018 to
consider the
request
on
merits
for
grant
of
EPCG licence
for import
of
capital
machineries
during as per
Import
and
Export Policy,
1990-93
The Committee noted that the Division
Bench of the Hon’ble High Court of
Judicature at Madras has passed a Common
Judgment dated 01.08.2018 in the Writ
Appeal Nos. 2421 to 2425 of 2010 preferred
by M/s Sundaram Textiles Ltd., Chennai.
The respondents are M/o Commerce, M/o
Finance,
DGFT
and
Customs
Deptt.,
Chennai.
ted 01.08.2018 in the Writ
Appeal Nos. 2421 to 2425 of 2010 preferred
by M/s Sundaram Textiles Ltd., Chennai.
The respondents are M/o Commerce, M/o
Finance,
DGFT
and
Customs
Deptt.,
Chennai. The judgement dated 01.08.2018
has been passed by the Division Bench
against the common order dated 20.04.2010
passed by the Learned Single Judge of the
High Court of Judicature at Madras
whereby the Learned Single Judge had
dismissed the Writ Petition Nos. 23722 to
23726 of 2004 filed by Sundaram Textiles
Ltd.
- The Division Bench, while allowing the
above Writ Appeals, has directed the DGFT to consider grant of EPCG authorisation to the Petitioner in the light of the Public Notice No. 59-ITC (PN)/90-93 dated 7.9.1990 for the relevant period it was sought for (Export Import Policy 1990-
- and without reference to any
subsequent policy prevailing.
- In this connection, the Committee further
noted the following:
i. Para 197 of the Export and Import Policy Vol.I, 1990-93 provided for import of capital goods at 25% concessional rate of
n this connection, the Committee further
noted the following:
i. Para 197 of the Export and Import Policy Vol.I, 1990-93 provided for import of capital goods at 25% concessional rate of
custom duty under EPCG Scheme. The Provisions are as under:
“197 (1) With a view to reduce the incidence of high capital costs on export prices and thereby making exports competitive in the international market, import of capital goods upto a maximum CIF value of Rs.10 crores will be permitted at concessional rate of customs duty of 25% of CIF value of the capital goods imported. The applications for this purpose shall be considered by an inter-ministerial committee headed by the CCI&E.
(2) The above facility will be
available to registered manufacturer-
exporters who have been regularly
exporting for a period of not less
than three years. The applicant will
have
to
undertake
an
export
obligation equivalent to three times
the CIF value of capital goods
permitted
for
import
and
the
obligation will have to be fulfilled
within a period of four years from
the date of import of the capital
goods. This EO will be independent
of any other obligations undertaken
by the applicant separately and will
be over and above the average level
of exports made by him in the
preceding three licensing
years.
Only direct exports of the products
manufactured through the Capital
Goods permitted for import shall be
counted
for
fulfilment
of
the
obligation. Third party exports will
not be accepted under this scheme.
ts of the products
manufactured through the Capital
Goods permitted for import shall be
counted
for
fulfilment
of
the
obligation. Third party exports will
not be accepted under this scheme.
(3) Detailed Policy/Procedure in this
regard, will be notified separately.”
ii.
Notification No.169/90-Cus dated
3.5.1990: General Exemption No. 184:- By
this Notification, the Central Government
gave concessional rate of import duty
for capital goods at 25% ad valorem and
exempted the imports totally from any
additional duty provided the conditions laid
down towards export obligations were
fulfilled and that in the subsequent four
years there must be exports of the value of
about three times the CIF value of the
capital goods imported and for which a
legal agreement and an indemnity bond
towards exempted duty were executed by
the Importer as per Para 197 of the
Import & Export Policy 1990-93.
iii.
A
Public
Notice
No.
59-ITC
(PN)/90-03 was issued on 7th Sept, 1990
bringing an amendment to the Policy (Para
197) that this facility may also be allowed on
merits, to other manufacturers who do not
fulfill
the
past
three
years
export
performance criteria, as laid down, subject to
such conditions as may be prescribed by the
Govt.
iv.
llowed on
merits, to other manufacturers who do not
fulfill
the
past
three
years
export
performance criteria, as laid down, subject to
such conditions as may be prescribed by the
Govt.
iv.
