Agenda for Approval Committee meeting scheduled on 9 May 2025 for SEZ and EOU under Pune Cluster.
In force — no superseding record on file.
Sr. No. EOU Unit Name UAC Matter Confirmation of Minutes if the Meeting held on 15.10.2024 Action taken report for the minutes of the meeting held on 15.10.2024 M/s. ADM Cryowest Pvt. Ltd. Application for Setting up of New EOU unit M/s. Helvoet Rubber and Plastic Technologies (India) Pvt. Ltd. Monitoring of performance Sr. No SEZ Unit Name UAC Matter Confirmation of the minutes of the meeting held on 21.03.2025 on 21.03.2025 M/s. Crum & Forster Services India Pvt. Ltd Application for setting up of a new unit M/s. Hexaware Technologies Ltd., (LOA 61) Application for capacity enhancement M/s. Hexaware Technologies Ltd., (LOA 05) Application for capacity enhancement M/s. Hexaware Technologies Ltd., (LOA 04) Application for capacity enhancement 21.03.2025 on 21.03.2025 M/s VITP Pvt Ltd. Application for Installation of Vending machine M/s. Crisil Ltd. M/s Triarq Health LLP M/s. SubEno India Pvt. Ltd. M/s. Prolifics Corporation Pvt. Ltd. M/s. Globant India Pvt. Ltd. M/s. Darwish Cybertech India Pvt. M/s. LTI Mindtree Ltd. 21.03.2025 on 21.03.2025 M/s.Nalanda Shelter Pvt. Ltd.(Developer) Application for Installation of Vending machine M/s. Aptiv Components India Pvt.Ltd Application for Addition of Location with Revision in Projection 21.03.2025 on 21.03.2025 M/s. Company3 Method India Pvt. Ltd. M/s. UPS Logistics Pvt. Ltd. M/s.Vodafone India Services Pvt. Ltd Monitoring of performance 21.03.2025 on 21.03.2025 M/s. UBS Business Solutions (India) Pvt. Ltd. Application for merger of LOAs M/s.
/s. UPS Logistics Pvt. Ltd. M/s.Vodafone India Services Pvt. Ltd Monitoring of performance 21.03.2025 on 21.03.2025 M/s. UBS Business Solutions (India) Pvt. Ltd. Application for merger of LOAs M/s. Altera Digital Health (India) LLP Monitoring of performance M/s.Cybage Software Pvt.Ltd 21.03.2025 on 21.03.2025 M/s. E-Infochips Pvt Ltd M/s. WNS Global Services Pvt Ltd LOA 30 M/s. WNS Global Services Pvt Ltd LOA 35 M/s. Hitachi Digital Services India Pvt Ltd 21.03.2025 on 21.03.2025 M/s Connectwise LLP Application of approval for withdrawal of application dated 29.01.2025 M/s. HCL Technologies Limited M/s. IBM India Pvt Ltd M/s. Nitor Infotech Pvt Ltd (Unit-II) 8 MAGARPATTA CITY-SEZ 7 Timeschedule for Approval Committee Meeting scheduled on 09.05.2025 EON KHRADI INFRASTRUCTURE PVT.LTD. PHASE-I-SEZ 5 Export Oriented Unit 1 MIDC Pune SEZ 2 NALANDA-SEZ 4 EMBASSY PUNE TECHZONE PVT LTD- SEZ QUBIX BUSINESS PARK PVT. LTD.-SEZ 3 EON KHRADI INFRASTRUCTURE PVT.LTD. PHASE-II-SEZ 6
T.LTD. PHASE-I-SEZ 5 Export Oriented Unit 1 MIDC Pune SEZ 2 NALANDA-SEZ 4 EMBASSY PUNE TECHZONE PVT LTD- SEZ QUBIX BUSINESS PARK PVT. LTD.-SEZ 3 EON KHRADI INFRASTRUCTURE PVT.LTD. PHASE-II-SEZ 6
21.03.2025 on 21.03.2025 M/s.Syntel Private Limited-(LOA 03) M/s Syntel Software LLP -(LOA 08) M/s Syntel Software LLP -(LOA 07) M/s. Syntel Pvt. Ltd. 21.03.2025 on 21.03.2025 M/s WNS BPM Americas LLC Application for approval of Sharing of Infrastructure M/s. Konecranes Pvt Ltd (Unit 1) M/s. Konecranes Pvt Ltd (Unit 2) 21.02.2025 on 21.02.2025 M/s Humane Business Intelligence Technology Solutions Pvt. Ltd 21.03.2025 on 21.03.2025 M/s. Serum Institute of India Pvt. Ltd. (Unit IV) M/s. Serum Institute of India Pvt. Ltd. (Unit V) 21.03.2025 on 21.03.2025 M/s Wipro Limited Unit V 17.01.2025 on 17.01.2025 M/s. Infosys Limited 21.02.2025 on 21.02.2025 M/s. Allstate India Pvt. Ltd. 21.02.2025 on 21.02.2025 M/s. Envipro Engineering Pvt Ltd M/s. Steam Equipments Ltd QUBIX BUSINESS PARK PVT. LTD.-SEZ M/s. LTIMindtree Ltd Application for approval of change in Board of Director. M/s. LTIMindtree Ltd Application for approval of change in Board of Director. M/s. Vodafone India Services Pvt. Ltd. Application for approval of change in Board of Director. M/s. Statestreet Corporate Services Delhi Pvt. Ltd Approval for Change in Name, Change in Board Of Directors and Change in Shareholding pattern of the Company M/s. LTIMindtree Ltd Application for approval of change in Board of Director. MANJRI STUD FARMS. - SEZ M/s.
in Name, Change in Board Of Directors and Change in Shareholding pattern of the Company M/s. LTIMindtree Ltd Application for approval of change in Board of Director. MANJRI STUD FARMS. - SEZ M/s. Vodafone India Services Pvt Ltd Application for approval of change in Board of Director. MANJRI STUD FARMS. - SEZ 11 MIDC Kesurdi (Satara) EON KHRADI INFRASTRUCTURE PVT.LTD. PHASE-I-SEZ SERUM BIO PHARMA- SEZ 12 Wipro Ltd. SEZ SYNTEL INTERNATIONAL PVT.LTD-SEZ QUADRON BUSINESS PARK PRIVATE LIMITED 17 9 10 13 Agendas under Instruction No. 109 14 Infosys Technologies Ltd. KRC Infrastructure and Projects Private Limited and Gera Developments Limited 15 16 EMBASSY PUNE TECHZONE PVT LTD- SEZ
SEEPZ SPECIAL ECONOMIC ZONE ANDHERI (EAST), MUMBAI.
AGENDA FOR
MEETING OF THE APPROVAL COMMITTEE FOR EXPORT ORIENTED UNITS UNDER THE JURISDICTION OF DEVELOPMENT COMMISSIONER, SEEPZ-SEZ
DATE : 09.05.2025
TIME : 12:00 PM
OVAL COMMITTEE FOR EXPORT ORIENTED UNITS UNDER THE JURISDICTION OF DEVELOPMENT COMMISSIONER, SEEPZ-SEZ
DATE : 09.05.2025
TIME : 12:00 PM
MEETING OF THE APPROVAL COMMITTEE FOR EXPORT ORIENTED UNITS UNDER THE JURISDICTION OF DEVELOPMENT COMMISSIONER, SEEPZ-SEZ ON 09.05.2025 INDEX
Agenda Item No.
Subject Agenda Item No. 01:- Confirmation of the Minutes of the meeting held on 15.10.2024 Agenda Item No. 02:- Action taken report for the Minutes of the meeting held on 15.10.2024 Agenda Item No. 03:- Application for Approval of Setting up of New unit as 100% EOU submitted by M/s. ADM Cryowest Pvt. Ltd. Agenda Item No. 04:- Monitoring of performance for M/s. Helvoet Rubber and Plastic Technologies (India) Pvt. Ltd.
15.10.2024 को े ीय वकास आयु SEEPZ-SEZ, मुंबई क अ"य ता म$ िनया'त उ)मुख इकाइय, के िलए अनुमोदन सिमित क दूसर2 बैठक का काय'वृ6।
उप9:थत सद:य
<.
नाम एवं पदनाम
(>ी/ >ीमती)
वभाग
1
ीमती िमतल Cहरेमठ संयु वकास आयु पुणे Fल:टर एसईजेड, पुणे 2 ी संजय बांगर, उप िनदेशक उKोग, उKोग वभाग, पुणे े
िमित क दूसर2 बैठक का काय'वृ6।
उप9:थत सद:य
<.
नाम एवं पदनाम
(>ी/ >ीमती)
वभाग
1
ीमती िमतल Cहरेमठ संयु वकास आयु पुणे Fल:टर एसईजेड, पुणे 2 ी संजय बांगर, उप िनदेशक उKोग, उKोग वभाग, पुणे े
महाराL सरकार के नािमत 3
ीमती अच'ना परब सहायक आयु, आयकर वभाग आयकर वभाग से नािमत
4
ीमती पुOपा गंगावणे, FTDO पुणे ड2जीएफट2 वभाग से नािमत 5 ी धवल एस िशकR , अधी क सीमा शुSक वभाग पुणे से नािमत
एज$डा वषय <. 01: - 30.05.2024 को आयो9जत Vथम बैठक के काय'वृ6 क पुW वचार-वमश' के बाद, सिमित ने 30.05.2024 को आयो9जत अनुमोदन सिमित क पहली बैठक के काय'वृ6 क पुW क ।
एज$डा वषय <. 02:- 30.05.2024 को आयो9जत बैठक के काय'वृ6 क कार'वाई Xरपोट' वचार-वमश' के बाद, सिमित ने 30.05.2024 को आयो9जत बैठक के संदभ' मे क गई कार'वाई Xरपोट' नोट Cकया । एज$डा वषय < 03: मैसस' टाटा ऑटोकॉ[प ह$C\कसन स:प$शन Vाइवेट िलिमटेड ]ारा नई िनया'त उ)मुख इकाई (EOU) क :थापना के िलए आवेदन प ।
इकाई के V:ताव को अनुमोदन सिमित के सम
वचाराथ' के िलए रखा गया।
वचार-वमश' के बाद सिमित ने `लॉट नंबर ड2-236/5, एमआईड2सी चाकन औKोिगक
े , चरण I I , dाम-वालR, खेड़, चाकन, पुणे, महाराL पुणे-410501 पर मेसस' टाटा ऑटोकॉ[प ह$C\कसन स:प$शन Vाइवेट िलिमटेड को, एफट2पी 2023 के पैरा 6.05(ए) और हfडबुक के पैरा 6.01 के संदभ' म$ एक नई िनया'त उ)मुख इकाई (EOU) क :थापना के V:ताव को अनुमोCदत Cकया है। अनुमोCदत V:ताव का ववरण नीचे Cदया गया है; (रािश करोड़ म$) SEEPZM-EOU0PROF/40/2024-O/o ADCP-SEEPZ SEZ I/72463/2024
U) क :थापना के V:ताव को अनुमोCदत Cकया है। अनुमोCदत V:ताव का ववरण नीचे Cदया गया है; (रािश करोड़ म$) SEEPZM-EOU0PROF/40/2024-O/o ADCP-SEEPZ SEZ I/72463/2024
Particulars Rs. In Cr. (a) Leased Premises- Lease Payout for 5 years 6.16 (b) Building (Interior and Fitouts) 26.40 (c) Plant and Machinery (Rs. In Crores)
(i) Indigenous 10.54
(ii) Import CIF Value 41.88
iii) Other direct expenses 20.21
TOTAL COST (a) + (b) + (c) 105.19 (d) Details of source(s) of finance:
Equity Shares 0
Internal Accruals 105.19
TOTAL
105.19
:थान
लॉट नंबर ड2-236/5, एमआईड2सी चाकन औKोिगक े , चरण II, dाम-वालR, खेड़, चाकन, पुणे, महाराL पुणे-410501 लॉट का
े फल 56156.91 Sq. Mt िनिम'त Cकया जाने वाला उhपाद / सेवा Vदान क जानी है. एंट2 रोल बार (एआरबी)।
अनुमान िनवेश िववरण:- और िव का
ोत 7. िनवेश ववरण:-
(बी) पूंजीगत व:तुओं और कjचे माल और अ)य इनपुट क :वदेशी आवkयकता (Rs. In Crores)
(a) Capital Goods
10.54 (b) Raw Material Components, Consumables, packing material, fuels etc, during the period of 5 years 25.90
Total 36.44 SEEPZM-EOU0PROF/40/2024-O/o ADCP-SEEPZ SEZ I/72463/2024
pital Goods
10.54 (b) Raw Material Components, Consumables, packing material, fuels etc, during the period of 5 years 25.90
Total 36.44 SEEPZM-EOU0PROF/40/2024-O/o ADCP-SEEPZ SEZ I/72463/2024
(सी) कुल रोजगार
Supervisory Non-Supervisory Men 25 114 Women 0 10
(ड2) वदेशी मुlा बैल$स शीट: Rs. in Crores
1st Year 2nd Year 3rd Year 4th Year 5th Year Total FOB Value of Export 45.22 83.5 98 106 106 438.72 Foreign Exchange outgo on 66.94 11.36 8.06 8.8 8.8 103.96 (i) Import of Machinery 41.88 -
41.88 (ii) Import of Raw Materials and Components 5.86 10.86 7.81 8.55 8.55 41.64 (iii) Import of Spares and Consumables 1.4
1.4 (iv) Repatriation of dividends and profits to foreign collaborates
--
--
-- (v) Royalty
--
--
-- (vi) Lumpsum
--
--
-- Know how fee (vii) Design & Drawing fees
--
--
-- (viii) Payment of foreign technicians
--
--
-- (ix) Payment on training of Indian tech. abroad
--
--
-- (x) Commission on export
--
--
-- (xi) Foreign Travel 2.5 0.5 0.25 0.25 0.25 3.75 (xii) Amount of interest to be paid on external commercial borrowing / deferred payment
--
--
-- SEEPZM-EOU0PROF/40/2024-O/o ADCP-SEEPZ SEZ I/72463/2024
n Travel 2.5 0.5 0.25 0.25 0.25 3.75 (xii) Amount of interest to be paid on external commercial borrowing / deferred payment
--
--
-- SEEPZM-EOU0PROF/40/2024-O/o ADCP-SEEPZ SEZ I/72463/2024
credit (specify details) (xiii) Any other payments (specify details) 15.29 -
15.29 Total (i) to (xiii) 66.94 11.36 8.06 8.8 8.8 103.96 Net Foreign Exchange
21.71 72.14 89.94 97.2 97.2 334.76 NFE % 48% 86.36% 91.77% 91.70% 91.70% 76.30%
अ"य को ध)यवाद mापन के साथ बैठक समाn हुई।
Minutes of the 2 nd Meeting of the Approval Committee for Export Oriented Units Under the Chairmanship of Zonal Development Commissioner SEEPZ- SEZ, Mumbai on 15.10.2024 at Nalanda SEZ, Pune.
Members present
Sr Name and Designation (S/Shri.) Department 1 Smt. Mital Hiremath Joint Development Commissioner Pune Cluster SEZ, Pune 2 Shri. Sanjay Bangar Deputy Director of Industries, Pune Region Nominee of Govt. of Maharashtra 3 Smt. Archana Parab, Asst. Commissioner, IT Nominee of Income Tax, Pune 4 Smt. Pushpa Gangawane FTDO Nominee of DGFT, Pune 5 Shri Dhaval S Shirke, Superintendent Nominee of Customs, Pune
Agenda Item No.01: Confirmation of the Minutes of the 1st meeting held on 30.05.2024
After deliberation, the Committee confirmed the minutes of the 1 st meeting of Approval Committee held on 30.05.2024.
Agenda Item No.02: Action taken report for the minutes of the meeting held on 30.05.2024
After deliberation, the Committee has noted the Action taken report for the SEEPZM-EOU0PROF/40/2024-O/o ADCP-SEEPZ SEZ I/72463/2024
n taken report for the minutes of the meeting held on 30.05.2024
After deliberation, the Committee has noted the Action taken report for the SEEPZM-EOU0PROF/40/2024-O/o ADCP-SEEPZ SEZ I/72463/2024
Particulars Rs. In Cr. (a) Leased Premises- Lease Payout for 5 years 6.16 (b) Building (Interior and Fitouts) 26.40 (c) Plant and Machinery (Rs. In Crores)
(i) Indigenous 10.54
(ii) Import CIF Value 41.88
iii) Other direct expenses 20.21
TOTAL COST (a) + (b) + (c) 105.19 (d) Details of source(s) of finance:
Equity Shares 0
Internal Accruals 105.19 meeting held on 30.05.2024.
Agenda Item No. 03: Application for setting up of New EOU Unit submitted by M/s. TATA Autocomp Hendrickson Suspensions Pvt. Ltd.
The proposal of the unit was placed before the Approval Committee for
consideration.
After deliberation, Committee approved the proposal of M/s. TATA
Autocomp Hendrickson Suspensions Pvt Ltd, for setting up of a New Export Oriented Unit (EOU) at Plot No. D-236/5, MIDC Chakan Industrial Area, Phase II, Village-Warle, Khed, Chakan, Pune, Maharashtra in terms of
Para 6.05(a) of FTP 2023 read with Para 6.01 of Hand book of Procedure .
The details of the approved proposal as detailed below:
(Amount in Rs. Cr.) Location Plot No. D-236/5, MIDC Chakan Industrial Area, Phase II, Village-Warle, Khed, Chakan, Pune, Maharashtra Area of the Plot 56156.91 Sq. Mt, Product to be manufactured /Service to be rendered. Anti Roll Bar (ARB)
PROJECTIONS Investment Details:- & Source of Finance A. Investment Details:-
SEEPZM-EOU0PROF/40/2024-O/o ADCP-SEEPZ SEZ I/72463/2024
TOTAL 105.19
B. Indigenous requirement of capital goods & raw Material and other input (Rs. In Crores)
(a) Capital Goods
10.54 (b) Raw Material Components, Consumables, packing material, fuels etc, during the period of 5 years 25.90
Total 36.44
C. Total Employment:-
Supervisory Non-Supervisory Men 25 114 Women 0 10
D. Foreign Exchange Balance Sheet :
1st Year 2nd Year 3rd Year 4th Year 5th Year Total FOB Value of Export 45.22 83.5 98 106 106 438.72 Foreign Exchange outgo on 66.94 11.36 8.06 8.8 8.8 103.96 (i) Import of Machinery 41.88 -
41.88 (ii) Import of Raw Materials and Components 5.86 10.86 7.81 8.55 8.55 41.64 (iii) Import of Spares and Consumables 1.4
1.4 (iv) Repatriation of dividends and profits to foreign collaborates
--
--
-- (v) Royalty
--
--
-- (vi) Lumpsum
--
--
-- Know how fee (vii) Design &
--
--
-- SEEPZM-EOU0PROF/40/2024-O/o ADCP-SEEPZ SEZ I/72463/2024
ign collaborates
--
--
-- (v) Royalty
--
--
-- (vi) Lumpsum
--
--
-- Know how fee (vii) Design &
--
--
-- SEEPZM-EOU0PROF/40/2024-O/o ADCP-SEEPZ SEZ I/72463/2024
Drawing fees (viii) Payment of foreign technicians
--
--
-- (ix) Payment on training of Indian tech. abroad
--
--
-- (x) Commission on export
--
--
-- (xi) Foreign Travel 2.5 0.5 0.25 0.25 0.25 3.75 (xii) Amount of interest to be paid on external commercial borrowing / deferred payment credit (specify details)
--
--
-- (xiii) Any other payments (specify details) 15.29 -
15.29 Total (i) to (xiii) 66.94 11.36 8.06 8.8 8.8 103.96 Net Foreign Exchange
21.71 72.14 89.94 97.2 97.2 334.76 NFE % 48% 86.36% 91.77% 91.70% 91.70% 76.30%
Meeting ended with a vote of thanks to the Chair.
(ानेर भा पाटील, आईएएस) (Dnyaneshwar B. Patil, IAS) अय एवं िवकास आयु Chairman-cum- Development Commissioner
SEEPZM-EOU0PROF/40/2024-O/o ADCP-SEEPZ SEZ I/72463/2024
ACTION TAKEN REPORT FOR THE APPROVAL COMMITTEE MEETING HELD ON 15.10.2024 IN RESPECT OF EXPORT ORIENTED UNITS.
Name of the unit
Subject Action Taken M/s.TATA Autocomp Hendrickson Suspensions Pvt.Ltd, Application for Approval of Setting up of New unit as 100% EOU
Approved and LOP issued to the unit on 25.10.2024
ct Action Taken M/s.TATA Autocomp Hendrickson Suspensions Pvt.Ltd, Application for Approval of Setting up of New unit as 100% EOU
Approved and LOP issued to the unit on 25.10.2024
GOVERNMENT OF INDIA, OFFICE OF THE DEVELOPMENT COMMISSIONER, SEEPZ SPECIAL ECONOMIC ZONE, GOVT. OF INDIA, ANDHERI (EAST), MUMBAI
AGENDA NOTE FOR CONSIDERATION OF APPROVAL COMMITTEE
a. Proposal :
Proposal dated 21.04.2025submitted by M/s. ADM Cryowest Pvt. Ltd. for setting up of New EOU Unit at Plot
No PAP-V-92 Chakan Industrial Area Phase II Vasu, Khed, Pune-410501.
b. Specific Issue on which decision of AC is required: -
Setting up a New Unit 100 % EOU for manufacturing of Stainless-steel tubular (Pipe) parts and components
for transfer and flow of Gases and Liquids, assembled inside various machinery and equipment used by
semiconductor industry in terms of 6.05 (a) of FTP 2023 read with Para 6.01 (b) of Hand book of Procedure.
c. Relevant provisions of SEZ Act, 2005 & Rules, 2006/Instruction/
Notification :-
Para 6.05(a) of FTP 2023 read with Para 6.01 of Hand book of Procedure
d. Other Information: -
I COMPANY/UNIT PROFILE
(a)
Name and address, telephone/ fax/
email id
M/s. ADM Cryowest Pvt. Ltd. Plot No
PAP-V-92 Chakan Industrial Area Phase II Vasu,
Khed, Pune-410501. PhoneNo
9992021655 E-mail:
Siddhartha.rastogi@admgroupindia.com
Website: www.admgroupindia.com
(b)
Status of the company
i.e.
Proprietorship/
partnership/
Individual and statute under which
registered with registration no. & year
of registration
Private Limited Company MCA Certificate dated
31.12.2024.
c) Financial capability of M/s. ADM Cryowest Pvt. Ltd.. The total cost of the project includes Rs. 24.30 Crores. The cost of the projects will be borne and funded out of its internal accruals. Cash and Cash Equivalents (Rs.in Cr.) 2021-22 2022-23 2023-24 9.33 17.08 21.38 Reserves and surplus ( Rs in Cr) 2021-22 2022-23 2023-24 83.74 128.86 195.84 (d) IEC No / date/ issued by
IEC No.: ABBCA8940Q Date: 10.04.2025. Issued By: O/o Joint DGFT, Pune.
