MINUTES OF EPCG COMMITTEE MEETING HELD UNDER THE CHAIRMANSHIP OF SHRI JAIKANT SINGH, ADDITIONAL DIRECTOR GENERAL OF FOREIGN TRADE AT 1430 Hours ON 15.05.2014   Following officers attended the meeting:   a.     Shri Akash Taneja, Joint Director General of Foreign Trade, DGFT b.     Shri V. K. Kohli, Director, O/o Textile Commissioner, Noida c.      Shri K. K. Sinha, Industrial Adviser, Department of Industrial Policy and Promotion d.     Shri S. S. Tak, Industrial Adviser, Ministry of Steel e.     Shri G. S. Bains, Technical Officer (DBK), Department of Revenue   II.            Minutes of the last Meeting held on 04.04.2014 were confirmed.   III.           The Committee deliberated upon all the cases and following decisions were taken:   S. No. Firm’s Name File Number EPCG Authorization No. and date   Subject Decision of the Committee 1. M/s  G.  M.  Pens International  Private Limited   01/36/218/407/AM­ 14/EPCG­I   0430002949 dated 18.08.2005 Condonation  of  block­ wise EO(first block) The Committee observed that as per the submissions  of  the  firm  they  have already  completed  the  EO  and, therefore,  decided  to  recommend  to DG for relaxation under Para 2.5 of FTP  to  allow  condonation  from condition  of  fulfillment  of  block­wise  EO subject to payment of composition fee of 3%  {2%  in  terms  of  the  provisions  of

Para  5.8.2  of  HBP  v1  (RE:2013)/Para

5.8.3 of HBP v1 (RE:2012) + 1% extra as  decided  by  EPCG  Committee  for  not approaching  the  RA  in  time}  on  duty saved  amount  in  proportion  to  the shortfall at the end of each block. This has the approval of DG. 2. M/s  Continental Automotive  Brake Systems (I) Pvt. Ltd.   01/36/218/282/AM­ 14/EPCG­I       0530157418 dated 06.01.2012 Permission for  shifting  of capital  goods  against EPCG  authorization  no. 0530157418  dated 06.01.2012 The Committee observed that:   a.          the  firm  has  sought  prior permission  to  shift  the machine  from  their  plant located at 38 KM Stone,  Delhi Jaipur  Highway,  Gurgaon  to their another plant at plot No. 179­80,  Sector­5,  IMT Manesar, Gurgaon; b.     addresses of both the units are mentioned in IEC and RCMC; c.           the  firm  have  also  furnished certificate  from  Central  Excise certifying installation of capital goods  in  their  unit  located  at 38  KM  Stone,  Delhi  Jaipur Highway, Gurgaon.   The  Committee,  therefore,  decided  to allow shifting of capital goods from their

ying installation of capital goods  in  their  unit  located  at 38  KM  Stone,  Delhi  Jaipur Highway, Gurgaon.   The  Committee,  therefore,  decided  to allow shifting of capital goods from their

plant  located  at  38  KM  Stone,  Delhi Jaipur  Highway,  Gurgaon  to  their  other plant at plot No. 179­80, Sector­5, IMT Manesar,  Gurgaon  subject  to  the condition that the firm will furnish fresh installation certificate. 3. M/s  Indo  Autotech Limited 01/36/218/10/AM­ 15/EPCG­I 0530150687 dated 18.12.2009 0530154540 dated 14.01.2011 Condonation  of  delay  in getting  installation certificate  from  central excise The  Committee  observed  that  as  per Installation Certificates issued by Central Excise there is a delay of 30 months and 23  months  in  installation.  Since  the Installation  Certificates  have  already been  obtained  from  the  Central  Excise, the Committee decided to recommend to DG for relaxation under Para 2.5 of  FTP  to  condone  the  delay  in installation of capital goods.   4. M/s Ladhar Paper Mills 01/36/218/11/AM­ 15/EPCG­I 3030002682 dated 26.04.2007 Condonation  of  block­ wise EO The  Committee  observed  that  the  EOP of  the  Authorization  is  still  valid  and decided  to  recommend  to  DG  for relaxation under Para 2.5 of FTP  to allow  condonation  from  condition  of fulfillment  of  block­wise  EO  subject  to payment of composition fee of 3% {2% in terms of the provisions of Para 5.8.2 of HBP v1 (RE:2013)/Para 5.8.3 of HBP v1 (RE:2012) + 1% extra as decided by EPCG  Committee  for  not  approaching

