MINUTES OF 6th EPCG COMMITTEE MEETING HELD UNDER THE CHAIRMANSHIP OF SHRI SATYAN SHARDA, ADDITIONAL DIRECTOR GENERAL OF FOREIGN TRADE AT 12.00 NOON ON 01.11.2018.
Following officers attended the meeting:
a. Shri Vaibhav Bhatnagar, OSD, Department of Revenue b. Shri Rajbir Sharma, Joint Director General of Foreign Trade, DGFT c. Shri Randheep Thakur, Deputy Director General of Foreign Trade, DGFT
II. Minutes of the last Meeting held on 27.09.2018 were confirmed.
III. The Committee deliberated upon all the cases and following decisions were taken:
Sl.
No
.
Firm’s
Name
and Numbers
EPCG
Authorisation No.
Subject
Decision of the Committee
1.
M/s
Aqeel Leathers, Chennai
01/36/218/107/A M-15/EPCG-I 0430003704 dated 11.05.2006 Request for condonation of EO fulfilled by third party export with alternate product. The representative of the party came to present their case before the EPCG Committee. The Committee heard the submission made by the representative of the party.
The Committee noted that the party has requested for acceptance of exports of alternate products manufactured by third party.
The Committee deliberated upon the case and
decided to reject it as exports of alternate product
which are manufactured by third party are not
permitted for fulfilment of export obligation under
EPCG Scheme.
2.
berated upon the case and
decided to reject it as exports of alternate product
which are manufactured by third party are not
permitted for fulfilment of export obligation under
EPCG Scheme.
2.
M/s
Jagriti
Drapes, Panipat
01/36/218/100/A M-19/EPCG-I i.3330001777 dated 16.08.2010 ii.3330002643 dated 31.11.2012 Request for appeal against rejection of application for redemption of export obligation The representative of the party came to present their case before the EPCG Committee. The Committee heard the submission made by the representative of the party.
The Committee noted that the party has imported “shuttle-less looms” under the EPCG authorisations for manufacturing and exporting Polyester/Cotton Made-up and Polyester/Cotton Fabric. Party has, however, fulfilled the export obligation by exporting Polyester Decorative Chair Pad Cover through third party made on “handloom.”
The Committee decided that since shuttle-less looms
have not been used to manufacture the export
product, such exports cannot be considered. Thus
the case is rejected.
3.
M/s
Samraj
Engineering
Controls Pvt Ltd,
Kanchipuram
District
01/37/218/174/A i.3230005538 dated 27.10.2005 ii.3230006445 dated 20.03.2006 Condonation of procedural lapse of non- mentioning of name and EPCG authorization The representative of the party came to present their case before the EPCG Committee. The Committee heard the submission made by the representative of the party.
f name and EPCG authorization The representative of the party came to present their case before the EPCG Committee. The Committee heard the submission made by the representative of the party.
The Committee noted that the party has submitted free shipping bills of third party which do not have
M-18/EPCG-II No. on third party shipping bills in respect of EPCG authorizations Nos. 3230005538 dated 27.10.2005 and 3230006445 dated 20.03.2006 license number and name of the license holder.
decided to reject it as free shipping bills are not
permitted for fulfilment of Export Obligation under
EPCG Scheme.
4.
M/s Travancore
Titanium
Products
Ltd,
Trivandrum
18/07/AM-18/P- 5 i.5330001038 dated 22.06.2007 ii.5330001042 dated 11.07.2007 iii.5330001049 dated 02.08.2007 iv.5330001058 dated 30.08.2007 v.5330001075 dated 31.10.2007 vi.5330001087 dated 17.12.2007 vii.5330001093 dated 11.02.2008 viii.5330001099 dated 19.02.2008 i. Waiver of Average Obligation. ii. Extension of EOP till March, 2021. iii. Extension in time for installation of capital goods, iv. Specific exemption from the requirement of installation of machinery in respect of EPCG authorization Nos. 5330001038 dated 22.06.2007, 5330001058 dated 30.08.2007, 5330001081 dated 17.12.2007 and 5330001093 dated 11.02.2008. v. Removal of TTPL from the DEL.
t of EPCG authorization Nos. 5330001038 dated 22.06.2007, 5330001058 dated 30.08.2007, 5330001081 dated 17.12.2007 and 5330001093 dated 11.02.2008. v. Removal of TTPL from the DEL. The Committee observed that the case was first placed in its meeting held on 20.02.2018 wherein the case was deferred with the direction to call an updated report from RA and to call the party for PH. The case was again placed in its meeting held on 27.09.2018 and was again deferred on the request of the party as their concerned person was not available for PH.