The Petitioner in the meanwhile had
made two applications dated 20.08.1990 and
dated 17.09.1990 to the erstwhile Office of
the Chief Controller of Imports and Exports
(CCI&E),
now
called
the
Directorate
General of Foreign Trade, for import of 6
capital goods machineries for a CIF value of
Rs. 129.8 lakhs and 4 capital goods
machineries for CIF value of Rs. 57.50 lakhs
at 25% concessional rate of duty.
v.
Before
any
decision
could
be
conveyed to the Petitioner on the status of
his application, he had imported capital
machinery and kept it in bonded warehouse.
The Petitioner also approached the Hon’ble
High Court of Judicature at Madras in WP
No. 16596 of 1990 with a request to issue
directions to permit clearance of one
Autoconer
capital
machinery
already
imported. The High Court of Madras vide
order dated 31.10.1990 permitted clearance
of the capital machinery under certain
conditions, observing that no decision has so
apital machinery already imported. The High Court of Madras vide order dated 31.10.1990 permitted clearance of the capital machinery under certain conditions, observing that no decision has so
far been taken on the petitioner’s request
dated 20.08.1990.
vi.
The
Petitioner’s
request
was
considered by the EPCG Committee and
vide letter dated 20.11.1990, rejection was
conveyed to them on the ground that they
have a meagre export performance for one
year only whereas the value of Capital
Goods applied for is large.
vii.
The Petitioner, vide letter dated
15.01.1991 requested the Office of CCI&E
to reconsider the above rejection dated
20.11.1990 and also requested that their
applications
dated
20.08.1990
and
17.09.1990 for import of a total of 10 capital
machineries primarily on the ground that
they have made direct as well as indirect
exports; that though as per para 197 of the
Policy, third party exports would not count
towards
discharge
of
EO
of
Manufacture/Exporter,
their
case
was
entirely different as a portion of the export
was made through Export House and
Merchant Exporters and further they had not
claimed any REP benefit against such
exports.
viii.
their
case
was
entirely different as a portion of the export
was made through Export House and
Merchant Exporters and further they had not
claimed any REP benefit against such
exports.
viii.
Their request letter dated 15.01.1991
for review was rejected vide letter dated
31.01.1991 saying that their case was
considered
by
the
EPCG
Committee
carefully but was rejected on the ground that
they had a meagre export performance for
one year only whereas the value of capital
goods licence applied for was large and
moreover, third party exports are not to be
accepted under this scheme.
ix.
The Hon’ble High Court vide order
dated 09.11.1998 in WP No. 2243/1991 set
aside the rejection of their applications
dated 20.08.1990 and 17.9.1990, stating
that the action of the respondents in rejecting
these applications cannot be held to be valid
as the impugned order has not taken into
consideration
the
Public
Notice
No.59/ITC/PN/90-93 dated 07.09.1990 bringing an amendment to the Policy (Para 197) that this facility may also be allowed on merits, to other manufacturers who do not fulfill the past three years export performance criteria, as laid down, subject to such conditions as may be prescribed by the Govt. The Court directed this office to pass fresh order taking into consideration the Public Notice No. 59/ITC/PN/90-93 dated 07.09.1990. x.
ject to
such conditions as may be prescribed by the
Govt. The Court directed this office to pass
fresh order taking into consideration the
Public Notice No. 59/ITC/PN/90-93 dated
07.09.1990.
x.
In pursuance of the above Court
Order, the Petitioner approached this office
and
submitted
certain
documents
for
consideration of their request for issuance of
the EPCG Authorisation.
xi.
This
office,
vide
letter
dated
22.03.2002, again rejected their application
dated 20.08.1990 stating that their request
was considered by the EPCG Committee in
consultation with the Policy Division of this
Office as well as Ministry of Law, Justice
and Company Affairs (Deptt. Of Legal
Affaires) and the Committee had decided to
reject the request for issuance of the licence
under 25% concessional duty scheme stating
that licence under 25% duty scheme as per
the policy prevailing during 1990-91 cannot
be issued under the current policy which
provides for EPCG facility with 5% duty
concession with different export obligation/
period.
xii.
