S. No. Firm’s  Name  and Numbers EPCG Authorisation No.   Subject Decision of the Committee   1. M/s    Afflatus Gravures  Private Limited   01/36/218/404/AM­ 14/EPCG­I 0530143416 dated 03.04.2007 Condonation  of  delay  and extension  of  EO  prescribed for  first  block  in  respect  of EPCG  Authorization  No. 0530143416  dated 03.04.2007 The  Committee  observed  that EOP  of  the  Authorization  is  still valid  and  decided to  recommend  to  DG  for relaxation  under  Para  2.5  of FTP  to  allow  condonation  from condition  of  fulfilment  of  block­ wise  EO  subject  to  payment  of composition  fee  of  2%  on  duty saved  amount  in  proportion  to the  shortfall  at  the  end  of  each block in terms of the provisions of

Para 5.8.3 of HBP v1 (RE:2012).

  This has the approval of DG. 2. M/s  Charbhuja Industries  Private Limited   01/36/218/375/AM­ 14/EPCG­I 0330033624 dated 07.09.2012 Shifting  of  capital  goods imported  against  EPCG Authorization  No. 0330033624  dated 07.09.2012 both  the  addresses  of  the  unit i.e. the unit where it was  initially installed  and  the  unit  where  it was  subsequently  shifted  are mentioned in IEC and RCMC and therefore decided to regularize the  shifting  of  capital  of  capital goods  from  the  unit  located  at Unit  129,  SIDC  RD,  B/H Shantidham  Society  At.  Village Veraval  (shaper),  Tal.  Kotda Sangani, Dist. – Rajkot – 360024 to  the  unit  located  at  Sur.  No. 187  Plot  No.  10/11,  Opp.  Atul Auto  Limited,  At  Village  Veraval, Tal. Kotda Sangani, Dist. Rajkot – 360024  subject  to  the  condition that  the  firm  will  furnish  fresh installation certificate. MINUTES OF EPCG COMMITTEE MEETING HELD UNDER THE CHAIRMANSHIP OF SHRI JAIKANT SINGH, ADDITIONAL DIRECTOR GENERAL OF FOREIGN TRADE AT 1430 Hours ON 04.04.2014   Following officers attended the meeting:   a.     Shri Akash Taneja, Joint Director General of Foreign Trade, DGFT b.     Shri V. K. Kohli, Director, O/o Textile Commissioner, Noida c.      Shri K. K. Sinha, Industrial Adviser, Department of Industrial Policy and Promotion d.     Shri A.K Pandey, Senior Technical Officer (DBK), Department of Revenue   II.            Minutes of the last Meeting held on 27.02.2014 were confirmed.

ment of Industrial Policy and Promotion d.     Shri A.K Pandey, Senior Technical Officer (DBK), Department of Revenue   II.            Minutes of the last Meeting held on 27.02.2014 were confirmed.   III.           The Committee deliberated upon all the cases and following decisions were taken:

S. No. Firm’s  Name  and Numbers EPCG Authorisation No.   Subject   3. M/s  Mahalaxmi Polypack  Private Limited   01/36/218/372/AM­ 14/EPCG­I 0530145447 dated 18.01.2008 0530145755 dated 05.03.2008 0530143922 dated 19.06.2007 0530151097 dated 29.01.2010 0530151098 dated 29.01.2010 0530151099 dated 29.01.2010 0530151102 dated 01.02.2010 0530151104 dated 01.02.2010 0530151103 dated 01.02.2010 0530151147 dated 04.02.2010 0530151146 dated 04.02.2010 0530151547 dated 16.03.2010 0530151871 dated 23.04.2010 0530151870 dated 23.04.2010 0530152079 dated 12.05.2010 Condonation of block­wise EO EOP  of  the  Authorizations  is  still valid  and  decided

Para 5.8.3 of HBP v1 (RE:2012).

                                                                                                      DGFT = Directorate General of Foreign Trade DG = Director General FTP = Foreign Trade Policy HBP v1 = Handbook of Procedure Vol. I EO = Export Obligation EODC = Export Obligation Discharge Certificate

S. No. Firm’s  Name  and Numbers EPCG Authorisation No.   Subject   4. M/s  Allied  Strips Limited   01/36/218/399/AM­ 14/EPCG­I 0530157833 dated 06.03.2012 Extension  in  time  for installation of capital goods the  firm  could  not  install  the capital  goods  due  to  severe financial  crisis  for  which Corporate  Debt  Restructuring (CDR)  package  has  been approved  on  28.09.2013.  The Committee, therefore, decided to recommend  to  DG  for FTP  to  grant  extension  in  time for  installation  of  capital  goods upto June, 2015.   5. M/s  JCT  Electronics Limited   01/36/218/376/AM­ 14/EPCG­I 0530135928 dated 19.03.2004 Extension in EOP in respect of EPCG  Authorization  No. 0530135928  dated 19.03.2004  as  the  EOP expired  on  18.03.2012  and condonation  of  delay  in seeking extension the  Company  is  registered  in BIFR vide case No. 316/2002 and decided  to  grant  extension  in EOP upto 18.03.2016 in terms of

Para 5.5.1 of FTP.

