MINUTES OF EPCG COMMITTEE MEETING HELD UNDER THE CHAIRMANSHIP OF SHRI JAIKANT SINGH, ADDITIONAL DIRECTOR GENERAL OF FOREIGN TRADE AT 1430 Hours ON 27.06.2014
Following officers attended the meeting:
a.
ShriAkashTaneja, Joint Director General of Foreign Trade, DGFT
b.
Shri K. K. Sinha, Industrial Adviser, Department of Industrial Policy and Promotion
c.
ShriGajraj Singh, Sr. Development Officer, Department of Heavy Industry
d.
Shri G. S. Bains, Technical Officer (DBK), Department of Revenue
II. Minutes of the last Meeting held on 15.05.2014 were confirmed.
III. The Committee deliberated upon all the cases and following decisions were taken:
Sl. No. Firm’s Name and Numbers EPCG Authorisati on No. and Date Subject Decision of the Committee 1. M/s Askar Microns Private Limited
01/36/218/12/AM- 15/EPCG-I 0730002454 dated 13.01.2005 0730002719 dated 23.03.2005 0730003345 dated 03.10.2005 Condonation of block- wise EO and extension in EOP. The Committee observed that there is shortfall in first block against EPCG Authorization 0730002454 dated 13.01.2005 and shortfall in second block against EPCG Authorization Nos. 0730002719 dated 23.02.2005 and 0730003345 dated 03.10.2005. The Committee, therefore, decided to recommend to DG for relaxation under Para 2.5 of FTP to allow:
(a) condonation from condition of fulfillment of block-wise EO in respect of EPCG Authorization No.
herefore, decided to recommend to DG for relaxation under Para 2.5 of FTP to allow:
(a) condonation from condition of fulfillment of block-wise EO in respect of EPCG Authorization No. 0730002454 dated 13.01.2005 subject to payment of 2% composition fee on duty saved amount in proportion to the shortfall at the end of each block in terms of the provisions of Para 5.8.2 of HBP v1(RE:2013)/Para 5.8.3 of HBP v1 (RE:2012); and (b) extension in EOP in respect of EPCG Authorization Nos. 0730002719 dated 23.02.2005 and 0730003345 dated 03.10.2005 for 2 years on payment of composition fee equal to 2% of proportionate duty saved amount on unfulfiled EO or an enhancement in EO imposed to the extent of 10% of total EO at the choice of exporter, for each year of extension sought in terms of provisions contained in Para 5.11(a) of HBP Vol. I.
This has the approval of DG.
2.
M/s Honda Cars
India Limited
01/36/218/31/AM-
15/EPCG-I
0530159503
dated
16.10.2012
0530161145
dated
04.07.2013
Permission
to
shift
the
capital
goods
from Plant-I to Plant-
II.
The Committee observed that:
a. Addresses of both the factories of the company i.e. the factory where the capital goods are installed and the factory where the capital goods
to Plant-
II.
The Committee observed that:
a. Addresses of both the factories of the company i.e. the factory where the capital goods are installed and the factory where the capital goods
are to be shifted are incorporated in IEM, IEC and RCMC. b. The capital goods have been installed and installation certificate have been issued by the Jurisdictional Central Excise Authority. c. The firm have stated that as demand of their product (car) has increased and therefore the management decided to shift the production line of some of the car and car parts to the plant located at Alwar, Rajasthan.
The Committee, therefore, decided to grant permission to shift the capital goods from plant-I located at Plot No. A-1, Sector 40/41, SurajpurKasna Road, Greater Noida Industrial Development Area, Distt. GautamBudhNagar,U.P to their another plant-II located atSPL-1, Tapukara Industrial Area, Khuskhera, Distt. Alwar, Rajasthansubject to the condition that the company will furnish fresh installation certificate. This approval is in respect of only those Capital Goods which have been installed vide Installation Certificates dated 30.07.2013 and 09.05.2014 issued by Central Excise.
Reference received from M/s Jindal Stainless Limited
01/36/218/159/A M-14/EPCG-I
To clarify whether RA can redeem the licence or they will have to approach the DGFT Hqrs.