In the present meeting the representative of the party came to present their case before the EPCG Committee. The Committee heard the submission made by the representative of the party.
The Committee noted that to comply with the pollution control norms set by the Kerala State Pollution Control Board, TTPL imported capital goods for acid recovery plant and copperas recovery plant in 2007 under EPCG scheme. In 2008 TTPL fell into financial problems and could not complete the project. In the meanwhile, due to high cost, Government of Kerala decided to abandon the Acid Recovery Plant and implement only the Copperas Recovery Plant & Neutralization plant. The Committee noted that in all these cases, EO period had already expired and the company has not even fulfilled the 1st block of EO in any of the cases, so far. Further, the CGs have not been installed and installation certificate has not even furnished in any of these cases till date.
not even fulfilled the 1st block of EO in any of the cases, so far. Further, the CGs have not been installed and installation certificate has not even furnished in any of these cases till date.
The Committee noted that Customs, Kochi had
ordered for recovery of duty due to non-fulfilment
of EO. On appeal, CESTAT vide order dt.
05.01.2015 allowed time upto 31.12.2015 to
complete the erection of all the imported
equipments. The TTPL has failed to do so and
sought time up to 31.12.2018 for installation of the
machinery.
decided to reject it as despite getting enough time
to install the machinery, has failed to do so. The
Committee thus came to the conclusion that under
the circumstances the party is not in a position to
fulfil the EO. The Committee thus rejected the
request. RA may initiate steps to recover the duty
amount and regularise their authorisations as per
the policy.
5.
M/s Videocon
Industries
Limited,
Aurangabad
01/37/218/347/A M-17/EPCG-II i.0330004520 dated 17.10.2003 ii.0330004732 dated 19.11.2003 iii.0330004763 dated 28.11.2003 iv.0330006771 dated 05.10.2004 i. Regularization of EO fulfilment of export of Service/alternat e products by the Group Company,
ii. Request of
condonation of
shortfall
in
fulfilment
of
block–wise EO
period
and
waiver
of
Endorsement of
EPCG
authorization:
and
iii.
EO
extension
by
one block i.e.
by two years.
. Request of
condonation of
shortfall
in
fulfilment
of
block–wise EO
period
and
waiver
of
Endorsement of
EPCG
authorization:
and
iii.
EO
extension
by
one block i.e.
by two years.
The Committee observed that the case was first
placed in its meeting held on 27.09.2018 wherein it
was decided to defer it with the direction to call the
party for PH to explain the technical aspect of the
exports made. Party was to bring technical literature
of the export items and technical expert as well to
explain the technical aspect of the exports.
However, the representative of the party failed to
appear in the meeting.
decided to defer it again with the direction to give
one last chance to the party for PH.
6.
M/s
Deesan
Cotex Pvt Ltd,
Mumbai
01/36/218/260/A
M-18/EPCG-I
i.0330034946
dated 30.01.2013
ii.0330035925
dated
24.09.2013
iii.0330035213
dated 01.03.2013
iv.0330035284
dated 11.03.2013
Request
for
change
of
factory address.
The Committee observed that the request of the
party was first placed in the EPCG Committee
meeting held on 29.08.2018 and it was decided to
defer the case with the direction to call the party
for PH who did not appear in the next meeting on
27.09.2018.
The case was deferred again.
decided to defer it again to call the party for PH in the next meeting.