M/s  Balkrishna Industries Limited   01/36/218/190/AM­ 13/EPCG­I 0330031269 dated 12.12.2011 0330031712 dated 25.01.2012 0330032735 dated 25.05.2012 0330032942 dated 20.06.2012 0330033043 dated 29.06.2012 0330033440 dated 14.08.2012 0330034711 dated 02.01.2013 Extension  in  time  for installation of capital goods The Committee observed that   a.     the Central Excise has confirmed  that  the capital goods imported against  these  licences are  in  the  possession of the firm and b.     the firm could not install the  capital  goods  as location of the plant is in  high  seismic  zone, retention  of  labour force  which  is  mainly from  other  states, delay  in  erection  of water  and  power facilities etc.   The  Committee,  therefore, decided  to  recommend  to  DG for relaxation under Para 2.5 of  FTP  to  grant  extension  in time  for  installation  of  capital goods upto 31.12.2014.   EOP = Export Obligation Period EPCG = Export Promotion Capital Goods RA = Regional Authority BG = Bank Guarantee FFE = Free Foreign Exchange FE = Foreign Exchange IEC = Importer­Exporter Code DOR = Department of Revenue CLA = Central Licensing Area IEM = Industrial Entrepreneurs Memorandum RCMC = Registration­cum­Membership Certificate ICD = Inland Container Depot CDR=Corporate Debt Restructuring


t of Revenue CLA = Central Licensing Area IEM = Industrial Entrepreneurs Memorandum RCMC = Registration­cum­Membership Certificate ICD = Inland Container Depot CDR=Corporate Debt Restructuring


S. No. Firm’s  Name  and Numbers EPCG Authorisation No.   Subject   7. M/s  Jindal  Steel  & Power Limited   01/36/218/379/AM­ 14/EPCG­I 3330001957 dated 11.02.2011 3330001685 dated 26.05.2010 Shifting of capital goods The Committee observed that:   a.          the  firm  has  sought prior permission to shift the machine from their Patratu  (Jharkahnd) plant  to  their  Angul, Odisha Plant; b.     address of their Angul Plant,  Odisha  i.e.  the plant  where  capital goods are to be shifted is endorsed in the IEC.   The  Committee,  therefore, decided  to  allow  shifting  of capital goods from their  Patratu, Jharkhand Plant to Angul, Odisha Plant  subject  to  the  condition that  the  firm  will  furnish  fresh installation certificate.

S. No. Firm’s  Name  and Numbers EPCG Authorisation No.   Subject   8. M/s  Mitter Fasteners   01/36/218/209/AM­ 14/EPCG­I 3030000867 dated 27.01.2005 for  1st  block    year  and Extension in EOP the firm’s request for extension in EOP has been rejected by the RA on  the  basis  that  as  per  Public Notice  No.  1  dated  18.04.2013 request  for  extension  shall  be made to RA within 30 days from the date of expiry of original EOP. The  Committee  decided FTP  to  allow  (i)  condonation from  condition  of  fulfilment  of block­wise  EO  subject  to payment  of  composition  fee  of 2%  on  duty  saved  amount  in

riginal EOP. The  Committee  decided FTP  to  allow  (i)  condonation from  condition  of  fulfilment  of block­wise  EO  subject  to payment  of  composition  fee  of 2%  on  duty  saved  amount  in proportion to the shortfall at the end of each block in terms of the provisions  of  Para  5.8.3  of  HBP v1(RE:2012) and (ii) extension in EOP  for  2  years  on  payment  of composition  fee  equal  to  2%  of proportionate  duty  saved amount  on  unfulfiled  EO  or  an enhancement  in  EO  imposed  to the extent of 10% of total EO at the  choice  of  exporter,  for  each year of extension sought in terms of  provisions  contained  in  Para 5.11(a) of HBP Vol. I.   9. M/s  Fiat  India Automobiles Limited   01/36/218/189/AM­ 14/EPCG­I 21  EPCG authorizations issued  during AM­08 to AM­09 To consider EOP as 12 years [given  that  the  duty  saved amount is more than INR 100 Crores] for clubbed licences The Committee deliberated upon the  case  and  decided  that  the case may be examined on file.