Reference received from M/s Jindal Stainless Limited
01/36/218/159/A M-14/EPCG-I
To clarify whether RA can redeem the licence or they will have to approach the DGFT Hqrs. for condonation of delay in installation certificate if the capital goods are installed within 18 months from the dated of completion of imports but submission of installation certificate has been delayed. The Committee deliberated on the issue and observed that as per Para 5.3.1 of HBP v1 an exporter is required to obtain Installation Certificate within 18 months from the date of completion of imports and can submit the same to the RA any time before redemption of licence. The modification in language of
Para 5.3.1 of HBP v1 would be taken up
during the formulation of Foreign Trade Policy. The issue is recommended to DG for approval.
M/s C & S Efacec MV India Private Limited
01/36/218/395/A M-14/EPCG-I 0530148386 dated 10.02.2009 Condonation of delay in submission of installation certificate The Committee observed that
a.
The Capital Goods were imported
on 19.02.2009.
b.
The firm have already obtained
Installation
Certificate
dated
31.01.2014 confirming installation
of CG on 23.06.2011 from Central
Excise.
c.
The firm have completed Export
Obligation.
d.
The firm have obtained Installation
Certificate beyond 18 months from
the date of completion of imports.
Since the Installation Certificates have already been obtained from the Central
Excise, the Committee decided to recommend to DG for relaxation under
Para 2.5 of FTP to condone the delay in
installation of capital goods.
M/s Brain “N” Beyond Biotech Private Limited
01/36/218/389/A
M-14/EPCG-I
0730002752
dated
01.04.2005
0730002854
dated
09.05.2005
0730003183
dated
22.08.2005
0730004055
dated
24.04.2006
Change
of
export
product
and
installation address.
The Committee deliberated upon the case
and decided to defer the case with the
direction to call for comments of DIPP In the
matter in respect of firm’s request regarding
change of export product.
6.
M/s Musashi Auto
Parts India Private
Limited
18/14/AM-15/P-5 0530139785 dated 26.10.2005 0530139969 dated 05.12.2005 0530140087 dated 20.12.2005 0530140102 dated 21.12.2005 0530140218 dated 05.01.2006 0530140219 dated 05.01.2006 0530140600 dated 08.03.2006 0530140815 dated 04.04.2006 Condonation of block- wise E.O. The Committee observed that the firm have already fulfilled the specific EO against all the 8 Authorizations as reported by CLA, New Delhi and therefore decided to recommend to DG for relaxation under Para 2.5 of FTP to allowcondonation from condition of fulfillment of block-wise EO subject to payment of 2% composition fee on duty saved amount in proportion to the shortfall at the end of each block in terms of the provisions of Para 5.8.2 of HBP v1(RE:2013)/Para 5.8.3 of HBP v1 (RE:2012). 7. M/s Vardhman Textiles Limited
18/53/AM-15/P-5
Issuance of Post EPCG authorization.
of the provisions of Para 5.8.2 of HBP v1(RE:2013)/Para 5.8.3 of HBP v1 (RE:2012). 7. M/s Vardhman Textiles Limited
18/53/AM-15/P-5
Issuance
of
Post
EPCG authorization.
The Committee deliberated upon the case
and decided to defer it with the direction to
examine the case again.
8.
M/s
Mitter
Fasteners
18/07/AM-15/P-5 3030001210 dated 15.09.2005 Extension in EOP for 2 years and condonation of block- wise E.O. The Committee observed that the firm/RA have not furnished Block-wise EO/EO fulfilment status and have also not indicated the reasons for shortfall. The Committee, therefore, decided to defer the case with the direction to call for the requisite information from the RA/firm.