Thereafter, the petitioner filed WP
No.23724/2004 in the High Court of
Judicature at Madras challenging the
rejection order dated 22.03.2002 and again
requesting for issuance EPCG licence under
25%
concessional
duty
scheme.
The
Petitioner also filed WP Nos. 23722, 23723,
23725 and 23726 of 2004 for refund of the
excess Customs Duty paid.
xiii.
On
20.04.2010,
a
Common
judgment in WP Nos. 23722 to 23726 of
2004 was passed by High Court of
722, 23723, 23725 and 23726 of 2004 for refund of the excess Customs Duty paid. xiii. On
20.04.2010,
a
Common
judgment in WP Nos. 23722 to 23726 of
2004 was passed by High Court of
Judicature at Madras, dismissing their Writ Petitions on the ground that the claim of the petitioner that PN. No. 59 dated 07.09.1990 by way of amendment permitted even a new industry to apply for a licence to import capital goods under EPCG licence vide Para 197 of Exim Policy cannot be accepted as the amendment brought out at para 197 in PN. No. 59 date 07.09.1990 states that this facility may also be allowed on merits, to other manufacturers who do not fulfill the past three years export performance criteria, as laid down, subject to conditions laid down by the Government and that para 197 never said that the cases with no export performance or little export performance shall be considered. The Court also observed that the question of fulfilling the export obligation within a given period arises only when import licence certificate is issued by the licensing authority and that further the question of fulfilling export obligations does not arise in this case since the licence was not issued to the petitioner, as the petitioner company failed to satisfy the requirement for import as per the existing policy provisions. xiv. The petitioner filed appeals in WA Nos. 2421 to 2425 of 2010 in High Court of Judicature at Madras against the common judgment dated 20.04.2010. xv.
as per the existing policy provisions.
xiv.
The petitioner filed appeals in WA
Nos. 2421 to 2425 of 2010 in High Court of
Judicature at Madras against the common
judgment dated 20.04.2010.
xv.
On 01.08.2018, the Division Bench
of the High Court allowed the writ
appeals, including the writ appeal No.23724
of 2004 which was against the DGFT
rejection order dated 22.03.2002 and for
issuance of EPCG licence under 25%
concessional duty scheme. The operative
part of the Oder dated 01.08.2018 is
reproduced below:
“……….., we are of the view that
the order of the learned single Judge
is also not correct. Accordingly, the
order dated 22.03.2002 stands set
aside and consequently, the order of
the learned single Judge also stands
set aside. We once again remit the matter back to the third respondent for fresh consideration. The third respondent is directed to consider the grant of licence to the appellant for the relevant period for which it was sought for and which has been rejected on the earlier occasion in the light of the Public Notice No. 59/ITC/90-93 dated 07.09.1990 without reference to any subsequent policy prevailing thereafter. This is for the reason that the third respondent is duty bound to consider the policy which was available at the time of passing the earlier impugned order dated 20.11.1990, which was confirmed by the order dated 31.01.1991 for the relevant period………..” 4.
der
the policy which was available at the
time of passing the earlier impugned
order dated 20.11.1990, which was
confirmed
by
the
order
dated
31.01.1991
for
the
relevant
period………..”
4.
In view of the foregoing, it was
decided that to understand the point of view
of the petitioner afresh, it would be better to
call the Petitioner for a hearing before the
EPCG Committee to explain the case. The
meeting of the EPCG Committee was
scheduled on 13.02.2019. The representative
of the Petitioner, Mr. S. Ramamoorthy,
F.C.A., explained the case in detail to the
members of the EPCG Committee.
5.