9.33 17.08 21.38 Reserves and surplus ( Rs in Cr) 2021-22 2022-23 2023-24 83.74 128.86 195.84 (d) IEC No / date/ issued by
IEC No.: ABBCA8940Q Date: 10.04.2025. Issued By: O/o Joint DGFT, Pune.
(e) Whether manufacturer / trader/ company warehouse/ Service provider. Manufacturer
Project Profile: (i) Product to be manufactured/ service to be rendered
Stainless-steel tubular (Pipe) parts and components for transfer and flow of Gases and Liquids, assembled inside various machinery and equipment used by semiconductor industry ITC HS Code 730723,730729,730792. (ii) Brief detail of the project M/s. ADM Cryowest Pvt. Ltd. (ADMCW) is a 51:49 Joint Venture between ADM Joinflex India Pvt. Ltd. (ADMJF) and Cryowest USA, with its registered office at 703, Tower 2, Montreal Business Centre, Pallod Farms, Baner, Pune, India. ADMJF will invest up to USD 5 million in the JV. Cryowest USA, based in Watsonville, California, manufactures advanced fluid handling components and subsystems for industries such as semiconductors, cryogenics, aerospace, and space. It is led by industry veteran John Wolfe. ADMJF, led by Mr. Aman Mehtani, is part of the ADM Group, comprising five companies—four of which are manufacturing JVs with global partners from China, Korea, France, and the USA. Dr. Disha Mehtani, a US-educated PhD and co-founder of ADMCW, brings deep technical expertise from her experience in the US semiconductor industry. ADMCW is setting up its plant at MIDC Chakan, Pune, to manufacture ultra-clean, high-tech fluid handling parts and subsystems.
echnical expertise from her experience in the US semiconductor industry. ADMCW is setting up its plant at MIDC Chakan, Pune, to manufacture ultra-clean, high-tech fluid handling parts and subsystems. The plant, expected to be operational by June 2025, will export 100% of its output, initially to LAM Research Inc., a leading US-based semiconductor OEM. Equipment on Loan basis: The Indigenous and imported plant and machinery will be supplied & installed at ADM Cryowest Pvt. Ltd factory on loan basis from the parent company, ADM Jointflex India Pvt. Ltd. for a period of about 7 years,. During this period, they will intend to enter into a lease agreement between ADM Jointflex India Pvt. Ltd. and ADM Cryowest Pvt. Ltd. At the end of this lease period, the Plant and Machinery will be transferred at residual value to ADM Cryowest Pvt. Ltd. As per para 6.03 (a) of FTP 2023, an EOU Unit may, on the basis of a firm contract between parties, source capital goods from a domestic / foreign leasing company with or without payment of duties / taxes as provided at Para 6.01 (d) (ii) and (iii) as the case may be, EOU Unit and domestic/ foreign company shall jointly file documents to enable import / procurement of capital goods. The company is investing ₹24.30 crore and targets export revenue o f ₹540.55 crore and net foreign exchange earnings (NFE) of ₹231.19 crore (43%) over the first five years, creating employment for 45 people.
ny is investing ₹24.30 crore and targets export revenue o f ₹540.55 crore and net foreign exchange earnings (NFE) of ₹231.19 crore (43%) over the first five years, creating employment for 45 people.
Particulars Rs. In Cr. (a) Building 1.46 (b) Plant and Machinery (Rs. In Crores)
(i) Indigenous 4.00
(ii) Import CIF Value 18.84
iii) Other direct expenses 0.00
TOTAL COST (a) + (b) 24.30 (c) Details of source(s) of finance:
Equity Shares 14.00
Internal Accruals 10.30
TOTAL 24.30 iii) Projections A. Investment Details:-
Indigenous requirement of capital goods & raw Material and other input (Rs. In Cr) (a) Capital Goods 5.46 (b) Raw Material Components, Consumables, packing material, fuels etc, during the period of 5 years 0.00
Total 5.46 Total Employment:-
Supervisory Non-Supervisory Total Men 25 8 33 Women 8 4 12
45
Foreign Exchange Balance Sheet : (Amount in INR Cr.)
1st Year 2nd Year 3rd Year 4th Year 5th Year Total US $ in '000 FOB Value of Export 21.59 74.14 111.21 148.27 185.34 540.55 62132.53 Foreign Exchange outgo on 14.39 43.36 64.25 83.85 103.52 309.36 35558.47 (i) Import of Machinery 1.88 3.1 4.32 4.32 4.32 17.94 2061.56 (ii) Import of Raw Materials and Components 9.65 33.13 49.69 66.25 82.82 241.53 27762.01 (iii) Import of Spares and Consumables 1.7 5.85 8.77 11.69 14.61 42.62 4899.18 (iv) Repatriation of dividends and profits to foreign collaborates
--
--
--
(v) Royalty
--
--
--
(vi) Techinal Fees 0.8 0.88 0.97 1.07 1.17 4.9 563.32 (vii) Design & Drawing fees
--
--
--
dividends and profits to foreign collaborates
--
--
--
(v) Royalty
--
--
--
(vi) Techinal Fees 0.8 0.88 0.97 1.07 1.17 4.9 563.32 (vii) Design & Drawing fees
--
--
--
(viii) Payment of foreign technicians 0.15 0.15 0.2 0.2 0.25 0.95 109.2 (ix) Payment on training of Indian tech. abroad
--
--
--
(x) Commission on export
--
--
--
(xi) Foreign Travel 0.2 0.25 0.3 0.32 0.35 1.42 163.22 (xii) Amount of interest to be paid on external commercial borrowing / deferred payment credit (specify details)
--
--
--
(xiii) Any other payments (specify details)
Total (i) to (xiii) 14.39 43.36 64.25 83.85 103.52 309.36 35558.47 Net Foreign Exchange 7.2 30.78 46.96 64.43 81.82 231.19 26574.06 NFE % 33% 42% 42% 43% 44% 43% 43% III Request of the company Setting up 100% New EOU Unit. IV Relevant provision of FTP/HBP
Para 6.05(a) of FTP 2023 read with Para 6.01 of Hand book of
Procedure V Decision required for UAC Setting up of a new unit for manufacturing of Stainless-steel tubular (Pipe) parts and components for transfer and flow of Gases and Liquids, assembled inside various machinery and equipment used by semiconductor industry VI Recommendation/ observation of the ADC The proposal of the applicant company for setting up a New Unit 100 % EOU for manufacturing of Stainless-steel tubular (Pipe) parts and components for transfer and flow of Gases and Liquids, assembled inside various machinery and equipment used by semiconductor industry in terms of 6.05 (a) of FTP 2023 read with Para 6.01 (b) of Hand book of Procedure.
Further, Assistant Commissioner, Customs Facilitation Division Pune Customs vide letter dated
25.04.2025 has stated that the verification report in the prescribed format is given below:
1
Name & Complete Postal
Address of location of
factory with Telephone
No. and Fax No.
ADM CRYOWEST PRIVATE LIMITED
Plot No PAP-V-92 Chakan Industrial Area Phase II Vasuli,
Khed, Pune – 410501, Telephone No. – 9899997241
Fax No. – Not Applicable
2
Item(s) of Manufacture
Various kinds of Parts and Components, for transfer of
gases and liquids inside machinery/equipment used by
Semiconductor industry. These Parts and Components
are manufactured by forming/bending ultra-high purity
(UHP) tubes of stainless-steel/other material, using
various kinds of UHP Stainless steel/other material fittings
(such as elbows, T, Union etc.) through special welding
processes.
ultra-high purity (UHP) tubes of stainless-steel/other material, using various kinds of UHP Stainless steel/other material fittings (such as elbows, T, Union etc.) through special welding processes. Some of the parts may additionally have other child parts (such as flanges, glands etc.) which are joined/welded similarly. Parts and Components are manufactured as per overseas customers’ design and specifications. All of these are made by using ultra high purity materials and are manufactured inside a Cleanroom of high order. Various items of manufacture are such as –
- UHP SS316L, 6.35 OD by 0.89 mm thickness, Weldment Gas/Liquid Divert Assemblies
- UHP SS316L, 9.53 OD by 0.89 mm thickness; Flex Tube Assembly to Exchanger
- UHP SS316L, 12.7 OD by 1.24 mm thickness, Tube Assembly Gas/Liquid Manifolds; Exhaust Lines
- UHP Al 6061-0 19.05 mm x 1.24 mm, Vacuum Lines; Showerhead Fin Cooling Lines
- UHP SS304L, 25.4 OD by 1.65 mm thickness, Other Gas/Liquid Transfer Lines
- UHP SS304L, 38.1 OD by 1.65 mm thickness, Tube Assembly Weldment Chambers
- UHP SS304L, 50.8 OD by 1.65 mm thickness, Weldment Ducts
25.4 OD by 1.65 mm thickness, Other Gas/Liquid Transfer Lines 6. UHP SS304L, 38.1 OD by 1.65 mm thickness, Tube Assembly Weldment Chambers 7. UHP SS304L, 50.8 OD by 1.65 mm thickness, Weldment Ducts
3 Whether the premises is on ownership basis or on lease basis. In Case of lease basis whether the lease period is for a period of 5 year or less. The premises are hired on lease from M/s Starwalk Electronics Private Limited for period of 5 years 4 Area of Factory premises showing plot area, built up area separately. Plot Area is 41,555.12 Sq. Ft. and Built up Area is 29396 Sq. Ft. Site Plan attached 5 Details of nature of building as concrete construction or asbestos shed Building is a concrete and brick construction with Precoated GI Corrugated Sheets Sides and Roofing 6 Details of source of power (Generator / Electric Connection of Industrial Type) available. MSEB Power Supply is connected. 7 Whether separate entry and exit is provided for the proposed location and is physically segregated from any DTA unit to avoid intermingling of goods. Proposed location and is physically segregated from any DTA unit .
entry and exit is provided for the proposed location and is physically segregated from any DTA unit to avoid intermingling of goods. Proposed location and is physically segregated from any DTA unit . EOU has separate Entry and Exit
8 Whether the proposed plan of premises / building is suitable for necessary permission under section 58 and 65 to be issued by central excise and customs authority. The premises/building meets the requirements for Bonded warehouse, but they have not applied under section 58 and 65 9 The detail report about contiguous land, security status for set up of EOU Unit, suitability of place and monitoring ensurance of goods etc. 24/7 Security Service of premises is provided by Aatop Security & Detective Services Pvt. Ltd Total of 16 CCTV Cameras are installed covering internal and external area. And 9 fire extinguisher and fire hydrant system is installed at premises for fire safety measures. Declaration of ADM Cryowest is attached 11 Additional information, if any. NA
e. Recommendation: The proposal of the applicant company for setting up a New Unit 100% EOU for manufacturing of Stainless-steel tubular (Pipe) parts and components for transfer and flow of Gases and Liquids, assembled inside various machinery and equipment used by semiconductor industry is submitted before the Approval Committee for consideration in terms of 6.05 (a) of FTP 2023 read with Para 6.01 (b) of Hand book of Procedure.
try is submitted before the Approval Committee for consideration in terms of 6.05 (a) of FTP 2023 read with Para 6.01 (b) of Hand book of Procedure.
a. Proposal : Monitoring of the performance of M/s. Helvoet Rubber and Plastic Technologies (India) Pvt. Ltd., EOU for 3 Block Period of 5 years i.e. FY 2008-09 to FY 2012-13, FY 2013-14 to FY 2017-18, FY 2018-19 to 2022- 23 and 1 year of 4th Block period i.e FY 2023-24. Monitoring of the performance of the unit for M/s. Helvoet Rubber and Plastic Technologies (India) Pvt. Ltd., EOU
5 years of 1st Block Period i.e. FY 2008-09 to FY 2012-13, 5 years of 2nd Block Period i.e. FY 2013-14 to FY 2017-18, 5 years of 3rd Block Period i.e. FY 2018-19 to 2022-23 & 1 year of 4th Block period i.e FY 2023-24, in terms of Rule 54 of SEZ Rules, 2006. Notification :- Attention is invited to Appendices 6.F Part B (Scheme Specific condition) 7(a) & (b) of HBP 2023, which stipulates that – (a) The performance of EOUs would be reviewed by the Unit Approval Committee on six monthly basis i.e…, April-September each year to be completed in the following quarter on the basis of QPRs/APRs to be furnished by EOUs. The formats of QPRs/APR have been prescribed in the LUT at APPENDIX-6E (b) Review of NFE of EOUs would be conducted by the Unit Approval Committee.” 1. Name of the Unit M/s. Helvoet Rubber and Plastic Technologies (India) Pvt. Ltd. 2. Address of the unit Gat no.
NDIX-6E (b) Review of NFE of EOUs would be conducted by the Unit Approval Committee.” 1. Name of the Unit M/s. Helvoet Rubber and Plastic Technologies (India) Pvt. Ltd. 2. Address of the unit Gat no. 125, Hissa B, Mouje Kadamwakwasti, Loni Kalbhor Near Pune, Central Railway, Pune-412201 3. LOP No. & Date PER:13(2008)/SEEPZ/EOU/17/2008-09/5820 Dated 04.08.2008 4. Items of Manufacture
- Injection Moulded automotive components & their assemblies, viz. Thermostat Housing, Plastic pumps/Valves assemblies, RFI Encapsulation and Bracket, Fuel Pump parts such as Inlet/Outlet, Housing Impeller, Spacer, Flow control Unit, Connecting piece, Base moulding assembly, Valve Body, Body valve Bosch Piston, Brush Carrier filter, Housing (A,B,C), Long Piston, End Cap (Part of Fuel Pump) Annual capacity- 4,54,00,000 Nos
- Thermal Battery components viz Shim for Halcon Annual capacity 5000000 Pcs..
Date of commencement of Production 01.04.1998 6. LOP Validity 15.09.2028
ump) Annual capacity- 4,54,00,000 Nos 2. Thermal Battery components viz Shim for Halcon Annual capacity 5000000 Pcs.. 5. Date of commencement of Production 01.04.1998 6. LOP Validity 15.09.2028
Export Raw Material Imported C.G. import DTA sale Other outflow 2008-09
192.26 118.53
285.47 0.00 8.34 2009-10
472.27 375.50
109.71 0.00 11.24 2010-11
1,194.32 597.27
604.75 0.00 36.08 2011-12
1,832.48 776.53 358.4 0.00 72.59 2012-13
2,693.53 1265.97 149.24 0.00 135.66 Total 6384.86 3133.8 1507.57 0 263.91
Export Raw Material Imported C.G. import DTA sale Other outflow 2013-14
2,558.24 1183.08
73.03 0.00 132.67 2014-15
2,071.40 928.12
91.53 0.00 92.54 2015-16
6,421.95 837.87
122.33 0.00 113.33 2016-17
2,008.31 1090.89 464.98 0.00 92.05 2017-18
2,002.00
1039.27 81.55 0.00 62.17 Total 15061.9 5079.23 833.42 0 492.76 7. Existing Block Period 2023-24 to 2027-28 8. Period of Monitoring Performance FY 2008-09 to FY 2023-24 9. Whether unit has achieved Positive NFE (Rs.
.00
62.17
Total
15061.9
5079.23
833.42
0
492.76
7.
Existing Block Period
2023-24 to 2027-28
8.
Period of Monitoring Performance
FY 2008-09 to FY 2023-24
9.
Whether unit has achieved Positive
NFE (Rs. In Lakhs)
Yes
10.
Whether any export proceeds are
outstanding? If yes, whether the
unit has submitted approval of RBI
regarding extension of time limit.
No
11.
Whether any audit paras are
pending
NO
Performance of the unit
1ST Block period for FY 2008-09 to FY 2012-13
(Rs. In Lakhs)
2nd Block period for FY 2013-14 to FY 2017-18 (Rs. In Lakhs)
Export Raw Material Imported C.G. import DTA sale Other outflow 2018-19
1,852.00
1024.21
9.48 0.00 89.27 2019-20
1,581.86 871.79
138.91 0.00 145.57 2020-21
1,179.12 689.42
98.87 0.00 95.06 2021-22
1,558.61 483.01 37.29 913 89.69 2022-23
1,073.69 445.11 77.28 719.69 78.18 Total 7245.28 3513.54 361.83 1632.69 497.77
Export Raw Material Imported C.G. import DTA sale Other outflow 2023-24
1,021.55
403.06 0 881.83 105.33 Total
1,021.55
403.06 0 881.83 105.33
3rd Block period for FY 2018-19 to FY 2022-23 (Rs. In Lakhs)
4th Block period for FY 2023-24 (Rs. In Lakhs)
1,021.55 403.06 0 881.83 105.33
3rd Block period for FY 2018-19 to FY 2022-23 (Rs. In Lakhs)
4th Block period for FY 2023-24 (Rs. In Lakhs)
Block
Period
Monitoring period
Cumulative
NFE
Achieved
In Lakhs
Cumulative % NFE
Achieved
1st
5 years i.e. FY 2008-09 to FY
2012-13
2668.16
41.80%
2nd
5 years i.e. FY 2013-14 to FY
2017-18
8483.26
56.32%
3rd
5 years i.e. FY 2018-19 to FY
2022-23
2363.39
32.62%
4th
1 year i.e. FY 2023-24
381.88
37.38%
Cumulative NFE achieved Block period wise;
The unit’s for renewal of LOP and Green Card for further period of 5 years i.e from FY 2023-24 to FY 2027-28 was approved on 26.09.2023. Unit had submitted Debonding application dated 07.01.2025requesting to exit EOU. e. Recommendation: Monitoring performance of the unit for the period mentioned below is placed before the Unit approval committee meeting for consideration in terms of Appendices 6.F Part B (Scheme Specific condition) 7 (a) & (b) of Handbook of Procedure 2023. 5 years of 1st Block Period i.e. FY 2008-09 to FY 2012-13, 5 years of 2nd Block Period i.e. FY 2013-14 to FY 2017-18, 5 years of 3rd Block Period i.e. FY 2018-19 to 2022-23 & 1 year of 4th Block period i.e FY 2023-24, in terms of Rule 54 of SEZ Rules, 2006.
AGENDA FOR
MEETING OF THE APPROVAL COMMITTEE FOR SECTOR SPECIFIC SPECIAL ECONOMIC ZONE FOR IT/ITES AT PUNE OF MIDC-SEZ
TIME : 12.00 P.M.
AGENDA FOR
MEETING OF THE APPROVAL COMMITTEE FOR SECTOR SPECIFIC SPECIAL ECONOMIC ZONE FOR IT/ITES AT PUNE OF MIDC-SEZ
TIME : 12.00 P.M.
MEETING OF THE APPROVAL COMMITTEE FOR IT/ITES AT PUNE, UNDER THE CHAIRMANSHIP OF DEVELOPMENT COMMISSIONER, SEEPZ-SEZ ON 09.05.2025 INDEX
Agenda Item No.
Subject
Agenda Item No. 01: - Confirmation of the Minutes of the meeting
held on 21.03.2025
Agenda Item No. 02:-
Action taken report for the Minutes of the
meeting held on 21.03.2025
Agenda Item No. 03:-
Approval for Setting up of New unit submitted
by M/s Crum & Forster Services India Pvt.
Ltd.
Agenda Item No. 04:-
Application for capacity enhancement in r/o
M/s. Hexaware Technologies Ltd., (LOA 61)
Agenda Item No. 05:-
Application for capacity enhancement in r/o
M/s. Hexaware Technologies Ltd., (LOA 05)
Agenda Item No. 06:-
Application for capacity enhancement in r/o
M/s. Hexaware Technologies Ltd., (LOA 04)
ity enhancement in r/o M/s. Hexaware Technologies Ltd., (LOA 05) Agenda Item No. 06:- Application for capacity enhancement in r/o M/s. Hexaware Technologies Ltd., (LOA 04)
मैसस एमआईडीसी -एसईजेड, पुणे, के आईटी/आईटीईएस के लए सेटर िवश िवशेष आथक े , के लए े ीय िवकास आयु! एसईईपीजेड-एसईजेड, सी"झ एसईजेड, क$ अ&य ता म( िद 21.03.2025 को आयो+जत 140 वी अनुमोदन सिम-त क$ बैठक का कायवृ1। 1 एसईजेड का नाम एमआईडीसी-एसईजेड 2 सेटर आय टी – आय टी ई एस 3 बैठक 3मांक 140वी 4 तारीख 21.03.2025 उप78थत सद8य 3. नाम एवं पदनाम (9ी/ 9ीमती) िवभाग 1 9ीमती िमतल िहरेमठ संयु! िवकास आयु! पुणे =8टर एसईजेड, पुणे 2 9ी संजय बांगर, उप िनदेशक उ>ोग महारा? सरकार से नािमत 3 9ीमती अचना परब सहायक आयु!, आयकर िवभाग आयकर िवभाग से नािमत 4 9ी काAतकेय लंगोटे, उप- े ीय अ-धकारी महारा? Cदूषण िनयं ण बोड से नािमत 5 9ीमती पुEपा गंगावणे, एफटीडीओ पुणे डीजीएफटी िवभाग से नािमत 6 9ी धवल एस शकH , अधी क सीमा शुIक िवभाग पुणे नािमत िवशेष आमंि त
नाम एवं पदनाम (9ी/ 9ीमती) िवभाग 1 9ी सतबीर शमा, िविनJद अ-धकारी सी"ज़-एसईज़ेड, पुणे =8टर एज(डा िवषय 3 01 : िद 21.02.2025 को आयो+जत 139 वL बैठक के कायवृ1 क$ पुि िवचार-िवमश के बाद, सिम-त ने 21.02.2025 को आयो+जत 139वL अनुमोदन सिम-त क$ बैठक के कायवृ1 क$ पुि क$।
एज(डा िवषय 3.