ct  to payment of composition fee of 3% {2% in terms of the provisions of Para 5.8.2 of HBP v1 (RE:2013)/Para 5.8.3 of HBP v1 (RE:2012) + 1% extra as decided by EPCG  Committee  for  not  approaching the RA in time} on duty saved amount in proportion to the shortfall at the end of each block.   5. M/s  Indian  Synthetic Rubber Limited 01/36/218/242/AM­ 14/EPCG­I 0530157502 dated 30.01.2012 Amendment  in  Import item  list  of  EPCG Authorization  No. 0530157502  dated 30.01.2012  and  in Invalidation  letter  No. 0559001344  dated 07.03.2012  issued against the authorization The  Committee  observed  that  the requests  of  the  firm  involve  huge enhancement  of  CIF  value  of  EPCG Authorization  and  therefore  decided  to defer  the  case  with  the  direction  to seek explanation from the firm about the same  and  also  to  call  for  a  detailed report  from  the  RA  in  this  regard.  The Committee  also  decided  to  call  a representative  of  the  firm  for  PH  to explain the case in the EPCG Committee meeting  the  next  time  this  case  is considered. 6. M/s  Mauli  Cotspin  (P) Limited 01/36/218/400/AM­ 14/EPCG­I 3130002494 dated 12.06.2007 Condonation  of  block­ wise EO The  Committee  observed  that  the  EOP of  the  Authorization  is  still  valid  and decided  to  recommend  to  DG  for relaxation under Para 2.5 of FTP  to allow  condonation  from  condition  of fulfillment  of  block­wise  EO  subject  to payment of composition fee of 3% {2% in terms of the provisions of Para 5.8.2 of HBP v1 (RE:2013)/Para 5.8.3 of HBP

low  condonation  from  condition  of fulfillment  of  block­wise  EO  subject  to payment of composition fee of 3% {2% in terms of the provisions of Para 5.8.2 of HBP v1 (RE:2013)/Para 5.8.3 of HBP

v1 (RE:2012) + 1% extra as decided by EPCG  Committee  for  not  approaching the RA in time} on duty saved amount in proportion to the shortfall at the end of each block.   7. M/s  Bharat  Aluminium Company Limited 01/36/218/289/AM­ 14/EPCG­I 33  EPCG authorizations issued during the period  AM­06  to AM­13 Submission of installation certificate  for  spares from  chartered  engineer in terms of Para 5.3.3(b) of HBP The  Committee  deliberated  upon  the case  in  detail  and  decided  to  defer  it with  the  direction  to  call  for  following information licence wise:   a.     list of import items; b.     list of spares that have  been imported; c.            Central  Excise  Certificate  for installation  of  capital goods/spares; d.     Chartered Engineer Certificate for  installation  of  capital goods/spares; e.          Correspondences  made  with Central  Excise  department  in respect  of  obtaining Installation  Certificate  in respect of spares. 8. M/s  Jubilant  Life Sciences Limited 01/36/218/304/AM­ 14/EPCG­I 0530138902 dated 17.06.2005 0530139111 dated 14.07.2005 0530139304 dated 11.08.2005 0530139505 dated 09.09.2005 0530143810 dated 01.06.2007 0530145060 dated 27.11.2007 a.  Regularization  of shifting  of  CGs  imported against  EPCG Authorization  No. 0530139111  dated 14.07.2005   b. Relaxation  required  in terms of Para 2.5 of FTP