M/s KSV Cotton Mills(P) Ltd, Tamil Nadu
01/36/218/158/A M-18/EPCG-I i.3230008685 dated 22.12.2006 ii.3230008997 dated 05.02.2007 iii.3230009067 dated 12.02.2007 Extension of EOP to 4 years (i.e.
ton Mills(P) Ltd, Tamil Nadu
01/36/218/158/A M-18/EPCG-I i.3230008685 dated 22.12.2006 ii.3230008997 dated 05.02.2007 iii.3230009067 dated 12.02.2007 Extension of EOP to 4 years (i.e. 2+2 years) and adjustment of Bank Guarantee enchased in respect of 03 EPCG authorization. The Committee observed that the case was placed in its meeting held on 29.08.2018 and was deferred as the request was not clear. The case was again placed in its meeting held on 27.09.2018 and it was decided to defer it with the direction to call the party for PH in the meeting.
The representative of the party came to present their case before the EPCG Committee. The Committee heard the submission made by the representative of the party who appeared for the PH.
decided to defer it with the direction to call report from RA regarding charging excess amount of Rs.13,34,153.00 as composition fee.
M/s Indorama Industries Limited, Chandigrah
01/36/218/311/A M-18/EPCG-I i.2230001643 dated 25.02.2011 ii.2230001694 dated 21.04.2011 iii.2230001705 dated 05.05.2011 iv.2230001706 dated 05.05.2011 v.2230001715 dated 12.05.2011 vi.2230001716 dated 12.05.2011 vii.2230001741 dated 31.05.2011 viii.2230001791 dated 12.07.2011 ix.2230001829 dated 25.08.2011 x.2230001837 dated 30.08.2011 xi.2230001835 dated 30.08.2011 xii.2230001833 dated 30.08.2011 xiii.2230001832 dated 30.08.2011 xiv.2230001836 dated 30.08.2011 xv.2230001856 dated 12.10.2011 xvi.2230001877 dated 24.11.2011 Request for waiver off export obligation in
30.08.2011 xiii.2230001832 dated 30.08.2011 xiv.2230001836 dated 30.08.2011 xv.2230001856 dated 12.10.2011 xvi.2230001877 dated 24.11.2011 Request for waiver off export obligation in respect of 16 EPCG authorizations. The representative of the party came to present their case before the EPCG Committee. The Committee heard the submission made by the representative of the party.
The representative of the party who appeared for PH submitted that their request for waiver of EO may be accepted on the ground that their product is 100% import substitute to be used by the domestic textile consumers in India and, therefore, in their case the foreign exchange saved is foreign exchange earned.
decided to reject it as there is no merit in the claim of the party for waiver of EO on the ground submitted by the party.
M/s Atma Garments Pvt Ltd, Noida(U.P.)
01/36/218/123/A M-19/EPCG-I 0530144828 dated 22.12.2007 Request for acceptance of exports made by alternate products. The Committee took into account submission of the party that they have fulfilled EO against the said EPCG authorisation with alternate products and requested for issuance of EODC. decided to remand the case back to RA. RA may examine the request on the basis of nexus certificate and subject to the condition that the alternate export product is manufactured by the use of same capital goods. 10. M/s Wockhardt Limited, Mumbai
01/37/218/12/A M-19/EPCG-II 0330039243 dated 11.07.2014 Request for permission for re-export of capital goods.
ured by the use of same capital goods. 10. M/s Wockhardt Limited, Mumbai
01/37/218/12/A M-19/EPCG-II 0330039243 dated 11.07.2014 Request for permission for re-export of capital goods. The Committee noted that their application for re- export of equipment of the said EPCG License has been rejected by RA, Mumbai siting Para number 5.16 of HBP and PN 29 dt. 09/10/2017 stating that to approve re-export of item imported under EPCG License was not under their purview as period of 3 years from the date of import has lapsed.
decided to defer the same to call the party for PH in
the next meeting to understand the circumstances
under which the request could not be made to RA
within the time.
11.
