Document text

S. No. Firm’s  Name  and Numbers EPCG Authorisation No.   Subject Decision of Committee     1. M/s  Lucky Yarn Tex India Limited   01/36/218/108/AM­ 14/EPCG­I 3230011877 dated 06.05.2008 Inclusion  of alternate  product in  respect  of  EPCG Authorization  No. 3230011877  dated 06.05.2008 The  Committee  observed  that  the there was a provision to fulfill EO upto the  extent  of  50%  by  alternate product/services  during  the  period 01.04.2008  to  17.04.2013  and therefore, allowed the  firm  inclusion of alternate products (for export) like Synthetic Yarn and all types of Fabrics and  Garments  for  fulfillment  of  EO subject to the condition that first 50% of EO shall be fulfilled only by original export product and Average EO will be refixed  in  respect  of  alternate products as well. MINUTES OF EPCG COMMITTEE MEETING HELD UNDER THE CHAIRMANSHIP OF SHRI JAIKANT SINGH , ADGFT AT 1430 Hours on 30.08.2013 Following officers attended the meeting: a.    Shri K. K. Tiwari, Industrial Adviser, D/o Heavy Industry b.    Shri K. K. Sinha, Industrial Adviser, D/o Industrial Policy and Promotion c.    Shri S. S. Tak, Joint Industrial Adviser, Ministry of Steel d.    Shri A. K. Pandey, Sr. Technical Officer, D/o Revenue e.    Shri V. K. Kohli, Deputy Director, O/o Textile Commissioner, Noida f.     Shri D. V. S. P. Varma, Deputy Director General, DGFT g.    Shri A. K. Gopal, Foreign Trade Development Officer (EPCG.I), DGFT h.    Shri S. K. Swarnkar, Foreign Trade Development Officer (EPCG.II), DGFT i.     Smt. Rekha Sharma, Foreign Trade Development Officer (P­5), DGFT

, Foreign Trade Development Officer (EPCG.I), DGFT h.    Shri S. K. Swarnkar, Foreign Trade Development Officer (EPCG.II), DGFT i.     Smt. Rekha Sharma, Foreign Trade Development Officer (P­5), DGFT 2.       Minutes of the last Meeting held on 24.07.2013 were confirmed. 3.       The Committee deliberated upon all the cases and following decisions were taken:

S. No. Firm’s  Name  and Numbers EPCG Authorisation No.   Subject     2. M/s  Jupiter  Gran Stones  Private Limited   01/36/218/95/AM­ 14/EPCG­I 0430003339 dated 16.01.2006 0430003340 dated 16.01.2006 Condonation  of block­wise  EO  in respect  of  EPCG Authorization  No. 0430003339  dated 16.01.2006  and 0430003340  dated 16.01.2006 The  Committee  decided to  recommend  to  DG  for relaxation  under  Para  2.5  of FTP  to  allow  condonation  from condition  of  fulfillment  of  block­wise EO subject to payment of composition fee  of  2%  on  duty  saved  amount  in proportion to the shortfall at the end of  each  block  in  terms  of  the provisions  of  Para  5.8.3  of  HBP v1/Para 5.8.2 of HBP v1 (RE: 2013).   This has the approval of DG. 3. M/s  LLOYD Insulation  (India) Limited.   01/36/218/238/AM­ 13/EPCG­I 0530134557 dated 23.07.2003 Condonation  of block­wise  EO against  EPCG License  No. 0530134557  dated 23.07.2003 The  Committee  decided to  recommend  to  DG  for FTP  to  allow  condonation  from condition  of  fulfillment  of  block­wise EO subject to payment of composition fee  of  2%  on  duty  saved  amount  in proportion to the shortfall at the end of  each  block  in  terms  of  the

rom condition  of  fulfillment  of  block­wise EO subject to payment of composition fee  of  2%  on  duty  saved  amount  in proportion to the shortfall at the end of  each  block  in  terms  of  the provisions  of  Para  5.8.3  of  HBP v1/Para 5.8.2 of HBP v1 (RE:2013).                                    


S. No. Firm’s  Name  and Numbers EPCG Authorisation No.   Subject     4. M/s    Amrita Enterprises  Private Limited   01/36/218/100/AM­ 14/EPCG­I 5330000856 dated 23.09.2004 Condonation  of block­wise  EO against  EPCG Authorization  No. 5330000856  dated 23.09.2004 The  Committee  decided to  recommend  to  DG  for FTP  to  allow  condonation  from condition  of  fulfillment  of  block­wise EO subject to payment of composition fee  of  2%  on  duty  saved  amount  in proportion to the shortfall at the end of  each  block  in  terms  of  the provisions  of  Para  5.8.3  of  HBP v1/Para 5.8.2 of HBP v1 (RE:2013).  

S. No. Firm’s  Name  and Numbers EPCG Authorisation No.   Subject     5. M/s    Arora’s  J.K. Natural  Marbles Limited   01/36/218/122/AM­ 14/EPCG­I 1330000469 dated 23.02.2004 Condonation  of block­wise  EO  and extension in EOP in respect  of  EPCG Authorization  No. 1330000469  dated 23.02.2004 The  Committee  decided to  recommend  to  DG  for FTP  to  allow  condonation  from condition  of  fulfillment  of  block­wise EO subject to payment of composition fee  of  2%  on  duty  saved  amount  in proportion to the shortfall at the end of  each  block  in  terms  of  the provisions  of  Para  5.8.3  of  HBP v1/Para 5.8.2 of HBP v1 (RE:2013).   The

tion fee  of  2%  on  duty  saved  amount  in proportion to the shortfall at the end of  each  block  in  terms  of  the provisions  of  Para  5.8.3  of  HBP v1/Para 5.8.2 of HBP v1 (RE:2013).   The  Committee  further  decided to  recommend  to  DG  for FTP to allow extension in EOP for 2 years on payment of composition fee equal  to  2%  of  proportionate  duty saved amount on unfulfilled EO or an enhancement  in  EO  imposed  to  the extent  of  10%  of  total  EO  at  the choice  of  exporter,  for  each  year  of extension  sought  in  terms  of provisions  contained  in  Para  5.11  of HBP Vol. I.  

S. No. Firm’s  Name  and Numbers EPCG Authorisation No.   Subject     6. M/s  Andhra Pradesh Paper Mills Limited   01/36/218/115/AM­ 14/EPCG­I 2630000431 dated 05.01.2007 0930001502 dated 17.05.2005 and 0930001504 dated 19.05.2005 (a)  Condonation  of shortfall  in  block­ wise  EO  in  respect of  EPCG Authorization  Nos. 2630000431  dated 05.01.2007  and 0930001502  dated 17.05.2005   (b)  Extension  in EOP  against  EPCG Authorization  No. 0930001502  dated 17.05.2005  and 0930001504  dated 19.05.2005 (a)  The  Committee  decided to  recommend  to  DG  for FTP  to  allow  condonation  from condition  of  fulfillment  of  block­wise EO subject to payment of composition fee  of  2%  on  duty  saved  amount  in proportion to the shortfall at the end of  each  block  in  terms  of  the provisions  of  Para  5.8.3  of  HBP v1/Para 5.8.2 of HBP v1 (RE: 2013).   (b)  The  Committee  further  decided to  recommend  to  DG  for FTP to allow extension in EOP for 2

ock  in  terms  of  the provisions  of  Para  5.8.3  of  HBP v1/Para 5.8.2 of HBP v1 (RE: 2013).   (b)  The  Committee  further  decided to  recommend  to  DG  for FTP to allow extension in EOP for 2 years on payment of composition fee equal  to  2%  of  proportionate  duty saved amount on unfulfilled EO or an enhancement  in  EO  imposed  to  the extent  of  10%  of  total  EO  at  the choice  of  exporter,  for  each  year  of extension  sought  in  terms  of provisions  contained  in  Para  5.11  of HBP Vol. I.  