M/s Mahindra CIE Automotive Limited
01/36/218/424/A M-14/EPCG-I 0330012382 dated 21.06.2006 0330008519 dated 29.04.2005 0330010257 dated 17.11.2005 Amendment of export product from the date of issuance of Authorizations The Committee observed that:
a. M/s Mahindra CIE Automotive Limited
are exporting various types of forgings
products and forgings manufactured
out of both alloy and non-alloy steel
under the main heading 7626 & 8708;
b. The forgings and machined products
exported
under
subheading
of
7626.19.90 & 8708.99.00 comprise of
Crankshaft, stub axle, upper arm, link,
spring seat etc. broadly covered under
the automotive component;
c.
machined products exported under subheading of 7626.19.90 & 8708.99.00 comprise of Crankshaft, stub axle, upper arm, link, spring seat etc. broadly covered under the automotive component; c. the HS Code was not mentioned at the time of applying for the EPCG application, even the description of all export items were not properly covered; d. Firm’s request is to give permission to amend the same in the license with the correct HS Code & description of export item; e. there will be no change in the main product description “Crank Shaft”; f. The firm fulfilled have fulfilled EO by the export of goods being manufactured by the use of the capital goods imported under the EPCG licence; g. The only error on the part of the firm is that at the time of applying for the EPCG licence they did not indicate the complete list of products exported which were to be manufactured out of the imported capital goods.
The Committee deliberated upon the case
and decided to allow amendment in export
product
as
detailed
below
subject
to
refixation of Average EO:
As per EPCG licence
(From)
Amendment required (To)
ITCHS Code No.
Export item
ITCHS
Code
No.
o allow amendment in export
product
as
detailed
below
subject
to
refixation of Average EO:
As per EPCG licence
(From)
Amendment required (To)
ITCHS Code No.
Export item
ITCHS
Code
No.
Export item
Not indicated in
the EPCG licence
Crank Shaft
73261990
Automotive Components (Alloy & non alloy steel forgings) Components supplied under the above Crankshaft, stub axle steering rod, upper arm, springs & other forgings component 87089900 Automotive components (Alloy & non alloy steel forgings) Components supplied under the above Crankshaft, stub axle steering rod, upper arm, springs & other forgings component 10. M/s Reliance Infratel Limited
18/18/AM- 13/EPCG-II 0330021083 dated 26.08.2008 0330019821 dated Counting of foreign exchange earnings of the parent company M/s Reliance Communications Shri S. Varadharajan, Advisor-Indirect Taxation of the company appeared before the EPCG Committee and explained the case. The Committee deliberated upon the case and decided to defer it with the direction to
arajan, Advisor-Indirect Taxation of the company appeared before the EPCG Committee and explained the case. The Committee deliberated upon the case and decided to defer it with the direction to
16.04.2008
0330019815
dated
11.04.2008
0330019775
dated
08.04.2008
0330019692
dated
01.04.2008
Limited for fulfilment
of
E.O
of
EPCG
authorizations.
call for information from the RA whether any
letter from DRI has been received in the
matter. DOR will also submit a report in this
regard.
11.
M/s
PrayagPolytech
Private Limited
01/37/218/255/A M-14/EPCG-II 0530143361 dated 23.03.2007 0530145692 dated 25.02.2008 0530146015 24.04.2008 0530154828 dated 18.02.2011 Condonation of delay in installation of capital goods. The Committee observed that the Installation Certificate has already been obtained from the Central Excise and, therefore, decided to recommend to DG for relaxation under
Para 2.5 of FTP to condone the delay in
installation of capital goods.
M/s Victora Tool Engineering Private Limited
01/37/218/205/A M-14/EPCG-II (a) 0530149246 dated 25.06.2009
(b) 0530140486 dated 22.02.2006 (a) Condonation of delay in installation of capital goods
(b) Condonation for installation of capital goods at another location (a) The Committee observed that the Installation Certificate has already been obtained from the Central Excise and, therefore, decided to recommend to DG for relaxation under Para 2.5 of FTP to condone the delay in installation of capital goods.This has the approval of DG.
(b) The Committee observed that as per
condition sheet attached with the EPCG
Authorization the firm was required to install
the capital goods in their unit located at Plot
No. 46, Sector-25, Ballabhgarh, Faridabad,
however, as per the Installation Certificate
obtained by the firm from Central Excise the
capital goods were installed in their unit
located at Plot No. 118, 125-126, Sector-25,
Faridabad. The firm has obtained installation
certificate
within
6
months.
Both
the
addresses are mentioned in IEC. The
Committee, therefore, decided to condone
the procedural lapse of installing the capital
goods at a different location not mentioned
in EPCG Authorization.
13.
dresses are mentioned in IEC. The
Committee, therefore, decided to condone
the procedural lapse of installing the capital
goods at a different location not mentioned
in EPCG Authorization.