M/s Gold Plus
Glass
Industry
Limited,
New
0530144915 dated
05.11.2007
Request
for
condonation of
procedural
The Committee noted that the case was first placed
in its meeting held on 27.09.2018 and it was
decided to defer it with the direction to call the
1.2007 Request for condonation of procedural The Committee noted that the case was first placed in its meeting held on 27.09.2018 and it was decided to defer it with the direction to call the
Delhi
01/36/218/101/A M-19/EPCG-I lapse of wrong mentioning of EPCG authorization number in invoices- regarding. party for PH.
The representative of the party came to present their case before the EPCG Committee. The Committee heard the submission made by the representative of the party who appeared for the PH.
The Committee took into account submission of the party that their request for consideration of export made to Nepal in INR for fulfilling EO in respect of EPCG authorisations has been accepted by PRC Committee on 03.04.2018. Subsequently, they observed at the time of submission of documents concerning redemption of EPCG Licences that in 687 invoices, EPCG Licence (s) number were wrongly mentioned. In such 687 invoices, EPCG Licence No. 0530144915 dated 05.11.2007 should have been mentioned.
decided to recommend to DG for relaxation under Para 2.58 of FTP 2015-20 to allow condonation of wrong mentioning the EPCG authorization No.0530144915 dated 05.11.2007, subject to condition that there is no double counting of exports and payment of a composition fee of Rs.200/- per ARE is made by the party.
This has the approval of DG. 12.
5 dated 05.11.2007, subject to condition that there is no double counting of exports and payment of a composition fee of Rs.200/- per ARE is made by the party.
This has the approval of DG. 12. M/s Birla Precision Technologies Limited, Aurangabad
01/36/218/34/A M-18/EPCG-I i.0330011202 dated 02.03.2006 ii.0330007162 dated 23.11.2004 Request for closure of EPCG authorization & withdrawal of demand letter issued by RA, Mumbai decided to defer it with the direction to call specific comments from RA. 13. M/s Chandak Woollens Pvt Ltd, Bikaner(Raj)
01/36/218/100/A
M-17/EPCG-I
1330001544 dated
12.03.2007
i. Extension of
EOP
for
2
years, and
ii. Change of
ITC (HS) Code
of export items.
The Committee took into account submission of
the party that they could not fulfil EO due to
recession in global market and non-availability of
exports order. Further, their export product and
ITC HS code in the condition sheet was wrongly
mentioned and, therefore, requested for change of
export product having ITC HS code 5703: Tufted
Carpets.
decided to remand the case back to RA. RA may examine the request on the basis of nexus certificate and subject to the condition that the export product is manufactured by the use of the same capital goods.
mand the case back to RA. RA may examine the request on the basis of nexus certificate and subject to the condition that the export product is manufactured by the use of the same capital goods.
M/s Hindustan Urban Infrastructure Limited, New Delhi
01/36/218/208/A M-16/EPCG-I 0530134322 dated 11.06.2003 Request for condonation of procedural laps of not- mentioning authorization number in supply invoice for fulfilment of export obligation. decided to defer it with the direction to call for detailed report from RA. 18. M/s Silver Spark Apparel Ltd, Bangalore
01/37/218/292/A
M-18/EPCG-II
i.0730007226
dated 29.07.2008
ii.0730007227
dated 29.07.2008
iii.0730011174
dated 04.04.2012
iv.0730011195
dated 19.04.2012
v.0730011249
dated 09.05.2012
vi.0730011469
dated 20.07.2012
vii.0730011634
dated 11.09.2012
viii.0730011778
dated 30.10.2012
ix.0730010056
dated 29.04.2011
x.0730010113
dated 11.05.2011
xi.0730010151date
d 16.05.2011
xii.0730010290
dated 16.06.2011
xiii.0730010435
dated 03.08.2011
xiv.0730010595
dated 26.09.2011
xv.0730010933
dated 18.01.2012
xvi.0730007202
dated 22.09.2008
xvii.0730008825
dated 20.04.2010
xviii.0730009094
dated 07.07.2010
xix.0730009261
dated 18.08.2010
xx.0730009746
dated 04.01.2011
xxi.0730009759
dated 07.01.2011
xxii.0730009911
dated 03.03.2011
xxiii.0730001003
dated 29.03.2011
xxiv.0730012389
dated 21.05.2013
i. Request for
condonation of
error
of
not
intimating
the
takeover to the
RA.
ii.