एज(डा िवषय 3 01 : िद 21.02.2025 को आयो+जत 139 वL बैठक के कायवृ1 क$ पुि िवचार-िवमश के बाद, सिम-त ने 21.02.2025 को आयो+जत 139वL अनुमोदन सिम-त क$ बैठक के कायवृ1 क$ पुि क$।
एज(डा िवषय 3. 02:- 21.02.2025 को आयो+जत बैठक के कायवृ1 क$ कारवाई Mरपोट िवचार-िवमश के बाद, सिम-त ने 21.02.2025आयो+जत बैठक के लए क$ गई कारवाई Mरपोट नोट क$ है। एज(डा आइटम नंबर 03: मैसस कॉिPज(ट टेनोलॉजी सॉIयूशंस इं-डया Cाइवेट लिमटेड,C8तुत िनदेशक मंडल म( बदलाव क$ मंजूरी के लए आवेदन। िवचार-िवमश के बाद, सिम-त ने MOC&I Qारा जारी िनदHश 109 िदनांक 18.10.2021 के अनुसार, िनदेशक मंडल म( बदलाव के लए यूिनटR के C8ताव को मंजूरी दे दी, जैसा िक नीचे बताया गया है: िनदेशक मंडल क$ अनुमोिदत सूची:
3मांक िनदेशक का नाम
पद
9ी राजेश वेMरयर अ&य एवं Cबंध िनदेशक 2. 9ी. नारायणन टी पूणकालक िनदेशक 3. 9ी मनीष Sसहवी मुTय िव1ीय अ-धकारी एवं पूणकालक िनदेशक मंजूरी िनUनलखत तीन SEZ इकाइयR के लए Cदान क$ गई है, जो MIDC पुणे SEZ म( 78थत हV:
8वीकृ-त संTया SEEPZ-SEZ/CTSIPL/02/2011-12/11650 िदनांक 24.01.2011, 8वीकृ-त संTया SEEPZ/NEWSEZ/DLF-PUNE/02/2007-08/1208 िदनांक 21.02.2008, और 8वीकृ-त संTया SEEPZ-SEZ/DAIPPL-SEZ/CTSIPL/02/2011-12/5870 िदनांक 21.04.2011 सभाप-त को धXयवाद Yापन के साथ बैठक समाZ हुई।
Minutes of the 140th Meeting of the Approval Committee held under the Chairmanship of Zonal Development Commissioner SEEPZ-SEZ, Mumbai for Sector Specific Special Economic Zone for IT/ITES of M/s. MIDC - SEZ, Hinjewadi, Phase III, Pune held on 21.03.2025. 1 Name of the SEZ M/s. MIDC-SEZ, Phase III 2 Sector IT/ITES 3 Meeting No. 140th 4 Date 21.03.2025
Members present: Sr No (S/Shri.) Department 1 Smt.
Hinjewadi, Phase III, Pune held on 21.03.2025. 1 Name of the SEZ M/s. MIDC-SEZ, Phase III 2 Sector IT/ITES 3 Meeting No. 140th 4 Date 21.03.2025
Members present: Sr No (S/Shri.) Department 1 Smt. Mital Hiremath Joint Development Commissioner 2 Shri. Sanjay Bangar, Dy. Director of Industries Nominee of Govt. of Maharashtra 3 Smt. Archana Parab, Asst. Commissioner, IT 4 Shri. Kartikeya Longote Sub-Regional Officer Nominee of Maharashtra Pollution Control Board 5 Smt. Pushpa Gangawane. FTDO 6 Shri Dhaval S Shirke, Superintendent
Special Invitee: Sr Department 1 Shri. Satbhir Sharma, Specified Officer SEEPZ-SEZ, Pune Cluster
Agenda Item No.01: Confirmation of the Minutes of the 139th meeting held on 21.02.2025
After deliberation, the Committee confirmed the minutes of the 139th meeting of Approval Committee
held on 21.02.2025
Agenda Item No.02: Action taken report for the minutes of the meeting held on 21.02.2025
After deliberation, the Committee has noted the Action taken report for the meeting held on 21.02.2025.
Agenda Item No.03: Application for change in Board of Directors submitted by M/s. Cognizant
Technology Solutions India Pvt. Ltd.
After deliberation, the committee approved the proposal of the unit for change in Board of Directors, in
terms of Instruction No. 109 dated 18.10.2021 issued by MOCI, as detailed below:
Approved List of Board of Directors:
Sr.
No
Name of the Directors Designation
Date of
Appointment
1.
Mr. Rajesh Varrier
Chairman & Managing
Director
10.09.2024
2.
Mr. Narayanan T
Whole time Director
27.09.2019
3.
Mr.
Board of Directors: Sr. No Name of the Directors Designation Date of Appointment 1. Mr. Rajesh Varrier Chairman & Managing Director 10.09.2024 2. Mr. Narayanan T Whole time Director 27.09.2019 3. Mr. Manish Singhvi CFO & Whole Time Director 13.12.2024 The approval is granted for following 3 SEZ Units located in MIDC Pune SEZ: 1, LOA No SEEPZ-SEZ/CTSIPL/02/2011-12/11650DATED 24.01.2011,
- LOA No SEEPZ/NEWSEZ/DLF-PUNE/02/2007-08/1208 DATED 21.02.2008 and
- LOA No SEEPZ-SEZ/DAIPPL-SEZ/CTSIPL/02/2011-12/5870 DATED 21.04.2011 The approval is subject to the conditions laid down in Instruction No. 109 issued by MOC&I.
(Yाने[र बी. पाटील, आईएएस) अ&य एवं िवकास आयु! Chairman-cum- Development Commissioner
signaturerectangle-1-186 Digitally signed by Dnyaneshwar Bhalchandra Patil Date: 2025.03.28 15:11:30 IST % DSUnknown q 1 G 1 g 0.1 0 0 0.1 9 0 cm 0 J 0 j 4 M []0 d 1 i 0 g 313 292 m 313 404 325 453 432 529 c 478 561 504 597 504 645 c 504 736 440 760 391 760 c 286 760 271 681 265 626 c 265 625 l 100 625 l 100 828 253 898 381 898 c 451 898 679 878 679 650 c 679 555 628 499 538 435 c 488 399 467 376 467 292 c 313 292 l h 308 214 170 -164 re f 0.44 G 1.2 w 1 1 0.4 rg 287 318 m 287 430 299 479 406 555 c 451 587 478 623 478 671 c 478 762 414 786 365 786 c 260 786 245 707 239 652 c 239 651 l 74 651 l 74 854 227 924 355 924 c 425 924 653 904 653 676 c 653 581 602 525 512 461 c 462 425 441 402 441 318 c 287 318 l h 282 240 170 -164 re B Q
786 365 786 c 260 786 245 707 239 652 c 239 651 l 74 651 l 74 854 227 924 355 924 c 425 924 653 904 653 676 c 653 581 602 525 512 461 c 462 425 441 402 441 318 c 287 318 l h 282 240 170 -164 re B Q
Action Taken for Approval Committee held on 21-03-2025 Agenda Item No. Subject Remarks Agenda Item No. 02 Application for Change of List of Directors/Partners(M/s Cognizant Technology Solutions India Pvt. Ltd.) Approval letter is issued to the Unit on 01.04.2025
a. Proposal : Proposal submitted by M/s. Crum & Forster Services India Pvt. Ltd., for setting up of New Unit at MIDC – SEZ. To consider the proposal of M/s. Crum & Forster Services India Pvt.Ltd., for setting up of new unit at MIDC – SEZ in terms of Rule 17 & 18 of SEZ Rules, 2006. Notification :- Rule 17 & 18 of SEZ Rules, 2006. I Name and address, telephone/fax/email ID
M/s. Crum & Forster Services India Pvt. Ltd., Registered address: Ground Floor, Block C, Global Technology Park, Marathalli Outer Ring Road, Bellandur, Bangalore 560 103.
Proposed address:
1st Floor, Plot No. 23/4, Developed by Fulcrum Worldwide Software
Pvt. Ltd. SEZ Co-Developer, Rajiv Gandhi Infotech Park, Phase 3,
MIDC – SEZ, Hinjewadi, Pune 411 057.
Telephone: - 91-91-9364096312
e-mail address:- srinivasa.joshi@cfins.com
Web-site: - www.cfins.com
Status of the company
i.e. proprietorship/
partnership/individual
and statute under which
registered with
registration no. & year of
registration
Registration : Private Limited
CIN No.
f the company
i.e. proprietorship/
partnership/individual
and statute under which
registered with
registration no. & year of
registration
Registration : Private Limited
CIN No. : U74999KA2019FTC120960
Date of issuance of CIN : 31.01.2019
Financial capability of the Unit
Reserves & Surplus (Rs.in Cr.) 2021-22 2022-23 2023-24 1.07 2.52 4.64
Cash and Cash Equivalents as per year (Rs.in Cr.) 2021-22 2022-23 2023-24 1.45 2.24 5.08
IEC No / date/ issued by
AAHCC9946M Dated 09.04.2019 Whether manufacturer / trader/ company warehouse/ Service provider
Service Provider
II.
PROJECT PROFILE
i. Product to be
manufactured/
service to be
rendered
Sr.
No.
Services
SAC/CPC
Authorized Operations
1
Computer
Software
services,
Information
Technology
SAC-
998314
CPC-842
Software
Development,
Application Development,
Integration,
testing,
maintenance,
upgradation/Enhancement
in
Existing
Application/Software,
IT
Support services etc.
2
Information
Technology
Enabled
Services such
as
other
business
services.
SAC-
998313
CPC-879
They provide Back office
operation,
BPO
&
customer
support
services etc.
IT Support services etc. 2 Information Technology Enabled Services such as other business services. SAC- 998313 CPC-879 They provide Back office operation, BPO & customer support services etc.
(ii) Brief detail of the project
M/s. Crum & Forster Services India Private Ltd., (“CFSIPL”) is Private limited company, incorporated on 31.01.2019 under Companies Act, 2013. Having Registered address: Ground Floor, Block C, Global Technology Park, Marathalli Outer Ring Road, Bellandur, Bangalore 560 103. It is wholly owned subsidiary of United States Fire Insurance Company and ultimate parent company is Crum & Forster Insurance Companies which is situated in USA and intent to set up a new SEZ unit at MIDC-SEZ.
M/s. Crum & Forster Services India Private Ltd., (“CFSIPL”) provides market –leading property & casualty, accident & Health and specialty insurance solutions. Established in 1822. Crum & Forster, has a long and reputable history in providing insurance solution s to both individuals and businesses. C & F offer admitted and surplus lines products for a broad array of customers and Industries and are dedicated to meeting clients needs with laser focused expertise, customized coverages and superior service. they develop the way enterprises work and accelerate their digital journey.
stries and are dedicated to meeting clients needs with laser focused expertise, customized coverages and superior service. they develop the way enterprises work and accelerate their digital journey.
Mission : to provide best in class products and services for our broker and producer partners – to deliver solutions for their changing business needs and to serve the communities in which they live and work.
Vision : Is to provide state of the art digital services for the Surplus and Speciality Lines division by assembling talented and dedicated technical teams.
Crum & Forster Services India Private Ltd., (“CFSIPL”) has decided to set up SEZ unit operations from MIDC - SEZ over an admeasuring 9236 Sq. ft. located at 1st Floor, Plot No. 23/4, Developed by Fulcrum Worldwide Software Pvt. Ltd. – Co-Developer, Rajiv Gandhi Infotech Park, Phase 3, MIDC – SEZ, Hinjewadi, Pune 411 057. Accordingly, the unit intends to invest Rs. 3.25 Cr with Projected Export of Rs. 15.25 Cr and Projected NFE of Rs. 66.20 Cr. (US $’000 7419.61) along with the generating Employment of 154 employees (Men – 139, Women – 15) within next 5 years.
.25 Cr with Projected Export of Rs. 15.25 Cr and Projected NFE of Rs. 66.20 Cr. (US $’000 7419.61) along with the generating Employment of 154 employees (Men – 139, Women – 15) within next 5 years.
III PROJECTIONS, YEAR- WISE Investment and Details of Source of Finance
S. No. Plant & Machinery Rs. In Crores (a) Capital Goods - Indigenous 2.93 Capital Goods - Imported (CIF Value) 0.32
Total 3.25 (b) Details of Source(s) of finance:
a. From existing reserves & surplus 3.00 b. From Internal Accruals (Over next 5 years)
0.25 Total 3.25
Imported and Indigenous requirement of Materials and other outputs
(Rs. In Crores)
Import Indigenous (b) Raw Material, components, consumables, packing material, fuel etc. 0 0 (c) Input Services 1.32 23.28
Total 1.32 23.28
Total employment
Total 154 (Male - 139, Female – 15)
Foreign Exchange Balance Sheet (1st Block) (Rs. In Crores)
1st 2nd 3rd 4th 5th Total FOB Value of Exports 11.99 12.58 13.22 13.86 14.55 66.20 FE outgo 0.38 0.26 0.29 0.39 0.32 1.64 NFE 11.61 12.32 12.93 13.47 14.23 64.56
Effluent Treatment Not applicable
Whether Foreign Technology Agreement is Envisaged No.
.58 13.22 13.86 14.55 66.20 FE outgo 0.38 0.26 0.29 0.39 0.32 1.64 NFE 11.61 12.32 12.93 13.47 14.23 64.56
Effluent Treatment Not applicable
Whether Foreign Technology Agreement is Envisaged No.
ThT
T The Unit has submitted the following documents:
i. Form F
ii. Project Report and projected financials of the SEZ Unit for the five years
iii. Demand Draft of Rs. 5000/- in favour of “The Pay & Accounts Officer, SEEPZ-SEZ”
payable at Mumbai.
iv. Certified copy of Memorandum and Articles of Associate along with certificate of
incorporation of the Company
v. PAN Card copy
vi. Letter of office of space from the Developer
vii. Copy of Board Resolution
viii. List of Directors
ix. Authorization Letter
x. Undertaking for Pollution Control
xi. List if Imported & Indigenous Capital Goods.
xii. Letter mentioning Web Address & E-mail ID;
xiii. List of Directors with details such as address, contact details etc.
xiv. List of Shareholders of Company;
xv. Copy of IEC Certificate of the Company;
xvi. Copy of ITR acknowledgement of last three years.
xvii. Copy of Audited Financial Statements of last three years of Company;
xviii. Copy of Letter of Permission of NSTPI unit.
Rule Provision w.r.t. SEZ
Rules, 2006
Rule 17 & 18 of SEZ Rules, 2006.
Request of the company
To approve their proposal for setting up of new unit at MIDC - SEZ Decision required for Approval Committee
To consider the proposal for setting up of new unit at MIDC - SEZ Observation of ADC Approval Committee may kindly consider the proposal of M/s.
MIDC - SEZ Decision required for Approval Committee
To consider the proposal for setting up of new unit at MIDC - SEZ Observation of ADC Approval Committee may kindly consider the proposal of M/s. Crum & Forster Services India Pvt. Ltd., for setting up of new unit in MIDC – SEZ. e. Recommendation: Approval Committee may kindly consider the proposal of M/s. Crum & Forster Services India Pvt. Ltd., for setting up of new unit in MIDC – SEZ.
a. Proposal : Proposal submitted on 07.04.2025 by M/s. Hexaware Technologies Ltd., (LOA No. SEEPZ-SEZ/MIDC- SEZ/HTL/61/2018-19 dated 06.07.2018 (As amended) located at MIDC – SEZ, Pune for approval of Revision in Projections. Approval of the Committee for Revision in Projection in terms of Rule 19(2) of SEZ Rules, 2006 as detailed below : Notification :- As per 1st proviso to Rule 19(2) of SEZ Rules, 2006 “Provided that the Approval Committee may also approve proposals for broadbanding, diversification, enhancement of capacity of production, change in the items of manufacturing or service capacity, if it meets the requirements of rule 18”. Investment Projections: (Rs. In Crores) Sr. No. Particulars Approved projection for current Block Period of 05 Years Revision in Projections for the current Block Period 03 Indigenous Services 21.06 194.16
Total 21.06 194.16
Existing Approved Projection for the current Block Period of 05 Years : (Rs.
Revision in Projections for the current Block Period 03 Indigenous Services 21.06 194.16
Total 21.06 194.16
Existing Approved Projection for the current Block Period of 05 Years : (Rs. In Crores)
2024-25 2025-26 2026-27 2027-28 2028-29 Total INR Total In USD in ‘000) 01 FOB value Of Exports 89.62 98.58 108.44 119.28 131.21 547.12 63,878 02 FE Outgo 2.49 2.70 1.85 1.55 1.55 10.14 1,184 03 NFE 87.13 95.88 106.59 117.73 129.65 536.98 62,694 Proposed Revision in Projection – (Rs. In Cr.)
2024-25 (Actual) 2025-26 (Revised) 2026-27 (Revised) 2027-28 (Revised) 2028-29 (Revised) Total INR Total In USD in ‘000) 01 FOB value Of Exports 213.63 224.31 235.52 247.30 259.66 1180.42 137820 02 FE Outgo 38.45 40.38 42.39 44.51 46.74 212.47 24808 03 NFE 175.17 183.93 193.13 202.79 212.92 967.95 113012 Proposed Employment : Particulars Approved projection for current block period Revised Projections for current block period. Employment 885 (Male-585, Women-300) 2228 (Male-1503, Women- 725) Relevant Provision: As per 1st proviso to Rule 19(2) of SEZ Rules, 2006 “Provided that the Approval Committee may also approve proposals for broadbanding, diversification, enhancement of capacity of production, change in the items of manufacturing or service capacity, if it meets the requirements of rule 18”. Other Information: M/s Hexaware Technologies Ltd., (LOA No.
enhancement of capacity of production, change in the items of manufacturing or service capacity, if it meets the requirements of rule 18”. Other Information: M/s Hexaware Technologies Ltd., (LOA No. SEEPZ-SEZ/MIDC- SEZ/HTL/61/2018-19 dated 06.07.2018 (As amended)) Location: 3RD Floor of North Wing, 1st & 2nd Floor of South Wing in the Premises of Co-Developer – Hexaware Technologies Ltd., MIDC-SEZ, Plot No. 19, Rajiv Gandhi Infotech Park, Phase III, MIDC- SEZ, Pune 411057. DCP – 03.05.2019 LOA Valid upto – 02.05.2029 Copy of Revised Form F3 Filed on SEZ online vide Request ID No. 422500076563 Copy of Board Resolution for authorization to the signatory Copy of Form F1 filed during the renewal of LOA for 2nd Block Period Copy of LOA List of Indigenous Services as an Annexure. Reason for the Revision in Projection: The unit has submitted that the main reason for revision in projection is as per the requirements of authorized operations, the management of the company has decided to revise financial projections. e. Recommendation: The Approval Committee may kindly consider for revision of Projection for the current Block in terms of Rule 19(2) of SEZ Rules, 2006.
ommendation: The Approval Committee may kindly consider for revision of Projection for the current Block in terms of Rule 19(2) of SEZ Rules, 2006.
a. Proposal : Proposal submitted on 07.04.2025 by M/s. Hexaware Technologies Ltd., (LOA No. SEEPZ- SEZ/HTL/05/2011-12 dated 19.04.2012 (As amended) located at MIDC – SEZ, Pune for approval of Revision in Projections. Approval of the Committee for Revision in Projection in terms of Rule 19(2) of SEZ Rules, 2006 as detailed below : Notification :- As per 1st proviso to Rule 19(2) of SEZ Rules, 2006 “Provided that the Approval Committee may also approve proposals for broadbanding, diversification, enhancement of capacity of production, change in the items of manufacturing or service capacity, if it meets the requirements of rule 18”. Investment Projections: (Rs. In Crores)
Sr. No. Particulars Approved projection for current Block Period of 05 Years Revision in Projections for the current Block Period 01 Indigenous (Plant & Machinery) 9.39 9.39 02 Imported (Plant & Machinery) 0.60 2.28 03 Indigenous Services 8.92 8.92 04 Imported Services 23.81 23.81
Total 42.72 44.40 Existing Approved Projection for the current Block Period of 05 Years (FY 2022-23 to FY 2026-27) : (Rs. In Cr)
2022-23 2023-24 2024-25 2025-26 2026-27 Total INR Total In USD in ‘000)
72 44.40 Existing Approved Projection for the current Block Period of 05 Years (FY 2022-23 to FY 2026-27) : (Rs. In Cr)
2022-23 2023-24 2024-25 2025-26 2026-27 Total INR Total In USD in ‘000)
01 FOB value Of Exports 36.75 60.64 62.15 62.91 63.67 286.12 33406 02 FE Outgo 4.00 4.40 4.84 5.32 5.85 24.41 2850 03 NFE 32.75 56.24 57.31 57.59 57.82 261.71 30556 Proposed Revision in Projection - EXPORT, FE OUTGO AND NFE Projection :(Rs. In Cr.)
2022-23 (Actual) 2023-24 (Actual) 2024-25 (Actual) 2025-26 (Revised) 2026-27 (Revised) Total INR Total In USD in ‘000) 01 FOB value Of Exports 41.50 57.65 63.88 67.07 70.42 300.52 35087 02 FE Outgo 0.04 4.03 10.86 6.14 6.45 27.52 3,213 03 NFE 41.46 53.62 53.02 60.93 63.97 273.00 31,873
Proposed Revised Employment : Particulars Approved projection for current block period of 05 years Revised Projections for the current Block Period Employment 350 (Male-275, Women-75) 375 (Male-290, Women- 85) Other Information: Other Information: M/s Hexaware Technologies Ltd., (LOA No. SEEPZ-SEZ/HTL/05/2011-12 dated 19.04.2012 (As amended)) Location : Plot No. 19, Rajiv Gandhi Infotech Park, Phase III, MIDC-SEZ, Pune 411057. DCP – 01.08.2012 LOA Valid upto – 31.07.2027 Copy of Revised Form F3 Filed on SEZ online vide Request ID No.
d)) Location : Plot No. 19, Rajiv Gandhi Infotech Park, Phase III, MIDC-SEZ, Pune 411057. DCP – 01.08.2012 LOA Valid upto – 31.07.2027 Copy of Revised Form F3 Filed on SEZ online vide Request ID No. 42200077031 Copy of Board Resolution for authorization to the signatory Copy of Form F1 filed during the renewal of LOA for 3rd Block Period Copy of LOA List of Imported Capital Goods as an Annexure. Reason for the Revision in Projection: The unit has submitted that the main reason for revision in projection is as per the requirements of authorized operations, the management of the company has decided to revise financial projections. e. Recommendation: The Approval Committee may kindly consider for Revision of Projection for the current Block period ( FY 2022-23 to FY 2026-27) in terms of Rule 19(2) of SEZ Rules, 2006.
a. Proposal : Proposal submitted on 07.04.2025 by M/s. Hexaware Technologies Ltd., (LOA No.
es, 2006.
a. Proposal : Proposal submitted on 07.04.2025 by M/s. Hexaware Technologies Ltd., (LOA No. SEEPZ- SEZ/HTL/04/2011-12 dated 19.04.2012 (As amended) located at MIDC – SEZ, Pune for approval of Revision in Projections Approval of the Committee for Revision in Projection in terms of Rule 19(2) of SEZ Rules, 2006 as detailed below : Notification :- As per 1st proviso to Rule 19(2) of SEZ Rules, 2006 “Provided that the Approval Committee may also approve proposals for broadbanding, diversification, enhancement of capacity of production, change in the items of manufacturing or service capacity, if it meets the requirements of rule 18”. Investment Projections: (Rs. In Crores) Sr. No. Particulars Approved projection for next Block Period of 05 Years (FY 2022-23 to FY 2026-27) Revision in Projections for the current Block Period of 5 years 01 Indigenous (Plant & Machinery) 14.51 14.51 02 Imported (Plant & Machinery) 1.16 2.74 03 Indigenous Services 73.35 73.35 04 Imported Services 118.13 118.13
Total 207.15 208.73 Existing Approved Projection for the current Block Period of 05 Years (FY 2022-23 to FY 2026-27) : (Rs. In Cr)
2022-23 2023-24 2024-25 2025-26 2026-27 Total INR To t a l In USD in ‘000) 01 FOB value Of Exports 74.81 97.33 100.74 101.97 105.65 480.50 56,081 02 FE Outgo 19.55 21.50 23.64 26.01 28.59 119.30 13,923
-23 2023-24 2024-25 2025-26 2026-27 Total INR To t a l In USD in ‘000) 01 FOB value Of Exports 74.81 97.33 100.74 101.97 105.65 480.50 56,081 02 FE Outgo 19.55 21.50 23.64 26.01 28.59 119.30 13,923
03 NFE 55.26 75.83 77.09 75.96 77.06 361.20 42,158 Proposed Revision in Projection - EXPORT, FE OUTGO AND NFE Projection (Rs. In Cr.)