It was decided to consider the matter
in the EPCG Committee again. The matter
was discussed at length in the EPCG
Committee in its meeting. In this connection,
the Committee noted that:
(a) the first rejection order dated 20.11.1990
issued by the DGFT was on the ground that
the
petitioner
had
a
meagre
export
performance for one year only whereas the
value of capital goods applied for was
large.
(b) the second rejection order dated
31.01.1991 issued by the DGFT was on the
ground that they had a meagre export
performance for one year only whereas the
value of capital goods licence applied for
he second rejection order dated 31.01.1991 issued by the DGFT was on the ground that they had a meagre export performance for one year only whereas the value of capital goods licence applied for
was large and moreover, third party exports
were not to be accepted under this scheme.
(c) The Hon’ble High Court vide order dated
09.11.1998 had set aside the rejection by
this office stating that the action of the
respondents in rejecting these applications
cannot be held to be valid as the impugned
order has not taken into consideration the
Public Notice No. 59/ITC/PN/90-93 dated
07.09.1990 bringing an amendment to the
Policy (Para 197) that this facility may also
be allowed on merits, to other manufacturers
who do not fulfill the past three years export
performance criteria, as laid down, subject to
such conditions as may be prescribed by the
Govt. The Court had directed this office to
pass fresh order taking into consideration the
Public Notice No. 59/ITC/PN/90-93 dated
07.09.1990.
(d)
This
office
again
rejected
their
application, vide rejection letter dated
22.03.2002, stating that their request for
issuance
of
the
licence
under
25%
concessional duty scheme as per the policy
prevailing during 1990-91 could not be
issued under the current policy which
provided for EPCG facility with 5% duty
concession with different export obligation/
period.
he policy
prevailing during 1990-91 could not be
issued under the current policy which
provided for EPCG facility with 5% duty
concession with different export obligation/
period.
(e) The High Court, vide its order dated
01.08.2018, has set aside the DGFT rejection
order dated 22.03.2002 primarily on the
ground that whereas the earlier Court
direction was to consider petitioner’s request
in the light of the Public Notice No.
59/ITC/90-93 dated 07.09.1990, it was
rejected on the ground that issuance of the
licence under 25% concessional duty scheme
as per the policy prevailing during 1990-91
could not be issued under the current
policy which provided for EPCG facility
with 5% duty concession with different
export obligation/ period, without examining
the case in terms of the provisions of Public
Notice No. 59/ITC/90-93 dated 07.09.1990.
That is why the Court has again remitted the
matter back to us for fresh consideration in
the light of the Public Notice No.59/ITC/90-
isions of Public Notice No. 59/ITC/90-93 dated 07.09.1990. That is why the Court has again remitted the matter back to us for fresh consideration in the light of the Public Notice No.59/ITC/90-
93 dated 07.09.1990 without reference to any
subsequent policy prevailing thereafter.
(f) Therefore, at this stage, in pursuance of
the Court order dated 01.08.2018, the matter
is being examined in the EPCG Committee
for fresh consideration of the petitioner’s
claim
for
issuance
of
the
EPCG
Authorisation in the light of the provisions of
the Public Notice No. 59/ITC/90-93 dated
07.09.1990.
In this regard, the Committee noted that:
6.1 Under Para 197 of the Export and Import Policy Vol. I, 1990-93 import of capital goods at 25% concessional rate of custom duty under EPCG Scheme could be allowed, inter-alia, to (i) registered manufacturer-exporters who have been regularly exporting for a period of not less than three years and further that (ii) only direct exports of the products manufactured through the Capital Goods permitted for import shall be counted for fulfilment of the obligation and, therefore, third party exports could not be accepted under this scheme;
6.2 Public Notice No. 59/ITC/90-93 dated 07.09.1990 brought about an amendment to the Policy Para 197 to the extent that the facility could also be allowed on merits, to other manufacturers who did not fulfill the past three years export performance criteria, as laid down, subject to such conditions as may be prescribed by the Govt.
also be allowed on merits, to other manufacturers who did not fulfill the past three years export performance criteria, as laid down, subject to such conditions as may be prescribed by the Govt.
