IN FORCE EPCG

DGFT Minutes

Reliability

In force — no superseding record on file.

Document text

S. No. Firm’s  Name  and File Number EPCG Authorization No. Subject Decision of the Committee   1. M/s  Cast Master   01/36/218/58/AM­ 14/EPCG­I 0530134768 dated 29.08.2003 Condition  of  shortfall  in fulfillment  of  stipulated percentage  of  EO  during the  2nd  block  of  EOP  in respect  of  EPCG Authorization  No. 0530134768  dated 29.08.2003 The  Committee  decided to  recommend  to  DG  for relaxation  under  Para  2.5  of FTP  to  allow  condonation  from condition  of  fulfillment  of  block­ wise  EO  subject  to  payment  of composition  fee  of  2%  on  duty saved  amount  in  proportion  to the  shortfall  at  the  end  of  each block in terms of the provisions of

Para 5.8.3 of HBP v1/Para 5.8.2 of

HBP v1 (RE:2013).   This has the approval of DG. 2. M/s  Bardiya Construction  Co. Pvt. Ltd.   01/36/218/53/AM­ 14/EPCG­I 1330000703 dated 25.08.2004 Condonation  of  shortfall in  block­wise  Export Obligation  against  EPCG Authorization  No. 1330000703  dated 25.08.2004 The  Committee  decided to  recommend  to  DG  for condition  of  fulfillment  of  block­ wise  EO  subject  to  payment  of composition  fee  of  2%  on  duty saved  amount  in  proportion  to the  shortfall  at  the  end  of  each block in terms of the provisions of

Para 5.8.3 of HBP v1/Para 5.8.2 of

HBP v1 (RE:2013).   MINUTES OF EPCG COMMITTEE MEETING HELD UNDER THE CHAIRMANSHIP OF SHRI JAIKANT SINGH, JOINT DGFT, AT 1430 Hours ON 24.07.2013   Following officers attended the meeting:   a.     Shri Dinesh Kumar Gupta, Director(DBK), D/o Revenue b.     Shri K. K. Tiwari, Industrial Adviser, Department of Heavy Industry c.      Shri S. S. Tak, Joint Industrial Adviser, M/o Steel d.     Shri D. V. S. P. Varma, Deputy Director General, DGFT e.     Shri A. K. Gopal, Foreign Trade Development Officer (EPCG. I), DGFT f.      Shri S. K. Swarnkar, Foreign Trade Development Officer (EPCG. II), DGFT g.     Smt. Rekha Sharma, Foreign Trade Development Officer (P­5), DGFT   2.             Minutes of the last Meeting held on 14.06.2013 were confirmed.   3.             The Committee deliberated upon all the cases and following decisions were taken:

S. No. Firm’s  Name  and File Number EPCG Authorization No. Subject Decision of the Committee   3. M/s  Gradex  Exports Pvt. Ltd.   01/36/218/43/AM­ 14/EPCG­I 0530137813 dated 10.01.2005 Condition  of  shortfall  in fulfillment  of  stipulated percentage  of  EO  during the  2nd  block  of  EOP  in respect  of  EPCG Authorization  No. 0530137813  dated 10.01.2005 The  Committee  decided to  recommend  to  DG  for condition  of  fulfillment  of  block­ wise  EO  subject  to  payment  of composition  fee  of  2%  on  duty saved  amount  in  proportion  to the  shortfall  at  the  end  of  each block in terms of the provisions of

Para 5.8.3 of HBP v1/Para 5.8.2 of

HBP v1 (RE:2013).   4. M/s  India  Offset Press   01/36/218/57/AM­ 14/EPCG­I 0530138573 dated 10.05.2005 Condition  of  shortfall  in fulfillment  of  stipulated percentage  of  EO  and extension  in  EOP  in respect  of  EPCG Authorization  No. 0530138573  dated 10.05.2005 The  Committee  decided to  recommend  to  DG  for condition  of  fulfillment  of  block­ wise  EO  subject  to  payment  of composition  fee  of  2%  on  duty saved  amount  in  proportion  to the  shortfall  at  the  end  of  each block in terms of the provisions of

Para 5.8.3 of HBP v1/Para 5.8.2 of

HBP v1(RE:2013). The  Committee  further  decided to  recommend  to  DG  for FTP to allow extension in EOP for 2  years  on  payment  of composition  fee  equal  to  2%  of proportionate duty saved amount on  unfulfilled  EO  or  an enhancement  in  EO  imposed  to the extent of 10% of total EO at the  choice  of  exporter,  for  each year of extension sought in terms of  provisions  contained  in  Para 5.11 of HBP Vol. I.  

