MINUTES OF EPCG COMMITTEE MEETING HELD UNDER THE CHAIRMANSHIP OF SHRI JAIKANT SINGH, ADDITIONAL DIRECTOR GENERAL OF FOREIGN TRADE AT 1430 Hours ON 27.04.2015
Following officers attended the meeting:
a. Shri Akash Taneja, Joint Director General of Foreign Trade, DGFT b. Shri D.K. Gupta, Director (DBK), Department of Revenue c. Shri K.K. Tiwari, Industrial Advisor, DHI
II. Minutes of the last Meeting held on 26.02.2015 were confirmed.
III. The Committee deliberated upon all the cases and following decisions were taken:
Sl.
No.
Party’s Name
and File
Numbers
EPCG
Auth. No.
Subject
Decision of the Committee
1.
M/s
Microtex
Energy Pvt. Ltd.,
Bangalore
18/116/AM-15/P-5
0730006172
dated
05.10.2007
Condonation
of
block-wise EO and
extension in EOP
for 2 years
The Committee took into account the
submission of the party that they could
not make any export during the
original EOP, due to slump in global
demand
for
PVC
Separators
for
batteries. The Committee noted that
the party has submitted copies of fresh
export orders and have stated that
they are confident to fulfil the EO
within the extended time period.
eparators for batteries. The Committee noted that the party has submitted copies of fresh export orders and have stated that they are confident to fulfil the EO within the extended time period.
The Committee, deliberated upon the case and decided to recommend to DG for relaxation under Para 2.58 of FTP 2015-20 to allow:
(a) condonation from condition of fulfillment of block-wise EO, as the party could not apply to RA within the prescribed time period, subject to payment of 2% composition fee, on duty saved amount in proportion to the shortfall at the end of each block in terms of the provisions of Para 5.8.2 of HBP v1 2009-14/ Para 5.14 (c) of HBP 2015-20; and (b) extension in EOP for 2 years on payment of composition fee equal to 2% of proportionate duty saved amount on unfulfilled EO or an enhancement in EO imposed to the extent of 10% of total EO at the choice of exporter, for each year of extension sought in terms of provisions contained in Para 5.11(a) of HBP Vol. I. 2009-14/
Para 5.17 (b) of HBP 2015-20, as
within the prescribed time period.
This has the approval of DG.
M/s Lupin Limited, Mumbai
01/36/218/216/AM -15/EPCG-I 0330038819 dated 22.05.2014 Permission to shift capital goods to another unit abroad before grant of EODC submission of the party that though they have fulfilled the entire export obligation, they have not obtained EODC so far as they are yet to receive payment for the supplies made by them towards EO fulfilment.
The Committee was of the opinion that
re-export of capital goods imported
under the EPCG scheme should not be
permitted till EODC is obtained. The
Committee therefore decided to reject
the case.
3.
M/s Maxrich Foods
Limited, Karnal
18/131/AM-15/P-5
3330000676
dated
18.12.2006
3330000677
dated
22.12.2006
3330000678
dated
22.12.2006
3330000679
dated
22.12.2006
3330000680
dated
22.12.2006
Condonation
of
block-wise EO
submission of the party they have not
made any export during the original
EOP due to non-availability of export
order for their export products. The
Committee noted that the party has
given copies of third party export
orders obtained by them and are
confident to fulfil the EO within the
extended time period.
The Committee, deliberated upon the of FTP 2015-20 to allow condonation from condition of fulfillment of block-wise EO, as the party could not apply to RA within the prescribed time period.
he Committee, deliberated upon the of FTP 2015-20 to allow condonation from condition of fulfillment of block-wise EO, as the party could not apply to RA within the prescribed time period. This would be subject to payment of 2% composition fee on duty saved amount in proportion to the shortfall at the end of each block in terms of the provisions of
Para 5.8.2 of HBP v1 2009-14/ Para
5.14 (c) of HBP 2015-20. Third party exports, if any, would be subject to conditions of Para 5.10(d) of HBP 2015-20.
M/s DK Shell Button Industries (P) Ltd., Gurgaon
01/36/218/155/AM -15/EPCG-I 0530139729 dated 19.10.2005 Condonation of block-wise EO and extension in EOP for 2 years submission of the party that they have not made any exports during the original EOP, due to recession in market. However, the party has furnished a certified copy of CA Certificate showing fulfilment of EO to the tune of US$ 1,60,432/- against total EO of US$ 1,99,373/-, which are made after 18.10.2013 (i.e. after expiry of EOP).
submission of the party that the party has given copies of fresh export orders obtained by them and are confident to
fulfil the EO within the extended time period.
(a) condonation from condition of party could not apply to RA within the prescribed time period. This would be subject to payment of 2% composition fee on duty saved amount in proportion to the shortfall at the end of each block in terms of the provisions of Para 5.8.2 of HBP v1 2009-14/ Para 5.14 (c) of HBP 2015-20; and payment of composition fee equal to 2% of proportionate duty saved amount on unfulfilled EO or an enhancement in EO imposed to the extent of 10% of total EO at the choice of exporter, for each year of extension sought in terms of provisions contained in Para 5.11(a) of HBP Vol. I. 2009-14/
Para 5.17 (b) of HBP 2015-20, as
within the prescribed time period.
M/s GP Golden Prints Pvt. Ltd., Chennai
01/36/218/149/AM -15/EPCG-I 0430004473 dated 22.12.2006 Condonation of block-wise EO and extension in EOP for 2 years. The Committee observed that the party has fulfilled 31.41% EO, but failed to fulfil the entire EO during the original EOP and has submitted copies of fresh export orders. The Committee took into account the submission of the party that they are confident to fulfil the EO within the extended time period.
(a) condonation from condition of party could not apply to RA within the prescribed time period. This would be subject to payment of 2% composition fee on duty saved amount in proportion to the shortfall at the end of each block in terms of the provisions of Para 5.8.2 of HBP v1 2009-14/ Para 5.14
payment of composition fee equal to 2% of proportionate duty saved amount on unfulfilled EO or an enhancement in EO imposed to the extent of 10% of total EO at the choice of exporter, for each year of extension sought in terms of provisions contained in Para 5.11(a) of HBP Vol. I. 2009-14/
Para 5.17 (b) of HBP 2015-20, as
within the prescribed time period.