S. No. Firm’s  Name  and Numbers EPCG Authorisation No.   Subject     7. M/s    Global  Health Private Limited   01/36/218/35/AM­ 14/EPCG­I 0530158688 dated 29.06.2012 Permission  to  sell the  damaged capital  goods  as scrap,  exemption from  provision  of

Para  5.4  of  FTP  (

RE:  2012)  and exemption  from provision  of  Para 5.3.1  (c)  of  HBP v1 (RE: 2012)   Minutes put up to DG. He desired that the  case  be  reconsidered  by  the Committee. 8. M/s    Meramex Private Limited   01/36/218/148/AM­ 11/EPCG­I 0330015155 dated 21.02.2007 Condonation  for partial  export obligation  of  US$ 17,08,314/­  (Rs. 7,52,51,225/­) under  EPCG License  No. 0330015155 dated 21.02.2007  as  per Para  5.11.2  of HBP,  v1  2004­09 in  relaxation  of Policy  Provision under  Para  2.5  of FTP  2004­09  on the  grounds  of genuine  hardship and  unforeseen circumstances beyond  their control Minutes put up to DG. He desired that the  case  be  reconsidered  by  the Committee.

S. No. Firm’s  Name  and Numbers EPCG Authorisation No.   Subject     9. M/s  Monnet Ispat & Energy Limited   01/36/218/63/AM­ 14/EPCG­I ­­­­­ Clarification  on whether Transformer  is permitted  to  be imported  under EPCG Scheme Technical members of the Committee indicated  that  the  SVC  System  with accessories is part of the mother unit as  a  built­in  unit  (used  in  arch furnace) and is essentially required in production of export product.  Hence, the  Committee  decided  to  allow  the import  of  SVC  system  with accessories.   10. M/s  ALPS Industries Limited   01/36/218/62/AM­ 14/EPCG­I ­­­­­ Clarification regarding procurement  of Transformer  (400 KVA  11/0.  415  KV oil  Filled)  under EPCG  Scheme  for Textile Unit Technical members of the Committee indicated  that  there  is  no  direct linkage  between  import  product  i.e.

nsformer  (400 KVA  11/0.  415  KV oil  Filled)  under EPCG  Scheme  for Textile Unit Technical members of the Committee indicated  that  there  is  no  direct linkage  between  import  product  i.e. Oil  Filled  Transformer  and  export product  viz.  Made  Ups.    The Committee,  therefore,  decided  to reject the case.

S. No. Firm’s  Name  and Numbers EPCG Authorisation No.   Subject     11. M/s  Grant Enterprises   01/36/218/88/AM­ 14/EPCG­I 0430000033 dated 28.01.2000 Conversion  from 0%  EPCG  License to  10%  Normal EPCG  Scheme  in respect  of  EPCG Authorization  No. 0430000033 dated 28.01.2000 The  Committee  observed  that  the case  was  referred  to  Department  of Revenue by the GRC. The Committee perused  the  written  comments  from the  Department  of  Revenue suggesting  that  conversion  may  be allowed  as  EPCG  Committee  in  its meeting  dated  10.12.2007  had  made recommendations  regarding  the conversion  of  Zero  Duty  EPCG Authorization  to  10%  Duty  EPCG Authorization  in  two  cases.  The Committee,  therefore,  decided  to allow  conversion  of  subject  EPCG Authorization from Zero Duty to 10% Duty.   12. M/s  G.  K.  dairy  & Milk  Products  Pvt. Ltd. 01/36/218/80/AM­ 14/EPCG­I 0530139635 dated 30.09.2005, 0530140025 dated 12.12.2005, 0530141424 dated 06.07.2006 and 0530148546 dated 05.03.2009 a.    Condonation for  non­ fulfillment  of block­wise  EO   in  respect  of EPCG Authorization Nos. 0530139635 dated 30.09.2005, 0530140025 dated 12.12.2005 and 0530141424 (a)  The  Committee  decided to  recommend  to  DG  for

ulfillment  of block­wise  EO   in  respect  of EPCG Authorization Nos. 0530139635 dated 30.09.2005, 0530140025 dated 12.12.2005 and 0530141424 (a)  The  Committee  decided to  recommend  to  DG  for FTP  to  allow  condonation  from condition  of  fulfillment  of  block­wise EO subject to payment of composition fee  of  2%  on  duty  saved  amount  in proportion to the shortfall at the end of  each  block  in  terms  of  the provisions  of  Para  5.8.3  of  HBP v1/Para  5.8.2  of  HBP  v1  (RE:2013).   (b)  The  Committee  further  decided to  recommend  to  DG  for

S. No. Firm’s  Name  and Numbers EPCG Authorisation No.   Subject     dated 06.07.2006 b.    Extension  in EOP  in respect of  EPCG Authorization Nos. 0530139635 dated 30.09.2005, 0530140025 dated 12.12.2005 and 0530141424 dated 06.07.2006 c.      Refixation  of Annual Average  EO  in respect  of EPCG Authorization Nos. 0530139635 dated 30.09.2005, 0530140025 dated 12.12.2005, 0530141424 dated 06.07.2006 and 0530148546 dated 05.03.2009 FTP to allow extension in EOP for 2 years on payment of composition fee equal  to  2%  of  proportionate  duty saved amount on unfulfilled EO or an enhancement  in  EO  imposed  to  the extent  of  10%  of  total  EO  at  the choice  of  exporter,  for  each  year  of extension  sought  in  terms  of provisions  contained  in  Para  5.11  of HBP Vol. I.  This has the approval of DG.   (c) The Committee observed that the export  products  come  under  the exempted category mentioned in Para 5.7.6 of HBP v1 and decided to refer the  case  with  this  observation  to  the

al of DG.   (c) The Committee observed that the export  products  come  under  the exempted category mentioned in Para 5.7.6 of HBP v1 and decided to refer the  case  with  this  observation  to  the concerned RA for further examination and necessary action viz. refixation of Average EO etc.   (d)     The Committee observed that the  request  of  the  firm  regarding inclusion  of  alternate  product  viz. other  milk  products  and  fruit beverages can be acceded to in terms of relevant provisions of FTP in vogue at  the  time  of  issue  of authorization(s).  The  Committee, however, decided to refer the case to RA with this observation for necessary action.