007 0530145060 dated 27.11.2007 a.  Regularization  of shifting  of  CGs  imported against  EPCG Authorization  No. 0530139111  dated 14.07.2005   b. Relaxation  required  in terms of Para 2.5 of FTP (2009­14) for inclusion of similar/alternate/other export items     a. The Committee deliberated upon the case  and  decided  to  regularize  the shifting  of  capital  goods  from  their  unit located  at  Bhartiagram,  Jyotiba  Phuley Nagar, Gajraula, UP to D­12, Sector­59, Noida, UP subject to the condition  that both  the  addresses  are  mentioned  in IEC and RCMC.   b.  The  Committee  observed  that  there was  provision  for  fulfillment  of  export obligation by export of alternate product at the time of issuance of authorizations and hence, decided to recommend  to DG for relaxation under Para 2.5 of FTP  to  count  the  exports  of  alternate product  already  made  by  the  firm towards  fulfillment  of  export  obligation against the subject EPCG Authorizations subject  to  fulfillment  of  Average  EO  of the alternate product.   9. M/s  Gondals  Press India Limited 01/36/218/276/AM­ 14/EPCG­I 0530140012 dated 08.12.2005 Condonation  of  block­ wise  E.O  and amendment  in  export products The  Committee  observed  that  as  per RA’s Report the firm has not fulfilled any EO during the first block whereas as per the firm’s submissions they have fulfilled some  EO  during  the  first  block.  The Committee  deliberated  upon  the  case and  decided  to  defer  it  with  the

ing the first block whereas as per the firm’s submissions they have fulfilled some  EO  during  the  first  block.  The Committee  deliberated  upon  the  case and  decided  to  defer  it  with  the

direction to the firm to first submit proof of exports to the RA and then approach us for condonation of block­wise EO. For the amendment in export products, they may approach RA. 10. M/s  Arihant  Tiles  & Marbles  Private Limited 01/36/218/48/AM­ 14/EPCG­I 1330000416 dated 17.12.2003 Condonation  for  slight deviation in description of Capital Goods The  Committee  deliberated  upon  the case in detail and decided to refer  the case  to  Department  of  Revenue  to examine  the  matter  in  respect  of details regarding date of manufacture of machine, model No. and date of machine and  as  to  whether  machine  was manufactured  before  the  date  of  B/E and  to  apprise  the  Committee  of  the facts. 11. M/s  Sri  Saravana  Tex Exports  India  Private Limited 01/37/218/11/AM­ 15/EPCG­II 3530000824 dated 02.02.2005 3530000897 dated 18.03.2005 Extension in EOP (a) The Committee deliberated upon the case  and  decided  not  to  allow extension  in  EOP  in  respect  of  EPCG Authorization  No.  3530000824  dated 02.02.2005  as  the  firm  has  not maintained Average EO.   (b)  The  Committee  decided to  recommend  to  DG  for  relaxation under  Para  2.5  of  FTP  to  allow extension  in  EOP  in  respect  of  EPCG Authorization  No.  3530000897  dated 18.02.2005  for  2  years  on  payment  of composition  fee  equal  to  3%  (2%  in

nder  Para  2.5  of  FTP  to  allow extension  in  EOP  in  respect  of  EPCG Authorization  No.  3530000897  dated 18.02.2005  for  2  years  on  payment  of composition  fee  equal  to  3%  (2%  in terms  of  provisions  contained  in  Para 5.11(a)  of  HBP  Vol.  I  +  1%  extra  as decided  by  EPCG  Committee  for  not approaching  the  RA  in  time)  of proportionate  duty  saved  amount  on unfulfiled EO or an enhancement in EO imposed to the extent of 15% (10% in terms of Para 5.11(a) of HBP Vol. I + 5% extra as decided by EPCG Committee for not approaching the RA in time) of total EO  at  the  choice  of  exporter,  for  each year of extension sought.   12. M/s  TV18  Broadcast Limited 01/37/218/35/AM­ 14/EPCG­II 0530139286 dated 10.08.2005 0530139858 dated 09.11.2005 0530141650 dated 02.08.2006 0530139517 dated 12.09.2005 Counting  of  export  of group  company  for fulfillment  of  EO  of  4 EPCG Authorizations The  Committee  deliberated  upon  the case in detail and decided to refer  the case to PIC for a decision in respect of group company exports. 13. M/s Tata Steel Limited 0230006236 Acceptance of installation The  Committee  deliberated  upon  the