M/s Focus Energy Limited, New Delhi
01/36/218/125/AM -15/EPCG-I 0530156044 dated 21.07.2011 Permission for re- export of capital goods after 3 years from the date of clearance by Customs in relaxation of Para 5.16 of HBP 2009- 14/Para 5.25(a) of HBP 2015-20 The Committee observed that the capital goods were imported as per Bill of Entry No. 4373848 dated 17.08.2011 and the goods were cleared from Customs on 12.09.2011. However, after installation of machines, the party found that these machines were unfit for use. The Committee noted that the party vide their letter dated 22.08.2014 (i.e. after 3 years from the date of clearance by Customs) has applied to CLA, New Delhi for re-export of capital goods for foreign supplier as per Para 5.16 of HBP 2009-14/Para 5.25(a) of HBP 2015-20. In response CLA, New Delhi has rejected their request stating that the request was made after expiry of 3 years and advised the party to approach DGFT Hqrs.
The Committee decided to ask RA the detailed reasons for rejection and also direct the party to furnish Installation Certificate and hence deferred the case. 7. M/s Jakhau Salt Company Pvt. Ltd., Chennai
01/36/218/265/AM -13/EPCG-I 3730000107 dated 29.09.2008 Regularization of import of capital goods (i.e.
ficate and hence deferred the case. 7. M/s Jakhau Salt Company Pvt. Ltd., Chennai
01/36/218/265/AM -13/EPCG-I 3730000107 dated 29.09.2008 Regularization of import of capital goods (i.e. Truck Model Tipper) under EPCG Scheme The Committee noted that the request of the party was rejected by the EPCG Committee in its meeting held on 14.06.2013 on the grounds that the trucks were imported for transportation of goods which is not permitted under the EPCG Scheme. The Committee took into account the submission of the party that tippers/dumpers are being utilized for transport within boundaries earmarked for extracting/mining activities of solar raw salt. The Committee however decided to reject the request of the party as extraction of Solar Raw Salt is not a mining activity and that the tippers/dumpers are being used only for transportation of material.
The RA is advised to take immediate
necessary action in this case
for
recovery of customs duty and interest.
8.
M/s Jindal (India)
Limited, Kolkata
01/36/218/185/AM
-15/EPCG-I
0230001625
dated
11.07.2006
i.
Change in the
name of the
company
from M/s UFL
to M/s JIL;
ii.
acceptance of
installation
certificate;
iii. condonation
of block-wise
EO
and
extension
in
EOP
for
2
years.
The Committee observed that the
authorization no. 0230001625 dated
11.07.2006 was issued to M/s Universal
Foils Limited. However M/s UFL could
not install the Capital Goods and the
same were lying in their custody at
their premises.
ization no. 0230001625 dated 11.07.2006 was issued to M/s Universal Foils Limited. However M/s UFL could not install the Capital Goods and the same were lying in their custody at their premises. The company was taken over by M/s Jindal (India) Limited by way of amalgamation vide order of Honb’le High Court of Kolkata dated 06.08.2012.
The Committee noted the submission of the party that after amalgamation of their company M/s JIL has taken over all assets and liabilities of M/s UFL and also the plant imported by M/s UFL to their custody and consequently M/s JIL has intimated their Jurisdictional central excise authority about the taking over vide letter dated 26.12.2012. M/s JIL has installed the Capital Goods, which was imported by M/s UFL and started production;
The Committee therefore decided to advise RA to allow change in the name of the company from M/s UFL to M/s JIL subject to obtaining certified copy of order of Hon’ble High Court of Kolkata w.r.t. amalgamation dated 06.08.2012 and submission of fresh BG/LUT.
submission of the party that they have obtained installation certificate issued by central excise authority. The Committee, therefore, decided that the installation certificate issued to M/s JIL may be accepted.
The Committee also noted that the party has already submitted the composition fee for condonation of block-wise EO to concerned RA.
allation certificate issued to M/s JIL may be accepted.
The Committee also noted that the party has already submitted the composition fee for condonation of block-wise EO to concerned RA. The Committee, deliberated upon the case and decided to recommend to DG for relaxation under Para 2.58 of FTP 2015-20 to allow:
the party could not apply to RA within the prescribed time period. This would be subject to payment of 2% composition fee on duty saved amount in
proportion to the shortfall at the end of each block in terms of the provisions of Para 5.8.2 of HBP v1 2009-14/ Para 5.14 (b) extension in EOP for 2 years on payment of composition fee equal to 2% of proportionate duty saved amount on unfulfilled EO or an enhancement in EO imposed to the extent of 10% of total EO at the choice of exporter, for each year of extension sought in terms of provisions contained in Para 5.11(a) of HBP Vol. I. 2009-14/ Para 5.17 (b) of HBP 2015-20, as the party could not apply to RA within the prescribed time period.
M/s Bangalore Villas Pvt. Ltd., Bangalore
01/36/218/116/AM
-15/EPCG-I
0730004390
dated
21.07.2006
Condonation
of
block-wise EO
The Committee noted that the Export
Product/Service provided by the party
is not clearly indicated in their request.
The Committee, therefore, decided to
defer the case with the directions to
obtain details of export product and
copy of EPCG authorization along with
condition sheet from party/RA.
heir request. The Committee, therefore, decided to defer the case with the directions to obtain details of export product and copy of EPCG authorization along with condition sheet from party/RA.
M/s Muthulaxmi Spinning Mills (P) Ltd., Srivilliputtur
18/123/AM-15/P-5
3530002289
dated
09.01.2007
3530002288
dated
09.01.2007
Condonation
of
block-wise EO and
extension in EOP
for 2 years
submission of the party that they have
not made any export during the
original EOP, due to recession in the
international market. The Committee
noted that the party has given copies
of fresh export orders obtained by
them and have stated that they are
confident to fulfil the EO within the
extended time period.
the party could not apply to RA within the prescribed time
(b) extension in EOP for 2 years on payment of composition fee equal to 2% of proportionate duty saved amount on unfulfilled EO or an enhancement in EO imposed to the extent of 10% of total EO at the choice of exporter, for each year of extension sought in terms of provisions within the prescribed time period.