S. No. Firm’s  Name  and Numbers EPCG Authorisation No.   Subject     d.    Addition  of Export Products  in respect  of EPCG Authorization Nos. 0530139635 dated 30.09.2005, 0530140025 dated 12.12.2005, 0530141424 dated 06.07.2006 and 0530148546 dated 05.03.2009

S. No. Firm’s  Name  and Numbers EPCG Authorisation No.   Subject     13. M/s    Essel  Propack limited   01/36/218/44/AM­ 14/EPCG­I 2134400  dated 16.06.95 a.                     To change name  of  M/s  RAS Propack  Lamipack Limited  to  M/s Essel  Propack Limited  in  view  of merger  of  the former  company with the latter vide BIFR  order  dated 28.08.2012.   b.           Extension in time  period  to meet re­fixed EO   c.                        To  count exports  made  by Essel  Propack Limited/Group Companies of Essel Propack Limited as exports  made  by RAS  Propack Lamipack Limited     The  Committee  observed  that  M/s

To  count exports  made  by Essel  Propack Limited/Group Companies of Essel Propack Limited as exports  made  by RAS  Propack Lamipack Limited     The  Committee  observed  that  M/s RAS Propack Lamipack Limited, which was a sick company and was granted rehabilitation scheme under BIFR has now  merged  with  M/s  Essel  Propack Limited  and  BIFR  has,  in  its  order dated  15.06.2012,  granted  certain reliefs including extension in EOP for 5 years  from  the  cut­off  date  and  to treat  the  exports  made  by  M/s  Essel Propack Limited/the Group Companies of  EPL  as  exports  made  by  M/s  RAS Propack  Lamipack  Limited.  The Committee  deliberated  the  case  in detail and decided that:   (a)  The name of the company may be changed  to  M/s  Essel  Propack Limited  once  modification  to  this effect  is  indicated  in  Registrar  of Companies  by  way  of  certification of incorporation. (b) Extension in  EOP  may  be  granted upto  01.04.2016  (cutoff  date  is 01.04.2011); (c)    Group  Company  aspect  will  be examined  by  the  RA  in  terms  of PIC decisions.

of incorporation. (b) Extension in  EOP  may  be  granted upto  01.04.2016  (cutoff  date  is 01.04.2011); (c)    Group  Company  aspect  will  be examined  by  the  RA  in  terms  of PIC decisions.

S. No. Firm’s  Name  and Numbers EPCG Authorisation No.   Subject     14. M/s  Gimpex Limited   01/36/218/106/AM­ 14/EPCG­I 0430005477 dated 22.10.2007 Condonation  for not  getting permission  from the  RA  before shifting  Capital Goods  and permission  to install  the machinery  at Gimpex  Ltd.  in respect  of  EPCG Authorization  No. 0430005477 dated 22.10.2007  issued to  M/s  Gimpex Limited, Chennai. The  Committee  observed  that  the address  to  which  the  Capital  Goods have been installed is endorsed in IEC and  RCMC  and  hence,  decided  to grant  post  facto  approval  for installation  of  Capital  Goods  at  their own  unit  located  at  M/s  Gimpex Limited, Opp. Railway Station, Kodur, Kadapah District, A.P.  – 516 101.   15. M/s  Indo­US  MIM Tec Pvt. Ltd.   01/36/218/03/AM­ 14/EPCG­I 0730010411 dated 27.07.2011 Transfer  of  Capital Goods  Procured under  EPCG scheme  in  respect of  EPCG Authorization  No. 0730010411  dated 27.07.2011 The Committee decided to allow the transfer  of  Capital  Goods  from  one Branch of the firm located at No. 43­ 44  &  45(P)  KIADB  Industrial  Area, Dodballapur,  Bangalore  –  562  103  to their  another  branch  at  No.  45(P) KIADB  Industrial  Area,  Hosakote, Bangalore  –  562  114  subject  to  the condition that both the addresses are mentioned  in  IEC  and  RCMC  and submission  of  fresh  installation

t  No.  45(P) KIADB  Industrial  Area,  Hosakote, Bangalore  –  562  114  subject  to  the condition that both the addresses are mentioned  in  IEC  and  RCMC  and submission  of  fresh  installation certificate  within  6  months  of  such transfer.

S. No. Firm’s  Name  and Numbers EPCG Authorisation No.   Subject     16. M/s  Motherson Automotive Technologies  & Engineering.   01/36/218/82/AM­ 14/EPCG­I 0530154734 dated 08.02.2011 0530147604 dated 27.10.2008 Permission  for adjustment  of excess  exports made against EPCG Authorization  No. 0530154734  dated 08.02.2011  for fulfillment of export obligation  against other  EPCG Authorization  No. 0530147604  dated 27.10.2008 The committee  deliberated  upon  the case in detail and observed that the request of the firm is for adjustment of excess exports made against EPCG Authorization  No.  0530154734  dated 08.02.2011  for  fulfillment  of  EO against other EPCG Authorization No. 0530147604  dated  27.10.2008.  The Committee,  therefore,  decided  to recommend to DG for relaxation under Para 2.5 of FTP for counting of excess exports made against EPCG Authorization  No.  0530154734  dated 08.02.2011  for  fulfillment  of  EO against other EPCG Authorization No. 0530147604  dated  27.10.2008 provided the exports made are within the  validity  period  of  EPCG Authorizations  and  subject  to  the condition  that    there  is  no  double counting  of  exports  and  exports made are within the validity period of EOP of licence obtained in 2008.

of  EPCG Authorizations  and  subject  to  the condition  that    there  is  no  double counting  of  exports  and  exports made are within the validity period of EOP of licence obtained in 2008.  

S. No. Firm’s  Name  and Numbers EPCG Authorisation No.   Subject     17. M/s  Marine Electricals  (I)  Pvt. Limited.   01/36/218/116/AM­ 14/EPCG­I 0330025976 dated 10.05.2010 Permission  for installation  of capital  goods  in another  unit imported  against EPCG  License  No. 0330025976  dated 10.05.2010 The  Committee  observed  that  both the  addresses  i.e.  the  address endorsed  in  EPCG  Authorization  and the  address  of  other  unit  where Capital  Goods  have  been  actually installed  are  mentioned  in  IEC  and therefore decided to allow post facto approval  of  shifting  of  Capital  Goods from  one  unit  located  at  S/17­18, Verna Electronics City, Salcete, Verna, Goa  –  403  722  to  Verna  Industrial Estate, Plot No. 51, 52, 59, 60, Phase­ IV,  Salcette,  Verna,  Goa  –  403  722 subject to the condition that the firm will  submit  fresh  Installation Certificate.   18. M/s  Jaquar  & Company Limited   01/36/218/119/AM­ 14/EPCG­I 0530144158 dated 20.07.2007 Relaxation  against one month delay in issuance  of installation Certificate  for machinery imported  against EPCG  License  No. 0530144158  dated 20.07.2007 The Committee observed that the firm had  already  obtained  Installation Certificate  from  Central  Excise  and decided  to  recommend  to  DG  for relaxation  under  Para  2.5  of  FTP for condonation of delay in Installation

he firm had  already  obtained  Installation Certificate  from  Central  Excise  and decided  to  recommend  to  DG  for relaxation  under  Para  2.5  of  FTP for condonation of delay in Installation of Capital Goods.    