13.
M/s SNY Autotech
Private Limited
01/37/218/228/A M-14/EPCG-II 0430001836 dated 05.08.2004 0430002663 dated 17.05.2005 0430002775 dated 30.06.2005 Condonation of block- wise E.O, extension in EOP and inclusion of alternate product.
The Committee decided to recommend to DG for relaxation under Para 2.5 of FTP to allow:
a. condonation from condition of fulfillment of block-wise EO subject to payment of 2% composition fee on duty saved amount in proportion to the shortfall at the end of each block in terms of the provisions of
Para 5.8.2 of HBP v1(RE:2013)/Para
5.8.3 of HBP v1 (RE:2012); and b. extension in EOP for 2 years on payment of composition fee equal to 2% of proportionate duty saved amount on unfulfiled EO or an enhancement in EO imposed to the extent of 10% of total EO at the choice of exporter, for each year of
extension sought in terms of provisions contained in Para 5.11(a) of HBP Vol. I.
For inclusion of alternate product, the firm
may approach the concerned RA.
14.
M/s
Surana
Telecom
and
Power Limited
18/177/AM- 13/EPCG-II 0930000193 dated 01.08.2001 Extension in EOP for 5 years and inclusion of alternate products. The case was placed before EPCG Committee in its meeting held on 30.08.2013 wherein it was deferred with the direction to call for comments from DOR. DOR in their comments iterated that the request of the firm for extension in EO for 5 years does not appear to be covered under FTP provisions. Moreover, the matter was under investigation by DRI for non-fulfilment of EO.
The Committee, therefore, decided to reject the case.
M/s VeekayPolycoats Limited
01/37/218/276/A M-14/EPCG-II 0530149218 dated 23.06.2009 Shifting of capital goods imported under EPCG scheme from one unit to other. The Committee observed that both the addresses of the unit i.e. the unit where the capital goods are installed at present and the unit where the capital goods are to be shifted are incorporated in IEC, RCMC.
e observed that both the
addresses of the unit i.e. the unit where the
capital goods are installed at present and the
unit where the capital goods are to be
shifted are incorporated in IEC, RCMC. The
firm have also produced the Installation
Certificate confirming installation at the
former unit. The Committee, therefore,
decided to grant permission to shift the
capital goods from Plot No. 2, Sector No. 3,
11E Ranipur, Haridwar, Uttaranchal to Plot
No. SP-1, Industrial Area, Tapukara, Distt.
Alwar, Rajasthan-301019 subject to the
condition that the company will furnish fresh
installation certificate.
16.
M/s
Sampark
Industries Limited
18/14/AM-
13/EPCG-II
0530132877
dated
21.05.2002
Extension in EOP for
2
years
i.e.
upto
20.05.2014
without
payment of customs
duty.
Sh. ChiragAggarwal, Director of the firm
appeared before the EPCG Committee and
explained
the
case.
The
Committee
deliberated upon the case in detail and
arrived at the conclusion to defer it with the
direction that the firm will submit a Report to
DOR who in turn will furnish comments in
the matter.
17.
eliberated upon the case in detail and
arrived at the conclusion to defer it with the
direction that the firm will submit a Report to
DOR who in turn will furnish comments in
the matter.
17.
M/s The Andhra
Pradesh
Paper
Mills Limited
01/37/218/198/A M-13/EPCG-II 0930001455 dated 30.03.2005 0930001502 dated 17.05.2005 0930001504 dated 19.05.2005 2630000295 dated 24.10.2005 2630000299 dated 11.11.2005 2630000302 dated 06.12.2005 2630000411 dated Acceptance of shipping bills having multiple EPCG authorization numbers and date of for discharge of E.O Representative from DOR informed that report in the matter is awaited from the Visakhapatnam Port. Therefore, the Committee decided to defer the case.
29.11.2006 2630000412 dated 29.11.2006 2630000415 dated 01.12.2006 2630000431 dated 05.01.2007 18. M/s Srinar Electronics Pvt. Ltd.