OP as 12 years [given  that  the  duty  saved amount is more than INR 100 Crores] for clubbed licences The Committee deliberated upon the  case  and  decided  that  the case may be examined on file.

S. No. Firm’s  Name  and Numbers EPCG Authorisation No.   Subject   10. M/s  Anest  Iwata Motherson Limited   01/36/218/233/AM­ 14/EPCG­I 0530157111 dated 02.12.2011 0530145571 dated 08.02.2008 Permission  for  adjustment  of excess exports made against EPCG  Authorization  No. 0530145571  dated 08.02.2008  for  fulfillment  of EO  against  other  EPCG authorization  No. 0530157111  dated 02.12.2011(issued  in  lieu  of original  EPCG  authorization no.  0530139797  dated 27.10.2005) The  Committee  deliberated upon  the  case  in  detail  and decided  to  recommend  to DG for relaxation under Para 2.5  of  FTP  for  counting  of excess  exports  made  against EPCG  Authorization  No. 0530145571  dated  08.02.2008 for  fulfillment  of  EO  against other  EPCG  Authorization  No. No.  0530157111  dated 02.12.2011  (issued  in  lieu  of original  EPCG  authorization  no. 0530139797 dated 27.10.2005) provided the exports made are within  the  validity  period  of EPCG  Authorizations  and subject  to  the  condition that there is no double counting of  exports  and  exports  made are within the validity period of EOP  of  licence  obtained  in 2011(in lieu  of  licence  obtained in 2005).   11. M/s  Jewel  Classic Hotels  Private Limited   01/36/218/301/AM­ 14/EPCG­I 3330001255 dated 26.02.2009 Condonation  from requirement  of  maintaining average EO year­wise

nce  obtained in 2005).   11. M/s  Jewel  Classic Hotels  Private Limited   01/36/218/301/AM­ 14/EPCG­I 3330001255 dated 26.02.2009 Condonation  from requirement  of  maintaining average EO year­wise excess in average EO in the year 2009­10 and 2010­11 covers the shortfall  in  average  EO  in  the year  2008­09  and,  therefore, decided  to  recommend  to  DG for relaxation under Para 2.5 of  FTP  to  regularize  the shortfall  in  average  EO  in  the year 2008­09.   12. M/s  Maithan  Ispat Limited   01/36/218/255/AM­ 14/EPCG­I 15  EPCG authorizations issued  during the  period  AM­ 07 to AM­08 Regularisation  of  EO  by allowing third party export in terms  of  Para  5.7  of  HBP  v1 read  with  Policy  Circular  No. 7/2002 dated 11.07.2002 the case and decided to defer it with the direction  to  call  for  the corroborative  evidence  from  the RA  regarding  exports  made  by the  firm  through  third  party alongwith  a  tabular  statement showing  S/B  No.  and  date,  ARE No.  and  date,  Invoice  No.  and date and details whether  ARE  & Shipping  Bills  mention  EPCG details.

through  third  party alongwith  a  tabular  statement showing  S/B  No.  and  date,  ARE No.  and  date,  Invoice  No.  and date and details whether  ARE  & Shipping  Bills  mention  EPCG details.

S. No. Firm’s  Name  and Numbers EPCG Authorisation No.   Subject   13. M/s  Dhanvantri Enterprises  private limited   01/36/218/242/AM­ 13/EPCG­I 0430000052 dated 25.02.2000 a.        To  accept  S/Bs  (where license  number/date  and licence  holder’s  name  are not                    mentioned) in terms  of  policy  circular  7 dated  11.07.2002.  The  firm have  stated  that  their despatches have been made under  ARE  forms countersigned  by  Central Excise  Authorities  and  they can  produce  the  copies  of these  ARE  forms  to  confirm that  they  only  supplied  the goods  to  Godrej  Sara  Lee Limited, Mumbai.   b.      The  firm’s  request  to accept  the  exports  made  by them after the expiry of initial EOP        i.e.  for  the  periods from  25.02.2005  to 24.02.2007.  As  per  Para 5.11(a) of HBP v1 extension in EOP  for  two  years  can  be granted  on  payment  of applicable composition fee.   c.        Condonation  of  block­ wise EO (RA has stated  that EODC  cannot  be  issued without condonation of block­ wise EO). As per Para 5.8.2 of HBP v1 condonation of block­ wise EO can be granted. the case and decided to defer it with the direction  to  call  for  the corroborative  evidence  from  the RA  regarding  exports  made  by the  firm  through  third  party alongwith  a  tabular  statement showing  S/B  No.  and  date,  ARE