M/s Baldva Textiles
Pvt. Ltd., Jaipur
01/36/218/43/AM-
15/EPCG-I
1330001260
dated
21.04.2006
Condonation
of
block-wise EO and
extension in EOP
for 2 years
submission that the party has not
made any export during the original
EOP, due to world-wide recession in
textile industry and bad economy.
of
block-wise EO and
extension in EOP
for 2 years
submission that the party has not
made any export during the original
EOP, due to world-wide recession in
textile industry and bad economy. The
Committee noted that the party has
given copies of fresh export orders
through merchant exporters obtained
by them and has stated that they are
confident to fulfil the EO within the
extended time period.
within the prescribed time payment of composition fee equal to 2% of proportionate duty saved amount on unfulfilled EO or an enhancement in EO imposed to the extent of 10% of total EO at the choice of exporter, for each year of extension sought in terms of provisions
within the prescribed time period.
In case of third party export, the party should follow conditions stipulated in
para 5.10 (d) of HBP 2015-20.
M/s Glenmark Generics Ltd., Mumbai
01/36/218/156/AM
-15/EPCG-I
0330028343
dated
06.01.2011
0330032459
dated
20.04.2012
(i) Condonation
for procedural
lapse
of
mentioning
wrong plot nos.
in
the
installation
certificate and
(ii) Accepting
the
unit
of
measurement
as
“Nos.”
instead of “Set”
in
the
installation
certificate
The
Committee
heard
the
representatives of the party in personal
hearing. It was observed that the
request submitted by the party was not
clear.
The
Committee,
therefore,
decided to defer it with directions to
advise the party to submit a clear
representation.
13.
M/s
K.N.
Industries, Kolkata
01/36/218/182/AM
-15/EPCG-I
0230003146
dated
04.04.2008
Condonation
of
block-wise
EO
(first block)
The Committee observed that the
report from RA states that a Show
Cause Notice (SCN) under rule 7(1) of
FT(D&R) Act has been issued to the
party.
The
Committee,
therefore,
decided to defer it with directions to
ask RA to furnish a copy of SCN.
14.
M/s
Dhiman
Engineering
Corporation,
Faridabad
01/36/218/150/AM
-15/EPCG-I
0530138431
dated
11.04.2005
Consideration
of
S/bills
wrongly
endorsed
with
other
EPCG
authorization
for
the
purpose
of
redemption
The Committee observed that the party
has already fulfilled their entire EO
during the original EOP. However the
party had wrongly endorsed other
EPCG authorizations in some S/bills.
submission of the party that the party
has given an affidavit/undertaking (as
per Policy Circular No.
ginal EOP. However the party had wrongly endorsed other EPCG authorizations in some S/bills. submission of the party that the party has given an affidavit/undertaking (as per Policy Circular No. 7/2002), duly certified by Chartered Accountant.
The Committee, deliberated upon the of FTP 2015-20 to condone procedural lapse of mentioning multiple EPCG authorization numbers on the shipping bills subject to the condition that there is no double counting of exports/Shipping Bills and free shipping bills, if any, would not be counted towards EO fulfilment. Partial shipping bill will not be counted. The Committee further recommended imposition of a composition fee of Rs. 200/- on each such shipping bill where more than one EPCG authorization number has been
endorsed and which are being counted for fulfilment of EO.
M/s Health Care Global Enterprises Ltd., Bangalore 01/36/218/68/AM- 15/EPCG-I 0730012989 dated 18.12.2013 Shifting of capital goods from one unit to other unit. The Committee observed that both the addresses of the unit i.e. the unit where the capital goods are installed at present and the unit where the capital goods are to be shifted are incorporated in IEC and RCMC. The company has already obtained installation certificate from Chartered Engineer. The Committee, therefore, decided to regularize shifting of the capital goods from their centre located at Curie Abdul Razzaque, Ansari Cancer Institute IRBA, Ranchi to their centre located at No. 8, P. Kalinga Rao Road, Sampangi Rama Nagar, Bangalore.
f the capital goods from their centre located at Curie Abdul Razzaque, Ansari Cancer Institute IRBA, Ranchi to their centre located at No. 8, P. Kalinga Rao Road, Sampangi Rama Nagar, Bangalore. The regularization is subject to payment of composition fee of Rs. 5000/-.
M/s Glenmark Pharmaceuticals Limited, Mumbai
01/36/218/137/AM -13/EPCG-I 24 EPCG authorizatio n issued during the period of AM-08 to AM-11 Re-fixation of average EO The case was placed before EPCG Committee in its meeting held on 22.01.2015 wherein it was decided to defer the case for seeking additional information.
The representatives of the party appeared for personal hearing before the Committee and stated that:
i. The company underwent a business reorganization in 2008 due to which the then subsisting Glenmark Pharmaceuticals Ltd demerged into 2 separate distinct entities, viz. Glenmark Pharmaceuticals Limited and Glenmark Generics Limited.
ii. According to the format of Re- organization, through a Business Transfer Agreement, two divisions namely, Active Pharmaceuticals Ingredients (API) and USA Formulation divisions were transferred to the newly created Glenmark subsidiary, namely Glenmark Generics Ltd; whereas SRM formulation division continued to remain with the Glenmark Pharmaceuticals Limited.
iii. Glenmark Generics was formed purely under a business reorganization essentially to strengthen focus on R&D and accelerate the growth in the
he Glenmark Pharmaceuticals Limited.
iii. Glenmark Generics was formed purely under a business reorganization essentially to strengthen focus on R&D and accelerate the growth in the
generics and API business and hence had nothing to do with the hitherto Export performance of Glenmark as an overall Company.
iv. The party submitted that their overall company exports have consistently grown during the years (2008-09, 2009-10 and 2010-11) under deliberation.
v. Exports of Glenmark Generics Limited (the new entity) has also consistently increased on year on year basis, and Glenmark Generics Limited has maintained its AEP.
vi. The temporary decrease in AEP (only in Glenmark Pharmaceuticals Limited) is basically on account of business re-organization.
However the demerged entity i.e. M/s Glenmark Generics Limited to whom the business of two divisions’ viz. API Division and USA Formulation Division has been transferred will also be required to maintain average EO corresponding to the business transferred as they have also obtained EPCG authorizations after demerger. In other words the two demerged entities will cumulatively maintain average EO of the unified company.
Therefore, the Committee decided that
the RA may allow re-fixation of
average
EO
of
M/s
Glenmark
Pharmaceuticals Limited.
17.
M/s Indian Optics
Pvt.
average EO of the unified company.