tail and decided to refer  the case to PIC for a decision in respect of group company exports. 13. M/s Tata Steel Limited 0230006236 Acceptance of installation The  Committee  deliberated  upon  the

01/37/218/15/AM­ 15/EPCG­II dated 17.01.2011 0230004986 dated 02.03.2010 0230004947 dated 16.02.2010 0230002997 dated 12.02.2008 0230001517 dated 09.05.2006 0230008135 dated 20.07.2012 certificate  issued  by Chartered Engineer case  in  detail  and  decided  to  defer  it with the direction to call for licence wise:   a.     list of import items; b.     list of spares that have  been imported; c.            Central  Excise  Certificate  for installation  of  capital goods/spares; d.     Chartered Engineer Certificate for  installation  of  capital goods/spares; e.          Correspondences  made  with Central  Excise  department  in respect  of  obtaining Installation Certificate. 14. M/s  Pyramid  Timber Association  Private Limited 01/37/218/177/AM­ 14/EPCG­II 0730003241 dated 02.09.2005 Re­fixation  of  Average EO The  case  was  placed  before  EPCG Committee  in  its  meeting  held  on 23.01.2014  and  04.04.2014.  In  the meeting  held  on  04.04.2014,  it  was decided to call for comments from DIPP in the matter.  DIPP in their comments have  stated  that  (a)  the  machines imported  under  EPCG  licence  can produce  the  products  which  were exported  by  the  Authorization  Holder and  (b)  these  products  are  quite different  from  Sawn  Teak  Wood  which the firm had exported before taking the EPCG  Authorization  i.e.  during  2002  to

rted  by  the  Authorization  Holder and  (b)  these  products  are  quite different  from  Sawn  Teak  Wood  which the firm had exported before taking the EPCG  Authorization  i.e.  during  2002  to 2005. The request of the firm is to refix the average EO by excluding the exports of  Sawn  Teak  Wood  as  this  product  is different  from  the  export  which  they exported.   The  Committee,  on  the  basis  of  the comments  furnished  by  the  DIPP, decided  to  allow  refixation  of  Average EO  under  Para  5.5(b)  of  FTP  by excluding exports of Sawn Teak Wood.      15. M/s  Smith  Industrial Corporation  Private Limited 01/37/218/251/AM­ 14/EPCG­II 0530155672 dated 03.06.2011 Acceptance of installation certification  issued  by Chartered  Engineer alongwith  confirmation received  from  Central Excise Authority The  Committee  observed  that  as  per letter dated 02.04.2014 of Central Excise Authority  the  capital  goods  imported against  the  subject  EPCG  Authorization are  installed  in  the  factory  premises  of the  firm  and,  therefore,  decided  to recommend  to  DG  for  relaxation under Para 2.5 of FTP to  accept  the Installation  Certificate  issued  by Chartered  Engineer  alongwith confirmation by Central Excise.

herefore,  decided  to recommend  to  DG  for  relaxation under Para 2.5 of FTP to  accept  the Installation  Certificate  issued  by Chartered  Engineer  alongwith confirmation by Central Excise.  