S. No. Firm’s  Name  and Numbers EPCG Authorisation No.   Subject     19. M/s  JKT Enterprises Pvt. Limited   01/36/218/102/AM­ 14/EPCG­I 0330030759 dated 05.10.2011 Amendment  of Factory Address for the  purpose  of Installation in EPCG Authorization  No. 0330030759  dated 05.10.2011 The  Committee  deliberated  upon  the case  and  decided  to  defer  the  case with  the  direction  to  RA  to  ask  the firm  as  to  why  the  Goods  were  not installed  after  being  imported  in January,  2012  and  where  are  the goods lying now.   20. M/s    Angalakshmi Spinning Mill   01/36/218/109/AM­ 14/EPCG­I 3230006539 dated 28.03.2006 3230006938 dated 18.05.2006 and 3230007881 dated 18.09.2006 Inclusion  of alternate  product from  the  date  of issuance of License No.  3230006539 dated  28.03.2006, No.  3230006938 dated  18.05.2006 and  No. 3230007881  dated 18.09.2006  and  to allow  counting  of excess  exports made  against  one EPCG Authorization (3230006539 dated 28.03.2006) towards  fulfillment of  shortfall  in  EO against  two  EPCG Authorizations  (No. 3230006938  dated 18.05.2006  and No.  3230007881 dated 18.09.2006) case  and  decided  to  defer  the  case with the direction to ask the firm as to whether they have their own unit for manufacture  of  RMG  and  whether they  had  any  past  exports  of  RMG before  or  after  obtaining  the

er  the  case with the direction to ask the firm as to whether they have their own unit for manufacture  of  RMG  and  whether they  had  any  past  exports  of  RMG before  or  after  obtaining  the Authorization.

S. No. Firm’s  Name  and Numbers EPCG Authorisation No.   Subject     21. M/s  Bharat Aluminium Company Limited.   01/36/218/120/AM­ 14/EPCG­I 0530142511 dated 28.11.2006 Grant  of  TED against  import (domestic procurement through invalidation  route) of  BATP  wagons against  EPCG Authorization  No. 0530142511  dated 28.11.2006 The Committee observed that:   a.          The  firm  had  ordered  for  the procurement  of  Capital  Goods before  the  issuance  of  Policy Circular  No.  48/19.12.2008.  However, the goods arrived after the issuance of circular.  b.          PRC  in  its  meeting  dated 04.09.2009  had  decided  that  the TED  claims  of  EPCG Authorizations  holder  who  had been  issued  EPCG  authorizations for  import  of  Railway  Wagons under  Wagon  Leasing  Scheme, Wagon  Investment  Scheme, Liberalized  Wagon  Investment Scheme of the M/o Railways and was  effected  the  import  prior  to issue  of  the  said  circular  may  be allowed the TED refund by RAs in relaxation of provision of Para 5.3 of FTP (RE: 2008) and Para 4 of Circular  No.  48/19.12.2008  and the  EODC  be  issued  subject  to fulfillment  of  all  other  condition governing  the  EPCG Authorization.  c.         The firm informed that they had placed  the  order  on  09.01.2004 i.e.  prior  to  issuance  of  the  said Circular; d.     They had also made 15% advance

rning  the  EPCG Authorization.  c.         The firm informed that they had placed  the  order  on  09.01.2004 i.e.  prior  to  issuance  of  the  said Circular; d.     They had also made 15% advance payment  prior  to  the  date  of  the circular. e.     The procurement of Capital Goods had  been  completed  by

S. No. Firm’s  Name  and Numbers EPCG Authorisation No.   Subject     12.08.2011. f.           In a similar case of M/s Rashmi Metallic,  the  EPCG  Committee had,  in  its  meeting  held  on 17.11.2011,  recommended  the case to DG for relaxation.   The  Committee  observed  that  the firm  had  taken  effective  steps  for procurement  of  Capital  Goods  prior to  issuance  of  the  said  circular.    Therefore, the Committee decided to recommend  to  DG  to  relax  the provisions  of  Policy  Circular  48  in favour of the firm in tune with PRC decision  dated  04.09.2009  in  other cases.      22. M/s  Globe Components  Private Limited.   01/36/218/114/AM­ 14/EPCG­I 0430003192 dated 25.11.2005 0430003899 dated 20.07.2006 To  Consider fulfillment  of specific  EO  and Annual Average EO under  EPCG Scheme  for  job work  supplies effected  to  EOU and  waiver  from maintaining  Annual Average  Export Obligation  Year­ wise The Committee observed that:   a.      The  firm  had  made  Job  Work supplies  to  EOU  unit  M/s  Lucas  – TVS  Limited  and  they  have furnished  invoice  copy  raised  for the  value  addition  in  job  work made to 100% EOU Unit; b.   The firm had also made supply of automotive components to the EOU Unit  and  they  have  produced  ARE

shed  invoice  copy  raised  for the  value  addition  in  job  work made to 100% EOU Unit; b.   The firm had also made supply of automotive components to the EOU Unit  and  they  have  produced  ARE Forms; c.      For  some  of  the  illegible  ARE Forms,  they  are  ready  to  replace the same with the legible ones; d.      They  have  completed  Average Export Obligation in toto during the 3rd, 4th and  5th  years  of  EOP  and

S. No. Firm’s  Name  and Numbers EPCG Authorisation No.   Subject     they  want  condonation  from requirement  of  maintenance  of average EO year­wise.   The Committee, therefore, decided to recommend  to  DG  for  relaxation under Para 2.5 of FTP to allow the firm:   a.        To  fulfill  the  specific  and average  EO  through  supply  of goods  and  job  work  supplies made to EOU Units; b.       Condonation from requirement of  maintenance  of  average  EO year­wise upto 5th year and no need  for  maintenance  in  6th year  if  EO  has  been  fulfilled within 5 years.     23. M/s  Bharat Aluminium Company Limited.   01/36/218/121/AM­ 14/EPCG­I 26 Authorizations issued  during AM­09 to AM­13 Condonation  of delay in Installation of Capital Goods in respect of some of the  Capital  Goods imported  against 26  EPCG Authorizations The Committee observed that:   a.        The  firm  is  in  the  process  of setting  up  a  mega  expansion projects  of  6.50  Lac  Mt  pa Aluminium  smelter  at  their existing works situated at Balco Nagar, Korba, Chattisgarh; b.       In first phase they are setting up of 3.25 Lac Mt pa aluminium smelter  to

s  of  6.50  Lac  Mt  pa Aluminium  smelter  at  their existing works situated at Balco Nagar, Korba, Chattisgarh; b.       In first phase they are setting up of 3.25 Lac Mt pa aluminium smelter  to  manufacture aluminium products; c.        While  they  have  installed substantial  capital  goods imported  under  EPCG  for  the aluminium  smelter  project,