2022-23 (Actual) 2023-24 (Actual) 2024-25 (Actual) 2025-26 (Revised) 2026-27 (Revised) Total INR Total In USD in ‘000) 01 FOB value Of Exports 86.48 117.35 111.42 117.18 123.24 555.68 64,878 02 FE Outgo 7.51 20.74 31.20 26.61 29.20 115.26 13,457 03 NFE 78.97 96.61 80.22 90.57 94.04 440.42 51,420 Proposed Revised Employment : Particulars Approved projection for current Block Period Revised Projections for the current Block period Employment 600 (Male-450, Women-150) 700(Male-525, Women- 175) Relevant Provision: As per 1st proviso to Rule 19(2) of SEZ Rules, 2006 “Provided that the Approval Committee may also approve proposals for broadbanding, diversification, enhancement of capacity of production, change in the items of manufacturing or service capacity, if it meets the requirements of rule 18”. Other Information: M/s Hexaware Technologies Ltd., (LOA No. SEEPZ-SEZ/HTL/04/2011-12 dated 19.04.2012 (As amended)) Location : 2nd Floor & Amenity Area of North Wing, in the premises of Co-Developer– Hexaware Technnologies Ltd.,MIDC-SEZ, Plot No. 19, Rajiv Gandhi Infotech Park, Phase III, MIDC-SEZ, Pune 411057. DCP – 02.07.2012 LOA Valid upto – 01.07.2027 Copy of Revised Form F3 Filed on SEZ online vide Request ID No.
Ltd.,MIDC-SEZ, Plot No. 19, Rajiv Gandhi Infotech Park, Phase III, MIDC-SEZ, Pune 411057. DCP – 02.07.2012 LOA Valid upto – 01.07.2027 Copy of Revised Form F3 Filed on SEZ online vide Request ID No. 422500076913 Copy of Board Resolution for authorization to the signatory Copy of Form F1 filed during the renewal of LOA for 3rd Block Period Copy of LOA List of Imported Capital Goods as an Annexure. Reason for the Revision in Projection: The unit has submitted that the main reason for revision in projection is as per the requirements of authorized operations, the management of the company has decided to revise financial projections. e. Recommendation: The Approval Committee may kindly consider for Revision of Projection for the current Block period ( FY 2022-23 to FY 2026-27) in terms of Rule 19(2) of SEZ Rules, 2006.
AGENDA FOR
MEETING OF THE APPROVAL COMMITTEE FOR IT/ITES AT PUNE OF M/s. QUBIX BUSINESS PARK PVT. LTD.-SEZ
TIME : 12:00 PM
AGENDA FOR
MEETING OF THE APPROVAL COMMITTEE FOR IT/ITES AT PUNE OF M/s. QUBIX BUSINESS PARK PVT. LTD.-SEZ
TIME : 12:00 PM
MEETING OF THE APPROVAL COMMITTEE FOR DEVELOPMENT COMMISSIONER, SEEPZ-SEZ ON 09.05.2025 INDEX
Agenda Item No.
Subject Agenda Item No. 01:- Confirmation of the Minutes of the meeting held on 21.03.2025 Agenda Item No. 02:- Action taken report for the Minutes of the meeting held on 21.03.2025 Agenda Item No. 03:- Application for Installation of Vending machine in M/s VITP Pvt Ltd.(Co- Developer’s) premises Agenda Item No. 04:- Monitoring of performance for M/s. Crisil Ltd. Agenda Item No. 05:- Monitoring of performance for M/s Triarq Health LLP Agenda Item No. 06:- Monitoring of performance for M/s. SubEno India Pvt. Ltd. Agenda Item No. 07:- Monitoring of performance for M/s. Prolifics Corporation Pvt. Ltd. Agenda Item No. 08:- Monitoring of performance for M/s. Globant India Pvt. Ltd. Agenda Item No. 09:- Monitoring of performance for M/s. Darwish Cybertech India Pvt. Ltd. Agenda Item No. 10:- Monitoring of performance for M/s. LTI Mindtree Ltd. Agenda Item No. 11:- Application for approval of change in Board of Director r/o M/s. LTIMindtree Ltd
tem No. 10:- Monitoring of performance for M/s. LTI Mindtree Ltd. Agenda Item No. 11:- Application for approval of change in Board of Director r/o M/s. LTIMindtree Ltd
मे. यूिबस िबजनेस पाक ाइवेट लिमटेड, एसईजेड, पुणे, के आईटीआ
थक िवशेष िव श! सेटर के आईटीईएस/
#े$, जोनल िवकास आयु& क' अ)य#ता म+, पुणे म+ िद 21.03.2025 को आयो-जत 142 वी अनुमोदन सिम.त क'
बैठक का कायवृ2।
एसईजेड का नाम
मे. यूिबस िबजनेस पाक ाइवेट लिमटेड, एसईजेड
सेटर
आईटीआईटीईएस/
बैठक 5मांक
142 वी
तारीख
21.03.2025
उप9:थत सद:य:
5.
नाम और पदनाम (एस/<ी.)
िवभाग
1
<ीमती िमतल िहरेमठ
संयु& िवकास आयु&
पुणे @:टर एसईजेड, पुणे
2
<ी संजय बांगर
उप िनदेशक उAोग
महारा!B सरकार से नािमत
3.
<ीमती अचना परब
सहायक आयु&, आयकर िवभाग
आयकर िवभाग से नािमत
4.
<ी काDतकेय लंगोटे, उप-#े$ीय
अ.धकारी
महारा!B दूषण िनयं$ण बोड से नािमत
5.
<ीमती पुFपा गंगावणे, एफटीडीओ
6
<ी धवल एस शकI , अधी#क
सीमा शुJक िवभाग पुणे नािमत
िवशेष आमंि$त
नाम एवं पदनाम (<ी/ <ीमती) िवभाग 1 <ी सतबीर शमा, िविनKद! अ.धकारी सीLज़-एसईज़ेड, पुणे @:टर एज+डा िवषय 5 01 : िद 21.02.2025 को आयो-जत 141 वN बैठक के कायवृ2 क' पुि! िवचार-िवमश के बाद, सिम.त ने 21.02.2025 को आयो-जत 141 वN अनुमोदन सिम.त क' बैठक के कायवृ2 क' पुि! क'। एज+डा िवषय 5 02: िदनांक 21.02.2025 को आयो-जत 141 वN बैठक के संदभ मे क' गयी कायवाई क' Oरपोट । िवचार-िवमश के बाद, सिम.त ने 21.02.2025 को आयो-जत अनुमोदन सिम.त क' 141 वN बैठक के संदभ मे क' गयी कायवाई क' Oरपोट को नोट िकया। एज+डा िवषय 5 03: मेसस :माटIक 21 ाइवेट लिमटेड के लए दशन क' िनगरानी। िवचार-िवमश के बाद, सिम.त ने एसईजेड िनयम, 2006 के िनयम 54 के अनुसार, इकाई के थम Pलॉक अव.ध के 5 व+ वष
क' Oरपोट को नोट िकया। एज+डा िवषय 5 03: मेसस :माटIक 21 ाइवेट लिमटेड के लए दशन क' िनगरानी। िवचार-िवमश के बाद, सिम.त ने एसईजेड िनयम, 2006 के िनयम 54 के अनुसार, इकाई के थम Pलॉक अव.ध के 5 व+ वष अथात िव2 वष 2021-22 और िRतीय Pलॉक अव.ध के 2 वषS अथात िव2 वष 2022-23 और िव2 वष 2023-24 के लए दशन को नोट िकया। इकाई ने थम Pलॉक अव.ध के 5व+ वष यानी िव2 वष 2021-22 म+ 12.84 करोड़ Uपये के अनुमािनत िनयात के मुकाबले 28.78 करोड़ Uपये का िनयात राज:व हा-सल िकया है। इकाई ने थम Pलॉक अव.ध के 5व+ वष म+ 88.16 करोड़ Uपये यानी संचयी 99.99% का सकाराVमक एनएफई हा-सल िकया है। इकाई ने िRतीय Pलॉक अव.ध के दूसरे वष यानी िव2 वष 2022-23 से 2023-24 म+ 58.10 करोड़ Uपये के अनुमािनत िनयात के मुकाबले 60.50 करोड़ Uपये का िनयात राज:व हा-सल िकया है। इकाई ने िRतीय Pलॉक अव.ध के दूसरे वष यानी िव2 वष 2023-24 म+ U. 60.50 करोड़ Uपये का सकाराVमक संचयी एनएफई हा-सल िकया है।
यूिनट ने 31.03.2024 यानी िव2 वष 2023-24 तक इकाई म+ 101 कमचाOरयW (पुUष-76, मिहला-25) को रोजगार िदया है। इकाई को िव2 वष 2021-22, 2022-23 और 2023-24 के लए सही एनएफई मूJय भरने के लए एपीआर को संशो.धत करना आवXयक है। एज+डा िवषय 5 04: मेसस नीयामो एंटराइज सॉJयूशंस ाइवेट लिमटेड के लए दशन क' िनगरानी। िवचार-िवमश के बाद, सिम.त ने एसईजेड िनयम, 2006के िनयम 54 के अनुसार, इकाई के िRतीय Pलॉक अव.ध अथात-2023 24 के थम वष म+ दशन को नोट िकया। इकाई ने िRतीय Pलॉक अव.ध के थम वष म+ िव2 वष 2023-24 के लए 8.1 करोड़ Uपये के अनुमािनत िनयात के मुकाबले 6.41 करोड़ Uपये का िनयात राज:व हा-सल िकया है। इकाई ने िRतीय Pलॉक अव.ध के थम वष यानी 2023-24 म+ 6.14 करोड़ Uपये यानी 95.75% का सकाराVमक एनएफई हा-सल िकया है ।
1 करोड़ Uपये के अनुमािनत िनयात के मुकाबले 6.41 करोड़ Uपये का िनयात राज:व हा-सल िकया है। इकाई ने िRतीय Pलॉक अव.ध के थम वष यानी 2023-24 म+ 6.14 करोड़ Uपये यानी 95.75% का सकाराVमक एनएफई हा-सल िकया है । यूिनट ने 31.03.2024 यानी िव2 वष 2023-24 तक इकाई म+ 310 कमचारी (पुUष-127, मिहला-183) को रोजगार िदया है। एज+डा िवषय 5 05: मेसस वी -सनजाइज़ आउटसोYसग ाइवेट लिमटेड के लए दशन क' िनगरानी। िवचार-िवमश के बाद, सिम.त ने एसईजेड िनयम, 2006के िनयम 54 के अनुसार, िRतीय Pलॉक अव.ध के5 व+ वष यानी िव2 वष 21-2020 और तृतीय Pलॉक अव.ध के 4 वषS यानी िव2 वष22-2021 से िव2 वष25-2024 के लए इकाई के दशन को नोट िकया। इकाई ने दूसरे Pलॉक अव.ध के 5व+ वष यानी िव2 वष 2020-21 म+ 14.58 करोड़ Uपये के अनुमािनत िनयात के मुकाबले 20.00 करोड़ Uपये का िनयात राज:व हा-सल िकया है। इकाई ने िRतीय Pलॉक अव.ध के 5व+ वष म+ 56.93 करोड़ Uपये यानी 99.67% का सकाराVमक संचयी एनएफई हा-सल िकया है। इकाई ने तीसरी Pलॉक अव.ध के 4 वषS म+ यानी िव2 वष 2021-22 से िव2 वष 2024-25 तक 93.66 करोड़ के अनुमािनत िनयात के मुकाबले 153.80 करोड़ Uपये का िनयात राज:व हा-सल िकया है। इकाई ने तीसरी Pलॉक अव.ध के 4 वष यानी िव2 वष 2024-25 म+ 153.76 करोड़ Uपये का यानी 99.98% सकाराVमक संचयी एनएफई हा-सल िकया है । यूिनट ने 31.03.2024 यानी िव2 वष 25 कमचाOरयW (पुUष-20, मिहला-05) को रोजगार िदया है। िविनKद! अ.धकारी (SO) Oरपोट के अनुसार, यह देखा गया है िक यूिनट ने मॉिनटZरग अव.ध के दौरान डीटीए (डोमे9:टक टैOरफ एOरया) म+ सेवाएं दान क' ह\ और इसके बदले म+ भुगतान भारतीय Uपये (INR) म+ ा] िकया है : FY Amount in INR in Cr. 2020-21 0.64 2021-22 0.26 Total 0.90
ट ने मॉिनटZरग अव.ध के दौरान डीटीए (डोमे9:टक टैOरफ एOरया) म+ सेवाएं दान क' ह\ और इसके बदले म+ भुगतान भारतीय Uपये (INR) म+ ा] िकया है : FY Amount in INR in Cr. 2020-21 0.64 2021-22 0.26 Total 0.90
चूंिक DTA म+ ा] भुगतान के खलाफ "सेवाओं" का दान करना SEZ अ.धिनयम, 2005 क' धारा 2(z) म+ िदए गए पOरभाषा के अनुसार 'सेवाएं' के ^प म+ यो_य नहN है, इसलए इकाई ने SEZ अ.धिनयम / िनयमW और िवदेशी `यापार (िवकास और िविनयमन) अ.धिनयम, 1992 के िव भa ावधानW का उbंघन िकया है।
चूंिक यूिनट को िवदेशी मुdा के बजाय भारतीय Uपये म+ भुगतान ा] हुआ है, इसलए अनुमोदन सिम.त ने एसईजेड अ.धिनयम, 2005 क' धारा 2 (जेड) ( iii) के ावधान का उbंघन करने के लए कारण बताओ नोिटस जारी करने का िनदIश िदया। एज+डा िवषय 5 06: मेसस एलीeाम -स:टfस एंड टेनोलॉजीज ाइवेट लिमटेड के लए दशन क' िनगरानी। िवचार-िवमश के बाद, सिम.त ने एसईजेड िनयम, 2006 के िनयम 54 के अनुसार िव2 वष24-2023 यानी दूसरे Pलॉक अव.ध के पहले वष के लए इकाई के दशन को नोट िकया।
इकाई ने दूसरे Pलॉक के पहले वष म+ यानी िव2 वष 2023-24 के 36.87 करोड़ Uपये के अनुमािनत िनयात के मुकाबले 40.15 करोड़ Uपये का िनयात राज:व हा-सल िकया है। इकाई ने दूसरे Pलॉक अव.ध यानी िव2 वष 2023-24 के पहले वष म+ 35.25 करोड़ Uपये यानी 87.80% का सकाराVमक एनएफई हा-सल िकया है। यूिनट ने 117 कमचाOरयW (पुUष- 103, मिहला-14) को रोजगार िदया है। एज+डा िवषय 5 07: मेसस टBेसिव:टा एनालिटस एलएलपी के लए दशन क' िनगरानी। िवचार-िवमश के बाद, सिम.त ने एसईजेड िनयम, 2006 के िनयम 54 के अनुसार, थम Pलॉक अव.ध के5 व+ वष यानी िव2 वष 23-2022 और िRतीय Pलॉक अव.ध के थम वष यानी िव2 वष24-2023 के लए इकाई के दशन को नोट िकया।
िवचार-िवमश के बाद, सिम.त ने एसईजेड िनयम, 2006 के िनयम 54 के अनुसार, थम Pलॉक अव.ध के5 व+ वष यानी िव2 वष 23-2022 और िRतीय Pलॉक अव.ध के थम वष यानी िव2 वष24-2023 के लए इकाई के दशन को नोट िकया। यू इकाई ने थम Pलॉक अव.ध के 5व+ वष यानी िव2 वष 2022-23 म+ 105 करोड़ Uपये के अनुमािनत िनयात के मुकाबले 115.36 करोड़ Uपये का िनयात राज:व हा-सल िकया है। इकाई ने थम Pलॉक अव.ध के 5व+ वष म+ 307.01 करोड़ Uपये यानी 99.04% का सकाराVमक संचयी एनएफई हा-सल िकया है। इकाई ने दूसरे Pलॉक अव.ध के पहले वष यानी िव2 वष 2023-24 म+ 138.44 करोड़ Uपये के अनुमािनत िनयात क' तुलना म+ 132.01 करोड़ Uपये का िनयात राज:व हा-सल िकया है। इकाई ने दूसरे Pलॉक अव.ध के पहले वष यानी िव2 वष 2023-24 म+ 129.23 करोड़ Uपये यानी 97.89% का सकाराVमक एनएफई हा-सल िकया है यूिनट ने 31.03.2024 तक 808 कमचाOरयW (पुUष-509, मिहला-299) को रोजगार िदया है। एज+डा िवषय 5 08: मेसस फोिटBया साइंिटिफक ाइवेट लिमटेड के लए दशन क' िनगरानी। िवचार-िवमश के बाद, सिम.त ने एसईजेड िनयम, 2006 के िनयम 54 के अनुसार िRतीय Pलॉक अव.ध के5 व+ वष यानी िव2 वष 21-2020 और तृतीय Pलॉक अव.ध के 3 वषS यानी िव2 वष22-2021 और िव2 वष24-2023 के लए इकाई के दशन को नोट िकया। यूिनट ने िRतीय Pलॉक अव.ध के 5व+ वष यानी िव2 वष 2020-21 म+ 71.27 करोड़ Uपये के अनुमािनत िनयात के मुकाबले 79.39 करोड़ Uपये का िनयात राज:व हा-सल िकया है। इकाई ने िRतीय Pलॉक अव.ध के 5व+ वष म+ 348.96 करोड़ Uपये यानी 98.12% का सकाराVमक संचयी एनएफई हा-सल िकया है। इकाई ने तीसरी Pलॉक अव.ध के 3 वषS यानी िव2 वष 2021-22 से िव2 वष 2023-24 तक 319.50 करोड़ Uपये के अनुमािनत िनयात के मुकाबले 326.17 करोड़ Uपये का िनयात राज:व हा-सल िकया है।
क संचयी एनएफई हा-सल िकया है। इकाई ने तीसरी Pलॉक अव.ध के 3 वषS यानी िव2 वष 2021-22 से िव2 वष 2023-24 तक 319.50 करोड़ Uपये के अनुमािनत िनयात के मुकाबले 326.17 करोड़ Uपये का िनयात राज:व हा-सल िकया है। इकाई ने तीसरी Pलॉक अव.ध के तीसरे वष यानी िव2 वष 2023-24 म+ 322.04 करोड़ Uपये का सकाराVमक संचयी एनएफई हा-सल िकया है । यूिनट ने 31.03.2024 तक 831 कमचाOरयW (पुUष-442, मिहला-389 को रोजगार िदया है। इकाई को िव2 वष 2022-23 और 2023 के लए सही एनएफई मूJय भरने के लए एपीआर को संशो.धत करना आवXयक है। एज+डा िवषय 5 09: मेसस फोिटBया साइंिटिफक ाइवेट लिमटेड, आईटी/आईटीईएस इकाइयW Rारा यूिबस िबजनेस पाक ाइवेट लिमटेड - एसईजेड म+ 9:थत अपनी 2 मौजूदा इकाइयW के एलओए के िवलय के लए आवेदन। िवचार-िवमश के बाद, सिम.त ने एसईजेड िनयम, 2006 के िनयम 19(2) के चौथे ावधान के अनुसार यूिबस िबजनेस पाक ाइवेट लिमटेड - एसईजेड म+ 9:थत अपनी 2 मौजूदा इकाइयW के एलओए के िवलय के लए मेसस फोिटBया साइंिटिफक ाइवेट लिमटेड के :ताव को मंजूरी दे दी, -जसका िववरण नीचे िदया गया है: इकाइ नंबर एलओए नंबर और .त थ आरंभ .त थ एलओए क' वैधता 1 SEZ1-SEEPZ/FIPL-SEZ/SIPL/10/2011- 12/3019 dt. 17.03.2011 17.03.2011 16.03.2026 3 SEEPZ/NSPL-SEZ/STPL/77/2018-19 dt. 22.01.2019 30.09.2019 29.09.2029 एलओए के िवलय के पOरणाम:व^प, यूिनट 1 (SEZ1-SEEPZ/FIPL-SEZ/SIPL/10/2011-12/3019 dt. 17.03.2011) क' Pलॉक अव.ध को 2006 के एसईजेड िनयम के िनयम 19(2) के संदभ म+ शुg िवदेशी मुdा क' गणना के लए िवचार िकया जाएगा। एक'कृत इकाई के बाद अनुमोिदत पूवानुमानW का िववरण:
/SIPL/10/2011-12/3019 dt. 17.03.2011) क' Pलॉक अव.ध को 2006 के एसईजेड िनयम के िनयम 19(2) के संदभ म+ शुg िवदेशी मुdा क' गणना के लए िवचार िकया जाएगा। एक'कृत इकाई के बाद अनुमोिदत पूवानुमानW का िववरण:
Sr.No Particulars 2021-22
2022-23 2023-24 2024-25 2025-26 Total 1. FOB Value of exports 92.01 105.81 121.68 174.87 197.40 691.77 2. Foreign Exchange outgo 0.76 0.87 0.92 2.16 1.76 6.47 3. Net Foreign Exchange 91.25 104.94 120.76 172.71 195.64 685.30 1. Investment in Plant & Machinery/Capital Good i. Indigenous 47.45 ii Imported 2.50
Total 49.95 4. Value of Services i. Indigenous 107.42 ii. Imported 1.50
Total 108.92 5. Employment(Men-697, Women-791) 1488 6. Area (Built up area ) Sq. Ft. remain same 41024 Sq. ft अ)य# को धhयवाद iापन के साथ बैठक समा] हुई।
Minutes of the 142nd Meeting of the Approval Committee held under the Chairmanship of Zonal Development Commissioner SEEPZ-SEZ, Mumbai for Sector Specific Special Economic Zone for IT/ITES of Qubix Business Park Pvt. Ltd.-SEZ, Pune, held on 21.03.2025.