direction  to  call  for  the corroborative  evidence  from  the RA  regarding  exports  made  by the  firm  through  third  party alongwith  a  tabular  statement showing  S/B  No.  and  date,  ARE No.  and  date,  Invoice  No.  and date and details whether  ARE  & Shipping  Bills  mention  EPCG details. 14. M/s  Dong­A  India Automotive  Private Limited   01/36/218/327/AM­ 14/EPCG­I 0430000836 dated 27.11.2002 0430001017 dated 12.03.2003 0430001370 dated 13.11.2003 0430002112 dated 25.11.2004 Clubbing  of  4  EPCG authorizations,  approval  of period (EOP) from the date of first  EPCG  authorization  till 31.01.2014,  condonation  of block­wise EO, condonation of 5% shortfall in EO as per Para 5.12 of HBP v1, to count the exports  made  vide  37  S/Bs wherein  incorrect  EPCG Authorization  nos.  were mentioned the case and decided to reject it as  EOP  in  all  cases  has  already expired.

S. No. Firm’s  Name  and Numbers EPCG Authorisation No.   Subject   15. M/s Cold Forge   01/36/218/284/AM­ 14/EPCG­I 0530141043 dated 15.05.2006 0530143300 dated 16.03.2007 Condonation  of  delay  in submission  of  installation certificate the  firm  have  already  obtained the  Installation  Certificate  from the Central Excise and, therefore, decided  to  recommend  to  DG for relaxation under Para 2.5 of FTP to condone the delay in submission  of  installation certificate.   16. M/s J.K. Tools   01/36/218/230/AM­ 13/EPCG­I 0530135280 dated 27.11.2003 Extension in EOP for 2 years The  Committee  decided  to recommend  to  DG  for FTP  to  allow  extension  in  EOP

cate.   16. M/s J.K. Tools   01/36/218/230/AM­ 13/EPCG­I 0530135280 dated 27.11.2003 Extension in EOP for 2 years The  Committee  decided  to recommend  to  DG  for FTP  to  allow  extension  in  EOP for  2  years  beyond  the  first extension  of  2  years  subject  to payment of 50% of duty payable in proportion to the unfulfilled EO in  terms  of  Para  5.11(b)  of  HBP v1(RE:2013)  to  enable  the  firm to complete the EO.    

S. No. Firm’s  Name  and Numbers EPCG Authorisation No.   Subject   17. M/s Ideal  Industrial Explosives Limited   01/36/218/423/AM­ 14/EPCG­I 0930001113 dated 03.09.2004 performance and extension in EOP for another 2 years the  firm  have  been  directed  by the  RA  to  approach  EPCG Committee  for  condonation  of block­wise  EO.  The  Committee decided  to  recommend  to  DG for relaxation under Para 2.5 of FTP to allow  (i)  condonation from  condition  of  fulfilment  of block­wise  EO  subject  to payment  of  composition  fee  of 2%  on  duty  saved  amount  in proportion to the shortfall at the end of each block in terms of the provisions  of  Para  5.8.3  of  HBP v1(RE:2012)/Para  5.8.2  of  HBP v1 (RE: 2013)  and  (ii)  extension in EOP for 2 years on payment of composition  fee  equal  to  2%  of proportionate  duty  saved amount  on  unfulfiled  EO  or  an enhancement  in  EO  imposed  to the extent of 10% of total EO at the  choice  of  exporter,  for  each year of extension sought in terms of  provisions  contained  in  Para 5.11(a) of HBP Vol. I.

enhancement  in  EO  imposed  to the extent of 10% of total EO at the  choice  of  exporter,  for  each year of extension sought in terms of  provisions  contained  in  Para 5.11(a) of HBP Vol. I.  

S. No. Firm’s  Name  and Numbers EPCG Authorisation No.   Subject   18. M/s  RSB  India Limited   18/08/AM­14/EPCG­ II 0230000515 dated 03.03.2004 and extension in EOP The Committee observed that as the EOP is over, before granting extension in EOP, condonation of block­wise EO is also required  to be  granted.    The  Committee, therefore,  decided FTP  to  allow  (i)  condonation from  condition  of  fulfilment  of block­wise  EO  subject  to payment  of  composition  fee  of 2%  on  duty  saved  amount  in proportion to the shortfall at the end of each block in terms of the provisions  of  Para  5.8.3  of  HBP v1(RE:2012)/Para  5.8.2  of  HBP v1 (RE: 2013)  and  (ii)  extension in EOP for 2 years on payment of composition  fee  equal  to  2%  of proportionate  duty  saved amount  on  unfulfiled  EO  or  an enhancement  in  EO  imposed  to the extent of 10% of total EO at the  choice  of  exporter,  for  each year of extension sought in terms of  provisions  contained  in  Para 5.11(a) of HBP Vol. I.   19. M/s  Premier  Paper Packaging   01/37/218/189/AM­ 14/EPCG­II 0530143048 dated 09.02.2007 Condonation  of  block­wise EO,  extension  in  EOP  for  2 years and amendment of the name in EPCG authorization the case and decided to reject it with  the  direction  to  the  RA  to take  necessary  action  against the firm in terms of FT(D&R)  Act as the capital goods were shifted