M/s  NSP  Electronics Limited, Bangalore 18/93/AM­12/EPCG­II 730000709 dated 30.08.2002 730000752 dated 17.10.2002 730000565 dated 07.04.2002 730000971 dated 10.04.2003     Waiver  from maintenance  of  average export obligation The  Committee  observed  that Department  of  Electronics  and Information  Technology  has,  in  its comments, stated that   a.          The  tools  and  dies  were imported  for  manufacturing PCB for CRT TV; b.          Until  2003,  the  TV manufacturers  were manufacturing CRT TVs; c.      Later on they have gradually changed from CRT to Flatron, LCD,  LED  and  Plasma Technology TVs i.e. there was a change in technology; d.     Gradually these tools  became obsolete;   The  Committee  also  observed  that inspite  of  obsolescence  of  technology the company could almost maintain the Average  EO  upto  the  year  2005.  But could not maintain the same afterwards.   The  Committee,  therefore,  decided  to recommend  to  DG  for  relaxation under Para 2.5 of FTP for waiver from maintenance  of  Average  EO  after  AM­ 2005.     17. M/s  Sangam  Press Private Limited 01/37/218/204/AM­ 14/EPCG­II 3130000254 dated 03.10.2002 Condonation  of  block­ wise  EO  for  the  second block The  Committee  observed  that  as  per RA’s  report  the  firm  have  already completed  the  EO  and,  therefore, decided  to  recommend  to  DG  for

on  of  block­ wise  EO  for  the  second block The  Committee  observed  that  as  per RA’s  report  the  firm  have  already completed  the  EO  and,  therefore, decided  to  recommend  to  DG  for relaxation under Para 2.5 of FTP  to allow  condonation  from  condition  of fulfillment  of  block­wise  EO  subject  to payment of composition fee of 3% {2% in terms of the provisions of Para  5.8.2 of HBP v1 (RE:2013)/Para 5.8.3 of HBP v1 (RE:2012) + 1% extra as decided by EPCG  Committee  for  not  approaching the RA in time} on duty saved amount in proportion to the shortfall at the end of each block.   18. M/s Reva Transmission 01/37/218/275/AM­ 14/EPCG­II 0530139041 dated 07.07.2005 Condonation  of  delay  in installation  of  capital goods The  Committee  observed  that  as  per letter dated 13.02.2014 of Central Excise Authority  the  capital  goods  imported against  the  subject  EPCG  Authorization are  installed  in  the  factory  premises  of the  firm  and,  therefore,  decided  to recommend  to  DG  for  relaxation

y  the  capital  goods  imported against  the  subject  EPCG  Authorization are  installed  in  the  factory  premises  of the  firm  and,  therefore,  decided  to recommend  to  DG  for  relaxation

under Para 2.5 of FTP to condone the delay  in  obtaining  the  Installation Certificate from Central Excise.   19. M/s  Tata  Motors Limited 18/209/AM­13/EPCG­II 0330014191 dated 01.12.2006 Re­export  of  imported Capital Goods to Foreign Supplier  for  repairing beyond  three  years  of importation The Committee decided to recommend to  DG  under  Para  2.5  of  FTP  for relaxation of provision of Para 5.16 of HBP v1 to allow the re­export of the capital goods subject to furnishing of an undertaking  that  the  firm  would  re­ import  the  same  capital  goods  after repairs subject to the condition that the firm shall pay customs duty at the time of re­import on repair charges if paid by them.   20. M/s  York  Cellulose Private Limited 01/37/218/223/AM­ 14/EPCG­II 3330000984 dated 22.04.2008 Condonation  of  delay  in installation  of  capital goods The  Committee  observed  that  as  per letter dated 16.09.2010 of Central Excise Authority  the  capital  goods  imported against  the  subject  EPCG  Authorization were installed on 16.11.2008  i.e. within 6  months  from  the  date  of  B/E  in  the factory  premises  of  the  firm.    However as the letter of Central Excise bears the date  16.09.2010,  the  Committee, decided  to  recommend  to  DG  for relaxation under Para 2.5 of FTP to condone  the  delay  in  obtaining  of Installation  Certificate  from  Central