S. No. Firm’s  Name  and Numbers EPCG Authorisation No.   Subject     some  of  capital  goods,  are pending to be installed in their factory due to Chimney collapse incident  on  23.09.2009  which was  reported  by  the  media repeatedly; d.    They expect that the process of Installation of Capital Goods, in toto, is about to  be  completed latest by Feb’14 and Installation Certificate  from  concerned Authority  shall  be  arranged consequent  to  Installation Certificate.   The Committee, therefore, decided to recommend  to  DG  for  relaxation under  Para  2.5  of  FTP  for condonation in delay in submission of Installation  Certificate  against  the subject  EPCG  Authorizations  and  also to grant time upto February 2014 for completing  the  Installation  process subject to the condition that the firm will furnish Installation Certificate from Jurisdictional  Central  Excise  Authority within  6  months  from  the  date  of completion of Installation Process.

ject to the condition that the firm will furnish Installation Certificate from Jurisdictional  Central  Excise  Authority within  6  months  from  the  date  of completion of Installation Process.  

S. No. Firm’s  Name  and Numbers EPCG Authorisation No.   Subject     24. M/s  Al­  Dua  Food Processing  (P) Limited.   01/36/218/67/AM­ 14/EPCG­I 0530152819 dated 20.07.2010 Condonation  of delay in installation of  capital  goods imported  under EPCG Authorization No.  0530152819 dated 20.07.2010 case and decided to recommend to DG for relaxation under Para 2.5 of  FTP  for  condonation  of  delay  in submission  of  Installation  Certificate against  the  subject  EPCG Authorization subject to the condition that  the  firm  will  furnish  the Installation  Certificate  from Jurisdictional  Central  Excise  Authority within 6 months to the concerned RA.   25. M/s  City  View Bangalore Properties Private Limited.   01/36/218/84/AM­ 14/EPCG­I ­­­­­ Import  of  ‘pre­ fabricated  unitized wall panels’ by City View  under  the EPCG Scheme The  Committee  observed  that  the import  item  viz.  pre­fabricated unitized  wall  panels  cannot  be considered  under  the  category  of Capital  Goods  under  EPCG  Scheme and, therefore, decided to reject the request.

hat  the import  item  viz.  pre­fabricated unitized  wall  panels  cannot  be considered  under  the  category  of Capital  Goods  under  EPCG  Scheme and, therefore, decided to reject the request.

S. No. Firm’s  Name  and Numbers EPCG Authorisation No.   Subject     26. M/s  MKB  Cast Private Limited.   01/36/218/123/AM­ 14/EPCG­I 0430011414 dated 06.07.2012 0430011326 dated 19.06.2012 0430011367 dated 28.06.2012 Condonation  for delay  in  filling Installation Certificate  for machines  imported against  3  EPCG Authorizations Nos. 0430011414  dated 06.07.2012, 0430011326  dated 19.06.2012  and 0430011367  dated 28.06.2012 case and decided to recommend to DG for relaxation under Para 2.5 of  FTP  for  condonation  of  delay  in submission  of  Installation  Certificate against  the  subject  EPCG Authorization(s)  subject  to  the condition that the firm will furnish the Installation  Certificate  from Jurisdictional  Central  Excise  Authority within 6 months to the concerned RA.   27. M/s  Manjeet  Cotton Private Limited.   01/36/218/89/AM­ 14/EPCG­I ­­­­­ Clarification  about Notification  No. 07/(RE: 2013)/2009­14, New  Delhi  dated 18.04.2013  about import  of  capital goods  of  electrical control panel case and decided to defer it with the direction to call for the catalogue and technical  literature,  including  flow chart, of the Capital Goods.   28. M/s  Saturn  Estate Management  Pvt. Ltd.   01/37/218/94/AM­ 14/EPCG­ll 0530148138 dated 05.01.2009 Counting of foreign exchange  earned by  other  firm  to fulfill  export obligation  of  EPCG authorization

urn  Estate Management  Pvt. Ltd.   01/37/218/94/AM­ 14/EPCG­ll 0530148138 dated 05.01.2009 Counting of foreign exchange  earned by  other  firm  to fulfill  export obligation  of  EPCG authorization The Committee observed that the firm had  neither  informed  RA  nor  taken approval before leasing out the Capital Goods. They have, therefore, violated the  ‘Actual  User’  Condition.  The Committee,  therefore,  decided  to reject the case.

S. No. Firm’s  Name  and Numbers EPCG Authorisation No.   Subject     29. M/s  Reliance Infrastructure Ltd.   18/184/AM­ 13/EPCG­ll 0330029636 dated 01.06.2011, 0330029874 dated 30.06.2011 and 0330030896 dated 21.10.2011 Import  of  cranes under  EPCG scheme. Two  representatives  from  the company  approached  the  Committee for PH at the time of the meeting. The Committee  decided  to  hear  them.  They  informed  that  they  provide  all the  services  and  equipment  including evaluation,  inspection,  load  testing and  installation  of  cranes  for  the proper  implementation,  determination of sequence of operation , organizing alternative  assemblies  of  Cranes, providing  technical  operator  for carrying  out  the  installation  and assembly  work  and  ensuring  safety training  of  all  the  operators.  They further informed that these cranes are not  normal  cranes  and  are  entirely different.  They  have  undergone agreement with a Chinese company to provide  the  said  service  and  thereby they earn foreign exchange. They also informed  that  realization  would  be  in foreign exchange.

hey  have  undergone agreement with a Chinese company to provide  the  said  service  and  thereby they earn foreign exchange. They also informed  that  realization  would  be  in foreign exchange.   The  Committee,  however,  decided  to defer  the  case  as  the  report  from Central  Excise  sought  by  DOR  was hitherto awaited.

S. No. Firm’s  Name  and Numbers EPCG Authorisation No.   Subject     30. M/s  Sampark Industries Limited   18/14/AM­13/EPCG­ ll 0530132877 dated 21.05.2002 Extension in export obligation  period for  two  years  i.e. upto  20.05.2014 without payment of customs duty. The  Committee  decided  to  defer the case for detailed examination.   31. M/s Surana Telecom and Power Ltd.   18/177/AM­ 13/EPCG­ll 0930000193 dated 01.08.2001 Extension  in  E.O. Period  for  five years and inclusion of  alternate products. case and decided to defer it with the direction to call comments from DOR. 32. M/s  Surya  Roshni Limited   18/193/AM­ 13/EPCG­ll 0530146949 dated 21.08.2008 Amendment  in export product case and decided to defer it with the direction to call comments from DIPP.   33. M/s Saraf Glass Pvt. Ltd.   01/37/218/96/AM­ 14/EPCG­ll 0230000626 dated 21.07.2004 Extension  in  E.O. Period  for  two years. The  Committee  decided to  recommend  to  DG  for FTP to allow extension in EOP for 2 years on payment of composition fee equal  to  2%  of  proportionate  duty saved amount on unfulfilled EO or an enhancement  in  EO  imposed  to  the extent  of  10%  of  total  EO  at  the choice  of  exporter,  for  each  year  of extension  sought  in  terms  of

te  duty saved amount on unfulfilled EO or an enhancement  in  EO  imposed  to  the extent  of  10%  of  total  EO  at  the choice  of  exporter,  for  each  year  of extension  sought  in  terms  of provisions  contained  in  Para  5.11  of HBP Vol. I.  