Therefore, the Committee decided that
the RA may allow re-fixation of
average
EO
of
M/s
Glenmark
Pharmaceuticals Limited.
17.
M/s Indian Optics
Pvt.
Ltd.,
New
Delhi
01/36/218/135/AM
-15/EPCG-I
0530142020
dated
25.09.2006
0530142021
dated
25.09.2006
Condonation
of
block-wise EO and
extension in EOP
The case was placed before EPCG
Committee in its meeting held on
22.01.2015 wherein it was decided to
defer the case with the direction to
obtain copies of confirmed export
orders, reasons for non-fulfilment of
EO and installation certificate from
central excise.
The Committee noted that the party has fulfilled 60% EO in respect of authorization no. 0530142020 dated 25.09.2006 and Nil against authorization no. 0530142021 dated 25.09.2006 The Committee took into account the submission of the party that due to poor market conditions in the international market they could not fulfil their EO and that they have fresh export orders and are confident to fulfil
count the submission of the party that due to poor market conditions in the international market they could not fulfil their EO and that they have fresh export orders and are confident to fulfil
the EO within the extended time period.
(a) condonation from condition of party could not apply to RA within the prescribed time period. This would be subject to payment of 2% composition fee on duty saved amount in proportion to the shortfall at the end of each block in terms of the provisions of Para 5.8.2 of HBP v1 2009-14/ Para 5.14 payment of composition fee equal to 2% of proportionate duty saved amount on unfulfilled EO or an enhancement in EO imposed to the extent of 10% of total EO at the choice of exporter, for each year of extension sought in terms of provisions contained in Para 5.11(a) of HBP Vol. I. 2009-14/
Para 5.17 (b) of HBP 2015-20, as
within the prescribed time period.
M/s Ind-Swift Limited, Chandigarh
01/36/218/64/AM- 15/EPCG-I 2230000482 dated 23.11.2006 Regularization of place of installation of capital goods imported under EPCG scheme The case was placed before EPCG Committee in its meeting held on 17.12.2014 wherein it was decided to defer the case with the directions to ask the party to furnish installation certificate from central excise authority.
The Committee observed that both the addresses of the unit i.e. the unit where the capital goods are installed at present and the unit where the capital goods are to be shifted are incorporated in IEC. The Committee took into account the submission of the party that their unit is excise exempted. The Committee, therefore, decided to regularize shifting of the capital goods from their unit located at Plot No.17B, Sector 2, Parwanoo (H.P) to their unit located at village – Malkumajra, Tehsil – Nalagarh, Distt. – Solan (H.P) based on installation certificate issued by chartered engineer. The regularization is subject
noo (H.P) to their unit located at village – Malkumajra, Tehsil – Nalagarh, Distt. – Solan (H.P) based on installation certificate issued by chartered engineer. The regularization is subject
to payment of composition fee of Rs. 5000/-.
M/s Vakrangee Limited, Mumbai
01/37/218/197/AM -15/EPCG-II 0330013702 dated 20.10.2006 Condonation of block-wise EO (1st block) submission of the party that the party has not made any export during the first block period, however, they have fulfilled 105.20% EO during the second block period.
of FTP 2015-20 to allow condonation from condition of fulfilment of block-wise EO, as the party could not apply to RA within the prescribed time period. This would be subject to payment of 2% composition fee on duty saved amount in proportion to the shortfall at the end of each block in terms of the provisions of
Para 5.8.2 of HBP v1 2009-14/ Para
5.14 (c) of HBP 2015-20.
M/s Rasandik Engineering Industries India Limited
01/37/218/98/AM-
15/EPCG-II
0530140595
dated
07.03.2006
0530140437
dated
14.02.2006
Condonation
of
lapse
of
non-
submission
of
installation
certificate
from
central excise.
The Committee observed that though
the party is registered with central
excise they have obtained installation
certificate from chartered engineer.
However, they have also submitted a
request to Central Excise Authority for
issuance of installation certificate but
the same has not yet been received.
The Committee deliberated upon the of FTP 2015-20 to allow acceptance of installation certificate issued by independent chartered engineer instead of Central Excise authority subject to payment of composition fee of Rs. 5000/-.
M/s Safire International Pvt. Ltd.
01/37/218/183/AM
-15/EPCG-II
0530142573
dated
06.12.2006
Condonation
of
block-wise EO
has not made any exports and their
export obligation period has already
expired on 5.12.2014. The Committee
therefore
decided
to
reject
the
request of party for condonation of
block-wise EO.
22.
M/s
Power
Technologies,
Bangalore
01/37/218/261/AM -14/EPCG-II 0730003371 dated 10.10.2005 Condonation of block-wise EO and extension in EOP for 2 years has fulfilled EO to the tune of Rs. 50,69,196/- out of Rs. 1,74,48,696/-. copies of fresh export orders obtained by them and submission of the party
ck-wise EO and extension in EOP for 2 years has fulfilled EO to the tune of Rs. 50,69,196/- out of Rs. 1,74,48,696/-. copies of fresh export orders obtained by them and submission of the party
that they are confident to fulfil the EO within the extended time period.
(a) condonation from condition of party could not apply to RA within the prescribed time period. This would be subject to payment of 2% composition fee on duty saved amount in proportion to the shortfall at the end of each block in terms of the provisions of Para 5.8.2 of HBP v1 2009-14/ Para 5.14 payment of composition fee equal to 2% of proportionate duty saved amount on unfulfilled EO or an enhancement in EO imposed to the extent of 10% of total EO at the choice of exporter, for each year of extension sought in terms of provisions contained in Para 5.11(a) of HBP Vol. I. 2009-14/
Para 5.17 (b) of HBP 2015-20, as
within the prescribed time period.
M/s SVG Fashions Limited, Mumbai
01/37/218/173/AM
-15/EPCG-II
0330008852
dated
08.06.2005
Addition
of
alternate
product
viz.
“Non
Embroidery Fabric”
from the date of
issuance
of
authorization.
The Committee observed that the party
has stated that they have already
fulfilled
their
EO
by
export
of
embroidered fabric, however they have
mentioned
description
of
export
product
as
‘with
or
without
embroidered fabric’ in order to claim
DEPB
benefits.
The
Committee,
therefore decided to defer the case
with the direction to call for copies of
10 shipping bills from the party as a
sample.
24.