se bears the date  16.09.2010,  the  Committee, decided  to  recommend  to  DG  for relaxation under Para 2.5 of FTP to condone  the  delay  in  obtaining  of Installation  Certificate  from  Central Excise.   21. M/s S. T. Woollen Mills Private Limited 01/37/218/252/AM­ 14/EPCG­II 3030003483 dated 10.12.2007 Condonation  of  block­ wise EO The  Committee  observed  that  the  EOP of  the  Authorization  is  still  valid  and decided  to  recommend  to  DG  for relaxation under Para 2.5 of FTP  to allow  condonation  from  condition  of fulfillment  of  block­wise  EO  subject  to payment of composition fee of 3% {2% in terms of the provisions of Para 5.8.2 of HBP v1 (RE:2013)/Para 5.8.3 of HBP v1 (RE:2012) + 1% extra as decided by EPCG  Committee  for  not  approaching the RA in time} on duty saved amount in proportion to the shortfall at the end of each block.   22. M/s  Reliance Industries Limited 01/37/218/18/AM­ 15/EPCG­II ­­­­­ Transfer of capital goods imported  under  EPCG scheme  to  another company  for  job work/fabrication The  Committee  deliberated  upon  the case  and  decided  to  allow  transfer  of capital  goods  to  another  company  for job  work/fabrication  subject  to  the conditions that:

work/fabrication The  Committee  deliberated  upon  the case  and  decided  to  allow  transfer  of capital  goods  to  another  company  for job  work/fabrication  subject  to  the conditions that:

a.         CG  will  move  to  job  worker’s premises  only  under intimation/permission  of Jurisdictional  Excise  Authority of  Authorization  Holder  and Job Worker; b.     The job worker must be  unit registered with Central Excise; c.      Wastage should be as per Para 5.3 of HBP v1; and, d.          Installation  Certificate  should be submitted within 6 months from the date of completion of imports. 23. M/s Eagle Press 01/36/218/22/AM­ 15/EPCG­I 0430001558 dated 05.03.2004 Condonation  of  shortfall in second block EO The  Committee  observed  that  as  per RA’s  report  the  firm  have  already completed  the  EO  and,  therefore, decided  to  recommend  to  DG  for relaxation under Para 2.5 of FTP  to allow  condonation  from  condition  of fulfillment  of  block­wise  EO  subject  to payment of composition fee of 3% {2% in terms of the provisions of Para  5.8.2 of HBP v1 (RE:2013)/Para 5.8.3 of HBP v1 (RE:2012) + 1% extra as decided by EPCG  Committee  for  not  approaching the RA in time} on duty saved amount in proportion to the shortfall at the end of each block.   24. M/s  Hyundai  Motor India Limited 01/36/218/197/AM­ 14/EPCG­I 36  EPCG Authorizations issued during AM­ 07 to AM­13 Post­facto  recognition  of 73  supporting manufacturers The Committee observed that:   a.     The firm have not taken  prior approval  before  shifting  of

thorizations issued during AM­ 07 to AM­13 Post­facto  recognition  of 73  supporting manufacturers The Committee observed that:   a.     The firm have not taken  prior approval  before  shifting  of capital  goods  amongst  their vendors; b.     The request of the firm  is  to recognize the 73 vendors/sub­ vendors  as  supporting manufactures  and  to regularize  shifting  of  capital goods  imported  against  the EPCG  Authorizations  amongst the  supporting manufactures/vendors already effected  during  the  course  of manufacturing  of  export products; c.      The firm have stated that they have  been  receiving  such approvals  and  relaxations  in the  past  from  DGFT  since 1999 for the last more than 15 years and it will be very difficult for  them  to  complete  export

targets  without  such approvals; d.         The  firm  have  stated  that  in their  case  prior  approval  for shifting  of  capital  Goods  was not  feasible  to  sustain  an export  production  volume  of 2200 cars/day.   The  Committee,  therefore,  decided  to allow  recognition  of  73  vendors  as supporting  manufactures  against  36 EPCG  Authorizations  and  also  to  grant post facto approval of shifting of capital goods amongst vendors.   25. M/s  Samsung  India Electronics  Private Limited 01/37/218/82/AM­ 14/EPCG­II 0530136920 dated 02.09.2004 0530136217 dated 14.05.2004 a.  Condonation  of  block­ wise  EO  in  respect  of EPCG  Authorization  Nos. 0530136920  dated 02.09.2004, 0530136217 dated 14.05.2004   b.  Counting  of  excess exports  made  against EPCG  Authorization  No.