01/37/218/24/AM-
14/EPCG-II
0430001270
dated
04.09.2003
0430001083
dated
09.05.2003
0430001555
dated
25.02.2004
0430001308
dated
25.09.2003
Acceptance
of
shipping bills having
different
EPCG
Authorisations
Nos.
and
date
for
fulfilment of EO
The Committee observed that RA, Chennai
has confirmed that there are excess exports
in two redeemed EPCG Authorizations (No.
0430002438 and 0430000546). The firm
have requested that the excess exports
against these two EPCG Authorizations may
be counted towards fulfilment of subject 4
EPCG
Authorizations.
ations (No.
0430002438 and 0430000546). The firm
have requested that the excess exports
against these two EPCG Authorizations may
be counted towards fulfilment of subject 4
EPCG
Authorizations.
The
Committee
deliberated upon the case and decided to
allow adjustment of excess exports made
against
the
aforesaid
two
EPCG
Authorizations
(Shipping
Bills
carrying
numbers of these two Authorizations have
been produced by the firm towards fulfilment
of subject 4 EPCG Authorizations) provided
the exports made are within the validity
period of EPCG Authorizations and subject to
the
condition
that there
is
no
double
counting of exports and adjustment of
excess exports is done in respect of value of
entire shipment under a shipping bill and not
a part of it.
19.
M/s Rajaram Mills
Pvt. Ltd.
01/37/218/14/AM- 15/EPCG-II 3530001072 dated 28.06.2005 Extension in EOP upto 13.12.2013 The Committee observed that the firm have fulfilled 100% EO upto 13.12.2013 and therefore, decided to recommend to DG for relaxation under Para 2.5 of FTP to allow extension in EOP on payment of composition fee equal to 2% of proportionate duty saved amount on unfulfiled EO or an enhancement in EO imposed to the extent of 10% of total EO at the choice of exporter, for each year of extension sought in terms of provisions contained in Para 5.11(a) of HBP Vol. I.
r an enhancement in EO imposed to the extent of 10% of total EO at the choice of exporter, for each year of extension sought in terms of provisions contained in Para 5.11(a) of HBP Vol. I.
M/s Yazaki India Limited
01/37/218/201/A M-14/EPCG-II 3130000108 dated 28.02.2001 3130000123 dated 28.05.2001 3130000156 dated 01.10.2001 3130000176 dated 18.12.2001 3130000148 dated 29.08.2001 3130000219 dated 03.07.2002 Subsumption of outstanding EO against EPCG authorizations in the export performance of the unit being converted from DTA to EOU The Committee deliberated upon the case and decided to defer the case with the direction to call for report from the concerned RA and Development Commissioner.
M/s Print Point India (P) Limited
01/37/218/53/AM- 15/EPCG-II 0730004017 dated 07.04.2006 Condonation of block- wise E.O The Committee observed that the firm have fulfilled 100% EO during the EOP and, therefore, decided to recommend to DG for relaxation under Para 2.5 of FTP to allowcondonation from condition of fulfillment of block-wise EO subject to payment of composition fee of 2% on duty saved amount in proportion to the shortfall at the end of each block in terms of the provisions of Para 5.8.2 of HBP v1 (RE:2013)/Para 5.8.3 of HBP v1 (RE:2012).
M/s Sri Sai Rocks
01/37/218/01/AM- 15/EPCG-II 0730004005 dated 31.03.2006 Condonation of block- wise E.O and extension in EOP The Committee decided to recommend to DG for relaxation under Para 2.5 of FTP to allow:
a.
/AM- 15/EPCG-II 0730004005 dated 31.03.2006 Condonation of block- wise E.O and extension in EOP The Committee decided to recommend to DG for relaxation under Para 2.5 of FTP to allow:
a. condonation from condition of fulfillment of block-wise EO subject to payment of composition fee of 2% on duty saved amount in proportion to the shortfall at the end of each block in terms of the provisions of Para 5.8.2 of HBP v1 (RE:2013)/Para 5.8.3 of HBP v1 (RE:2012); and b. extension in EOP for 2 years on payment of composition fee equal to 2% of proportionate duty saved amount on unfulfiled EO or an enhancement in EO imposed to the extent of 10% of total EO at the choice of exporter in terms of Para 5.11(a) of HBP Vol. I, for each year of extension sought.