M/s Shirpur Gold
Refinery Limited
18/49/AM- 12/EPCG-II 0330000677 dated 06.11.2000 Extension in EOP for one year on the grounds of RBI restrictions on import of Gold Dore. The case was placed before EPCG Committee in its meeting held on 22.01.2015, wherein it was decided to defer the case for calling additional details from RA.
report of RA that the export obligation period of the subject authorization has been extended by them upto 05.11.2014.
submission of the party that they have not been able to utilize their extended
A that the export obligation period of the subject authorization has been extended by them upto 05.11.2014.
submission of the party that they have not been able to utilize their extended
time due to restrictions imposed by RBI on import of raw material for refinery i.e. Gold Dore.
of FTP 2015-20 to allow second EOP extension for 1 year with the condition that 50% of duty payable in proportion to the unfulfilled export obligation is paid by authorization holder to Custom authorities before an endorsement of extension is made on EPCG authorization by RA concerned in terms of provisions contained in Para 5.11(b) of HBP Vol. I. 2009-14, as the party could not apply to RA within the prescribed time period.
M/s Shri Govindaraja Mills Ltd., Tamilnadu 01/37/218/207/AM -15/EPCG-II 3530000985 dated 06.05.2005 Condonation of block-wise EO has fulfilled their entire EO during the second block period, but could not fulfil the block-wise EO.
of FTP 2015-20 to allow condonation from condition of party could not apply to RA within the prescribed time period. This would be subject to payment of 2% composition fee on duty saved amount in proportion to the shortfall at the end of each block in terms of the provisions of
Para 5.8.2 of HBP v1 2009-14/ Para
5.14 (c) of HBP 2015-20.
M/s Rajat Wires Pvt. Ltd., New Delhi
01/37/218/208/AM -15/EPCG-II 0530140645 dated 14.03.2006 Condonation of block-wise EO and extension in EOP has fulfilled 71.21% EO. The Committee, deliberated upon the case and decided to recommend to DG for relaxation under Para 2.58 of FTP 2015-20 to allow:
(a) condonation from condition of party could not apply to RA within the prescribed time period. This would be subject to payment of 2% composition fee on duty saved amount in proportion to the shortfall at the end of each block in terms of the provisions of Para 5.8.2 of HBP v1 2009-14/ Para 5.14
payment of composition fee equal to 2% of proportionate duty saved amount on unfulfilled EO or an enhancement in EO imposed to the extent of 10% of total EO at the choice of exporter, for each year of extension sought in terms of provisions contained in Para 5.11(a) of HBP Vol. I. 2009-14/
Para 5.17 (b) of HBP 2015-20, as
within the prescribed time period.
M/s Biopac India Corporation Limited, Mumbai
01/36/218/147/AM -15/EPCG-I 14 EPCG authorizatio n issued during the period AM- 05 to AM-07 Re-fixation of average EO (by excluding the export performance of the unit lost in fire) submission of the party that they are unable to achieve their average export obligation due to the fact that their sole unit, based on exports of which, their average EO was fixed, was completely destroyed in a fire accident in 2004 prior to obtaining the fresh EPCG authorizations. The Committee decided to defer the case with directions to RA to carry out a physical inspection of the site of the fire accident and verify the documents submitted by the party in support of their claim. 28. M/s JSW Steel Limited, Mumbai
01/36/218/78/AM- 15/EPCG-I 0330004393 dated 25.09.2003 Re-fixation of average export performance The Committee noted that the business of M/s Ispat Industry was taken over by M/s JSW Steel Limited in 2011 and it started operating in the name of JSW Ispat Steel Ltd. Subsequently JSW Ispat Steel Ltd. got merged with JSW Steel ltd. based on merger plan approved by the Bombay High Court. The Committee further noted that the party has requested for re-fixation of average EO in respect of 118 EPCG Authorizations as the original authorization holder M/s Ispat Industry had not been able to fulfil their average EO.
arty has requested for re-fixation of
average EO in respect of 118 EPCG
Authorizations
as
the
original
authorization holder M/s Ispat Industry
had not been able to fulfil their
average
EO.
The
Committee
deliberated upon the case and decided
to defer it with the direction to call for
the details of fulfilment of Average EO
against the Authorizations from the RA
and the party.
29.
M/s
LGB
Forge
Limited,
Coimbatore
01/36/218/360/AM -14/EPCG-I 730001103 dated 27.06.2003 730001034 dated 22.05.2003 730001525 dated 19.01.2004 730001545 Review of the decision of the EPCG Committee The Committee noted that the request of the party regarding condonation of delay in submission of details regarding acquisition and demerger was earlier rejected in the EPCG Committee meeting held on 27.02.2014 on the grounds that party should have got the authorization amended and they should have furnished fresh LUT/BG before taking over the company as per High
Committee meeting held on 27.02.2014 on the grounds that party should have got the authorization amended and they should have furnished fresh LUT/BG before taking over the company as per High
dated 30.01.2004 730001418 dated 05.12.2003 Court order.
The party has represented against this decision of the Committee on the grounds that the delay on their part was not wilful and requested for a personal hearing to explain their case.
The Committee deliberated the matter and decided to give an opportunity of personal hearing before the next EPCG Committee scheduled for 25th May, 2015. 30. M/s Bestech Hospitalities Pvt. Ltd., Gurgaon
01/36/218/160/AM -15/EPCG-I 28 EPCG authorizatio ns issued during the period AM- 07 to AM-09 Modification of average EO for authorizations issued during the year of 2007-08 and 2008-09 The Committee noted that the case was considered in the EPCG Committee meeting held on 17.12.2014 and was deferred for further examination. The Committee took into account the submission of the party that they are unable to achieve their average export obligation due to the fact that their sole unit, based on exports of which, their average EO was fixed, has been sold off. The Committee also noted that the firm had redeemed the authorizations prior to obtaining fresh EPCG authorizations and that the condition of including exports made under redeemed EPCG authorizations in the average EO of fresh EPCG authorizations was deleted w.e.f. 1.4.2013.