S. No. Firm’s  Name  and File Number EPCG Authorization No. Subject Decision of the Committee   5. M/s  Hindustan  Zinc Limited   01/36/218/52/AM­ 14/EPCG­I 1330002513 dated 22.03.2010 Permission for transfer of 2  sets  of  Transformers imported  against  EPCG Authorization  No. 1330002513  dated 22.03.2010 The Committee decided to allow transfer of 2 sets of Transormers from  their  Pantnagar  Plant  to their  Dariba  Location  i.e.  Lead Smelter, Dariba Smelter Complex, Rajpura  Dariba  Mines,  P.  O. Dariba,  District  –  Rajsamand, Rajasthan  subject  to  submission of  fresh  installation  certificate within 6 months of such transfer.   6. M/s Gopsons Papers Limited   01/36/218/06/AM­ 14/EPCG­I 0530135584 dated  20.01.2004 and  0530133906 dated 03.03.2003 Condonation  of  shortfall in  block  wise  EO  against EPCG  Authorization  Nos. 0530135584  dated 20.01.2004  and 0530133906  dated 03.03.2003 The  Committee  decided to  recommend  to  DG  for condition  of  fulfillment  of  block­ wise  EO  subject  to  payment  of composition  fee  of  2%  on  duty saved  amount  in  proportion  to

.2003 The  Committee  decided to  recommend  to  DG  for condition  of  fulfillment  of  block­ wise  EO  subject  to  payment  of composition  fee  of  2%  on  duty saved  amount  in  proportion  to the  shortfall  at  the  end  of  each block in terms of the provisions of

Para 5.8.3 of HBP v1/Para 5.8.2 of

HBP v1 (RE:2013).  

S. No. Firm’s  Name  and File Number EPCG Authorization No. Subject Decision of the Committee   7. M/s  Durabuild Technologies  Pvt. Ltd.   01/36/218/77/AM­ 14/EPCG­I 0330012953 dated  18.08.2006 and  0330010545 dated 19.12.2005 a.      Acceptance  of Installation  Certificate from  Chartered Engineer  in  lieu  of Installation  Certificate from Central Excise or condone  the  delay  in submission  of  excise certificate b.      Change  in  ITCHS classification  of  the export product due to change  in classification by Excise Authority c.   Acceptance of few ARE in lieu of Bill of exports for  exports  to  SEZ  in respect  of  two  EPCG Authorizations  Nos. 0330012953  dated 18.08.2006  and 0330010545  dated 19.12.2005   a.  The  Committee  decided  to   recommend  to  DG  for FTP  to  condone  the  delay  in submission  of  Installation Certificate  subject  to  the condition  that  the  Authorization Holder will submit the Installation Certificate  issued by Jurisdictional Central  Excise  Authority    in respect of Capital Goods imported against EPCG Authorizations.   b.  The  Committee  observed  that the  Customs  have  classified  the export product under Chapter 39 of  ITC  HS  Code  and  therefore, decided  to  allow  the  change  in ITC (HS) in EPCG Authorization.   c.      The  Committee  decided  to recommend  to  DG  for FTP  for  acceptance  of  ARE­3 instead  of  Bill  of  Export  provided payment  has  been  received  in terms of SEZ Rules 30(8).   8. M/s  Lahoti  Terra Knitfab Ltd.

ed  to recommend  to  DG  for FTP  for  acceptance  of  ARE­3 instead  of  Bill  of  Export  provided payment  has  been  received  in terms of SEZ Rules 30(8).   8. M/s  Lahoti  Terra Knitfab Ltd.   01/36/218/79/AM­ 14/EPCG­I 0330023234 dated 30.06.2009 0330024759 dated 29.12.2009 0330025522 dated 19.03.2010 0330023228 dated 29.06.2009 0330023257 dated 02.07.2009 Relaxation  in  condition of  Para  5.3.1  of  HBP 2009­14  for  delay  in Installation  and obtaining  the Installation  Certificate from  Central  Excise  in respect  of  5  EPCG Authorizations The  Committee  decided  to   recommend  to  DG  for FTP    to  condone  the  delay  in submission  of  Installation Certificate  subject  to  the condition  that  the  Authorization Holder will submit the Installation Certificate  issued by Jurisdictional Central  Excise  Authority    in respect of Capital Goods imported against EPCG Authorizations.        