Name of the SEZ M/s. Qubix Business Park Pvt Ltd SEZ
Sector IT/ITES
Meeting No. 142nd
Date 21.03.2025 Members present: Sr No. Name and Designation(S/Shri.) Department 1 Smt. Mital Hiremath 2 Shri. Sanjay Bangar Deputy Director of Industries, Pune Region 3 Smt. Archana Parab, 4 Kartikeya Langote, Sub-Regional Officer Maharashtra Pollution Control Board. 5 6 Shri. Dhaval Shirke, Superintendent Special Invitee
puty Director of Industries, Pune Region 3 Smt. Archana Parab, 4 Kartikeya Langote, Sub-Regional Officer Maharashtra Pollution Control Board. 5 6 Shri. Dhaval Shirke, Superintendent Special Invitee
Sr Department 1 Shri Satbir Sharma, Specified Officer Agenda Item No.01: Confirmation of Minutes of the 141st meeting held on 21.02.2025 After deliberation, the Committee confirmed the minutes of the 141st Approval Committee meeting held on 21.02.2025 Agenda Item No. 02 : Action taken report for the Minutes of the 141st meeting held on 21.02.2025 After deliberation, the Committee has noted the Action taken report for the meeting held on 21.02.2025. Agenda Item No.03: Monitoring of Performance for M/s. Smartek21 Pvt. Ltd After deliberation, the committee noted the performance of the unit for for 5th year of 1st Block Period i.e. FY 2021-22 and 2 years of 2nd Block period i.e FY 2022-23 & FY 2023-24 in terms of Rule 54 of SEZ Rules, 2006.
The unit has achieved export revenue of Rs. 28.78 Crores as against projected export of Rs.12.84 Crores in 5th Year of 1st block period i.e. FY 2021-22 The unit has achieved positive cumulative NFE of Rs. 88.16 Crores i.e 99.99% in the 5th year of 1st block period. The unit has achieved export revenue of Rs. 60.50 Crores as against projected export of Rs.58.10 Crores in the 2nd Year of 2nd block period i.e. FY 2023-24 The unit has achieved positive cumulative NFE of Rs. 60.50 Crores in the 2nd Year of 2nd block period i.e.
nst projected export of Rs.58.10
Crores in the 2nd Year of 2nd block period i.e. FY 2023-24
The unit has achieved positive cumulative NFE of Rs. 60.50 Crores in the 2nd Year of 2nd block
period i.e. FY 2023-24
The unit has 101 employees (Male: 76, Female: 25) as on 31.03.2024
The Unit is required to revise the APRs to fill the correct NFE value for FY 2021-22, 2022-23 and
2023 24.
Agenda Item No.04: Monitoring of Performance for M/s Neeyamo Enterprise Solutions Pvt Ltd. After deliberation, the committee noted the performance of the unit 1ST Year of 2nd Block period i.e. 2023- 24, in terms of Rule 54 of SEZ Rules, 2006.
The Unit has achieved export revenue of Rs. 6.41 Crores as against projected export of Rs. 8.1 Crores for FY 2023-24 in 1st year of 2nd Block period i.e 79.13% The unit has achieved positive NFE of Rs. 6.14 Crores in the 1st year of 2nd Block Period i.e 2023- 24 on cumulative basis. i.e. 95.75% The unit has 310 employees (Men-127, Women-183) as on 31.03.2024 i.e. FY 2023-24. Agenda Item No.05: Monitoring of Performance for M/s. V Synergize Outsourcing Pvt. Ltd After deliberation, the committee noted the performance of the unit for 5th year of 2nd Block Period i.e. FY 2020-21 and 4 years of 3rd Block period i.e FY 2021-22 to FY 2024-25, in terms of Rule 54 of SEZ Rules, 2006.
the committee noted the performance of the unit for 5th year of 2nd Block Period i.e. FY 2020-21 and 4 years of 3rd Block period i.e FY 2021-22 to FY 2024-25, in terms of Rule 54 of SEZ Rules, 2006.
The unit has achieved export revenue of Rs. 20.00 Crores as against projected export of Rs.14.58 Crores and 137.17 Crores in 5th Year of 2nd block period i.e. FY 2020-21 The unit has achieved positive cumulative NFE of Rs. 56.93 Crores i.e 99.67% in the 5th year of 2nd Block period. The unit has achieved export revenue of Rs. 153.80 Crores as against projected export of Rs.93.66 Crores in 4 Years of 3rd Block period i.e. FY 2021-22 to FY 2024-25 The unit has achieved positive cumulative NFE of Rs. 153.76 Crores i.e 99.98% in the 4th Year of 3rd Block period i.e. FY 2024-25 The unit has 25 employees (Male: 20, Female: 05) as on 31.03.2024. As per the SO report, it is observed that the Unit has provided services in DTA against payment received in INR during the monitoring period as follows:
FY
Amount in INR in
Cr.
2020-21
0.64
2021-22
0.26
Total
0.90
Since providing of “Services” in DTA against payment received in INR does not qualify as ‘Services’ as
per definition given in Section 2(z) of the SEZ Act, 2005, The unit has made violation of various provision
of SEZ Act / Rules and under Foreign Trade (Development and Regulation) Act, 1992.
As the Unit has received payment in INR instead of Foreign Currency the Committee directed to issue a
SCN for contravening the provision of Section 2(z)(iii) of SEZ Act, 2005.
Agenda Item No.06: Monitoring of Performance for M/s.
in INR instead of Foreign Currency the Committee directed to issue a SCN for contravening the provision of Section 2(z)(iii) of SEZ Act, 2005. Agenda Item No.06: Monitoring of Performance for M/s. Allygram Systems and Technologies Pvt. Ltd After deliberation, the committee noted the performance of the unit for FY 2023-24 i.e. 1st Year of 2nd Block period in terms of Rule 54 of SEZ Rules, 2006.
The unit has achieved export revenue of Rs. 40.15 Crores as against projected export of Rs.36.87
Crores in 1st Year of 2nd Block period i.e. FY 2023-24
The unit has achieved positive cumulative NFE of Rs. 35.25 Crores i.e 87.80% in the 1st Year of 2nd
Block period i.e. FY 2023-24
As per SO report the unit has 117 employees (Male: 103, Female: 14) as on 31.03.2024
Agenda Item No.07: Monitoring of Performance for M/s. Tresvista Analytics LLP.
After deliberation, the committee noted the performance of the unit for 5th year of 1st Block Period i.e. FY
2022-23 and 1st year of 2nd Block period i.e FY 2023-24, in terms of Rule 54 of SEZ Rules, 2006.
The unit has achieved export revenue of Rs. 115.36 Crores as against projected export of Rs.105 Crores in 5th Year of 1st Block period i.e. FY 2022-23 The unit has achieved positive cumulative NFE of Rs. 307.01 Crores i.e 99.04% in the 5th year of 1st Block period. The unit has achieved export revenue of Rs. 132.01 Crores as against projected export of Rs.138.44 Crores in the 1st Year of 2nd Block period i.e. FY 2023-24
% in the 5th year of 1st Block period. The unit has achieved export revenue of Rs. 132.01 Crores as against projected export of Rs.138.44 Crores in the 1st Year of 2nd Block period i.e. FY 2023-24
The unit has achieved positive NFE of Rs. 129.23 Crores i.e 97.89% in the 1st Year of 2nd Block
period i.e. FY 2023-24
As per SO report the unit has 808 employees (Male: 509, Female: 299) as on 31.03.2024
Agenda Item No.08: Monitoring of Performance for M/s. Fortrea Scientific Private limited.
After deliberation, the committee noted the performance of the unit for 5th year of 2nd Block Period i.e. FY
2020-21 and 3 years of 3rd Block period i.e FY 2021-22 & FY 2023-24 in terms of Rule 54 of SEZ Rules,
2006.
The unit has achieved export revenue of Rs. 79.39 Crores as against projected export of Rs.71.27
Crores in 5th Year of 2nd block period i.e. FY 2020-21
The unit has achieved positive cumulative NFE of Rs. 348.96 Crores i.e 98.12% in the 5th year of
2nd Block period.
The unit has achieved export revenue of Rs. 326.17 Crores as against projected export of
Rs.319.50 Crores in the 3 Years of 3rd Block period i.e. FY 2021-22 to FY 2023-24
The unit has achieved positive cumulative NFE of Rs. 322.04 Crores in the 3rd Year of 3rd Block
period i.e. FY 2023-24
As per SO report the unit has 831 employees (Male: 442, Female: 389) as on 31.03.2024
The Unit is required to revise the APRs to fill the correct NFE value for FY 2022-23 and 2023 24.
Agenda Item No.09: Application by M/s. Fortrea Scientific Pvt.
442, Female: 389) as on 31.03.2024
The Unit is required to revise the APRs to fill the correct NFE value for FY 2022-23 and 2023 24.
Agenda Item No.09: Application by M/s. Fortrea Scientific Pvt. Ltd., IT/ITES Units for Merger of
LOAs of their 2 existing units located at Qubix Business Park Private Limited – SEZ.
After deliberation, the committee approved the proposal of M/s. Fortrea Scientific Pvt. Ltd for Merger of
LOAs of their 2 existing units located at Qubix Business Park Private Limited – SEZ, in terms of 4th
proviso of Rule 19(2) of SEZ Rules, 2006, as detailed below:
Unit No LOA NO. and Date Date of Commencement LOA Valid upto 1 SEZ1-SEEPZ/FIPL-SEZ/SIPL/10/2011- 12/3019 dt. 17.03.2011 17.03.2011 16.03.2026 3 SEEPZ/NSPL-SEZ/STPL/77/2018-19 dt. 22.01.2019 30.09.2019 29.09.2029 Consequent to merger of above two LOAs, the block period for the purpose of calculation of Net Foreign Exchange and Income Tax benefit, shall be considered from the date of commencement (17.03.2011) of the Unit 1 (LOA No SEZ1-SEEPZ/FIPL-SEZ/SIPL/10/2011-12/3019 dt. 17.03.2011) in terms of Rule 19(2) of SEZ Rule 2006. Details of Approved Projections after merger:
Sr.No Particulars 2021-22
2022-23 2023-24 2024-25 2025-26 Total 1. FOB Value of exports 92.01 105.81 121.68 174.87 197.40 691.77 2. Foreign Exchange outgo 0.76 0.87 0.92 2.16 1.76 6.47 3. Net Foreign Exchange 91.25 104.94 120.76 172.71 195.64 685.30
025-26 Total 1. FOB Value of exports 92.01 105.81 121.68 174.87 197.40 691.77 2. Foreign Exchange outgo 0.76 0.87 0.92 2.16 1.76 6.47 3. Net Foreign Exchange 91.25 104.94 120.76 172.71 195.64 685.30
Investment in Plant & Machinery/Capital Good i. Indigenous 47.45 ii Imported 2.50
Total 49.95 4. Value of Services i. Indigenous 107.42 ii. Imported 1.50
Total 108.92 5. Employment(Men-697, Women-791) 1488 6. Area (Built up area ) Sq. Ft. remain same 41024 Sq. ft
(iानेjर बी. पाटील, आईएएस) अ)य# एवं िवकास आयु&
signaturerectangle-1-186 Patil Date: 2025.03.28 15:10:59 IST % DSUnknown q 1 G 1 g 0.1 0 0 0.1 9 0 cm 0 J 0 j 4 M []0 d 1 i 0 g 313 292 m 265 625 l 100 625 l 313 292 l h 308 214 170 -164 re f 0.44 G 1.2 w 1 1 0.4 rg 287 318 m 239 651 l 74 651 l 287 318 l h 282 240 170 -164 re B Q
Agenda Item No. Subject Remarks Agenda Item No. 02 Application for Monitoring of Performace(M/s. Smartek21 Pvt. Ltd.) on 28.03.2025. Agenda Item No. 03 Monitoring of performance of EOU unit(M/s Neeyamo Enterprise Solutions Pvt Ltd) on 28.03.2025. Agenda Item No. 04 Application for Monitoring of Performace(M/s. Fortrea Scientific Private limited, Unit 1) on 28.03.2025. Agenda Item No. 05 Performace(M/s. V Synergize Outsourcing Pvt. Ltd ) on 28.03.2025. Agenda Item No. 06 Performace(M/s. Tresvista Analytics LLP) on 28.03.2025. Agenda Item No. 07 Performace(M/s. Allygram Systems and Technologies Pvt. Ltd) on 28.03.2025. Agenda Item No. 08 Application for Merger(M/s. Fortrea Scientific Private limited) on 28.03.2025.
.2025. Agenda Item No. 07 Performace(M/s. Allygram Systems and Technologies Pvt. Ltd) on 28.03.2025. Agenda Item No. 08 Application for Merger(M/s. Fortrea Scientific Private limited) on 28.03.2025.
a. Proposal : Proposal dated 23.04.2025 submitted by M/s. VITP Pvt Ltd (Qubix-SEZ) Co-Developer for allocating space to Service provider for Installation of Vending machine at Blue Ridge Township, Near Cognizant, Near Rajiv Gandhi Infotech Park, Hinjewadi. Approval of the committee to allocate a space on temporary basis without creating any lease, leave and license or tenancy arrangement for the purpose of vending machine service, in terms of Rule 11 (5) of SEZ Rules, 2006, as detailed below:
Name of the service provider Location Chargeable Area Remarks Instant Retail India Limited 9th Floor of IT 7 Building 50 Sq. ft (4X4 feet machine)- storage space will be provided Required for vending machine facility for employees working in SEZ campus.
Notification :-
Rule 11(5) of SEZ Rules, 2006 “the Developer may, with the prior approval of the Approval Committee, grant on lease land or built up space, for creating facilities such as canteen, public telephone booths, first aid centers, crèche and such other facility may be required for the exclusive use of the unit.” i. M/s VITP Pvt Ltd, are registered as a Co-Developer of Vance Project at VITP Pvt Ltd (Qubix SEZ) for Construction/Development of SEZ at Blue Ridge Township, Near RGIP, Hinjewadi Phase – I, Pune 411057. ii.
ITP Pvt Ltd, are registered as a Co-Developer of Vance Project at VITP Pvt Ltd (Qubix SEZ) for Construction/Development of SEZ at Blue Ridge Township, Near RGIP, Hinjewadi Phase – I, Pune 411057. ii. They have been granted Formal Letter of Approval Number F.2/274/2006-EPZDtd. 07.02.2012. iii. The Co Developer has declared that no cooking activity will be carried out in the food court area. The vending machine will dispense pre-packaged food products only. iv. The Co Developer has directed the Service provider to obtain all necessary licenses and approvals required to operate their vending machine services. v. The Co-developer has stated that the services will be utilized by all employees of units as well as
the Developer and the service provider will not avail any tax benefits or any tax exemptions under SEZ law. vi. The Co-Developer has submitted the following documents; Copy of letter of confirmation of availability of space to the service provider M/s. Instant Retail India Limited. Copy of Fire NOC from MIDC for IT 7 Building. Copy of Board Resolution. e. Recommendation: Approval Committee may like to consider the request of the Co- Developer for Installation of Vending machine at the food court area by the service provider Instant Retail India Limited, in terms of Rule 11(5) of SEZ Rules, 2006.
tallation of Vending machine at the food court area by the service provider Instant Retail India Limited, in terms of Rule 11(5) of SEZ Rules, 2006.
Year Export F.E. OUTGO
Projected
Actual Raw Material (Goods/Services) C.G. import Other outflow Projected Actual Projected Actual Actual 2020-21 157.70 102.89 0.00 0.00 3.17 0.18 18.84 Total 157.70 102.89 0.00 0.00 3.17 0.18 18.84
a. Proposal :
Monitoring of the performance of M/s. Crisil Ltd., an IT/ITES unit located in Qubix Business Park Pvt. Ltd.-
SEZ, Pune for 5th year of 2nd Block Period i.e. FY 2020-21 and 3 years of 3rd Block period i.e FY 2021-22
to FY 2023-24.
Monitoring of the performance of the unit for :
5th year of 2nd Block Period i.e. FY 2020-21 &
3 years of 3rd Block period i.e FY 2021-22 to FY 2023-24, in terms of Rule 54 of SEZ Rules, 2006.
Notification :-
As per Rule 54 of SEZ Rules, 2006
“Performance of the Unit shall be monitored by the Approval Committee as per the guidelines given in
Annexure appended to these rules”.
Approved Projections for 2nd Block Period FY 2016-17 to FY 2020-21
(Rs. In Crores)
2016-17
2017-18
2018-19
2019-20
2020-21
TOTAL
FOB Value of
Exports
128.64
147.69
157.1
151.62
157.7
742.75
FE Outgo
1.25
4.37
11.63
9.03
26.92
53.2
NFE
127.39
143.32
145.47
142.59
130.78
689.55
Performance as compared to projections: FY 2020-21
(Rs. In Crores)
ts
128.64
147.69
157.1
151.62
157.7
742.75
FE Outgo
1.25
4.37
11.63
9.03
26.92
53.2
NFE
127.39
143.32
145.47
142.59
130.78
689.55
Performance as compared to projections: FY 2020-21
(Rs. In Crores)
Year Cumulative NFE Achieved Cumulative % NFE Achieved 2020-21 571.04 91.13% Year Export F.E. OUTGO
Projected
Actual Raw Material (Goods/Services) C.G. import Other outflow Projected Actual Projected Actual Actual 2021-22 108.03 109.36 0.00 0.00 5.23 0.00 6.68 2022-23 113.43 148.42 0.00 0.00 0.02 0.01 2023-24 125.06 150.24 0.00 0.00 0.04 0.60 Total 346.52 408.02 0.00 0.00 5.23 0.06 7.29
Cumulative NFE achieved: FY 2020-21
(Rs. in Crores)
Approved Projections for 3rd Block Period FY 2021-22 to FY 2025-26 (Rs. In Crores)
2021-22 2022-23 2023-24 2024-25 2025-26 TOTAL FOB Value of Exports 108.03 113.43 125.06 131.31 137.88 615.71 FE Outgo 23.16 24.78 28.37 30.36 32.49 139.16 NFE 84.87 88.65 96.69 100.95 105.39 476.55 Performance as compared to projections: FY 2021-22 to FY 2025-26 (Rs. In Crores)
125.06 131.31 137.88 615.71 FE Outgo 23.16 24.78 28.37 30.36 32.49 139.16 NFE 84.87 88.65 96.69 100.95 105.39 476.55 Performance as compared to projections: FY 2021-22 to FY 2025-26 (Rs. In Crores)
Year Cumulative NFE Achieved Cumulative % NFE Achieved 2021-22 102.40 93.63% 2022-23 250.56 97.20% 2023-24 399.98 98.03%
Cumulative NFE achieved: FY 2021-22 to FY 2025-26 (Rs. in Crores)
Employment Achievement (Direct): FY 2023-24
Approved Achieved Men 500 269 Women 200 164 Total 700 433 Other Information: LOA No. & Date LOA No. SEEPZ/FIPL-SEZ/CL/14/2011- 12/6158 dated 29.04.2011 Location of Unit 1st & 2nd Floor, IT-2 Building. And 5th Floor, IT-4 Building, Qubix Business Park Pvt. Ltd., Rajiv Gandhi Infotech Park, Phase I, Hinjewadi, Pune 411 057 Validity of LOA 31.05.2026 Item(s) of manufacture/ Services IT/ITES Date of commencement of production 01.06.2011 Execution of BLUT 20.07.2022 Outstanding Rent dues NA Labour Dues NA Validity of Lease Agreement 5 years Pending CRA Objection, if any NA Pending Show Cause Notice/ Eviction Order/Recovery Notice/ Recovery Order issued, if any NA
tstanding Rent dues NA Labour Dues NA Validity of Lease Agreement 5 years Pending CRA Objection, if any NA Pending Show Cause Notice/ Eviction Order/Recovery Notice/ Recovery Order issued, if any NA
a. Projected employment for the block period b. No. of employees as on 31.03.2024 600 employees (Men-410, Women-190)
433 employees (Men-269, Women-164)
Area allotted (in sq.ft.) 17527 Sq.ft Area available for each employee per sq.ft. basis (area / no. of employees) 40.47 Investment till date
Building 0.00 Plant & Machinery 30.33 Quantity and value of goods exported under Rule 34 (unutilized goods) NA Value Addition during the monitoring period NA Whether all the APRs being considered now has been filed well within the time limit, or otherwise.
If no, details of the Year along with no of days delayed to be given.
Yes The Specified Officer has submitted a report vide letter dated 18.03.2025, in the prescribed format along with point-wise reply to the discrepancies as follows:- EXPORT (Rs. In Crores) From the year 2020-2021 to 2023-2024 (Rs. In Crores) Year/ Period Figures reported in APR (FOB Value) Figures as per Softex / Customs Records Difference, if any Reason for Difference / Remarks 2020-21 102.89 102.58 0.31 Exchange Rate variation 2021-22 109.36 108.52 0.84 Exchange Rate variation 2022-23 148.42 148.42 0.00 NA 2023-24 150.25 150.25 0.00 NA Import (Capital Goods including procurement done on IUT (from SEZ, EOU, STPI, EHTP) basis:
-22 109.36 108.52 0.84 Exchange Rate variation 2022-23 148.42 148.42 0.00 NA 2023-24 150.25 150.25 0.00 NA Import (Capital Goods including procurement done on IUT (from SEZ, EOU, STPI, EHTP) basis:
Year/ Period Figures as per APR Figures as per SEZ Online / Customs Records Difference, if any Reason for Difference / Remarks 2020-21 0.00 0.00 0.00 NA 2021-22 0.00 0.00 0.00 NA 2022-23 0.00 0.00 0.00 NA 2023-24 4.70 4.70 0.00 NA Raw Material Year/ Period Figures as per APR Figures as per SEZ Online / Customs Records Difference, if any Reason for Difference / Remarks 2020-21 0.00 0.00 0.00 NA 2021-22 0.00 0.00 0.00 NA 2022-23 0.00 0.00 0.00 NA 2023-24 0.00 0.00 0.00 NA BLUT 1 Value of BLUT Executed (Duty foregone) (including for CG / Raw Material / Services)
Value of Additional BLUT executed Year: Date of acceptance BLUT amount:
TOTAL value of BLUT Executed Rs. 2.04 Crore (Original) May 2011
July 2022 Rs.38.09 Crore Total: Rs. 40.13 Crore
tional BLUT executed Year: Date of acceptance BLUT amount:
TOTAL value of BLUT Executed Rs. 2.04 Crore (Original) May 2011
July 2022 Rs.38.09 Crore Total: Rs. 40.13 Crore
2 Total Duty Foregone on goods & services procured (Category-wise BLUT value utilized separately for imported and indigenous goods and services) This should be based on BLUT worksheet which provides for estimated value and duty foregone separately for each category of procurement. Value In Crore FY Goods (Imp. & Indi.) Services (Imp. & Indi.) 2020-21 0.72 4.53 2021-22 0.21 13.79 2022-23 0.22 13.77 2023-24 0.61 7.74 Total 1.77 39.83
(a) Employment made as on date (as on end of block period / year up to which monitoring is being done) Projected Employment Men : 410 Women: 190 Total : 600
As on 31st March 2024: Men: 269 Woman: 164 Total: 433 (b) Details of pending Foreign Remittance beyond permissible period, if any (as on 31.03.2024)
To Cross-check the same and verify whether necessary permission from AD Bank/RBI has been obtained. No Foreign Remittance is pending beyond the permissible period for realization.