ning fresh EPCG authorizations and that the condition of including exports made under redeemed EPCG authorizations in the average EO of fresh EPCG authorizations was deleted w.e.f. 1.4.2013. It was decided that all such requests for re-fixation of average EO on grounds of the above change in FTP would be taken up for consideration in consultation with the Department of Revenue (DoR). The Committee therefore decided to defer the case for examination in consultation with DoR. 31. M/s Tropical Granites
01/37/218/155/AM -14/EPCG-II 5330000786 dated 29.09.2003 5330000852 dated 25.08.2004 5330000897 dated 09.02.2005 5330000936 dated 23.09.2005 Waiver of average EO during the ban period The Committee noted that the request of the party was placed before the EPCG Committee meeting dated 27.2.2014 wherein it was decided that the request for waiver of average EO during the ban period can be examined only on getting a report from RA that the party had only one mine in Kerala which was closed. The Committee noted that the report from RA states that the party had four granite quarries in Kerala which were closed on account of the prohibitory orders w.e.f. 02.02.2006, imposed by the Government of Kerala. The Committee took into account the submission of the firm that they were able to obtain a fresh mining lease in Kondapalakala and Thammampati in Tamil Nadu and could resume full mining operations only in 2013.
k into account the submission of the firm that they were able to obtain a fresh mining lease in Kondapalakala and Thammampati in Tamil Nadu and could resume full mining operations only in 2013.
of FTP 2015-20 to allow waiver from maintenance of average EO for the period AM 06 till AM 13 i.e. from date of ban on mining activity by Government of Kerala till obtaining of fresh mining lease by the party.
M/s Reliance Industries Limited, Mumbai
01/37/218/174/AM -15/EPCG-II 0330035744 dated 10.05.2013 Re-validation of EPCG authorization The case was placed before EPCG Committee in its meeting held on 22.01.2015, wherein it was decided to defer the case with the directions that the party be asked to provide a certificate from the Labour Commissioner for the period of strike (in English).
The Committee was informed that the party had furnished a certified copy of letter/report dated 02.03.2015 obtained by M/s Larsen & Toubro Heavy Engineering, Surat from Deputy Labour Commissioner, Surat, in English, certifying that the strike started from 16.12.2013 to 12.05.2014 (4 months and 26 days) at M/s L&T Heavy Engineering, Hazira.
The Committee was also informed that the party has been allowed revalidation of said EPCG authorization for 4 months from the expiry of the validity of the EPCG authorization i.e. up to 31st March, 2015, with approval of DG subject to ex-post facto approval of the EPCG Committee.
The Committee granted post-facto approval.
of the validity of the EPCG authorization i.e. up to 31st March, 2015, with approval of DG subject to ex-post facto approval of the EPCG Committee.
The Committee granted post-facto approval. 33. M/s The Meenachil Marketing & Processing Co- operative Society Ltd., Kerala
18/119/AM-15/P-5
103000685
dated
28.10.2005
Counting
of
exports
of
alternate products
The Committee observed that there
was a provision to fulfill 100% EO by
exports
of
alternate
product
manufactured by them as per para
5.4(i) of FTP 2004-09. The Committee,
therefore, decided to allow counting
of exports of alternate products viz.
‘Natural
Rubber
HA
Latex
60%
DRC/Natural Rubber ISNR-20’ already
made by the party for EO fulfillment in
terms of the above provisions. The
party would however maintain average
export obligation for items viz. ‘Natural
Rubber HA Latex 60% DRC/Natural
Rubber ISNR-20’ as may be fixed by
RA.
M/s Sri Venkatram 3530002151 Extension in EOP
however maintain average export obligation for items viz. ‘Natural Rubber HA Latex 60% DRC/Natural Rubber ISNR-20’ as may be fixed by RA.
M/s Sri Venkatram 3530002151 Extension in EOP
Spinners (P) Ltd., Tamilnadu
01/37/218/209/AM -15/EPCG-II dated 24.11.2006 3530002168 dated 27.11.2006 3530002172 dated 27.11.2006 3530002169 dated 27.11.2006 3530002325 dated 23.01.2007 for 2 years has already obtained the first block extension as per para 5.8.2 of HBP v. 1 against all the 5 authorizations. The Committee took into account the submission of the party that they have not been able to fulfil the entire EO during the original EOP, due to recession in the international market and that they have given the copies of fresh export orders obtained by them and are confident to fulfil the EO within the extended time period.
of FTP 2015-20 to allow extension in EOP for 2 years on payment of composition fee equal to 2% of proportionate duty saved amount on unfulfilled EO or an enhancement in EO imposed to the extent of 10% of total EO at the choice of exporter, for each year of extension sought in terms of provisions contained in Para 5.11(a) of HBP Vol. I. 2009-14/ Para 5.17 (b) of HBP 2015-20, as the party could not apply to RA within the prescribed time period.
M/s High Street Fashions Ltd., Jaipur
01/36/218/28/AM- 14/EPCG-I 1330001670 dated 23.04.2007 Counting of excess exports made against three EPCG authorizations (i.e.
period.
M/s High Street Fashions Ltd., Jaipur
01/36/218/28/AM- 14/EPCG-I 1330001670 dated 23.04.2007 Counting of excess exports made against three EPCG authorizations (i.e. 1330001583 dated 13.04.2007, 1330001584 dated 13.04.2007, 1330001585 dated 13.04.2007) already clubbed and redeemed for fulfilment of EO of fourth EPCG Authorization (i.e. 1330001670 dated 23.04.2007). The Committee noted that as per the report of RA, Jaipur the party has clubbed three authorizations and fulfilled 90% EO. The said three authorizations were redeemed under fast track provision as per Para 5.9 of FTP 2009-14 / Para 5.09 of FTP 2015- 20 .
The Committee decided that RA should first revise the EODC’s issued against 3 clubbed EPCG authorizations issued to the party by deleting the extra shipping bills which the party wants to utilise for redemption of 4th EPCG authorisation and then consider EODC against the 4th EPCG authorization No. 1330001670 dated 23.04.2007 with following conditions:
i) The counting of excess exports made against 3 EPCG authorization nos. 1330001583 dated 13.04.2007, 1330001584 dated 13.04.2007, 1330001585 dated 13.04.2007 for fulfilment of EO of 4th EPCG authorization no. 1330001670 dated 23.04.2007 will be subject to the condition that the exports made are
4 dated 13.04.2007, 1330001585 dated 13.04.2007 for fulfilment of EO of 4th EPCG authorization no. 1330001670 dated 23.04.2007 will be subject to the condition that the exports made are
within the validity period of EPCG Authorizations and that there is no double counting of shipping Bills, all shipping bills are for direct exports and not third party exports and are not free shipping bills.
ii) A composition fee of Rs 200 per shipping bill would be charged for such shipping bills which are being considered for fulfilment of EO in respect of other EPCG authorizations. 36. M/s Mit-Dix Gems, Mumbai
18/40/AM-15/P-5
0330004511
dated
16.10.2003
Condonation
of
block-wise EO and
EOP extension for
2 years
The Committee noted that the said
authorization
was
valid
up
to
15.10.2011. However, the party has
fulfilled their entire EO on 31.10.2013
i.e. after completion of original EOP.
within the prescribed time payment of composition fee equal to 2% of proportionate duty saved amount on unfulfilled EO or an enhancement in EO imposed to the extent of 10% of total EO at the choice of exporter, for each year of extension sought in terms of provisions within the prescribed time period.
or an enhancement in EO imposed to the extent of 10% of total EO at the choice of exporter, for each year of extension sought in terms of provisions within the prescribed time period.