on  of  block­ wise  EO  in  respect  of EPCG  Authorization  Nos. 0530136920  dated 02.09.2004, 0530136217 dated 14.05.2004   b.  Counting  of  excess exports  made  against EPCG  Authorization  No. 0530141240  dated 02.06.2006 for fulfillment of  EO  of  EPCG Authorization  No. 0530136920  dated 02.09.2004 a.  The  Committee  decided to  recommend  to  DG  for  relaxation under  Para  2.5  of  FTP  to  allow condonation from condition of fulfillment of block­wise EO subject to payment of composition fee of 3% {2% in terms of the  provisions  of  Para  5.8.2  of  HBP  v1 (RE:2013)/Para  5.8.3  of  HBP  v1 (RE:2012)  +  1%  extra  as  decided  by EPCG  Committee  for  not  approaching the RA in time} on duty saved amount in proportion to the shortfall at the end of each block.   b.  The  Committee  also  decided  to recommend  to  DG  for  relaxation under  Para  2.5  of  FTP  to  allow  the firm  to  count  excess  exports  made against  EPCG  authorizations  No. 0530141240  dated  02.06.2006  for fulfillment  of  EO  against  EPCG Authorization  No.  0530136920  dated 02.09.2004.   26. M/s AGH Altech Private Limited   01/37/218/23/AM­ 15/EPCG­II 0530160369 dated 13.02.2013 0530156577 dated 26.09.2011 0530155668 dated 03.06.2011 0530161540 dated 12.09.2013 Permission for Shifting of capital goods The Committee observed that addresses of both the factories of the company i.e. the factory where the capital goods are installed  and  the  factory  where  the capital  goods  are  to  be  shifted  are mentioned  in  IEC  and  RCMC.  The  firm have  stated  that  due  to  space

the factory where the capital goods are installed  and  the  factory  where  the capital  goods  are  to  be  shifted  are mentioned  in  IEC  and  RCMC.  The  firm have  stated  that  due  to  space constraint  they  are  shifting  the machinery to bigger premises for better operational  activities  and  cost effectiveness. The Committee, therefore, decided  to  grant  permission  to  shift the  capital  goods  from  their  factory located  at  Plot  No.  16,  Sector  16, HSIIDC,  Bahadurgarh,  Haryana  –

124507 to their another factory located at  Khasra  No.  36/13/1(6­14)  &  18/1(1­ 18),  Village:  Sankhol,  Tehsil  – Bahadurgarh, Haryana – 124507 subject to  the  condition  that  the  company  will furnish fresh installation certificate.   DGFT = Directorate General of Foreign Trade DG = Director General FTP = Foreign Trade Policy HBP v1 = Handbook of Procedure Vol. I EO = Export Obligation EODC = Export Obligation Discharge Certificate EOP = Export Obligation Period EPCG = Export Promotion Capital Goods RA = Regional Authority BG = Bank Guarantee FFE = Free Foreign Exchange FE = Foreign Exchange IEC = Importer­Exporter Code DOR = Department of Revenue CLA = Central Licensing Area IEM = Industrial Entrepreneurs Memorandum RCMC = Registration­cum­Membership Certificate ICD = Inland Container Depot PCB = Printed Circuit Board CRT = Cathode Ray Tube


Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.

Analysis

No analysis generated for this document yet (analysis runs over brief docs + on-demand). Run build_analysis.py --ids 6361 --apply.

Citation copied