S. No. Firm’s  Name  and Numbers EPCG Authorisation No.   Subject     34. M/s  S.  Kumar Nationwide Limited   01/37/218/73/AM­ 14/EPCG­ll 0330020227 dated 05.06.2008 Counting  of  excess exports  made against  EPCG Authorization  No. 01500711  dated 19.02.1998 (redeemed  on 25.03.2011)  for fulfillment of export obligation  of  EPCG Authorization  No. 0330020227  dated 05.06.2008 The  Committee  observed  that  export product  against  EPCG  authorization No.01500711  dated  19.02.1998  are ‘woven  Fabrics  of  Carded  Wool  or  of Carded  Fine  Animal  Hair  containing 85%  or  more  by  weight  of  Wool  or Fine  Animal  Hair’  whereas  the  export product  against  EPCG  authorization No.0330020227 dated 05.06.2008 are Cotton Mill Made Fabrics, Cotton Made ups.  Since  the  export  products  are different  against  the  EPCG authorizations,  therefore,  the Committee  decided  to  reject  the request.

.06.2008 are Cotton Mill Made Fabrics, Cotton Made ups.  Since  the  export  products  are different  against  the  EPCG authorizations,  therefore,  the Committee  decided  to  reject  the request.

S. No. Firm’s  Name  and Numbers EPCG Authorisation No.   Subject     35. M/s  Victora  Tool Engineering’s  Pvt. Ltd.   18/54/AM­13/EPCG­ ll 0530156249 dated 17.08.2011 Installation  of capital  goods  at different  location and  inclusion  of alternate products. The  Committee  observed  that  both the  addresses  i.e.  the  address endorsed  in  EPCG  Authorization  and the  address  of  other  unit  where Capital  Goods  have  been  actually installed  are  mentioned  in  IEC  and therefore decided to allow post facto approval  of  shifting  of  Capital  Goods from  units  located  at  Plot  No.1049, Sector  58,  Faridbad,  Haryana­121004 &  Plot  No.  340,Krishna  Colony,  Opp. Sector­25,  Faridbad­121004  to  Plot No.118,125  &  126,  Sector­25, Faridabad, Haryana­121004 subject to the condition that the firm will submit fresh Installation Certificate within six months.   As  regards  inclusion  of  alternate product,  the  firm  may  approach  the concerned RA in terms of Para 5.5(c) of FTP.   36. M/s  Vedanta Aluminium Limited.   18/100/AM­ 13/EPCG­ll 46  EPCG Authorizations issued  during the  period 11.09.2008  to 16.06.2010 To  allow commencement  of export  obligation period  of  46  EPCG Authorizations from the date of grant of approval by MOEF. The Committee observed that:   a.       The firm obtained approval of Terms of Reference (TOR) form

export  obligation period  of  46  EPCG Authorizations from the date of grant of approval by MOEF. The Committee observed that:   a.       The firm obtained approval of Terms of Reference (TOR) form Ministry  of  Environment  and Forests  on  12.03.2008  before expansion  of  their  existing Alumina Refinery from 1 Million to 6 Million TPY in the line with EIA Notification 2006;

S. No. Firm’s  Name  and Numbers EPCG Authorisation No.   Subject     b.        They  started  the  construction work  and  simultaneously applied for EPCG Authorizations for  procurement  of  Plant  and machinery; c.        They  obtained  46  EPCG Authorizations  during  the period  11.09.2008  to 16.06.2010; d.    The project was in progress as per  schedule  and  it  was expected  that  plant  would  be commissioned  in  the  second quarter of year 2011; e.    However, MOEF issued a Notice on 20.10.2010 withdrawing the Terms of Reference; f.         On receipt of the notice, they clarified  the  matter  to  Ministry of Environment and Forests; g.        The  firm  have  informed  that M/o  EF  issued  a  general clarification  stating  that  all projects  require  prior  EC  and issued  directions  for maintaining  status  quo  by stopping  all  construction activities; h.        The  firm  approached    Orissa High Court for EC for expansion projects; i.          Hon’ble  High  Court  in  its judgment  dated  16.11.2011 directed  that  opposite  parties are also justified in holding that the  process  for  environment clearance has to be started de

Hon’ble  High  Court  in  its judgment  dated  16.11.2011 directed  that  opposite  parties are also justified in holding that the  process  for  environment clearance has to be started de

S. No. Firm’s  Name  and Numbers EPCG Authorisation No.   Subject     novo for which petitioner has to submit  fresh  proposal  to  the Ministry  under  the  procedure laid  down  by  EIA  Notification 2006; j.     As per High Court’s order they approached  M/o  EF  again  and submitted fresh EIA in line with the  fresh  TOR  issued  by  the M/o EF on 02.02.2012; k.    M/o EF advised vide their letter dated  17.04.2012  to  keep  the same  (Project  work)  in abeyance till further instruction and hence they are still waiting for final decision. l.         The  firm  have  requested  that EOP should commerce from the date of clearance from M/o EF.   The  Committee  deliberated  upon the  case  in  view  of  the  facts mentioned  above.  The  committee noted  that  earlier  request  of  the firm  for  grant  of  time  for installation  of  capital  goods  in respect of 33 EPCG Authorizations was  considered  and  extension  in time period for 6 months from the date of approval of clearance from M/o  EF  was  allowed  in  EPCG committee  meeting  held  on 10.10.2012.  Representative  of Department  of  Revenue  was  also of  the  view  that  the  relaxation  in the  Policy  should  be  given  to  the firm, in exceptional circumstances,

ting  held  on 10.10.2012.  Representative  of Department  of  Revenue  was  also of  the  view  that  the  relaxation  in the  Policy  should  be  given  to  the firm, in exceptional circumstances,

S. No. Firm’s  Name  and Numbers EPCG Authorisation No.   Subject     as  they  are  facing  genuine hardship  subject  to  the  condition that this case cannot be quoted as precedence  in  any  case.  The Committee  therefore, recommended  the  case  to  DG for  relaxation  under  Para  2.5 of FTP for commencement of EOP from  the  date  of  clearance  given by  M/o  EF  in  respect  of  subject Authorizations  subject  to  above condition.   37. M/s  Indian  Oil Corporation Limited   01/36/218/125/AM­ 14/EPCG­I 0530152971 dated 05.08.2010 Extension  in validity  of  EPCG Authorization  No. 0530152971  dated 05.08.2010  for import  of equipment  re­ exported for repair. The Committee observed that   a.        At  the  time  of  unloading  of  the three  items  of  machinery (indicated  at  Sl.  No.  23  of  Import List – Item Description – Claus Air Blowers (Tag No. 086­K­001, 087­ K­001 and 088­K­001) at the port of  import  major  component  of Item  having  Tag  No.  088­K­001 got  damaged  and  the  same  was re­exported  for  repair  after  taking the  permission  from  Custom Authority  in  line  with  the requirement  of  Para  5.16  of  HBP v1. b.        After  re­exporting  the  damaged component  Bill  of  Entry  No. 4487825  dated  29.08.2011  was revised  to  give  the  credit  of  0.5 Nos. of quantity in Item No. Sl. No. 23 of EPCG Authorization;

ter  re­exporting  the  damaged component  Bill  of  Entry  No. 4487825  dated  29.08.2011  was revised  to  give  the  credit  of  0.5 Nos. of quantity in Item No. Sl. No. 23 of EPCG Authorization;