S. No. Firm’s  Name  and File Number EPCG Authorization No. Subject Decision of the Committee   9. M/s  Caparo Engineering  India Ltd.   01/36/218/21/AM­ 14/EPCG­I 0530147654 dated 05.11.2008 a.        Condonation  for procedural  lapse  of delay  in  obtaining Installation Certificate  even though  machinery was  installed  within 6  months  from  the completion  of import, and b.      Condonation  of procedural  lapse  of not  seeking  an amendment  in  the licence  for  change of  address  of  place of installation. a.       The Committee  decided  to recommend  to  DG  for relaxation under Para 2.5 of  FTP  to  condone  the delay  in  submission  of

e licence  for  change of  address  of  place of installation. a.       The Committee  decided  to recommend  to  DG  for relaxation under Para 2.5 of  FTP  to  condone  the delay  in  submission  of Installation Certificate.  This has the approval of DG. b.   The Committee also allowed change  of  address  in  EPCG Authorization for Installation of Capital Goods at Plot No. M­5, Phase Large, Sector  – Adityapur,  Saraikela Kaharswad,  Jamshedpur  – 832108  subject  to  the condition that the address is mentioned in IEC and RCMC and  submission  of Installation  Certificate  from Jurisdictional  Central  Excise Authority.      10. M/s KLT  Automotive Tubular  Products Ltd.   01/36/218/173/AM­ 13/EPCG­I 0330003599 dated 08.05.2003 Nexus  Approval  for machinery  imported against  EPCG Authorization  No. 0330003599  dated 08.05.2003 issued to M/s KLT  Automotive  Tubular Products  Limited. (Thakkersons  Auto Ancillary (I) Ltd.) The  technical  members  of  the Committee  scrutinized  the Agenda Papers and certified the nexus  of  Capital  Goods  with export  products  viz.  Automobiles components  fabrication component, Frame Assembly and MS forms and sections.       11. M/s  Federal  Mogul Goetze (India) ltd.   01/36/218/182/AM­ 13/EPCG­I List    of  21  EPCG Authorizations enclosed Acceptance  of Installation  Certificate issued  by  Jurisdictional Central  Excise  Authority in  respect  of  21  EPCG Authorizations  issued during AM­03 to AM­07 The Committee observed that the firm  have  obtained  Installation Certificate  from  Central  Excise  in respect  of  only  21

in  respect  of  21  EPCG Authorizations  issued during AM­03 to AM­07 The Committee observed that the firm  have  obtained  Installation Certificate  from  Central  Excise  in respect  of  only  21  EPCG Authorizations  issued  during  AM­ 03  to  AM­07  and  decided  to recommend  to  DG  for FTP  for  codonation  of  delay  in Installation of Capital Goods.  

S. No. Firm’s  Name  and File Number EPCG Authorization No. Subject Decision of the Committee   12. M/s  Hosur  CNC Applications  Pvt. Ltd.   01/36/218/29/AM­ 14/EPCG­I 0430001493 dated 23.02.2004 Extension  in  EOP  and Condonation  of  block­ wise  EO  in  respect  of EPCG  Authorization  No. 0430001493  dated 23.02.2004 The  Committee  decided to  recommend  to  DG  for condition  of  fulfillment  of  block­ wise  EO  subject  to  payment  of composition  fee  of  2%  on  duty saved  amount  in  proportion  to the  shortfall  at  the  end  of  each block in terms of the provisions of

Para 5.8.3 of HBP v1/Para 5.8.2 of

HBP v1(RE:2013).   The  Committee  further  decided to  recommend  to  DG  for FTP to allow extension in EOP for 2  years  on  payment  of composition  fee  equal  to  2%  of proportionate duty saved amount on  unfulfilled  EO  or  an enhancement  in  EO  imposed  to the extent of 10% of total EO at the  choice  of  exporter,  for  each year of extension sought in terms of  provisions  contained  in  Para 5.11 of HBP Vol. I.   13. M/s Mawana Sugars Ltd.   01/36/218/46/AM­ 14/EPCG­I P/CG/2156113 dated 31.03.1997 Condonation  of  delay  in installation  of  Capital Goods  imported  against the  EPCG  Authorization No.    P/CG/2156113 dated 31.03.1997 issued to  M/s  Mawana  Sugars limited   The Committee observed that the firm  had  already  obtained Installation  Certificate  from Central  Excise  and  decided  to recommend  to  DG  for FTP  for  codonation  of  delay  in Installation of Capital Goods.  