6.3 Public Notice No. 59/ITC/90-93 dated 07.09.1990 did not dilute or even touch the other major requirement of the EPCG Scheme that only direct exports of the products manufactured through the Capital Goods permitted for import shall be counted for fulfilment of the obligation and, therefore, third party exports could not be accepted under this scheme;
6.3 The petitioner has admitted that they have made direct as well as indirect exports and argued that though as per para 197 of the Policy, third party exports would not count towards discharge of EO of Manufacture/Exporter, their case was entirely different as a portion of the export was made through Export House and Merchant Exporters and further they had not claimed any REP benefit against such exports;
6.4 The Committee noted that the Hon’ble Court in its order dated 01.08.2018 has directed that the party’s claim for issuance of the EPCG authorisation in terms of Public Notice No. 59/ITC/90-93 dated 07.09.1990 must be considered. At the same time, the Hon’ble Court has not said that the other vital conditions for issuance of the EPCG Authorisation will not be applicable to the Petitioner. Now, as far as applicability of Public Notice No.
, the Hon’ble Court has not said that the
other vital conditions for issuance of the
EPCG Authorisation will not be applicable
to the Petitioner. Now, as far as applicability
of Public Notice No. 59/ITC/90-93 dated
07.09.1990 to the petitioner’s application is
considered, it is seen that EPCG Scheme
facility could also be allowed on merits, to
other manufacturers who did not fulfill the
past three years export performance criteria.
In this regard, the Committee observed that
the extent of past exports performance which
could make the petitioner eligible for
issuance of the EPCG Authorisation is again
based on the merits like quantum of such
past exports; the value of the EPCG
Authorisation applied for vis-à-vis the
quantum of such past exports and fulfilment
of other conditions for issuance of the
Authorisation. The Committee noted that in
terms of Public Notice No. 59/ITC/90-93
dated 07.09.1990, it is no longer looking at
the fact of the petitioner not having past
three years exports. However, at the same
time the Committee is of the opinion that to
have past export performance for only one
year and that too meagre, does not merit
favourable
consideration.
Further,
the
Committee was of the opinion that it cannot
examine this claim by ignoring the other
t performance for only one year and that too meagre, does not merit favourable consideration. Further, the Committee was of the opinion that it cannot examine this claim by ignoring the other
condition of Para 197 of the Policy, i.e., third party exports would not count towards discharge of EO.
The Committee, therefore, concluded that since the petitioner has past export performance for only one year and that too meagre, its application for issuance of the EPCG Authorisation is devoid of merit even in terms of Public Notice No. 59/ITC/90-93 dated 07.09.1990. Further, since party has admittedly made third party exports as well which would not count towards discharge of EO under the prevailing provisions of the then EXIM Policy, these exports also cannot be taken into consideration towards export obligation fulfilment under the applications submitted for issuance of the EPCG Authorisation.
- The Committee, therefore, rejected the
request of the petitioner for issuance of the
EPCG Authorisation under the para 197 of
the Export and Import Policy Vol. I 1993
read with Public Notice No.59/ITC/90-93
dated 07.09.1990 for being devoid of merit.
DGFT = Directorate General of Foreign Trade, DG = Director General, FTP = Foreign Trade Policy, HBP v1 = Handbook of Procedure Vol.
o.59/ITC/90-93
dated 07.09.1990 for being devoid of merit.
DGFT = Directorate General of Foreign Trade, DG = Director General, FTP = Foreign Trade Policy, HBP v1 =
Handbook of Procedure Vol. I, EO = Export Obligation, EODC = Export Obligation Discharge Certificate, EOP =
Export Obligation Period, B.O.E.=Bill of Entry, EPCG = Export Promotion Capital Goods, RA = Regional
Authority, BG = Bank Guarantee, FFE = Free Foreign Exchange, IEC = Importer-Exporter Code, DoR =
Department of Revenue, IEM = Industrial Entrepreneurs Memorandum, RCMC = Registration-cum-Membership-
Certificate.
Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.
No analysis generated for this document yet (analysis runs over brief docs + on-demand). Run build_analysis.py --ids 6410 --apply.