M/s GPT Steel Industries Limited, Kutch
01/36/218/166/AM -15/EPCG-I 3730000033 dated 03.06.2005 Condonation of block-wise EO and extension in EOP for 2 years submission of the party that they have not made any export during the original EOP, due to procedural lapse of non-mentioning the EPCG authorization number on shipping bills.
has given copies of fresh export orders obtained by them and have stated that they are confident to fulfil the EO within the extended time period.
The Committee also noted that the party has already submitted the composition fee for unfulfilled EO to concerned RA.
within the prescribed time payment of composition fee equal to 2% of proportionate duty saved amount on unfulfilled EO or an enhancement in EO imposed to the extent of 10% of total EO at the choice of exporter, for each year of extension sought in terms of provisions within the prescribed time period.
M/s Mafatlal Industries Limited, Mumbai
01/36/218/156/AM -12/EPCG-I 01500721 dated 30.03.1998 i. Extension for fulfilment of import obligation as recommended by BIFR in order dated 25.06.09; ii. Re-fixation of EO from CIF value to duty saved value.
500721 dated 30.03.1998 i. Extension for fulfilment of import obligation as recommended by BIFR in order dated 25.06.09; ii. Re-fixation of EO from CIF value to duty saved value. The Committee noted that the request of the party to amend the EPCG authorization to allow import at zero duty in terms of Customs Notification No. 29/97 dated 01.04.1997 amended vide Notification no. 122/99 dated 4.11.99 was last placed before the EPCG Committee in its meeting held on 10.4.2013 wherein it was deferred for obtaining the comments of DoR. The Committee noted that DoR has not agreed to the proposal on the grounds that goods under the authorization have been imported before issuance of
Notification No. 122/99 dated 4.11.99.
The Committee decided not to extend the validity of the EPCG authorisation for allowing further import. Re-fixation of the EO from CIF to Duty Saved Value is possible but before considering that request the party should first deposit duty along with interest as per the provisions in case of reduced import. 39. M/s Kumar Printers Pvt. Ltd., Gurgaon
01/36/218/262/AM -14/EPCG-I 0530134617 dated 06.08.2003 i. Condonation from the maintenance of average exports year- wise completing the same in totality by the end of the 10th year; ii. Condonation of block-wise EO in terms of Para 5.8.3 of HBP v1 for the 2nd and 3rd block; and iii. Final extension in EOP upto 05.08.2013 (by two years) has fulfilled 76.05% EO during the original EOP.
ock-wise EO in terms of Para 5.8.3 of HBP v1 for the 2nd and 3rd block; and iii. Final extension in EOP upto 05.08.2013 (by two years) has fulfilled 76.05% EO during the original EOP. The Committee took into account the submission of the party that the party has fulfilled their entire EO during the period of August, 2011 to August, 2013 (i.e. 9th and 10th year).
The
Committee,
therefore,
recommended
to
DG
for
relaxation under Para 2.58 of
FTP 2015-20 for :
i. condonation of shortfall in Average
EO for the years 2003-13 which
was fulfilled in totality by the end
of 10th year.
ii. condonation
from
condition
of
fulfilment of block-wise EO subject
to payment of composition fee of
2% on duty saved amount in
proportion to the shortfall at the
end of each block in terms of the
provisions of Para 5.8.2 of HBP v1
2009-14/Para 5.14 (c) of HBP
2015-20; and
iii. second EOP extension for 2 years
(i.e. up to 05.08.2013) with a
condition that 50% of duty payable
in proportion to the unfulfilled
export
obligation
is
paid
by
authorization holder to Custom
authorities before an endorsement
of extension is made on EPCG
authorization by RA concerned in
terms of provisions contained in
Para 5.11(b) of HBP Vol. I. 2009-
14, as the party could not apply to RA within the prescribed time period. 40. M/s Jindal Poly Films Limited, New Delhi
01/36/218/72/AM-
13/EPCG-I
0530133359
dated
27.09.2002
0530136565
dated
14.07.2004
0530140674
Clubbing
of
3
EPCG
authorizations and
change the EOP to
12 years against
EPCG
Authorization No.
Representative of the DOR stated that
they need to call for a report from
Customs
in
the
matter
before
furnishing
their
comments.
The
Committee,
therefore,
decided
to
defer the case. DOR was requested to
send the comments before the next
dated 20.03.2006 0530133359 dated 27.09.2002 as the CIF value of the Authorization was more than 100 Crore. meeting of EPCG Committee. 41. M/s Winlex Impex Pvt. Ltd., New Delhi
01/37/218/219/AM -15/EPCG-II 0530145675 dated 22.02.2008 0530146235 dated 30.05.2008 Regularization of EO fulfillment by export of alternate products through group company The Committee noted that there was a provision to fulfil 100% EO by exports of alternate product manufactured by the party or group company in respect of EPCG authorization No. 0530145675 dated 22.02.2008 (i.e. issued prior to March, 2008) and upto 50% EO against EPCG authorization No. 0530146235 dated 30.05.2008 (i.e. issued after the March, 2008) as per
Para 5.4(i) of FTP 2004-09.
The Committee, therefore, decided to recommend to DG for relaxation under Para 2.58 of FTP -2015-20 to allow the exports made by group company prior to endorsement of alternate products in the subject EPCG authorizations (but after issue of authorisation) in terms of provisions of
para 5.5(c) and para 9.28 of FTP
2009-14.