S. No. Firm’s  Name  and File Number EPCG Authorization No. Subject Decision of the Committee   14. M/s  JMT  Auto Limited   01/36/218/194/AM­ 13/EPCG­I 0230000605 dated 11.06.2004 Condonation  of  shortfall in block­wise EO against EPCG  Authorization  No. 0230000605  dated 11.06.2004 The  Committee  decided to  recommend  to  DG  for condition  of  fulfillment  of  block­ wise  EO  subject  to  payment  of composition  fee  of  2%  on  duty saved  amount  in  proportion  to the  shortfall  at  the  end  of  each block in terms of the provisions of

Para 5.8.3 of HBP v1/Para 5.8.2 of

HBP v1 (RE: 2013).   15. M/s  Al­Nafees Proteins Pvt. Ltd.   01/36/218/20/AM­ 14/EPCG­I Applied for Clarification  on  whether item  Puf  Panel  etc.  are permitted  to  be imported  under  EPCG Scheme The  Committee  deliberated  upon the case in detail and decided to defer the case with the direction to call for Catalogue and technical literature  of  the  items  proposed to  be  imported  under  EPCG Scheme.   EPCG authorization No. Capital goods Present  place  of installation Proposed  place  of installation/  name  of supporting manufacturer Sl. No. of Lic. Details  of  capital goods No.0530154115 dated 02.12.2010 4   Press  Tool  Dies along  with inspection Fixtures, Accessories Tooling’s  and Spares  for  Panel  A Pillar  inner  Upper LH (Part NImiti  Auto Components Pvt. Ltd, Plot  No.5,  Sector  11, SIDUL,  Tata  vendor park,  Pantnagar, Uttarakhand Autoline  Industries Ltd,  Gate  No.313, 304,  320­323, Nanekarwadi,  Chakan,  Talkhed, Pune­410501   16. M/s  Tata  Motors Ltd.   01/37/218/64/AM­ 14/EPCG­II 0530154115 dated 02.12.2010 0530158087 dated 30.03.2012 Change  of  supporting manufacturer  and  place of  installation  of  capital goods The  Committee  deliberated  upon the  case  and  decided  to  allow endorsement  of  supporting manufacturer and shifting of Capital goods  from  their  present  place  of installation  to  proposed  place  as indicated  under  subject  to  the submission  of  fresh  Installation Certificate  within  6  months  of shifting:        


rom  their  present  place  of installation  to  proposed  place  as indicated  under  subject  to  the submission  of  fresh  Installation Certificate  within  6  months  of shifting:        


( a t No.55176360 8201) – 1set 10 Press  Tool  Dies along  with inspection Fixtures, Accessories Tooling’s  and Spares  for  REINF Front  Wall  Lower (Part  No.5517 6120 8201)­1 set Automotive  Stamping and  Assemblies  Ltd, Plot No.71, Sector II, IIE  SIDUL, Pantanagar­263145 Uttarakhand Autocomp Corporation  Panse Pvt.  Ltd,  Gate No.219,  Borhade wadi,  Dehu  Alandi Road,  Haveli,  Pune­ 412105 53 Press  Tool  Dies along  with inspection Fixtures, Accessories Tooling’s  and Spares  for  Panel  A Pillar  inner  Upper RH  (Part No.55176360 8202) – 1 set NImiti  Auto Components Pvt. Ltd, Plot  No.5,  Sector  11, SIDUL,  Tata  vendor park,  Pantnagar, Uttarakhand Autoline  Industries Ltd,  Gate  No.313, 304,  320­323, Nanekarwadi,  Chakan,  Talkhed, Pune­410501   No.0530158087 dated 30.03.2012. 5 Kunkel  Wagner make  Semi automatic  Pouring Machine – model – FOX  15­S  along with accessories.  – 1 Set. Tata  Motors  Ltd, Pimpri,  Chakhali Chinchwad,  Haveli, Pune­411018 Tata  Motors  Ltd, Maval  Foundry, Bebedohol,  Maval, Pune­410506   17. M/s  T.D.  Power Systems Ltd.   01/37/218/70/AM­ 14/EPCG­II   Import  of  ‘Transformer’ under EPCG Scheme The  technical  members  of  the Committee were of the opinion that the  transformer  proposed  to  be imported  will  not  be  used  for transmission  of  power  and  will  be used  for  testing/quality  checking  of