1
xxii.0730009911
dated 03.03.2011
xxiii.0730001003
dated 29.03.2011
xxiv.0730012389
dated 21.05.2013
i. Request for
condonation of
error
of
not
intimating
the
takeover to the
RA.
ii. Request for
allowing
transfer
of
EPCG
authorizations
from
M/s.
Raymonds
Limited to M/s.
Silver
Spark
Apparel
Limited.
iii. Request for
condonation of
non-
maintenance of
annual average
for the financial
year 2009-10 &
2011-12
iv. Request for
assigning some
of the surplus
shipping
bills
from
Silver
Spark Apparel
Limited
after
the
takeover
date
for
fulfilling export
obligation
for
Authorizations
by
way
of
clubbing.
The representative of the party came to present their case before the EPCG Committee. The Committee heard the submission made by the representative of the party.
The Committee took into account submission of party in respect of its four requests. The Committee noted that that Raymond Limited (part of Raymond Group) imported various capital goods under EPCG scheme. The unit, as a part of group consolidation activity, was sold under Business Transfer Agreement to its 100 % subsidiary company, namely, M/s Silver Spark Apparel Limited. Resultantly, this unit was added under branch code 29 of IEC of Silver Spark Apparel Limited. The fact of takeover of the company was, inadvertently, not informed to the Regional Licensing Authority at Bengaluru. However, the address of the unit has been updated in the Central Excise Certificate.
of takeover of the company was, inadvertently, not informed to the Regional Licensing Authority at Bengaluru. However, the address of the unit has been updated in the Central Excise Certificate. The Committee deliberated on the issue and decided to condone the error of not intimating the takeover to the RA since the address of the unit had been updated in the Central Excise Certificate.
The Committee also decided that RA may consider transfer of EPCG authorizations from M/s. Raymond Limited to Silver Spark Apparel Limited, to fulfil export obligation in respect of the EPCG authorisations by Silver Spark Apparel Limited, subject to condition that the average Export Obligation of Raymond Limited imposed in respect of subject EPCG authorisation in addition to annual average export obligation of transferee company shall be maintained by the transferee company. The transferee company, however, shall furnish fresh BG/LUT to the Customs authorities and also submit amended IEC and RCMC incorporating the name and address of transferee company in IEC / RCMC to RA.
The Committee further decided that the Request for condonation of non-maintenance of annual average for the financial year 2009-10 & 2011-12 had no merit and thus rejected this request.
The Committee also decided that the request for assigning some of the surplus shipping bills from
average for the financial year 2009-10 & 2011-12 had no merit and thus rejected this request.
The Committee also decided that the request for assigning some of the surplus shipping bills from
xxv.0730007318
dated 25.08.2008
xxvi.0730007363
dated 11.09.2008
xxvii.0730007393
dated 17.08.2008
xxviii.0730007404
dated 19.09.2008
xxix.0730007510
dated 23.10.2008
xxx.0730007264
dated 06.08.2008
xxxi.0730008315
dated 23.10.2009
xxxii.0730008400
dated 27.11.2009
Silver Spark Apparel Limited after the takeover
date
for
fulfilling
export
obligation
for
Authorizations by way of clubbing may be dealt
with by RA strictly as per the applicable policy
provisions.
DGFT = Directorate General of Foreign Trade, DG = Director General, FTP = Foreign Trade Policy, HBP v1 =
Handbook of Procedure Vol. I, EO = Export Obligation, EODC = Export Obligation Discharge Certificate, EOP =
Export Obligation Period, B.O.E.=Bill of Entry, EPCG = Export Promotion Capital Goods, RA = Regional
Authority, BG = Bank Guarantee, FFE = Free Foreign Exchange, IEC = Importer-Exporter Code, DoR =
Department of Revenue, IEM = Industrial Entrepreneurs Memorandum, RCMC = Registration-cum-Membership
Certificate.
Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.
No analysis generated for this document yet (analysis runs over brief docs + on-demand). Run build_analysis.py --ids 6404 --apply.