name in EPCG authorization the case and decided to reject it with  the  direction  to  the  RA  to take  necessary  action  against the firm in terms of FT(D&R)  Act as the capital goods were shifted without permission.  20. M/s V.S. Industries   01/37/218/186/AM­ 14/EPCG­II 1830000008 dated 20.11.2006 1830000009 dated 12.12.2006 EOP  of  the  Authorization  is  still valid  and  decided

Para 5.8.3 of HBP v1 (RE:2012).

 

S. No. Firm’s  Name  and Numbers EPCG Authorisation No.   Subject   21. M/s Pyramid Timber Associates  Private Limited   01/37/218/177/AM­ 14/EPCG­II 0730003241 dated 02.09.2005 Re­fixation of average EO The Committee decided to defer the case with the direction to call for comments from DIPP. 22. M/s  Pujita  Spinning Mills Pvt. Ltd.   01/37/218/233/AM­ 14/EPCG­II 0930002078 dated 14.03.2006 EOP  of  the  Authorization  is  still valid  and  decided

Para 5.8.3 of HBP v1 (RE: 2012).

  23. M/s  Sterlite Technologies Limited   01/37/218/248/AM­ 14/EPCG­II 27  EPCG authorizations Shifting of capital goods from one unit to other unit both  the  addresses  of  the  unit i.e.  the  unit  where  the  capital goods are installed and the unit where  these  are  to  be  installed are  mentioned  in  IEC  and therefore,  decided  to  grant permission  to  shift  the  capital goods  from  the  unit  located  at 2D,  Sector­10,  Integrated Industrial  Estate,  Haridwar  – 263145  to  the  new  unit  located at  Build.C  PTB  Div.,  Survey  No. 209  &  203/2,  Phase­II,  Piparia Indl. Estate, UT of D&N  Haveli  – 396230  subject  to  the  condition that  the  firm  will  furnish  fresh installation certificate. 24. M/s  Uttar  Pradesh Steels   01/37/218/264/AM­ 14/EPCG­II 0530146991 dated 26.08.2008 Condonation  of  delay  in installation of capital goods The Committee observed that as per Installation Certificate issued by Central Excise there is a delay of 20 months in installation. Since the  Installation  Certificate  has already  been  obtained  from  the Central  Excise,  the  Committee decided  to  recommend  to  DG for relaxation under Para 2.5 of FTP to condone the delay in installation of capital goods.  

S. No. Firm’s  Name  and Numbers EPCG Authorisation No.   Subject   25. M/s  Turbo Industries  Private Limited 01/37/218/268/AM­ 14/EPCG­II 3030002478 dated 21.02.2007 EOP  of  the  Authorization  is  still valid  and  decided

Para 5.8.3 of HBP v1 (RE: 2012).

  26. M/s  Repromen Offset  Printers Private Limited   01/37/218/267/AM­ 14/EPCG­II 0730003663 dated 28.12.2005 The  RA  advised  the  firm  to approach  the  EPCG  Committee as the firm could not submit their request within 3 months from the date of expiry of 1st block period. The  Committee  decided

Para 5.8.3 of HBP v1 (RE: 2012).

  27. M/s S.K.A. Exports   01/37/218/213/AM­ 14/EPCG­II 0530140034 dated 12.12.2005 Extension  in  EOP  and condonation of block­wise EO the case and decided to defer it with  the  direction  to  call  for details  of  exports,  copy  of installation  certificates  and information  whether  the  firm have  taken  benefit  of  Public Notice  22  dated  12.08.2013  to regularize the case.

S. No. Firm’s  Name  and Numbers EPCG Authorisation No.   Subject   28. M/s  Woodstock Laminates Limited   01/37/218/265/AM­ 14/EPCG­II 2230000624 dated 29.03.2007 EOP  of  the  Authorization  is  still valid  and  decided

Para 5.8.3 of HBP v1 (RE:2012).