mbers  of  the Committee were of the opinion that the  transformer  proposed  to  be imported  will  not  be  used  for transmission  of  power  and  will  be used  for  testing/quality  checking  of the export product. The Committee, therefore,  decided  to  allow  import of ‘Testing Transformer’ under EPCG Scheme in this case. 18. M/s Rainbow Denim Ltd.   01/37/218/65/AM­ 14/EPCG­II 03501092 dated 13.01.1999 Extension  in  EO  period as per BIFR order The  Committee  observed  that  BIFR has, vide its order dated 22.01.2013, given direction  for  extension  in  EOP for 12 years from date of sanction of scheme.    The  Committee,  however, decided  to  grant  extension  in  EOP for 12 years from the date of expiry of original EOP.   19. M/s  Usha  Martin Limited   01/37/218/60/AM­ 14/EPCG­II 0230006883 dated 11.07.2011 Disposal  of  damaged capital  goods  imported under  EPCG  scheme  on payment  of  customs duty  with  interest  and The Committee observed that:   a.          One  of  the  machinery imported  against  the subject  Authorization  was

imported under  EPCG  scheme  on payment  of  customs duty  with  interest  and The Committee observed that:   a.          One  of  the  machinery imported  against  the subject  Authorization  was

proportionate  reduction of export obligation found damaged during the clearing of goods itself; b.     The Authorization Holder is ready  to  pay  the corresponding  duty  saved amount  with  applicable interest.   The  Committee,  therefore,  decided to  allow  disposal  of  the  damaged machinery  subject  to  payment  of corresponding  duty  saved  amount with  applicable  interest  and proportionate  reduction  in  Export Obligation.   20. M/s WWICS Resorts Pvt. Ltd.   01/37/218/36/AM­ 14/EPCG­II 2230000019 dated 12.06.2002 Extension in EOP for two years The  Committee  decided to  recommend  to  DG  for FTP to allow extension in EOP for 2 years i.e. upto 11.06.2014 subject to payment of 50% of customs duty on the  duty  saved  amount proportionate  to  unfulfilled  EO  in terms of provisions contained in Para 5.11 of HBP Vol. I.   21. M/s  Omni  Matrix Pvt. Ltd.   01/37/218/68/AM­ 14/EPCG­II 0730001738 dated 15.04.2004 0730001768 dated 07.05.2004 0730002037 dated 18.08.2004 0730001850 dated 04.06.2004 Extension  in  EO  period, Condonation  of  block­ wise  EO  and  re­fixation of average EO The  Committee  decided to  recommend  to  DG  for condition  of  fulfillment  of  block­wise EO  subject  to  payment  of composition fee of 2% on duty saved amount in proportion to the shortfall at the end of each block in terms of the  provisions  of  Para  5.8.3  of  HBP

t  of  block­wise EO  subject  to  payment  of composition fee of 2% on duty saved amount in proportion to the shortfall at the end of each block in terms of the  provisions  of  Para  5.8.3  of  HBP v1/Para 5.8.2 of HBP v1 (RE:2013).   The  Committee  further  decided to  recommend  to  DG  for FTP to allow extension in EOP for 2 years on payment of composition fee equal  to  2%  of  proportionate  duty saved amount on unfulfilled EO or an enhancement in EO imposed to the extent  of  10%  of  total  EO  at  the choice of exporter, for each year of extension  sought  in  terms  of provisions contained in Para 5.11 of HBP Vol. I.

As regards refixation of Average EO, the Committee decided to refer the case  to  the  concerned  Regional Authority to examine it.   22. M/s  Unisex Footwears Pvt. Ltd.   01/37/218/48/AM­ 14/EPCG­II 0530133465 dated 29.10.2002 (i)        Condonation  of block­wise EO (ii)      Regularization  of EPCG  authorization after  payment  of Customs  duty+ interest  on unfulfilled 40.67% of EO The Committee deliberated upon the case. It was observed that the party had  not  fulfilled  Average  EO.    This amounts to total default and hence the Committee decided to reject the case  with  the  direction  to  the Regional  Authority  to  initiate  action against  the  Authorization  Holder  as per Policy. 23. M/s  Welspun  Corp Ltd.   01/37/218/76/AM­ 14/EPCG­II 3430001869 dated 13.01.2011 3430001671 dated 26.02.2010 3430001927 dated 27.04.2011 3430001840 dated 06.12.2010 Condonation  of  delay  in installation  of  capital goods