Remittance beyond
(c) Whether all softex has been filed for the said period. If no, details, thereof. SO to also check whether unit has obtain Softex condonation from DC office/RBI and if approved, whether they have filed such pending Softex. Yes
(d) Whether all Softex has been certified, if so till which month has the same been certified.
tex condonation from DC office/RBI and if approved, whether they have filed such pending Softex. Yes
(d) Whether all Softex has been certified, if so till which month has the same been certified. If not, provide details of the Softex and reasons for pendency. The following request ids are pending with the Unit for resubmission after deficiency is raised. 142000339036,142100021490, 142100052205,142100128645, 142100216731
(e) Whether unit has filed any request for Cancellation of Softex No (f) Whether any Services provided in DTA / SEZ/EOU/STPI etc. against payment in INR in r/o IT/ITES Unit during the period. If yes, details thereof (year wise details to be provided) They have not provided any services in DTA / SEZ / EOU / STPI etc. against payment in INR w.r.t. IT/ITES Services. (g) SO to verify and certify whether the unit has updated the BLUT ledger Module in SEZ Online. NA (h) Has the unit cleared any Capital Goods procured duty free in DTA against payment of Duty, or otherwise? Full details to be provided along with value of assets and duty discharged. Yes. The Unit has cleared E-waste as under: Rs.
ital Goods procured duty free in DTA against payment of Duty, or otherwise? Full details to be provided along with value of assets and duty discharged. Yes. The Unit has cleared E-waste as under: Rs. In Crore FY Value Duty 2020-2021 0.17 0.06 2021-2022 0.0037 0.0007 2022-2023 0.2961 0.0533 2023-2024 0.0905 0.0322 Total 0.56 0.15 (i) Is the unit sharing any of their infrastructure with other units or are utilizing infrastructure of another unit in the same or other SEZ? If so, details thereof, including the details of the unit with whom the sharing is being made, and the payment terms If approval for sharing of common infrastructure has been obtained from UAC / DC office, the date of UAC / Approval letter to be Indicated. No (j) Whether all DSPF for services procured during the said monitoring period under consideration has been filed by the unit and whether the same has been processed for approval by the SO Office. No (k) Whether unit has filed all DTA procurement w.r.t. the Yes
goods procured by them during the monitoring period for the relevant period. If no, details thereof
or approval by the SO Office. No (k) Whether unit has filed all DTA procurement w.r.t. the Yes
goods procured by them during the monitoring period for the relevant period. If no, details thereof
(l) Details of the request IDs pending for OOC in respect of DTA procurement on the date of submission of monitoring report No request ID is pending for OOC. (m) Has the unit set up any cafeteria / canteen / food court in unit premises? If yes, whether permission from UAC / DC office has been issued, or otherwise office has been issued, or otherwise Whether unit has availed any `duty paid goods / services for setting up such facility? If yes, whether unit has discharged such duty / tax benefit availed? details to be given including amount of duty / tax recovered or yet to be recovered. The unit has set up cafeteria & Gymnasium for which they have obtained the permission F.NO.SEEPZ/FIPL-SEZ/CL/14/2011- 12/VOL-II/1258 dated 14.12.2023 (n) Whether any violation of any of the provisions of law has been noticed / observed by the Specified Officer during the period under monitoring No e. Recommendation: The unit has achieved export revenue of Rs. 102.89 Crores as against projected export of Rs.157.70 Crores in 5th Year of 2nd Block period i.e. FY 2020-21. The unit has achieved positive cumulative NFE of Rs. 571.04 Crores i.e 91.13% in the 5th year of 2nd Block period. The unit has achieved export revenue of Rs. 408.02 Crores as against projected export of Rs.346.52 Crores in 3 Years of 3rd Block period i.e.
Crores i.e 91.13% in the 5th year of
2nd Block period.
The unit has achieved export revenue of Rs. 408.02 Crores as against projected export of
Rs.346.52 Crores in 3 Years of 3rd Block period i.e. FY 2021-22 to FY 2023-24
The unit has achieved positive cumulative NFE of Rs. 399.98 Crores i.e 98.03% in the 3rd Year of
3rd Block period i.e. FY 2023-24
As per SO report the unit has 433 employees (Male: 269, Female: 164) as on 31.03.2024
The Unit is required to file revised APR for FY 2020-21 with corrected NFE value.
Approval Committee may like to monitor the performance of the Unit for
5th year of 2nd Block Period i.e. FY 2020-21 &
3 years of 3rd Block period i.e FY 2021-22 to FY 2023-24, in terms of Rule 54 of SEZ
Rules, 2006.
Year Export F.E. OUTGO
Projected
Actual Raw Material (Goods/Services) C.G. import Other outflow Projected Actual Projected Actual Actual 2022-23 7.99 2.44 0.00 0.00 1.44 0.00 0.00 2023-24 11.42 6.99 0.00 0.00 0.00 0.00 Total 19.41 9.43 0.00 0.00 1.44 0.00 0.00
a. Proposal : Monitoring of the performance of M/s Triarq Health LLP, located at Qubix Business Park Pvt. Ltd, for 2 years of 1st Block period. Monitoring of the performance of the unit for 2 years of 1st Block period i.e. FY 2022-23 & FY 2023-24, in terms of Rule 54 of SEZ Rules, 2006 Notification :- “Performance of the Unit shall be monitored by the Approval Committee as per the guidelines given in Annexure appended to these rules”. Approved Projections for 1ST Block period (Rs.
Notification :- “Performance of the Unit shall be monitored by the Approval Committee as per the guidelines given in Annexure appended to these rules”. Approved Projections for 1ST Block period (Rs. In Crores)
2022-23 2023-24 2024-25 2026-27 2027-28 TOTAL FOB Value of Exports 7.99 11.42 12.47 13.73 14.97 60.58 FE Outgo 0.76 0.19 0.21 0.69 0.28 2.13 NFE 7.23 11.23 12.26 13.04 14.69 58.45 Performance as compared to projections: FY 2022-23 & FY 2023-24 (Rs. In Crores)
Cumulative NFE achieved: FY 2022-23 & FY 2023-24
(Rs. in Crores)
Year Cumulative NFE Achieved 2022-23 2.44 100% 2023-24 9.43 100%
Employment Achievement: FY 2023-24
Approved Achieved Men 60 27 Women 45 37 Total 105 64 Other Information: LOA No. & Date SEEPZ-SEZ/QBPPL-SEZ/THLLP/ 80/2022-23 dated 05.05.2022. Location of Unit Ground Floor, IT-5 Building, Qubix Business Park Pvt. Ltd.,- SEZ, Plot No. 2, Blue Ridge Township, Near Rajiv Gandhi Infotech Park, Phase-I, Pune Hinjewadi 411 057 Validity of LOA 31.10.2027 IT/ITES 01.11.2022 Execution of BLUT 07.06.2022 NA Labour Dues NA
NA Pending Show Cause Notice/ Eviction Order/Recovery Notice/ Recovery Order issued, if any NA period
64(Men-27, Women-37) 8459.89 132.18
Building 0.00 Plant & Machinery 301.15 under Rule 34 (unutilized goods) NA
Notice/ Eviction Order/Recovery Notice/ Recovery Order issued, if any NA period
64(Men-27, Women-37) 8459.89 132.18
Building 0.00 Plant & Machinery 301.15 under Rule 34 (unutilized goods) NA
period NA
Yes The Specified Officer vide his report dated 18.03.2025 has reported that SEZ Unit has submitted the following Details of year-wise export as per the prescribed format: From the year 2022-23 to 2023-2024 (Rs. In Crores) Year/ Period Figures reported in APR (FOB Value) Figures as per Softex / Customs Records Difference, if any Reason for Difference / Remarks 2022-2023 2.44 2.44 0.00 NA 2023-2024 6.99 7.00 (-0.01) Difference of Rs. (0.01) Crore is due to Exchange Rate variation
Import (Capital Goods including procurement done on IUT (from SEZ, EOU, STPI, EHTP) basis: From the year 2022-23 to 2023-2024 (Rs. in Crores) Year/ Period Figures as per APR Figures as per SEZ Online / Customs Records Difference, if any Reason for Difference / Remarks 2022-2023 0.00 0.00 0.00 NA 2023-2024 0.00 0.00 0.00 NA Raw Material From the year 2022-23 to 2023-2024 (Rs.in Crores) Year/ Period Figures as per APR Figures as per SEZ Online / Customs Records Difference, if any Reason for Difference / Remarks 2022-2023 0.00 0.00 0.00 NA 2023-2024 0.00 0.00 0.00 NA
(Rs.in Crores) Year/ Period Figures as per APR Figures as per SEZ Online / Customs Records Difference, if any Reason for Difference / Remarks 2022-2023 0.00 0.00 0.00 NA 2023-2024 0.00 0.00 0.00 NA
BLUT 1 Value of BLUT Executed (Duty foregone) (including for CG / Raw Material / Services) Year: Date of acceptance BLUT amount: TOTAL value of BLUT Executed F.No. SEEPZ-SEZ/QBPPL- SEZ/THLLP/80/ 2022-23/290 dated 10.06.2022 Rs. 2.36 Crore
Total: Rs. 2.36 Crore 2 Total Duty Foregone on goods & services procured (Category-wise BLUT value utilized separately for imported and indigenous goods and services) This should be based on BLUT worksheet which provides for estimated value and duty foregone separately for each category of procurement. Value Rs. In Crore FY Goods (Imp. & Indi.) Services (Imp. & Indi.) 2022-2023 0.06 0.58 2023-2024 0.01 0.18 Total 0.07 0.76
(a) Employment made as on date (as on end of block period / year up to which monitoring is being done) As per Projection- Men: 60 Women: 45 Total: 105 Men: 27 Women: 37 Total: 64 (b) Details of pending Foreign Remittance beyond Permissible period, if any (as on 31.03.2024) To cross-check the same and verify whether necessary permission from AD Bank / RBI has been obtained. No Foreign Remittance is pending beyond the permissible period for export invoices raised till 31st March, 2024. (c) Whether all softex has been filed for the said period.
nk / RBI has been obtained. No Foreign Remittance is pending beyond the permissible period for export invoices raised till 31st March, 2024. (c) Whether all softex has been filed for the said period. If no, details thereof. SO to also check whether unit has obtained Softex condonation from DC office / RBI and if approved, whether they have filed such pending Softex. No Softex Forms has been pending for filing.
(d) Whether all Softex has been certified, if so till which month has the same been certified. If not, provide details of the Softex and reasons for pendency. All the Softex Forms till March, 2024 has been certified. (e) Whether unit has filed any request for Cancellation of Softex No (f) Whether any Services provided in DTA / SEZ/EOU/STPI etc. against payment in INR in r/o IT/ITES Unit during the period. If yes, details thereof (year wise details to be provided) Unit has not provided any Services in DTA / SEZ / EOU / STPI etc. against payment in INR during the reporting period. (g) SO to verify and certify whether the unit has updated the BLUT ledger NA (h) Has the unit cleared any Capital Goods procured duty free in DTA against payment of Duty, or otherwise? value of assets and duty discharged. NO (i) utilizing infrastructure of another unit in the same or other SEZ? If so, details thereof, including the details of the unit with whom the sharing is being made, and the payment terms infrastructure has been obtained from UAC / DC office, the date of UAC / Approval letter to be indicated No (j) Whether all DSPF for services
ith whom the sharing is being made, and the payment terms infrastructure has been obtained from UAC / DC office, the date of UAC / Approval letter to be indicated No (j) Whether all DSPF for services procured during the said monitoring period under consideration has been filed by the unit and whether the same has been processed for approval by the SO Office. YES. All the DSPF Forms filed till March 2024 have been certified. (k) procurement w.r.t. the goods procured by them during the monitoring period for the relevant period. Unit have filed all the DTA Procurement w.r.t. the goods procured by them during the monitoring period. (l) Details of the request IDs pending for OOC in respect of DTA procurement on the date of submission of monitoring report No Request ID is pending for OOC.
(m) canteen / food court in unit premises? If yes, whether permission from UAC / DC office has been issued, or otherwise office has been issued, or otherwise Whether unit has availed any `duty paid goods / services for setting up such facility? If yes, whether unit has discharged such duty / tax benefit availed? details to be given including amount of duty / tax recovered or yet to be recovered The Unit have dry pantry with no cooking facility. The Unit has not taken permission for the same from Unit Approval Committee (UAC). (n) observed by the Specified Officer during the period under monitoring No e. Recommendation: The Unit has achieved export revenue of Rs. 9.44 Crores as against projected export of Rs.
ittee (UAC). (n) observed by the Specified Officer during the period under monitoring No e. Recommendation: The Unit has achieved export revenue of Rs. 9.44 Crores as against projected export of Rs. 19.41 Crores upto FY 2023-24 i.e 2 years of 1st Block period. The unit has achieved positive NFE of Rs. 9.44 Crores in the 2 years of 1st Block period i.e 2023- 24 on cumulative basis. i.e. 100% As per SO report the unit has 64 employees (Men-27, Women-37) as on 31.03.2024. Approval Committee may Monitor the performance of the unit for 2 years of 1st Block Period i.e. FY 2022-23 to FY 2023-24, in terms of Rule 54 of SEZ Rules, 2006.
Year Export F.E. OUTGO
a. Proposal : Monitoring of the performance of M/s. SubEno India Private Limited, an IT/ITES unit located in Qubix Business Park Pvt. Ltd.-SEZ, Pune for 5th year of 2nd Block Period i.e. FY 2020-21 and 3 years of 3rd Block period i.e FY 2021-22 to FY 2023-24. Monitoring of the performance of the unit for : 5th year of 2nd Block Period i.e. FY 2020-21 & 3 years of 3rd Block period i.e FY 2021-22 to FY 2023-24, in terms of Rule 54 of SEZ Rules, 2006. Notification :-
Approved Projections for 2nd Block Period FY 2016-17 to FY 2020-21 (Rs. In Crores)
2016-17 2017-18 2018-19 2019-20 2020-21 TOTAL FOB Value of Exports 98.00 100.00 102.00 107.00 111.00 518.00 FE Outgo 1.95 2.05 2.15 2.30 2.47 10.92 NFE 96.05 97.95 99.85 104.70 108.53 507.08
Performance as compared to projections: FY 2020-21
(Rs. In Crores)
rts 98.00 100.00 102.00 107.00 111.00 518.00 FE Outgo 1.95 2.05 2.15 2.30 2.47 10.92 NFE 96.05 97.95 99.85 104.70 108.53 507.08
Performance as compared to projections: FY 2020-21
(Rs. In Crores)
Year
Projected
Actual Raw Material (Goods/Services) C.G. import Other outflow Projected Actual Projected Actual Actual 2020-21 111.00 94.39 0.00 0.00 10.75 0.00 22.96 Total 111.00 94.39 0.00 0.00 10.75 0.00 22.96 Year Cumulative NFE Achieved Cumulative % NFE Achieved 2020-21 372.52 80.89% Year Export F.E. OUTGO
Projected
Actual Raw Material (Goods/Services) C.G. import Other outflow Projected Actual Projected Actual Actual 2021-22 89.15 89.15 0.00 0.00 7.24 0.00 13.89 2022-23 225.79 177.69 0.00 0.00 0.00 26.87 2023-24 338.91 257.98 0.00 0.59 1.61 38.12 Total 653.85 524.82 0.00 0.59 7.24 1.61 78.88
Cumulative NFE achieved: FY 2020-21
(Rs. in Crores)
Approved Projections for 3rd Block Period FY 2021-22 to FY 2025-26 (Rs. In Crores)
2021-22 2022-23 2023-24 2024-25 2025-26 TOTAL FOB Value of Exports 89.15 225.79 338.91 355.85 373.64 1383.34 FE Outgo 14.16 39.36 44.20 46.80 58.77 203.29 NFE 74.99 186.43 294.71 309.05 314.87 1180.05
Performance as compared to projections: FY 2021-22 to FY 2025-26 (Rs. In Crores)
1 355.85 373.64 1383.34 FE Outgo 14.16 39.36 44.20 46.80 58.77 203.29 NFE 74.99 186.43 294.71 309.05 314.87 1180.05
Performance as compared to projections: FY 2021-22 to FY 2025-26 (Rs. In Crores)
Year Cumulative NFE Achieved 2021-22 74.99 84.12% 2022-23 225.72 84.59% 2023-24 444.75 84.74%
Cumulative NFE achieved: FY 2021-22 to FY 2025-26 (Rs. in Crores)
Approved Achieved Men 741 609 Women 212 154 Total 953 763
Other Information: LOA No. & Date LOA No. SEEPZ/FIPL- SEZ/ASPL/12/2011-12 dated 08.03.2011 Location of Unit 1st, 2nd and 3rd Floor, IT-2 Building and 5th Floor IT-4 Building, Qubix Business Park Pvt Ltd. SEZ Validity of LOA 14.04.2026 IT/ITES 15.04.2011 Execution of BLUT 01.10.2024 NA Labour Dues NA 01.07.2024 to 30.06.2032 NA
issued, if any NA period 953 employees (Men-741, Women-212)
763 employees (Men-609, Women-154)
92892 Sq.ft 121.75
Building 0.00 Plant & Machinery 34.77 under Rule 34 (unutilized goods) NA period NA
Yes
The Specified Officer has submitted a report vide letter dated 19.03.2025, in the prescribed format along with point-wise reply to the discrepancies as follows:- a. EXPORT (Rs. In Crores) Year/ Period Figures reported in APR (FOB Value) Figures as per Softex / Customs Records Difference, if any Reason for Difference / Remarks
(Rs. In Crores) Year/ Period Figures reported in APR (FOB Value) Figures as per Softex / Customs Records Difference, if any Reason for Difference / Remarks
2020- 2021 94.39 78.92 15.48
- Invoice Recorded against revenue recorded in Previous FY2019-20: (- )3.63
- Advance Invoices raised in Previous FY2019-20 for current FY2020-21: 9.34
- Revenue recorded in Current FY2020-21 and subsequently issued in next FY 2021-22: 10.15
- Credit note issued in Current FY2020-21: (-) 0.62
- Exchange Fluctuation in Current FY2020-21: 0.23 (SEZ exchange rate is lower than Companies softex booking rate) (78.92-3.63- 0.62+9.34+10.15+0.23=94.39) 2021- 2022 89.15 90.89 (-)1.74
- Invoice Recorded against revenue recorded in Previous FY2020-21: (- )10.15
- Revenue recorded in Current FY2021-22 and subsequently issued in next FY2022-23: 10.49
- Credit note issued in Current FY2021-22: (-)0.08
- Exchange Fluctuation in Current FY2021-22: (-)2.00 (SEZ exchange rate is higher than Companies softex booking rate) (90.89-10.15+10.49-0.08-2=89.15) 2022- 2023 177.69 154.39 23.30
- Invoice Recorded against revenue recorded in Previous FY2021-22: (- )10.49
- Revenue recorded in Current FY 2022-23 and subsequently issued in next FY2023-24: 28.17
- Reimbursements not part of Softex : 4. 74
- Exchange Fluctuation in Current FY2022-23: 0.88 (SEZ exchange rate is lower than Companies softex booking rate) (154.39-10.49+28.17+4.74+0.88= 177.69)
. Reimbursements not part of Softex : 4. 74 4. Exchange Fluctuation in Current FY2022-23: 0.88 (SEZ exchange rate is lower than Companies softex booking rate) (154.39-10.49+28.17+4.74+0.88= 177.69)
2023- 2024 258.03 258.39 (-0.35)
- Invoice Recorded against revenue recorded in Previous FY2022-23: (- )28.17
- Revenue recorded in Current FY 2023-24 and subsequently issued in next FY 2024-25: 24.83
- Exchange Fluctuation in Current Year2023-24: 2.99 (SEZ exchange rate is lower than Companies softex booking rate) (258.39-28.17+24.83+2.98=258.03) (b) Import (i) (Capital Goods including procurement done on IUT (from SEZ, EOU, STPI, EHTP) basis: Year/ Period Figures as per APR Figures as per SEZ Online / Customs Records Difference, if any Reason for Difference / Remarks 2020-2021 0.00 0.04 0.00 BOE on loan basis 2021-2022 0.00 1.01 0.00 BOE on loan basis 2022-2023 0.00 0.73 0.00 BOE on loan basis 2023-2024 1.61 2.21 0.59 Zone to Zone-Shown under investments in APR ii. Raw Material Year/ Period Figures as per APR Figures as per SEZ Online / Customs Records Difference, if any Reason for Difference / Remarks 2020-2021 0.00 0.00 Nil NA 2021-2022 0.00 0.00 Nil NA 2022-2023 0.00 0.00 Nil NA 2023-2024 0.00 0.00 Nil NA
res as per SEZ Online / Customs Records Difference, if any Reason for Difference / Remarks 2020-2021 0.00 0.00 Nil NA 2021-2022 0.00 0.00 Nil NA 2022-2023 0.00 0.00 Nil NA 2023-2024 0.00 0.00 Nil NA
(c ) BLUT 1 BLUT amount:
Rs. 4.87 Crore
04.01.2022-Rs.3.14 Crore 26.05.2022-Rs.37.18 Crore 26.09.2023 Rs.17.82 Crore
Total: Rs. 63.01 Crore 2 services procured (Category-wise BLUT value utilized separately for imported and indigenous goods and services) This should be based on BLUT worksheet which provides for estimated value and duty foregone separately for each category of procurement. Rs. In Crore FY Goods (Imp. & Indi.) Services (Imp. & Indi.) 2020-2021 0.07 0.00 2021-2022 0.45 1.51 2022-2023 0.96 3.24 2023-2024 6.63 5.6 Total 8.11 10.35
(a) Employment made as on date (as on end of block period / year up to As per Projection- Men: 687 Women: 183 Total: 870 As on 28 Feb 2025: Men: 609 Women: 154 Total: 763 (b) Details of pending Foreign Remittance beyond Permissible period, if any (as on 31.03.2024) AD Bank / RBI has been obtained. No Foreign Remittance is pending beyond the permissible period for export invoices raised till 31st March 2024.
beyond Permissible period, if any (as on 31.03.2024) AD Bank / RBI has been obtained. No Foreign Remittance is pending beyond the permissible period for export invoices raised till 31st March 2024.
(c) Whether all softex has been filed for obtained Softex condonation from DC office / RBI and if approved, whether they have filed such pending Softex. No Softex Forms has been pending for filing. (d) Whether all Softex has been certified, if so till which month has the same been certified. If not, provide details of the Softex and reasons for pendency. All the Softex Forms till 31st March 2024 has been certified. (e) Whether unit has filed any request for Cancellation of Softex No (f) DTA / SEZ/EOU/STPI etc. against during the period. No (g) SO to verify and certify whether the unit has updated the BLUT ledger NA (h) against payment of Duty, or otherwise? Yes. The unit has removed Capital Goods as E-waste (Rs. in crore) FY Value Duty 2020-2021 0.05 0.01 2021-2022 1.72 0.48 2022-2023 0.02 0.01 2023-2024 0.00 0.00 Total 1.79 0.50
(i) utilizing infrastructure of another unit in the same or other SEZ? payment terms infrastructure has been obtained from UAC / DC office, the date of UAC / Approval letter to be indicated No (j) Whether all DSPF for services period under consideration has been filed by the unit and whether the same has been processed for DSPF not filed. However, the unit has informed that the DSPF filing is in process for monitoring period.
nder consideration has been filed by the unit and whether the same has been processed for DSPF not filed. However, the unit has informed that the DSPF filing is in process for monitoring period.