  29. M/s  Caparo Engineering  India Limited   01/36/218/198/AM­ 14/EPCG­I 0530142872 dated 16.01.2007 0530143489 dated 18.04.2007 0530148498 dated 25.02.2009 a.    To amend the description of EO item from existing “machine  tool,  dies  & their  parts”  to  “machine tools, dies & their parts” &  “Sheet  Metal Components/Aluminium Casting  all  types  for motor vehicles” b.      To  allow  transfer  of  1 machine  imported against  EPCG authorization  No. 0530143489  dated 18.04.2007  from  M/s Caparo Engineering India Limited, Chennai to their Group  Company  M/s Caparo  Maruti  Limited, Bawal; c.        To  allow  transfer  of  1 machine  imported against  EPCG authorization  No. 0530145498  dated 25.02.2009  from  M/s caparo Engineering India Limited, Chennai to their group  company  M/s Caparo  Maruti  Limited, Bawal. the case and decided to defer it with the direction  to  call  for  the details  of  machinery,  catalogue, technical  literature  and  copy  of Chartered  Engineer  Certificate regarding  nexus.  A  doubt  was raised about the capability of the CG in respect of manufacture of Aluminium  Casting/all  types  of Motor vehicles.

and  copy  of Chartered  Engineer  Certificate regarding  nexus.  A  doubt  was raised about the capability of the CG in respect of manufacture of Aluminium  Casting/all  types  of Motor vehicles.

S. No. Firm’s  Name  and Numbers EPCG Authorisation No.   Subject   30. M/s  Independent News  services private limited   01/36/218/196/AM­ 13/EPCG­I 0530135793 dated 01.03.2004 Extension in EOP for 2 years The  Committee  decided  to  recommend  to  DG  for FTP  to  allow  extension  in  EOP for  2  years  beyond  the  first extension  of  2  years  subject  to payment of 50% of duty payable in proportion to the unfulfilled EO in  terms  of  Para  5.11(b)  of  HBP v1(RE:2013)  to  enable  the  firm to complete the EO.    31. M/s  Yazaki  India Limited   01/37/218/201/AM­ 14/EPCG­II 3130000108 dated 28.02.2001 3130000123 dated 28.05.2001 3130000156 dated 01.10.2001 3130000176 dated 18.12.2001 3130000148 dated 29.08.2001 3130000219 dated 03.07.2002 Subsumption  of  outstanding EO  against  EPCG authorizations  in  the  export performance  of  the  unit being converted from DTA to EOU the case and decide d to defer it    with  the  direction  to  call  for details regarding:   a.     Chronological details  of debonding; b.     Chronological details  of fulfillment of EO; c.            Final  exit  order  from SEEPZ authorities. 32. M/s  Vardhman Textile Limited   01/37/218/246/AM­ 14/EPCG­II Applied Import  of  automatic  storage and  retrieval  system  under EPCG  scheme  –  request  for issuance  of  EPCG authorization The  Technical  Member  of  the

ited   01/37/218/246/AM­ 14/EPCG­II Applied Import  of  automatic  storage and  retrieval  system  under EPCG  scheme  –  request  for issuance  of  EPCG authorization The  Technical  Member  of  the Committee confirmed the nexus between  the  capital  goods  and export  product.  The  Committee, therefore,  allowed  import  of automatic  storage  and  retrieval system under EPCG scheme.

S. No. Firm’s  Name  and Numbers EPCG Authorisation No.   Subject   33. RA, Ludhiana   01/37/218/278/AM­ 14/EPCG­II Applied Issuance  of  EPCG authorization  for  import  of ‘Electric Fork Lift Truck’ The  technical  Members  of  the Committee  perused  the catalogue of the Electric Fork Lift Truck and confirmed that these are  distinctly  different  from ordinary trucks and are essential for  the  purpose  of  loading, unloading  and  stacking  of  the material  within  the  factory premises.    Therefore,  the Committee  decided  to  allow import of Electric Fork Lift Truck subject to the condition that the same  will  not  ply  on  the  road, should  be  used  within  the factory premises and would not be sold in the market. 34. M/s    Jindal  Steel  & Power Limited   01/36/218/378/AM­ 14/EPCG­I ­­­­­ Import of  Transformer  under EPCG Scheme The technical member confirmed that these transformers are not for  generation/transmission  of electricity but are used to make the  electric  furnace  operational. The  Committee,  therefore, decided to allow import of these transformers  (EAF  Transformer, Series  Reactor,  and  LF Transformer)  under  EPCG Scheme. 35. M/s  Gopsons