S. No. Firm’s  Name  and Numbers EPCG Authorisation No.   Subject     c.    Import of 0.5 No. Quantity of Item No. 23 of the Item List is pending under  the  Authorization  against which damaged component will be re­imported after repairing. d.        The  validity  of  subject  EPCG Authorization was upto 04.08.2013 and  the  firm  have  requested  for extension  in  validity  upto 31.12.2013.   The Committee, therefore, decided to recommend  to  DG  for  relaxation under  Para  2.5  of  FTP  to  grant extension  in  validity  of  the  subject EPCG Authorization upto 31.12.2013.   38. M/s  Hindalco Industries Limited   01/36/218/107/AM­ 14/EPCG­I 3430002389 dated 07.06.2013 Certification  of nexus in respect of EPCG Authorization No.  3430002389 dated  07.06.2013 issued  to  M/s Hindalco  Industries Ltd. case and decided to defer it with the direction  to  call  the  firm  for  Personal Hearing before EPCG Committee in its next meeting.

389 dated  07.06.2013 issued  to  M/s Hindalco  Industries Ltd. case and decided to defer it with the direction  to  call  the  firm  for  Personal Hearing before EPCG Committee in its next meeting.

S. No. Firm’s  Name  and Numbers EPCG Authorisation No.   Subject     39. M/s  Baxter  (India) Private Limited   01/36/218/130/AM­ 14/EPCG­I 20  EPCG Authorizations issued  during AM­10 to AM­12 Condonation  of delay in installation of  Capital  Goods imported  against 20  EPCG Authorizations  issued  during  AM­ 10 to AM­12 The Committee observed that the firm have  obtained  Installation  Certificate from  Jurisdictional  Central  Excise Authority against the subject 20 EPCG Authorization(s)  issued  during  AM­10 to  AM­12  and,  therefore,  decided  to recommend  to  DG  for  relaxation under  Para  2.5  of  FTP  for condonation of delay in submission of Installation Certificate.     40. M/s  Berkeley  Infra Projects  Private Limited (Formerly  known  as Gremach  Projects Pvt. Ltd.)   01/36/218/127/AM­ 14/EPCG­I 0330023532 dated 04.08.2009 a.  Condonation  of delay  in installation  of Capital Goods b.Condonation  of delay  in submission  of installation certificate c.  To  grant  time for one year for necessary compliance  (i.e. to  install  the machinery)  in respect of EPCG Authorization No. 0330023532 dated 04.08.2009

submission  of installation certificate c.  To  grant  time for one year for necessary compliance  (i.e. to  install  the machinery)  in respect of EPCG Authorization No. 0330023532 dated 04.08.2009

S. No. Firm’s  Name  and Numbers EPCG Authorisation No.   Subject     The Committee observed that:   a.    The firm obtained the EPCG Authorization on 04.08.2009; b.        Before  obtaining  EPCG  Authorization,  the  firm  had  purchased  land  from  private  land  owner  at Pudimadaka Village, Visakhapatnam in January, 2008; c.    On 06.02.2008, they were served notice by Deputy Collector(Land Acquisition) for compulsory acquisition of land for SEZ purpose by APIIC, a a subsidiary of Government of A. P.; d.    As the land was under compulsory acquisition, the firm, in consultation with Andhra Pradesh Industrial Infrastructure Corporation Limited, a subsidiary of Government of A. P. , purchased 25 acres of land at Krisnapalem Village in Visakhapatnam district for installation of Capital Goods, the possession of which was given on 20.04.2009; e.    They started civil work but suddenly villagers came inside their campus and protested from doing any work as their rehabilitation cost was not paid by APIIC; f.     For solving all the aforesaid issues, it took almost two years of time and thus the firm were not able to implement the proposed project and provide the necessary installation certificate of capital goods, due to various reasons beyond their control. g.       Now, the firm is in clear possession of the previous land situated at Pudimadaka (on which the EPCG

ry installation certificate of capital goods, due to various reasons beyond their control. g.       Now, the firm is in clear possession of the previous land situated at Pudimadaka (on which the EPCG license  had  been  obtained)  which  is  free  from  the  land  acquisition  act  as  APIIC  had  not  paid  the award/compensation and if they did not pay the award within a period of three years from the date of notifications, the act itself become null and void according to Land acquisition act 1984; h.    Due to all the above uncertain reasons beyond their control, the firm were unable to provide with the necessary  installation  certificate    in  time  on  the  original  land,  on  which  the  EPCG  license  has  been obtained; i.         Further the machineries in question are still lying on the port in a private ware houses and they are incurring a heavy loss day by day due to warehouse rent and interest cost involved in the purchase of machinery. j.     The firm, is therefore not in a position to install the machinery within the time frame.     The Committee, in view of the situation beyond control of the firm, decided to recommend to DG for relaxation under Para 2.5 of FTP for condonation of delay in Installation of Capital Goods and to grant time for one year for Installation of Capital Goods subject to the condition (a) the firm will fulfill 100% Export Obligation imposed on the subject EPCG Authorization and no proportionate reduction in EO/no recast of EO

Installation of Capital Goods subject to the condition (a) the firm will fulfill 100% Export Obligation imposed on the subject EPCG Authorization and no proportionate reduction in EO/no recast of EO

S. No. Firm’s  Name  and Numbers EPCG Authorisation No.   Subject     will  be  allowed  (b)  the  firm  will  not  ask  for  any  waiver  of  Export  Obligation  and  (c)  the  firm  will  furnish Installation Certificate to RA after the Installation of Capital Goods.   41. M/s  Bestech Hospitalities  Private Limited   01/36/218/274/AM­ 13/EPCG­I 24 Authorizations issued  during AM­05 to AM­08 Condonation  of procedural  lapse made in respect  of 24  EPCG Authorizations  issued  during  AM­ 05 to AM­08 The Committee observed that:   a.    the firm had obtained 24 EPCG Authorizations  from  CLA,  New Delhi during AM­05 to AM­08; b.        they  claim  that  they  have completed EO till 31.03.2007 in respect  of  21  EPCG Authorizations  and  during 2007­08 in respect of remaining 3  EPCG  Authorizations  issued after 31.03.2007; c.        After  completion  of  EO  in respect  of  all  the  24  EPCG Authorizations  they  sold  their hotel  to  M/s  MDLR  Tours  and Travels  Private  Limited  on 11.06.2008  (Sale  agreement date  –  22.04.2008)  without waiting  for  issuance  of  a  few redemption letters; d.       O/o Commissioner of Customs have stated that the firm have violated  the  provisions  of  Para 5.7.6 of HBP v1; e.       The firm have contended that they  have  not  violated  any provision of FTP/HBP v1; f.          As  per  Para  5.4  of  FTP,  the Capital

olated  the  provisions  of  Para 5.7.6 of HBP v1; e.       The firm have contended that they  have  not  violated  any provision of FTP/HBP v1; f.          As  per  Para  5.4  of  FTP,  the Capital  Goods  under  EPCG Scheme  shall  be  subject  to Actual User Condition till EO is completed;