01/37/218/76/AM­ 14/EPCG­II 3430001869 dated 13.01.2011 3430001671 dated 26.02.2010 3430001927 dated 27.04.2011 3430001840 dated 06.12.2010 Condonation  of  delay  in installation  of  capital goods The  Committee  observed  that  the firm  had  already  obtained Installation  Certificate  from  Central Excise and decided to recommend to  DG  for  relaxation  under  Para 2.5 of FTP for codonation of delay in Installation of Capital Goods.         24. M/s  Pritam International   01/37/218/79/AM­ 14/EPCG­II 2230000130 dated 21.12.2004 Condonation  of  block­ wise EO The  Committee  decided to  recommend  to  DG  for condition  of  fulfillment  of  block­wise EO  subject  to  payment  of composition fee of 2% on duty saved amount in proportion to the shortfall at the end of each block in terms of the  provisions  of  Para  5.8.3  of  HBP v1/Para 5.8.2 of HBP v1 (RE:2013).   25. M/s  Shree  Krishna Paper  Mills  & Industries Ltd.   18/195/AM­ 13/EPCG­II 0530136980 dated 13.09.2004 Inclusion  of  alternate product The Committee observed that there was  a  provision  to  fulfill  export obligation  by  export  of  alternate product  at  the  time  of  issuance  of EPCG  Authorization  and  therefore, decided  to  allow  inclusion  of alternate  product  from  the  date  of application  in  DGFT  Hqrs.  for  the purpose  of  fulfillment  of  export obligation  subject  to  refixation  of Average  EO  in  respect  of  alternate product also.   26. M/s Tata Steel Ltd. 20  EPCG Extension  in  time  for The  Committee  observed  that  the

export obligation  subject  to  refixation  of Average  EO  in  respect  of  alternate product also.   26. M/s Tata Steel Ltd. 20  EPCG Extension  in  time  for The  Committee  observed  that  the

01/37/218/81/AM­ 14/EPCG­II Authorizations submission  of  installation certificate Authorization  Holder  could  not complete  the  Installation  due  to various  reasons  such  as  delay  in allotment of land, massive amount of enabling  work  for  site  leveling,  civil and  structural  work  to  be  done before installation of equipment. The Committee,  therefore,  decided recommend to DG for relaxation under  Para  2.5  of  FTP  for extension  in  time  upto  May,  2015 (i.e.  6  months  from  the  date  of commissioning i.e. November, 2014) for  submission  of  Installation Certificate.   27. M/s  Victora  Auto­ parts Pvt. Ltd.   18/162/AM­ 13/EPCG­II 0530134957 dated 29.09.2003 Counting  of  export  of alternate  product  for fulfillment  of  export obligation The Committee observed that there was already a provision for fulfillment of  export  obligation  by  export  of alternate  product  manufactured  by same  firm/company  at  the  time  of issuance  of  licence.    Since,  the Company  has  already  effected  the exports  of  alternate  product  but could  not  get  it  endorsed  in  the EPCG  Authorization,  the  Committee decided to  recommend to DG for FTP to allow counting of exports of alternate  product  made  during  the period  2003­04  to  2005­06  for fulfillment  of  export  obligation subject to refixation of Average EO in

ommend to DG for FTP to allow counting of exports of alternate  product  made  during  the period  2003­04  to  2005­06  for fulfillment  of  export  obligation subject to refixation of Average EO in respect of alternate product as well.   28. M/s  SR  Foils  and Tissue Ltd.   18/117/AM­ 13/EPCG­II 0530138942 dated 23.06.2005 Extension  in  EO  period and  Condonation  of block­wise EO The  Committee  decided to  recommend  to  DG  for condition  of  fulfillment  of  block­wise EO  subject  to  payment  of composition fee of 2% on duty saved amount in proportion to the shortfall at the end of each block in terms of the  provisions  of  Para  5.8.3  of  HBP v1/Para 5.8.2 of HBP v1 (RE:2013).   The  Committee  further  decided to  recommend  to  DG  for FTP to allow extension in EOP for 2 years on payment of composition fee