ctric  furnace  operational. The  Committee,  therefore, decided to allow import of these transformers  (EAF  Transformer, Series  Reactor,  and  LF Transformer)  under  EPCG Scheme. 35. M/s  Gopsons Papers Limited   01/36/218/422/AM­ 14/EPCG­I 0530134936 dated 26.09.2003 (3rd block) the  firm  have  fulfilled  the  EO within  the  EOP  and,  therefore, decided  to  recommend  to  DG for relaxation under Para 2.5 of  FTP  to  allow  condonation from  condition  of  fulfilment  of block­wise  EO  subject  to payment  of  composition  fee  of 2%  on  duty  saved  amount  in proportion to the shortfall at the end of each block in terms of the provisions of Para 5.8.3 of HBP v1 (RE: 2012)/Para 5.8.2 of HBP v1 (RE: 2013).   36. M/s  Maruti  Suzuki India Limited   01/36/218/425/AM­ 14/EPCG­I 55 EPCG authorizations Addition of Export Product as “car”  in  55  EPCG authorizations  issued  to  M/s Suzuki  Powertrain  India Limited  (SPIL)  now  merged with  M/s  Maruti  Suzuki  India Limited

EPCG authorizations Addition of Export Product as “car”  in  55  EPCG authorizations  issued  to  M/s Suzuki  Powertrain  India Limited  (SPIL)  now  merged with  M/s  Maruti  Suzuki  India Limited

S. No. Firm’s  Name  and Numbers EPCG Authorisation No.   Subject   The Committee observed the following submissions made by the firm M/s Maruti Suzuki India Limited:   a.     SPIL has been amalgamated with MSIL vide Hon’ble Delhi High Court Order effective on 01.04.2012 with completion of all the required formalities on 17.03.2013; b.          Both  Powertrain  plant  (erstwhile  SPIL)  and  Car  manufacturing  plant  of  MSIL  are  situated  in  the  same premises i.e. Plot No. 1, Phase­3A, IMT Manesar, Gurgaon(Haryana); c.      SPIL had obtained 55 EPCG Authorizations for import of Capital Goods with export product as “Engine, Transmission and components”; d.     Due to economic slowdown in Europe, the export of Engines was stopped from India. However, export  of Transmission and components is still continuing; e.     Due to limited production of Engine and growing demand of Maruti vehicles in domestic as well as export markets, the company stopped exporting engine and concentrated more on vehicle exports; f.      The Capital Goods imported by SPIL are now directly involved in manufacture of Automobile sub­assemblies which are used in manufacture of final product viz. CAR. The firm has requested that the final export product may  kindly  be  added  as  “Passenger  Cars”  in  addition  to  existing  “Engines/Transmissions  (gear box)/components;

final product viz. CAR. The firm has requested that the final export product may  kindly  be  added  as  “Passenger  Cars”  in  addition  to  existing  “Engines/Transmissions  (gear box)/components; g.     The firm have obtained Revised Nexus Certificate from an independent Chartered Engineer on Appendix 32 A which clearly shows the nexus between CG imported under EPCG Licences and final product “Car”.   The Committee also noted that at the time of issuance of Authorizations and even at the time of amalgamation there was a provision to fulfill 50% of EO by exports of other goods.   The  Committee  deliberated  upon  the  case  in  detail  and  decided  to  allow  addition  of  export  product  as  “Cars”  in addition to existing products. It observed that the company would be exporting value added product which would be in  the  interest  of  the  party  as  well  as  national  interest.  The  Committee  decided  to  recommend  to  DG  for relaxation under Para 2.5 of FTP to allow fulfillment of export obligation by export of cars in relaxation of the provisions of Para 5.5 (c) of FTP RE:2012. The requests of the firm regarding change of name as “Maruti Suzuki India Limited” in place of “Suzuki Powertrain India Limited” may be considered by RA as per High Court Order regarding  amalgamation  of  the  firms.  The  request  of  the  firm  regarding  refixation  of  Average  EO  would  also  be examined by RA.

ited” may be considered by RA as per High Court Order regarding  amalgamation  of  the  firms.  The  request  of  the  firm  regarding  refixation  of  Average  EO  would  also  be examined by RA.  