S. No. Firm’s  Name  and Numbers EPCG Authorisation No.   Subject     g.        The  firm  have  claimed  that EODC  in  respect  of  all  the licences  have  since  been issued.   The  Committee  observed  that  the conflict  has  arisen  due  to  the interpretation  of  Para  5.4  of  FTP which  stipulates  that  the  Capital Goods  under  EPCG  Scheme  shall  be subject to Actual User Condition till EO is completed.  The Committee was of the  view  that  if  the  firm  have completed EO in respect of all the 24 EPCG Authorizations before sale of the Hotel,  the  procedural  lapse  of  not taking EODC before such sale may be condoned.    However,  the  Regional Authority  will  check  all  the  relevant documents  establishing  the  fact  that all the shipments were effected before such sale.   The Committee, thereafter, decided to recommend  to  DG  to  allow condonation of procedural lapse of not taking EODC before sale of the Hotel subject to the condition that the firm will  produce  all  the  documents  to establish  that  they  have  completed the  EO  before  sale  of  Hotel  to  the satisfaction of Regional Authority.

l subject to the condition that the firm will  produce  all  the  documents  to establish  that  they  have  completed the  EO  before  sale  of  Hotel  to  the satisfaction of Regional Authority.  

S. No. Firm’s  Name  and Numbers EPCG Authorisation No.   Subject     42. M/s  Mafatlal  Denim Limited   01/36/218/183/AM­ 11/EPCG­I 8  Authorizations issued  during AM­06 to AM­10 Re­fixation  of average  exports and condonation of 1st  block  condition with  extension  of EO  period  without payment  of compensation  in respect  of  their  8 EPCG Licences The  Committee  decided  to  defer the case  with  the  direction  to  call  for comments  from  O/o  Textile Commissioner,  Noida,  Ministry  of Textiles.   43. M/s  Netrack Enclosures  Private Limited, Bangalore   01/37/218/17/AM­ 14/EPCG­II 0730008646 dated 26.02.2010 Acceptance of ARE­ 1  in  lieu  of  Bill  of Exports The  Committee  observed  that  the party has furnished certificates issued by  Central  Excise  Authority  showing that  the  party  has  made  export  to SEZ.  The firm has also provided list of ARE­1  details  for  the  years  2009­10, 2010­11  and  Bank  Certificate  of payments  for  domestic  supplies  in Appendix  22B.  The  Committee, therefore,  decided  to  allow acceptance  of  ARE­1  in  lieu  of  Bill  of Exports.   44 M/s Vedanta Aluminium Ltd.   18/187/AM­ 13/EPCG­II 63  EPCG authorizations issued  during AM­09 to AM­13 Fulfilment of EO by export  of ‘Aluminium products’  instead of  export  of ‘calcined Alumina’.

s Vedanta Aluminium Ltd.   18/187/AM­ 13/EPCG­II 63  EPCG authorizations issued  during AM­09 to AM­13 Fulfilment of EO by export  of ‘Aluminium products’  instead of  export  of ‘calcined Alumina’.

S. No. Firm’s  Name  and Numbers EPCG Authorisation No.   Subject     The  issue  had  earlier  come  up  in  EPCG  Committee  Meetings  dated  06.03.2013  and  15.05.2013.    The Committee was of the view that value added product should be allowed for export as in this case SION exists and  calcined alumina is an input for final export product Aluminium Ingots. In fact, India should encourage export of value added products for higher foreign exchange realization, capacity utilization of the units and additional employment generation. Initially, the party had mentioned that it will export aluminium products produced by them and that Alumina would be used captively.  However, it was not clear which product the party was likely to export and as such the value and final export produce could not be determined.  The party has  now  indicated  that  they  would  export  aluminium  ingot/billet.  Since,  SION  for  aluminium  billet  is  not available,  the  proposal  is  being  examined  only  in  respect  of  export  of  aluminium  ingots.  The  issue  was discussed taking into the average annual value of last year in the meeting, but the representative of DOR felt that it would be more accurate if value pertaining to last three years is taken into consideration and then the

he average annual value of last year in the meeting, but the representative of DOR felt that it would be more accurate if value pertaining to last three years is taken into consideration and then the EO  be  calculated.  Accordingly,  taking  into  consideration  the  average  FOB  value  of  Aluminium  Ingots  and Calcined Alumina for last three years i.e. 2010­11, 2011­12 and 2012­13, the ratio of value­wise content of calcined alumina in the final export product i.e. Aluminium Ingots was calculated (as per  the principle given below) according to which the EO would be 3.3 times the export obligation imposed in respect of Calcined Alumina:   SION for Aluminium Ingots/Aluminium Sow Ingots are at Serial NO. C 1150.  Against 1 MT of Aluminium Ingots quantity of Calcined Alumina required is 1.92 MT.  Average FOB value of 1 MT of Aluminium Ingot, in the last three years i.e. 2010­11, 2011­12 and 2012­13. is US $ 2360.   Average FOB value of 1 MT of Calcined Alumina, in the last three years i.e. 2010­11, 2011­12 and 2012­13. is US $ 367.3.   Since for  each  Ton  of  Aluminium  Ingot  1.92  Ton  of  Calcined  Alumina  is  needed.    Hence,  the  Average value of Calcined Alumina per Ton of Aluminium Ingots  would come to US $ 705(1.92 x 367.3) .  If we calculate the ratio of the value of Calcined Alumina in 1 Ton of Aluminium Ingot it would come to 0.3.  Thus, the EO would be 3.33 times (e.g. if EO for export of Calcined Alumina is US $ 1000, the party will have to fulfil export obligation by export of Aluminium Ingots for FOB value of US $ 3333.33).

us, the EO would be 3.33 times (e.g. if EO for export of Calcined Alumina is US $ 1000, the party will have to fulfil export obligation by export of Aluminium Ingots for FOB value of US $ 3333.33).   Therefore, if EO for export of Calcined Alumina is for FOB value of US $ ‘x’ and if the party is desiring to fulfil export obligation by export of Aluminium Ingots then their EO would be amended to US $ ‘3.33x’.   The  Committee  recommended  to  DG  for  consideration  of  the  above  principle  and  fulfillment  of  EO  by export of Aluminium Ingots instead of Calcined Alumina in this case.

S. No. Firm’s  Name  and Numbers EPCG Authorisation No.   Subject

Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.