(k) procurement w.r.t. the goods procured by them during the monitoring period for the relevant period. Yes. (l) Details of the request IDs pending for OOC in respect of DTA procurement on the date of The pending request IDs, yet to be relocated to existing AO. Request ID Request Created Date 292008992155 10-11-2020 292008991595 10-11-2020 292010194571 18-12-2020 292010194361 18-12-2020 292010188691 17-12-2020 292010187781 17-12-2020 292010185854 17-12-2020 292101633913 17-02-2021 292101416950 11-02-2021
(m) canteen / food court in unit premises? If yes, whether permission from UAC / DC office has been issued, or otherwise office has been issued, or otherwise Whether unit has availed any `duty paid goods / services for setting up such facility? If yes, whether unit has discharged such duty / tax benefit availed? details to be given including amount of duty / tax recovered or yet to be recovered The unit does not have any Cafeteria/Canteen/Food Court facility in the premises. (n) during the period under monitoring No
e. Recommendation: The unit has achieved export revenue of Rs. 94.39 Crores as against projected export of Rs.111.00 Crores in 5th Year of 2nd Block period i.e. FY 2020-21. The unit has achieved positive cumulative NFE of Rs. 372.52 Crores i.e 80.89% in the 5th year of 2nd Block period.
ojected export of Rs.111.00 Crores in 5th Year of 2nd Block period i.e. FY 2020-21. The unit has achieved positive cumulative NFE of Rs. 372.52 Crores i.e 80.89% in the 5th year of 2nd Block period.
The unit has achieved export revenue of Rs. 524.8 Crores as against projected export of
Rs.653.90 Crores in 3 Years of 3rd Block period i.e. FY 2021-22 to FY 2023-24
The unit has achieved positive cumulative NFE of Rs. 444.75 Crores i.e 84.74% in the 3rd Year of
3rd Block period i.e. FY 2023-24
As per SO report the unit has 763 employees (Male: 609, Female: 154) as on 31.03.2024
Approval Committee may like to monitor the performance of the Unit for
5th year of 2nd Block Period i.e. FY 2020-21 &
3 years of 3rd Block period i.e FY 2021-22 to FY 2023-24, in terms of Rule 54 of SEZ
Rules, 2006.
Year Export F.E. OUTGO
Projected
Actual Raw Material (Goods/Services) C.G. import Other outflow Projected Actual Projected Actual Actual 2020-21 13.60 3.94 0.00 0.00 2.16 0.00 0.00 Total 13.60 3.94 0.00 0.00 2.16 0.00 0.00
a. Proposal : Monitoring of the performance of M/s. Prolifics Corporation Pvt. Ltd., an IT/ITES unit located in Qubix Business Park Pvt. Ltd.-SEZ, Pune for 5th year of 1st Block Period i.e. FY 2020-21 and 3 years of 2nd Block period i.e FY 2021-22 to FY 2023-24. Monitoring of the performance of the unit for : 5th year of 1st Block Period i.e.
, Pune for 5th year of 1st Block Period i.e. FY 2020-21 and 3 years of 2nd Block period i.e FY 2021-22 to FY 2023-24. Monitoring of the performance of the unit for : 5th year of 1st Block Period i.e. FY 2020-21 & 3 years of 2nd Block period i.e FY 2021-22 to FY 2023-24, in terms of Rule 54 of SEZ Rules, 2006. Notification :-
Approved Projections for 1st Block Period FY 2016-17 to FY 2020-21
(Rs. In Crores)
2016-17
2017-18
2018-19
2019-20
2020-21
TOTAL
FOB Value of
Exports
5.14
10.84
12.75
13.60
13.60
55.93
FE Outgo
1.13
0.45
0.52
0.67
0.49
3.26
NFE
4.01
10.39
12.23
12.93
13.11
52.67
Performance as compared to projections: FY 2020-21
(Rs. In Crores)
Year Cumulative NFE Achieved Cumulative % NFE Achieved 2020-21 22.44 99.54% Year Export F.E. OUTGO
Projected
Actual Raw Material (Goods/Services) C.G. import Other outflow Projected Actual Projected Actual Actual 2021-22 4.25 3.88 0.00 0.00 1.00 0.00 0.00 2022-23 4.50 3.46 0.00 0.00 0.00 0.00 2023-24 4.90 3.73 0.00 0.00 0.00 0.00 Total 13.65 11.07 0.00 0.00 1.00 0.00 0.00
Cumulative NFE achieved: FY 2020-21
(Rs. in Crores)
Approved Projections for 2nd Block Period FY 2021-22 to FY 2025-26 (Rs. In Crores)
2021-22 2022-23 2023-24 2024-25 2025-26 TOTAL FOB Value of Exports 4.25 4.50 4.90 5.10 5.40 24.15 FE Outgo 0.20 0.10 0.25 0.30 0.15 1.00 NFE 4.05 4.40 4.65 4.80 5.25 23.15 Performance as compared to projections: FY 2021-22 to FY 2025-26 (Rs. In Crores)
e of Exports 4.25 4.50 4.90 5.10 5.40 24.15 FE Outgo 0.20 0.10 0.25 0.30 0.15 1.00 NFE 4.05 4.40 4.65 4.80 5.25 23.15 Performance as compared to projections: FY 2021-22 to FY 2025-26 (Rs. In Crores)
Year Cumulative NFE Achieved 2021-22 3.87 99.78% 2022-23 7.33 99.77% 2023-24 11.06 99.77%
Cumulative NFE achieved: FY 2021-22 to FY 2023-24 (Rs. in Crores)
Approved Achieved Men 20 17 Women 10 18 Total 30 35 Other Information: LOA No. & Date LOA No. SEEPZ/NTPL-SEZ/PCL/51/2015- 16 dt. 29.08.2016 Location of Unit 5th Floor, IT-4 Building, Qubix Business Park, Pvt. Ltd.-SEZ, Hinjawadi, Phase I, Pune 411057 Validity of LOA 30.11.2026 IT/ITES 01.12.2016 Execution of BLUT 02.02.2023 NA Labour Dues NA
NA issued, if any NA period 30 employees (Men-20, Women-10) 35 employees (Men-17, Women-18) 4334.94 Sq.ft
123.85
Building 0.00 Plant & Machinery 0.00 Quantity and value of goods exported under Rule 34 (unutilized goods) NA Value Addition during the monitoring period NA Whether all the APRs being considered now has been filed well within the time limit, or otherwise. Yes
The Specified Officer has submitted a report vide letter dated 08.04.2025, in the prescribed format along with point-wise reply to the discrepancies as follows:- EXPORT (Rs.
letter dated 08.04.2025, in the prescribed format along with point-wise reply to the discrepancies as follows:- EXPORT (Rs. In Crores)
Year/ Period Figures reported in APR (FOB Value) Figures as per Softex / Customs Records Difference, if any Reason for Difference / Remarks 2020-21 3.94 3.94 0.00 NA 2021-22 3.88 3.88 0.00 NA 2022-23 3.46 3.46 0.00 NA 2023-24 3.73 3.73 0.00 NA Import (Capital Goods including procurement done on IUT (from SEZ, EOU, STPI, EHTP) basis:
Year/ Period Figures as per APR Figures as per SEZ Online / Customs Records Difference, if any Reason for Difference / Remarks 2020-21 0.00 0.00 0.00 NA 2021-22 0.00 0.00 0.00 NA 2022-23 0.00 0.00 0.00 NA 2023-24 0.00 0.00 0.00 NA Raw Material Year/ Period Figures as per APR Figures as per SEZ Online / Customs Records Difference, if any Reason for Difference / Remarks 2020-21 0.00 0.00 0.00 NA 2021-22 0.00 0.00 0.00 NA 2022-23 0.00 0.00 0.00 NA 2023-24 0.00 0.00 0.00 NA
(c ) BLUT
er SEZ Online / Customs Records Difference, if any Reason for Difference / Remarks 2020-21 0.00 0.00 0.00 NA 2021-22 0.00 0.00 0.00 NA 2022-23 0.00 0.00 0.00 NA 2023-24 0.00 0.00 0.00 NA
(c ) BLUT
1 foregone) (including for CG / Raw Material / Services)
Value of Additional BLUT executed BLUT amount: F.No. SEEPZ/NTPL-SEZ/PCL/51/2015- 16/26080 dated 01.12.2016 Rs. 0.85 Crore
Total: Rs. 0.85 Crore 2 services procured (Category- wise BLUT value utilized separately for imported and indigenous goods and services) This should be based on BLUT worksheet which provides for estimated value and duty foregone separately for each category of procurement. Value In Crore FY Goods (Imp. & Indi.) Services (Imp. & Indi.) 2020-21 0.00 0.00 2021-22 0.00 0.00 2022-23 0.00 0.00 2023-24 0.00 0.00 Total 0.00 0.00 (a) Employment made as on date (as on end of block period / year up to which monitoring is being done) As per Projection- Men: 20 Women: 10 Total: 30 Men: 17 Women: 18 Total: 35
ock period / year up to which monitoring is being done) As per Projection- Men: 20 Women: 10 Total: 30 Men: 17 Women: 18 Total: 35
(b) Details of pending Foreign Remittance beyond Permissible period, if any (as on 31.03.2024) To cross-check the same and verify whether necessary permission from AD Bank / RBI has been obtained. No Foreign Remittance is pending beyond the permissible period for realization. (c) Whether all softex has been filed for the said period. If no, details thereof. SO to also check whether unit has obtained Softex condonation from DC office / RBI and if approved, whether they have filed such pending Softex. No Softex Forms has been pending for filing. (d) Whether all Softex has been certified, if so till which month has the same been certified. If not, provide details of the Softex and reasons for pendency. All the Softex Forms filed till March, 2024 have been certified. (e) Whether unit has filed any request for Cancellation of Softex No (f) Whether any Services provided in DTA / SEZ/EOU/STPI etc. against payment in INR in r/o IT/ITES Unit during the period. They have not provided any services in DTA / SEZ / EOU / STPI etc. against payment in INR w.r.t. IT/ITES Services. (g) SO to verify and certify whether the unit has updated the BLUT ledger Module in SEZ Online. NA (h) against payment of Duty, or otherwise? Full details to be provided along with value of assets and duty discharged. No
ertify whether the unit has updated the BLUT ledger Module in SEZ Online. NA (h) against payment of Duty, or otherwise? Full details to be provided along with value of assets and duty discharged. No
(i) infrastructure with other units or are utilizing infrastructure of another unit in the same or other SEZ? If so, details thereof, including the details of the unit with whom the sharing is being made, and the payment terms If approval for sharing of common infrastructure has been obtained from UAC / DC office, the date of UAC / Approval letter to be indicated No (j) Whether all DSPF for services procured during the said monitoring period under consideration has been filed by the unit and whether the same has been processed for approval by the SO Office. Yes (k) procurement w.r.t. the goods procured by them during the monitoring period for the relevant period. No DTA procurement by the Unit during the monitoring period. (l) Details of the request IDs pending for OOC in respect of DTA procurement on the date of NA
monitoring period for the relevant period. No DTA procurement by the Unit during the monitoring period. (l) Details of the request IDs pending for OOC in respect of DTA procurement on the date of NA
(m) Has the unit set up any cafeteria / canteen / food court in unit premises? If yes, whether permission from UAC / DC office has been issued, or otherwise office has been issued, or otherwise Whether unit has availed any `duty paid goods / services for setting up such facility? If yes, whether unit has discharged such duty / tax benefit availed? details to be given including amount of duty / tax recovered or yet to be recovered Unit has not set-up cafeteria / canteen / food court in their premises. (n) Whether any violation of any of the provisions of law has been noticed / observed by the Specified Officer during the period under monitoring No e. Recommendation: The unit has achieved export revenue of Rs. 3.94 Crores as against projected export of Rs.13.60 Crores in 5th Year of 1st Block period i.e. FY 2020-21. The unit has achieved positive cumulative NFE of Rs. 22.44 Crores i.e 99.54% in the 5th year of 1st Block period. The unit has achieved export revenue of Rs. 11.08 Crores as against projected export of Rs.13.65 Crores in 3 Years of 2nd Block period i.e. FY 2021-22 to FY 2023-24 The unit has achieved positive cumulative NFE of Rs. 11.06 Crores i.e 99.77% in the 3rd Year of 2nd Block period i.e.
of Rs.13.65
Crores in 3 Years of 2nd Block period i.e. FY 2021-22 to FY 2023-24
The unit has achieved positive cumulative NFE of Rs. 11.06 Crores i.e 99.77% in the 3rd Year of
2nd Block period i.e. FY 2023-24
As per SO report the unit has 35 employees (Male: 17, Female: 18) as on 31.03.2024
The Unit is required to file revised APR for FY 2020-21 to FY 2023-24 with corrected NFE value.
Approval Committee may like to monitor the performance of the Unit for
5th year of 1st Block Period i.e. FY 2020-21 &
3 years of 2nd Block period i.e FY 2021-22 to FY 2023-24, in terms of Rule 54 of SEZ
Rules, 2006.
Year Export F.E. OUTGO
Projected
Actual Raw Material (Goods/Services) C.G. import Other outflow Projected Actual Projected Actual Actual 2020-21 35.08 39.79 0.00 0.00 4.33 1.01 0.00 Total 35.08 39.79 0.00 0.00 4.33 1.01 0.00
a. Proposal : Monitoring of the performance of M/s. Globant India Pvt. Ltd., an IT/ITES unit located in Qubix Business Park Pvt. Ltd.-SEZ, Pune for 5th year of 1st Block Period i.e. FY 2020-21 and 3 years of 2nd Block period i.e FY 2021-22 to FY 2023-24. Monitoring of the performance of the unit for : 5th year of 1st Block Period i.e. FY 2020-21 & 3 years of 2nd Block period i.e FY 2021-22 to FY 2023-24, in terms of Rule 54 of SEZ Rules, 2006. Notification :-
Approved Projections for 1st Block Period FY 2016-17 to FY 2020-21 (Rs.
0-21 & 3 years of 2nd Block period i.e FY 2021-22 to FY 2023-24, in terms of Rule 54 of SEZ Rules, 2006. Notification :-
Approved Projections for 1st Block Period FY 2016-17 to FY 2020-21 (Rs. In Crores) 2016-17 2017-18 2018-19 2019-20 2020-21 TOTAL FOB Value of Exports 28.71 76.06 30.66 27.93 35.08 198.45 FE Outgo 2.58 0.00 0.86 0.50 0.50 4.44 NFE 26.13 76.06 29.80 27.43 34.58 194.00 Performance as compared to projections: FY 2020-21 (Rs. In Crores)
Year Cumulative NFE Achieved Cumulative % NFE Achieved 2020-21 242.72 99.27% Year Export F.E. OUTGO
Projected
Actual Raw Material (Goods/Services) C.G. import Other outflow Projected Actual Projected Actual Actual 2021-22 43.00 98.59 0.00 0.00 1.58 1.29 0.00 2022-23 43.86 164.56 0.00 0.00 0.00 0.00 2023-24 44.74 134.26 0.00 0.00 0.00 0.00 Total 131.60 397.41 0.00 0.00 1.5 1.29 0.00 Year Cumulative NFE Achieved
Cumulative NFE achieved: FY 2020-21 (Rs. in Crores)
Approved Projections for 2nd Block Period FY 2021-22 to FY 2025-26 (Rs. In Crores)
2021-22 2022-23 2023-24 2024-25 2025-26 TOTAL FOB Value of Exports 43.00 43.86 44.74 45.63 46.54 223.77 FE Outgo 0.25 0.28 0.30 0.35 0.40 1.58 NFE 42.75 43.58 44.43 45.28 46.14 222.19 Performance as compared to projections: FY 2021-22 to FY 2023-24 (Rs. In Crores)
Cumulative NFE achieved: FY 2021-22 to FY 2023-24 (Rs. in Crores)
44.43 45.28 46.14 222.19 Performance as compared to projections: FY 2021-22 to FY 2023-24 (Rs. In Crores)
Cumulative NFE achieved: FY 2021-22 to FY 2023-24 (Rs. in Crores)
2021-22 98.06 99.46% 2022-23 262.09 99.60% 2023-24 395.82 99.60%
Approved Achieved Men 180 297 Women 100 107 Total 280 404
Other Information: LOA No. & Date LOA No. SEEPZ/NTPL- SEZ/CTPL/46/2015-16/18393 dated 06.11.2015 Location of Unit 8th Floor, IT-7 Building. Qubix Business Park Pvt. Ltd., Rajiv Gandhi Infotech Park, Phase I, Hinjewadi, Pune 411 057 Validity of LOA 31.03.2026 IT/ITES 01.04.2016 Execution of BLUT 16.08.2021 NA Labour Dues NA 9 years NA issued, if any NA period 280 employees (Men-180, Women-100) 404 employees (Men-297, Women-107) 15168 Sq.ft 37.54
Building 0.00 Plant & Machinery 532.88 under Rule 34 (unutilized goods) NA period NA
Yes
The Specified Officer has submitted a report vide letter dated 18.03.2025, in the prescribed format along
with point-wise reply to the discrepancies as follows:-
EXPORT
a.
rescribed format along
with point-wise reply to the discrepancies as follows:-
EXPORT
a. Details of year-wise export as per the prescribed format:
From the year 2020-2021 to 2023-2024 (Rs.In Crores)
Year/ Period
Figures
reported in
APR (FOB
Value)
Figures as per
Softex /
Customs
Records
Difference,
if any
2020-2021
39.79
27.27
12.52
Credit Note Rs.(-6.76) Cr
Deemed export Rs.19.18 Cr
Exchange
rate
difference
of
Rs.0.10 Cr
2021-2022
98.59
7.02
91.57
Credit Note Rs.(-7.05) Cr
Deemed export Rs.98.61 Cr
Exchange
rate
difference
of
Rs.0.01 Cr
2022-2023
164.56
0.29
164.27
Credit Note Rs.(-17.59) Cr
Deemed export Rs.181.85 Cr
Exchange
rate
difference
of
Rs.0.01 Cr
2023-2024
134.26
4.33
129.93
Credit Note Rs.(-1.04) Cr
Deemed export Rs.130.96 Cr
Exchange
rate
difference
of
Rs.0.01 Cr
Regarding the deemed export figures the Unit vide email dated 11.04.2025 has clarified that they had executed service contracts with the entities located in India for which they received remittances in freely convertible currency i.e. in USD. The fact has also been verified from the export data of the Unit. Import (Capital Goods including procurement done on IUT (from SEZ, EOU, STPI, EHTP) basis:
freely convertible currency i.e. in USD. The fact has also been verified from the export data of the Unit. Import (Capital Goods including procurement done on IUT (from SEZ, EOU, STPI, EHTP) basis:
From the year 2020-2021 to 2023-2024 (Rs.In Crores) Year/ Period Figures as per APR Figures as per SEZ Online / Customs Records Difference, if any Reason for Difference / Remarks 2020-2021 1.01 1.01 0.00 NA 2021-2022 1.30 1.30 0.00 NA 2022-2023 0.00 0.00 0.00 NA 2023-2024 0.00 0.00 0.00 NA ii. Raw Material From the year 2020-2021 to 2023-2024 (Rs.In Crores) Year/ Period Figures as per APR Figures as per SEZ Online / Customs Records Difference, if any Reason for Difference / Remarks 2020-2021 0.00 0.00 Nil NA 2021-2022 0.00 0.00 Nil NA 2022-2023 0.00 0.00 Nil NA 2023-2024 0.00 0.00 Nil NA (c ) BLUT 1 BLUT amount: F.No. SEEPZ/NTPL-SEZ/CTPL/46/2015- 16/542 dated 16.06.2021 Rs. 3.09 Crore
Total: Rs. 3.09 Crore 2 services procured (Category-wise BLUT value utilized separately for imported and indigenous goods and services) This should be based on BLUT worksheet which provides for estimated value and duty foregone separately for each category of procurement. Value Rs. In Crore FY Goods (Imp. & Indi.) Services (Imp. & Indi.) 2020-21 0.19 0.03 2021-22 0.12 0.64 2022-23 0.09 0.12 2023-24 0.00 0.07 Total 0.39 0.86
ajnish Kumar Independent Director 27/07/2023 3. Mr.Sudhir Chaturvedi President-Sales and Whole Time director 27/01/2025 4. Mr. Sekharipuram Narayanan Subrahmanyan Non-Executive Vice Chairman
Mr. R Shankar Raman Non-Executive Director
Mr.Nachiket Deshpande Chief Operating Officer and Whole time Director
Sanjeev Aga
Mr.James Varghese Abraham
9 Mr. Vinayak Chatterjee Independent Director
10 Mr. Debashish Chatterjee Chief Executive Officer and Managing Director
11 Ms. Apurva Purohit
Mr. Bijou Kurien
Mr. Chandrasekaran Ramakrishnan
Proposed List of Board of Director: Sr. No. Name of Director Designation Date of Appointment 1. Mr. Sekharipuram Narayanan Subrahmanyan Non-Executive Vice Chairman 10.01.2015 2. Mr. Ramamurthi Shankar Raman Non-Executive Director 28.10.2015 3. Mr. Debashish Chatterjee Chief Executive Officer and Managing Director 14.11.2022 4. Mr.Nachiket Deshpande Chief Operating Officer and Whole time Director 02.05.2019 5. Mr. Sanjeev Aga 09.112016 6. Mr.James Varghese Abraham 18.07.2021 7. Mr. Vinayak Chatterjee 01.04.2022 8. Ms. Apurva Purohit 14.11.2022 9. Mr. Bijou Kurien 14.11.2022 10. Mr. Chandrasekaran Ramakrishnan 14.11.2022 11. Mr.Venugopal Lambu CEO-Designate and Whole time Director 24.01.2025 Reason for change in Board of Director: The change in the Board of Directors is due Resignation of Mr. A.M, Naik, Mr. Rajnish Kumar and Mr. Sudhir Chaturvedi and appointment of Mr. Venugopal Lambu , there is Change in Board of Directors. Information: - M/s. LTIMindtree Limited., is granted LOA NO.