S. No. Firm’s  Name  and Numbers EPCG Authorisation No.   Subject   37. M/s  Ejaz  Tanning Company   01/36/218/418/AM­ 14/EPCG­I 0430001839 dated 09.08.2004 0430001841 dated10.08.2004 Condonation  of  block­wise EO  (1st  block)  and extension in EOP The Committee observed that as the EOP is over, before granting extension in EOP condonation of block­wise EO is also required to be  granted.    The  Committee, therefore,  decided FTP  to  allow  (i)  condonation from  condition  of  fulfilment  of block­wise  EO  subject  to payment  of  composition  fee  of 2%  on  duty  saved  amount  in proportion to the shortfall at the end of each block in terms of the provisions  of  Para  5.8.3  of  HBP v1(RE:2012) and (ii) extension in EOP  for  2  years  on  payment  of composition  fee  equal  to  2%  of proportionate  duty  saved amount  on  unfulfiled  EO  or  an enhancement  in  EO  imposed  to the extent of 10% of total EO at the  choice  of  exporter,  for  each year of extension sought in terms of  provisions  contained  in  Para 5.11(a) of HBP Vol. I.

enhancement  in  EO  imposed  to the extent of 10% of total EO at the  choice  of  exporter,  for  each year of extension sought in terms of  provisions  contained  in  Para 5.11(a) of HBP Vol. I.  

S. No. Firm’s  Name  and Numbers EPCG Authorisation No.   Subject   38. M/s  Glenmark Pharmaceuticals Limited   01/36/218/137/AM­ 13/EPCG­I 0330020538 dated 03.07.2008 Re­fixation of Average EO the  authorization  was  issued  on 03.07.2008 and Average EO was fixed  by  taking  into  account exports of all the three Divisions viz. API Division, USA Formulation Division  and  SRM  Formulations Division  of  M/s  Glenmark Pharmaceuticals  Limited.  RA  has confirmed  that  the  business  of two  out  of  the  three  Divisions had  been  transferred  to  their subsidiary M/s Glenmark Generics Limited as per Business Transfer Agreement dated 24.12.2007 i.e. before  the  issuance  of  the subject  EPCG  Authorization.  The Committee,  therefore,  felt  that RA  should  allow  refixation  of Average  EO  by  subtracting  the figures of exports of API Division and USA Formulation Division (i.e. Average would be fixed by taking into  accounts  the  export  figures of  only  one  unit  i.e.  SRM Formulation  which  remains  with the  firm)  which  had  been transferred  by  the  firm  to  their subsidiary  under  Business Transfer  Agreement  prior  to obtaining  the  EPCG Authorization.  39. M/s  Jindal  Steel  & Power Limited   01/36/218/428/AM­ 14/EPCG­I 30 EPCG authorizations issued during AM­ 05 to AM­08 Condonation  of  delay  in submission  of  installation certificate

zation.  39. M/s  Jindal  Steel  & Power Limited   01/36/218/428/AM­ 14/EPCG­I 30 EPCG authorizations issued during AM­ 05 to AM­08 Condonation  of  delay  in submission  of  installation certificate the  firm  have  already  obtained Installation  Certificate  from  the Central  Excise  Authorities  and, therefore,  decided  to recommend  to  DG  for FTP  to  condone  the  delay  in installation  of  capital  goods imported  against  the  subject Authorizations.  

S. No. Firm’s  Name  and Numbers EPCG Authorisation No.   Subject   40. M/s G.N.H Kini   01/36/218/02/AM­ 15/EPCG­I 0730003665 dated 28.12.2005 Condonation  of  block­wise EO and extension in EOP The Committee observed that as the EOP is over, before granting extension in EOP condonation of block­wise EO is also required to be  granted.    The  Committee, therefore,  decided FTP  to  allow  (i)  condonation from  condition  of  fulfilment  of block­wise  EO  subject  to payment  of  composition  fee  of 2%  on  duty  saved  amount  in proportion to the shortfall at the end of each block in terms of the provisions  of  Para  5.8.3  of  HBP v1(RE:2012) and (ii) extension in EOP  for  2  years  on  payment  of composition  fee  equal  to  2%  of proportionate  duty  saved amount  on  unfulfiled  EO  or  an enhancement  in  EO  imposed  to the extent of 10% of total EO at the  choice  of  exporter,  for  each year of extension sought in terms of  provisions  contained  in  Para 5.11(a) of HBP Vol. I.   41. M/s  Sach  Fabs Creation Pvt. Ltd.   01/37/218/254/AM­ 14/EPCG­II 0530141229 dated 02.06.2006

each year of extension sought in terms of  provisions  contained  in  Para 5.11(a) of HBP Vol. I.   41. M/s  Sach  Fabs Creation Pvt. Ltd.   01/37/218/254/AM­ 14/EPCG­II 0530141229 dated 02.06.2006 Condonation  of  block­wise EO EOP  of  the  Authorization  is  still valid  and  decided

Para 5.8.3 of HBP v1 (RE:2012).

Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.

Analysis

No analysis generated for this document yet (analysis runs over brief docs + on-demand). Run build_analysis.py --ids 6360 --apply.

Citation copied