equal  to  2%  of  proportionate  duty saved amount on unfulfilled EO or an enhancement in EO imposed to the extent  of  10%  of  total  EO  at  the choice of exporter, for each year of extension  sought  in  terms  of provisions contained in Para 5.11 of HBP Vol. I.   29. M/s  Mafatlal  Denim Ltd.   01/36/218/183/AM­ 11/EPCG­I 0330010404 dated 02.12.2005 0330010766 dated 09.01.2006 0330011921 dated 08.05.2006 0330013430 dated 28.09.2006 0330016135 dated 21.05.2007 0330016589 dated 29.06.2007 0330023362 dated 13.07.2009 0330024709 dated 22.12.2009 Request for waiver or re­ fixation  of  average exports and Condonation of 1st block condition with extension  of  EO  period without  payment  of compensation  in  respect of their 8 EPCG Licences

9 Request for waiver or re­ fixation  of  average exports and Condonation of 1st block condition with extension  of  EO  period without  payment  of compensation  in  respect of their 8 EPCG Licences As  the  technical  member  from  the Textile Ministry was not present, the Committee  decided  to  defer  the case.                           30. M/s  Global  Exports Ltd.   01/36/218/51/AM­ 14/EPCG­I 0430002810 dated 13.07.2005 0930002114 dated 28.03.2006 0430002680 dated 25.05.2005 0430002995        dated 08.09.2005 0930001921 dated 20.12.2005     Request  for  waiver  from maintenance  of  average EO  in  the  FYs  2006­07, 2007­08  as  during  the remaining  years  exports were more than average EO  x  7  (they  completed EO in 7 years) + Specific EO  in  respect  of  their  5 EPCG Authorizations The  Committee  observed  that there is shortfall in Average EO in the years 2006­07 and  2007­08.  However,  during  the  remaining years  of  EOP  they  have  fulfilled the  shortfall  in  Average  EO including  specific  EO.  The Committee,  therefore, recommended  to  DG  for FTP for condonation of shortfall in Average EO for the years 2006­07 and 2007­08 which was fulfilled in remaining  blocks  and  block­wise condonation of shortfall in specific EO.    However,  for  shortfall  in specific  EO,  the  firm  will  be required to pay composition fee of 2%  on  duty  saved  amount  in proportion to the shortfall at the

of shortfall in specific EO.    However,  for  shortfall  in specific  EO,  the  firm  will  be required to pay composition fee of 2%  on  duty  saved  amount  in proportion to the shortfall at the

end of each block in terms of the provisions  of  Para  5.8.3  of  HBP v1/Para  5.8.2  of  HBP v1(RE:2013).”   31. M/s  Vesuvio  Papers Pvt. Ltd.   01/37/218/54/AM­ 14/EPCG­ll 0430005659 dated 02.01.2008 Extension  in  time  for submission  of  installation certificate The  Directorate  had  already considered  extension  in  time  period for  installation  of  Capital  Goods under  the  EPCG  Licence  No. 04300056[4]59 dated 02.01.2008 as a  special  case.    The  Committee, therefore,  rejected  further  request of  extension  in  Installation.    The party may opt out of EPCG Scheme by  payment  of  duty  +  applicable interest.   32. M/s NSP  Electronics Ltd.   18/93/AM­12/EPCG­ ll 730000565 dated 17.04.2002 730000971 dated 10.04.2003 730000709 dated 30.08.2002 730000752 dated 07.10.2002 Waiver from maintenance of  average  export obligation  against  EPCG Authorizations  No. 730000565  dated 07.04.2002,  730000971 dated  10.04.2003, 730000709  dated 30.08.2002  and 730000752  dated 07.10.2002 The Committee decided to defer the case  with  the  direction  to  call  for comments  from  Department  of Information Technology. 33. M/s  Reliance Infrastructure Ltd.   18/184/AM­ 13/EPCG­ll 0330029636 dated 01.06.2011 0330029874 dated 30.06.2011 0330030896 dated 21.10.2011 Import  of  cranes  under EPCG scheme. The Committee deliberated upon the case and decided to defer the same

PCG­ll 0330029636 dated 01.06.2011 0330029874 dated 30.06.2011 0330030896 dated 21.10.2011 Import  of  cranes  under EPCG scheme. The Committee deliberated upon the case and decided to defer the same as a new officer from DOR had come and  he  was  not  aware  of  the background of the case.

Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.

Analysis

No analysis generated for this document yet (analysis runs over brief docs + on-demand). Run build_analysis.py --ids 6349 --apply.

Citation copied