M/s S.K.A Exports
01/37/218/213/A M-14/EPCG-II 0530140034 dated 12.12.2005 Extension in EOP and condonation of block- wise EO. The case was placed before EPCG Committee in its meeting held on 04.04.2014 wherein the case was deferred. This time, the Committee deliberated upon the case and decided to recommend to DG for relaxation under Para 2.5 of FTP to allow:
a. condonation from condition of fulfillment of block-wise EO subject to payment of composition fee of 2% on duty saved amount in proportion to the shortfall at the end of each block in terms of the provisions of Para 5.8.2 of HBP v1 (RE:2013)/Para 5.8.3 of HBP v1 (RE:2012); and b.
ition fee of 2% on duty saved amount in proportion to the shortfall at the end of each block in terms of the provisions of Para 5.8.2 of HBP v1 (RE:2013)/Para 5.8.3 of HBP v1 (RE:2012); and b. extension in EOP for 2 years on payment of composition fee equal to 2% of proportionate duty saved amount on unfulfiled EO or an enhancement in EO imposed to the extent of 10% of total EO at the choice of exporter in terms of Para 5.11(a) of HBP Vol. I, for each year of extension sought.
M/s Hindustan Syringes & Medical Devices Limited
01/36/218/225/A
M-14/EPCG-I
0530139025
dated
05.07.2005
Re-fixation of average
E.O.
The Committee deliberated upon the case in
detail and decided to defer with the
direction to call for comments from DIPP in
the matter.
25.
M/s
Elecon
Engineering
Company Limited
01/36/218/374/A M-14/EPCG-I 3430000321 dated 16.07.2004 3430000414 dated 04.11.2004 3430000516 dated 28.02.2005 3430000511 dated 23.02.2005 3430000583 dated 30.05.2005 3430000582 dated 30.05.2005 Condonation of procedural lapse The Committee deliberated upon the case and decided to defer it with the direction to remand the case back with the request to submit the following details, in respect of each Authorizations/Shipping Bills in tabular form:
a.
Shipping Bill No.
b.
Shipping Bill Date
c.
EPCG Authorization No. endorsed
on the Shipping Bill
d.
EPCG Authorization No.
spect of each Authorizations/Shipping Bills in tabular form:
a.
Shipping Bill No.
b.
Shipping Bill Date
c.
EPCG Authorization No. endorsed
on the Shipping Bill
d.
EPCG Authorization No. towards
which the Shipping Bill is requested
to be counted
Besides the above, RA would also obtain an
undertaking from the firm that Shipping Bill
has not been utilized towards discharge of
EO against any other licence/s.
26.
M/s Kirby Building
Systems
(Uttaranchal) Pvt.
Ltd.
01/36/218/81/AM- 14/EPCG-I 0530139821 dated 28.10.2005 0530139822 dated 28.10.2005 0530139823 dated 31.10.2005 0530139835 dated 28.10.2005 0530139836 dated 31.10.2005 0530139954 dated 02.12.2005 0530139955 dated 02.12.2005 0530140729 dated 24.03.2006 0530140730 dated 24.03.2006 To accord relaxation for mentioning of several authorization numbers on each ARE-I, Bill of export and Invoices and in
Para 5.18.6 of HBP v1
under Para 2.5 of FTP
for
clubbing
of
9
EPCG
authorizations
issued
during
the
year 2005 and 2006.
The Committee deliberated upon the case
and decided to defer it.
DGFT = Directorate General of Foreign Trade
DG = Director General
FTP = Foreign Trade Policy
HBP v1 = Handbook of Procedure Vol. I
EO = Export Obligation
EODC = Export Obligation Discharge Certificate
EOP = Export Obligation Period
EPCG = Export Promotion Capital Goods
RA = Regional Authority
BG = Bank Guarantee
FFE = Free Foreign Exchange FE = Foreign Exchange IEC = Importer-Exporter Code DOR = Department of Revenue CLA = Central Licensing Area IEM = Industrial Entrepreneurs Memorandum RCMC = Registration-cum-Membership Certificate
Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.
No analysis generated for this document yet (analysis runs over brief docs + on-demand). Run build_analysis.py --ids 6362 --apply.