M/s Nancy Krafts, New Delhi
18/31/AM-15/P-5
0530132526
dated
28.01.2002
0530132875
dated
21.5.2002
0530133196
dated
19.8.2002
0530133609
dated
4.12.2002
Condonation
of
block-wise EO and
second
EOP
extension
submissions of the party that they have
not made any export during the
original EOP, due to recession in
International market.
within the prescribed time (b) first extension in EOP for 2 years for regularization purposes on payment of composition fee equal to 2% of proportionate duty saved amount on unfulfilled EO or an
enhancement in EO imposed to the extent of 10% of total EO at the choice of exporter, for each year of extension sought in terms of provisions within the prescribed time period. (a) second EOP extension for two years for regularization purposes with a condition that 50% of duty payable in proportion to the unfulfilled export obligation is paid by authorization holder to Custom authorities before an endorsement of extension is made on EPCG authorization by RA concerned in terms of provisions contained in Para 5.11(b) of HBP Vol. I. 2009-14, as the party could not apply to RA within the prescribed time period.
M/s Mastercraft Engineers Pvt. Ltd., Bangalore
18/79/AM-15/P-5
0730003369
dated
10.10.2005
0730004972
dated
8.12.2006
Condonation
of
Block-wise EO
The Committee observed that the party
has fulfilled 100% EO and also made
some excess export during the second
block of their EOP.
0730004972
dated
8.12.2006
Condonation
of
Block-wise EO
The Committee observed that the party
has fulfilled 100% EO and also made
some excess export during the second
block of their EOP. However they could
not fulfil any EO during 1st block
period.
of FTP 2015-20 to allow condonation from condition of party could not apply to RA within the prescribed period. This would be subject to payment of 2% composition fee on duty saved amount in proportion to the shortfall at the end of each block in terms of the provisions of
Para 5.8.2 of HBP v1 2009-14/ Para
5.14 (c) of HBP 2015-20.
M/s Mansingh Hotels & Resorts Limited, New Delhi
18/62/AM-15/P-5
053013452
0
dated
17.07.2003
053013633
9
dated
08.06.2004
Issuance of EODC
has not furnished any documents
indicating actual dates when they sold
the car imported under the EPCG
scheme as well as for EO fulfilment
status.
Therefore,
the
Committee
decided to defer the case with
directions to call for proof of exact date
of car sale and a copy of chartered
accountant certificate for showing the
EO fulfilment status by the party.
45.
M/s Grand Windsor
Resorts
Limited,
Jalandhar
01/36/218/296/AM
-14/EPCG-I
10
EPCG
authorizatio
ns
issued
during
the
period AM-
07 to AM-10
Re-fixation
of
average EO
The
representative
of
the
party
appeared for personal hearing before
the Committee and informed that they
have responded to the show cause
notices issued to them by Customs
alleging misuse of cars imported under
the EPCG scheme. Representative of
the DOR stated that the matter is
under examination. The Committee,
therefore, decided to defer the case.
46.
Seyad Cotton Mills
Ltd., Tamilnadu
01/37/218/181/AM -15/EPCG-II 3530003085 dated 22.01.2008 3530002134 dated 15.11.2006 Condonation of block-wise EO and extension in EOP for 2 years submission of the party that they have fulfilled 40.47% EO in respect of EPCG authorization no. 3530002134 dated 15.11.2006 and have not made any export against EPCG authorization no.
or 2 years submission of the party that they have fulfilled 40.47% EO in respect of EPCG authorization no. 3530002134 dated 15.11.2006 and have not made any export against EPCG authorization no. 3530003085 dated 22.01.2008 during the original EOP, due to unstability in export market. The Committee noted the fact that the party has given copies of fresh export orders obtained by them and have stated that they are confident to fulfil the EO within the extended time period.
within the prescribed time payment of composition fee equal to 2% of proportionate duty saved amount on unfulfilled EO or an enhancement in EO imposed to the extent of 10% of total EO at the choice of exporter, for each year of extension sought in terms of provisions within the prescribed time
period.
M/s Omega Enterprises, New Delhi
01/37/218/262/AM -15/EPCG-II 0530140162 dated 28.12.2005 Condonation of block-wise EO and extension in EOP for 2 years submission of the party that they had supplied goods under deemed export and are confident to fulfil the EO within the extended time period.
within the prescribed time payment of composition fee equal to 2% of proportionate duty saved amount on unfulfilled EO or an enhancement in EO imposed to the extent of 10% of total EO at the choice of exporter, for each year of extension sought in terms of provisions within the prescribed time period.
or an enhancement in EO imposed to the extent of 10% of total EO at the choice of exporter, for each year of extension sought in terms of provisions within the prescribed time period.
M/s Subtleweight Electric India Limited, Kolkata
01/37/218/175/AM -15/EPCG-II 0230001389 dated 09.03.2006 Condonation of block-wise EO and extension in EOP for years submission of the party they are unable to count the exports already made by them towards EO fulfilment due to procedural lapse of non- mentioning the EPCG authorization number on shipping bills of third party exports made by them.
(a) condonation from condition of
party could not apply to RA within the prescribed time period. This would be subject to payment of 2% composition fee on duty saved amount in proportion to the shortfall at the end of each block in terms of the provisions of Para 5.8.2 of HBP v1 2009-14/ Para 5.14 payment of composition fee equal to 2% of proportionate duty saved amount on unfulfilled EO or an enhancement in EO imposed to the extent of 10% of total EO at the choice of exporter, for each year of extension sought in terms of provisions contained in Para 5.11(a) of HBP Vol. I. 2009-14/
Para 5.17 (b) of HBP 2015-20, as
within the prescribed time period.
In case of third party export, the party should follow conditions stipulated in
para 5.10 (d) of HBP 2015-20.
DGFT = Directorate General of Foreign Trade DG = Director General FTP = Foreign Trade Policy HBP v1 = Handbook of Procedure Vol. I EO = Export Obligation EODC = Export Obligation Discharge Certificate EOP = Export Obligation Period EPCG = Export Promotion Capital Goods RA = Regional Authority BG = Bank Guarantee FFE = Free Foreign Exchange FE = Foreign Exchange IEC = Importer-Exporter Code DOR = Department of Revenue CLA = Central Licensing Area, New Delhi IEM = Industrial Entrepreneurs Memorandum RCMC = Registration-cum-Membership Certificate DHI = Department of Heavy Industry DOT=Department of Telecommunication