Mr. A.M, Naik, Mr. Rajnish Kumar and Mr. Sudhir Chaturvedi and appointment of Mr. Venugopal Lambu , there is Change in Board of Directors. Information: - M/s. LTIMindtree Limited., is granted LOA NO. SEZ/PUNE/10D/2010-11/7042 dt. 24.08.2010 is located at 2nd & 3rd Floor, IT-06 Building, Blue Ridge Township, RGIP, Phase 1, Hinjewadi, Pune 411057. DCP: 07.04.2011 LOA valid till: 06.04.2026 The Unit has submitted following documents: A Copy of Board resolution for appointment and resignation of directors Copy of Form No. DIR-12 for Appointment of Director with ROC along with its challan Copy of Form No. DIR-12 for Resignation of Director with ROC along with its challan Copy of List of Directors before and after change in composition of Board of Directors Copy of Undertaking regarding Personal liability arising if any, against resigning director Copy of undertaking in term of Instruction No. 109 e. Recommendation: Approval Committee may kindly consider the proposal of the unit for Change in Board of Director, in terms of Instruction no. 109 issued by MOC&I.
AGENDA FOR MEETING OF THE APPROVAL COMMITTEE FOR IT/ITES AT PUNE OF M/S. NALANDA SHELTER PRIVATE LTD.
DATE : 09.05.2025
TIME : 12:00 P.M.
AGENDA FOR MEETING OF THE APPROVAL COMMITTEE FOR IT/ITES AT PUNE OF M/S. NALANDA SHELTER PRIVATE LTD.
DATE : 09.05.2025
TIME : 12:00 P.M.
MEETING OF THE APPROVAL COMMITTEE FOR DEVELOPMENT COMMISSIONER, SEEPZ-SEZ ON 09.05.2025 INDEX
Agenda Item No.
Subject
Agenda Item No. 01 :- Confirmation of the Minutes of the meeting held on 21.03.2025 Agenda Item No. 02 :- Action taken report for the Minutes of the meeting held on 21.03.2025 Agenda Item No. 03: - Approval for Installation of Vending machine submitted by M/s.Nalanda Shelter Pvt. Ltd.(Developer) Agenda Item No. 04 :- Application for Addition of Location submitted by M/s. Aptiv Components India Pvt.Ltd
मेसस नालंदा शे
टर ाइवेट लिमटेड -एसईजेड, पुणे,, के आईटी/आईटीईएस के लए से
टर िव
श िवशेष आ!थक
#े$, का जोनल िवकास आयु' क( अ*य#ता म, पुणे म, िदनांक 21.03.2025 को आयो-जत 48वी अनुमोदन
सिम.त क( बैठक का कायवृ3।
1
एसईजेड का नाम
मेसस नालंदा शे
टर ाइवेट लिमटेड -एसईजेड, पुणे
2
से
टर
आईटी/आईटीईएस
3
बैठक सं5या
48व6
4
तारीख
21.03.2025
उप9:थत सद:य
;.
नाम और पदनाम
(एस/=ी.)
िवभाग
1
=ीमती िमतल िहरेमठ
संयु' िवकास आयु'
पुणे A:टर एसईजेड, पुणे
2
=ी संजय बांगर
उप िनदेशक उBोग
महाराC सरकार से नािमत
3
=ीमती अचना परब
सहायक आयु', आयकर िवभाग
आयकर िवभाग से नािमत
4
=ी काEतकेय लंगोटे, उप-#े$ीय अ.धकारी
महाराC दूषण िनयं$ण बोड से नािमत
5
=ीमती पुHपा गंगावणे, एफटीडीओ
6
=ी धवल एस
शकK , अधी#क
सीमा शु
क िवभाग पुणे नािमत
िवशेष आमंि$त सद:य
;.
नाम और पदनाम
(=ी.)
िवभाग
1
=ी सतबीर शमा
िविनLद अ.धकारी
सीMज़-एसईज़ेड, पुणे A:टर
ड से नािमत
5
=ीमती पुHपा गंगावणे, एफटीडीओ
6
=ी धवल एस
शकK , अधी#क
सीमा शु
क िवभाग पुणे नािमत
िवशेष आमंि$त सद:य
;.
नाम और पदनाम
(=ी.)
िवभाग
1
=ी सतबीर शमा
िविनLद अ.धकारी
सीMज़-एसईज़ेड, पुणे A:टर
एज,डा आइटम नंबर 01: िदनांक 21.02.2025 को आयो-जत 47व6 बैठक के कायवृ3 क( पुि
िवचार-िवमश के बाद, सिम.त ने 21.02.2025 को आयो-जत अनुमोदन सिम.त क( 47व6 बैठक के कायवृ3 क( पुि क( ।
एज,डा आइटम नंबर 02: िदनांक 21.02.2025 को आयो-जत 47व6 बैठक के संदभ मे क( गयी कायवाई क( Oरपोट ।
िवचार-िवमश के बाद, सिम.त ने 21.02.2025 को आयो-जत अनुमोदन सिम.त क( 47व6 बैठक के के संदभ मे क( गयी कायवाई क(
Oरपोट को नोट िकया।
एज,डा आइटम नंबर 03: मेसस आसKलरिम3ल Pलोबल कैपेिबलटी स,टर ाइवेट लिमटेड Qारा :तुत नई यूिनट क( :थापना के
लए :वीकृ.त:
यूिनट का :ताव अनुमोदन सिम.त के सम# िवचाराथ :तुत िकया गया था।
िवचार-िवमश के बाद, सिम.त ने एसईजेड िनयम, 2006 के िनयम 17 और 18 के अनुसार नालंदा शे
टर ाइवेट लिमटेड - एसईजेड म,
एक नई यूिनट क( :थापना के लए मैसस आसKलरिम3ल Pलोबल कैपेिबलटी स,टर ाइवेट लिमटेड के :ताव को मंजूरी दे दी।
अनुमोिदत :ताव का िववरण नीचे िदया गया है:
:थान Rाउंड Sोर, कायालय सं5या #1, #3, #4 और तीसरी मं-जल, कायालय सं5या #3 और #4 टॉवर 'ए', अवांस II SEZ, नालंदा शे टर ाइवेट लिमटेड – SEZ, राजीव गांधी इUफोटेक पाक के िनकट, चरण-I, िहUजवाड़ी, पुणे 411057
काय-#े$ 95,435 Sq. ft.
#1, #3, #4 और तीसरी मं-जल, कायालय सं5या #3 और #4 टॉवर 'ए', अवांस II SEZ, नालंदा शे टर ाइवेट लिमटेड – SEZ, राजीव गांधी इUफोटेक पाक के िनकट, चरण-I, िहUजवाड़ी, पुणे 411057
काय-#े$ 95,435 Sq. ft.
उWपाद का िनमाण िकया जाना है/सेवा दान क( जानी है। Sr. No. Services ITC/CPC 1 Information Technology 998313/8313 2 Information Technology Enabled Services.
अनुमान, वष-वार संयं$ एवं मशीनरी/पूंजीगत व:तुओं म, िनवेश (करोड़ X. म,)
स्थानीय 51.41
आयात
5.00
कुल 56.41
सेवाएँ
स्थानीय 202.56
आयात 0.00
कुल 202.56
रोजगार कुल - 1170 (पुXष - 700, [ी – 470)
पहली \लॉक अव.ध के लए अनुमोिदत अनुमान (करोड़ X. म,)
1st 2nd 3rd 4th 5th कुल कुल ($ हजार म,) िनयात का एफओबी मू य 76.86 193.67 308.80 330.64 355.97 1265.94 145376.66 िवदेशी मु]ा ^यय5.00 0.00 0.00 0.00 0.00 5.00 574.18 एनएफई 71.86 193.67 308.80 330.64 355.97 1260.94 144802.48 एज,डा आइटम नंबर 04: मेसस -सरेUस सLवसेज़ इं.डया एलएलपी के दशन क( िनगरानी के लए आवेदन। िवचार-िवमश के बाद, सिम.त ने एसईजेड िनयम, 2006 के िनयम 54 के संदभ म, थम \लॉक अव.ध के िव3 वष 2020-21 से िव3 वष 2023-24 तक 4 वष_ के लए यूिनट के दशन को नोट िकया। जैसा िक नीचे बताया गया है:
यूिनट ने थम \लॉक अव.ध के 4 वष_ अथात् 2020-21 से 2023-24 म, 272.68 करोड़ Xपए के अनुमािनत िनयात क( तुलना म, 291.30 करोड़ Xपए का िनयात राज:व ा` िकया है । यूिनट ने िव3 वष 2023-24 म, संचयी आधार पर 290.30 करोड़ Xपये यानी 99.66 % का सकाराWमक एनएफई हा-सल िकया है। यूिनट ने 31.03.2024 तक 339 कमचाOरयa (पुXष-244, मिहला-95) को रोजगार दान िकया है।
एज,डा आइटम नंबर 05: मेसस स,टCालो-जक कंस
आधार पर 290.30 करोड़ Xपये यानी 99.66 % का सकाराWमक एनएफई हा-सल िकया है। यूिनट ने 31.03.2024 तक 339 कमचाOरयa (पुXष-244, मिहला-95) को रोजगार दान िकया है।
एज,डा आइटम नंबर 05: मेसस स,टCालो-जक कंस ट,सी ाइवेट लिमटेड Qारा #े$ म, वृ.b के लए आवेदन एवं अनुमान म, संशोधन :तुत िकया गया। िवचार-िवमश के बाद, सिम.त ने एसईजेड िनयम, 2006 के िनयम 19(2) के अनुसार, अनुमानa म, संशोधन के साथ #े$ को बढ़ाने के लए इकाई के :ताव को मंजूरी दे दी, -जसका िववरण नीचे िदया गया है: :वीकृत #े$:
मौजूदा पता और #े$ :तािवत जोड़ा जाने वाला #े$ जोड़ के बाद कुल #े$
यूिनट नंबर 3, 11व6 मं-जल, टॉवर ए, नालंदा शे टर ाइवेट लिमटेड, राजीव गांधी इUफोटेक पाक के िनकट, िहUजवाडी फेज I, पुणे 411057. यूिनट नंबर 2, 11व6 मं-जल, टॉवर 'ए', नालंदा शे टर ाइवेट लिमटेड, राजीव गांधी इUफोटेक पाक के पास, eहजेडी, फेज़ I, पुणे 411057. यूिनट सं5या 2 और 3, 11व6 मं-जल, टॉवर 'A' नालंदा शे टर ाइवेट लिमटेड, राजीव गांधी इनफोटेक पाक के पास, eहजवाड़ी, चरण I, पुणे 411057। 26,666 वग फुट 26,557 वग फुट 53,223 वग फुट :वीकृत संशो.धत अनुमान: (करोड़ Xपये म,)
;मांक िववरण 2023-24 (वा:तिवक) 2024-25 2025-26 2026-27 2027-28 कुल 1. िनयात का एफओबी मू य 0.97 12.64 45.00 55.00 60.00 173.61 2. िवदेशी मु]ा ^यय 0.00 0.08 4.90 4.92 4.92 14.82 3. शुb िवदेशी मु]ा 0.97 12.56 40.10 50.08 55.08 158.79 Mलांट और मशीनरी/पूंजीगत व:तुओं म, िनवेश i. :वदेशी पूंजीगत सामान 13.30 ii. आया.तत पूंजीगत सामान 09.50 सेवाएँ i. :वदेशी सेवाएँ 47.50 ii. आया.तत सेवाएँ 05.32
रोज़गार (पुXष-200, मिहला-200) 400 एज,डा आइटम नंबर 06: मेसस नालंदा शे
तुओं म, िनवेश i. :वदेशी पूंजीगत सामान 13.30 ii. आया.तत पूंजीगत सामान 09.50 सेवाएँ i. :वदेशी सेवाएँ 47.50 ii. आया.तत सेवाएँ 05.32
रोज़गार (पुXष-200, मिहला-200) 400 एज,डा आइटम नंबर 06: मेसस नालंदा शे टर ाइवेट लिमटेड (डेवलपर) Qारा िव;ेता को िवशेष आ!थक #े$ पOरसर म, कैफेटेOरया :थािपत करने के लए :थान पfे पर देने क( मंजूरी के लए आवेदन :तुत िकया गया है। िवचार-िवमश के बाद, सिम.त ने एसईजेड िनयम, 2006 के िनयम 11(5) के अनुसार, एसईजेड पOरसर म, कैफेटेOरया सुिवधा :थािपत करने के लए िव;ेता को िनLमत :थान पfे पर देने के डेवलपर के :ताव को मंजूरी दे दी, -जसका िववरण नीचे िदया गया है:
िव;ेता का नाम ग.तिव.ध :थान #े$. मेसस 7 - इं.डया कंवीिनयंस Oरटेल लिमटेड। SEZ पOरसर म, काम करने वाले कमचाOरयa के लए खाB सुिवधा। टक शॉप नंबर 1 और 2, Rाउंड Sोर, कैफेटेOरया, NSPL, \लू Oरज टाउन शप, कोिgज,ट के पास, राजीव गांधी इUफोटेक पाक के पास, eहजवाडी फेज - 1, पुणे 411057. 181 वग फुट सिम.त ने डेवलपर को कैफेटेOरया म, खाली/ पfे पर िदया गए #े$ का िववरण, Sोर Mलान/मान.च$ के साथ :तुत करने का भी िनदKश िदया। अनुमोदन मं$ालय और उBोग मं$ालय Qारा जारी एसईजेड िनयम, 2006 के िनयम 11(5) म, िनधाOरत शत_ के अधीन है।
Minutes of the 48th Meeting of the Approval Committee held under the Chairmanship of Zonal Development Commissioner SEEPZ-SEZ, Mumbai for Sector Specific Special Economic Zone for IT/ITES of M/s. Nalanda Shelter Pvt Ltd -SEZ, PUNE held on 21.03.2025. 1 Name of the SEZ M/s Nalanda Shelter Pvt Ltd – SEZ, PUNE
ner SEEPZ-SEZ, Mumbai for Sector Specific Special Economic Zone for IT/ITES of M/s. Nalanda Shelter Pvt Ltd -SEZ, PUNE held on 21.03.2025. 1 Name of the SEZ M/s Nalanda Shelter Pvt Ltd – SEZ, PUNE
2 Sector IT/ITES 3 Meeting No. 48th 4 Date 21.03.2025 Members present
Sr. No. (S/Shri.) Department 1 Smt. Mital Hiremath 2 Shri. Sanjay Bangar, Dy. Director of Industries 3 Smt. Archana Parab, 4 Shri. Kartikeya Longote Sub-Regional Officer Nominee of Maharashtra Pollution Control Board 5 6 Shri Dhaval S Shirke, Superintendent Special Invitee
Sr. No. Department 1 Shri Satbir Sharma Specified Officer Agenda Item No.01: Confirmation of the Minutes of the 47th meeting held on 21.02.2025 After deliberation, the Committee confirmed the minutes of the 47th meeting of Approval Committee held on 21.02.2025. Agenda Item No. 02: Action taken report for the Minutes of the meeting held on 21.02.2025 After deliberation, the Committee has taken a note of the Action taken report for the Minutes of the 47th meeting held on 21.02.2025. Agenda Item No. 3: Approval for Setting up of New unit submitted by M/s. ArcelorMittal Global Capability Centre Private Ltd.: The proposal of the unit was placed before the Approval Committee for consideration. After deliberation, Committee approved the proposal of M/s. ArcelorMittal Global Capability Centre Private Ltd. for setting up of a new unit in Nalanda Shelter Pvt Ltd. - SEZ, in terms of Rule 17 & 18 of SEZ Rules, 2006.
ommittee approved the proposal of M/s. ArcelorMittal Global Capability Centre
Private Ltd. for setting up of a new unit in Nalanda Shelter Pvt Ltd. - SEZ, in terms of Rule 17 & 18 of SEZ
Rules, 2006.
The details of the approved proposal as detailed below :
Location Ground Floor, Office number #1, #3, #4 and 3rd Floor, Office No. #3 & #4 Tower ‘A’, aVance II SEZ, Nalanda Shelter Private Limited – SEZ, Near Rajiv Gandhi Infotech Park, Phase-I, Hinjewadi, Pune 411057. Area 95,435 Sq. ft.
Product to be manufactured /Service to be rendered. Sr. No. Services ITC/CPC 1 Information Technology 998313/8313 2 Information Technology Enabled Services. PROJECTIONS, YEAR-WISE Investment in Plant & Machinery / Capital Goods (Rs. In Cr.) Indigenous
51.41
Imported
5.00 TOTAL
56.41 Services
Indigenous
202.56 Imported
0.00 TOTAL
202.56 Employment Total 1170 (Male – 700, Female – 470) Approved Projections for 1st Block Period (Rs. In Crores)
1st 2nd 3rd 4th 5th Total Total ($ in Thousand) FOB Value of Exports 76.86 193.67 308.80 330.64 355.97 1265.94 145376.66 FE outgo 5.00 0.00 0.00 0.00 0.00 5.00 574.18 NFE 71.86 193.67 308.80 330.64 355.97 1260.94 144802.48 Agenda Item No. 04 : Application for Monitoring of performance of M/s Cerence Services India LLP. After deliberation, the committee noted the performance of the unit for 4 years of 1st block period i.e. FY 2020-21 to 2023-24, in terms of Rule 54 of SEZ Rules, 2006, as detailed below:
The Unit has achieved export revenue of Rs.
noted the performance of the unit for 4 years of 1st block period i.e. FY 2020-21 to 2023-24, in terms of Rule 54 of SEZ Rules, 2006, as detailed below:
The Unit has achieved export revenue of Rs. 291.30 Crores as against projected export of Rs. 272.68 Crores in 4 years of 1st Block period i.e. 2020-21 to 2023-24. The Unit achieved cumulative NFE of Rs. 290.30 Crores which is 99.66 % in 2023-24. The unit has achieved Employment of 339 employees (Men –244, Women – 95) as on 31.03.2024. Agenda Item No. 5: Application for Addition in Area alongwith revision in projection submitted by M/s CentraLogic Consultancy Pvt. Ltd.: After deliberation, the committee approved the proposal of the unit for addition of area with revision in projections, in terms of Rule 19(2) of SEZ Rules, 2006, as detailed below: Approved addition of area: Existing address and area Area proposed to be added Total area after addition
Unit no. 3, 11th Floor, Tower A, Nalanda Shelter Private Ltd., Near Rajiv Gandhi Infotech Park, Hinjewadi Phase I, Pune 411057. Unit No. 2, 11th Floor, Tower ‘A’, Nalanda Shelter Private Limited, Near Rajiv Gandhi Infotech Park, Hinjewadi, Phase I, Pune 411057. Unit No. 2 & 3, 11th Floor, Tower ‘A’ Nalanda Shelter Pvt. Limited, Near Rajiv Gandhi Infotech Park, Hinjewadi, Phase I, Pune 411057. Admeasuring area of 26,666 Sq. ft. Admeasuring area of 26,557 Sq. ft. Admeasuring area of 53,223 Sq. ft. Approved revised projections: (Rs.
iv Gandhi Infotech Park, Hinjewadi, Phase I, Pune 411057. Admeasuring area of 26,666 Sq. ft. Admeasuring area of 26,557 Sq. ft. Admeasuring area of 53,223 Sq. ft. Approved revised projections: (Rs. in Cr.)
Sr.No Particulars 2023-24 (Actual as per APR) 2024-25 2025-26 2026-27 2027-28 Total 1. FOB Value of exports 0.97 12.64 45.00 55.00 60.00 173.61 2. Foreign Exchange outgo 0.00 0.08 4.90 4.92 4.92 14.82 3. Net Foreign Exchange 0.97 12.56 40.10 50.08 55.08 158.79 Investment in Plant & Machinery/Capital Goods (Rs. In Crores) i. Indigenous Capital Goods 13.30 ii. Imported Capital Goods 9.50 Services i. Indigenous Services 47.50 ii. Imported Services 5.32
Employment (Men-200, Women-200) 400 Agenda Item No. 6: Application Submitted by M/s. Nalanda Shelter Pvt Ltd. (Developer) for approval to lease out the space to vendor for setting up Cafeteria in SEZ premises. After deliberation, the Committee approved the proposal of the Developer for leasing out built up space to vendor for setting up Cafeteria facility in SEZ premises., in terms of Rule 11(5) of SEZ Rules, 2006, as detailed below:
Sr. No. Name of the Vendor Activity Location Area to be Leased (Sq ft) 1 M/s 7 – India Convenience Retail Limited. Food facility for employees working in SEZ Campus. Tuck Shop No. 1 & 2, Ground Floor, Cafeteria, NSPL, Blue Ridge Township, Near Cognizant, Near Rajiv Gandhi Infotech Park, Hinjewadi, Phase - 1, Pune 411057. 181 Sq.
r employees working in SEZ Campus. Tuck Shop No. 1 & 2, Ground Floor, Cafeteria, NSPL, Blue Ridge Township, Near Cognizant, Near Rajiv Gandhi Infotech Park, Hinjewadi, Phase - 1, Pune 411057. 181 Sq. ft. The Committe also directed the developer to submit the details of vacent/occupied area in the cafeteria along with floor plan/map. The approval is subject to the conditions laid down in Rule 11(5) of SEZ Rules, 2006 issued by MOC&I. अ*य# को धUयवाद hापन के साथ बैठक समा` हुई
(hानेiर बी. पाटील, आईएएस( अ*य# एवं िवकास आयु' Chairman-cum- Development Commissioner signaturerectangle-1-186 Patil Date: 2025.03.28 15:11:29 IST % DSUnknown q 1 G 1 g 0.1 0 0 0.1 9 0 cm 0 J 0 j 4 M []0 d 1 i 0 g 313 292 m 265 625 l 100 625 l 313 292 l h 308 214 170 -164 re f 0.44 G 1.2 w 1 1 0.4 rg 287 318 m 239 651 l 74 651 l 287 318 l h 282 240 170 -164 re B Q
Agenda Item No. Subject Remarks Agenda Item No. 02 Application for setting up of a new unit(M/s. Arcelormittal Global Capacity Center Private Limited ) LOA is issued to the Unit on 28.03.2025 Agenda Item No. 03 Application for Addition of Location(M/s. Centralogic Consultancy Private Limited ) on 01.04.2025 Agenda Item No. 04 Performace(M/s. Cerence Services India LLP ) on 01.04.2025 Agenda Item No. 05 Application for leasing out space for vendor(M/s. Nalanda Shelter Private Limited (Developer)) on 01.04.2025
Item No. 04 Performace(M/s. Cerence Services India LLP ) on 01.04.2025 Agenda Item No. 05 Application for leasing out space for vendor(M/s. Nalanda Shelter Private Limited (Developer)) on 01.04.2025
a. Proposal : Proposal dated 23.04.2025 submitted by M/s. Nalanda Shelter Pvt Ltd (Developer) located at Blue Ridge Township, Near Cognizant, Near Rajiv Gandhi Infotech Park, Hinjewadi Phase 1, Pune 411057 for approval for Vending Machine Setup in Tower ‘A’ Café Area at Nalanda Shelter Private Limited, aVance – II. Approval of the committee to lease out the space on a temporary basis, without creating any lease, leave and license or tenancy arrangement within their notified SEZ for the purpose of vending machine services, as detailed below, in terms of Rule 11 (5) of SEZ Rules, 2006, as detailed below: Notification :- As per Rule 11 (5) of SEZ Rules, 2006
“(5) The land or Build up space in the processing area or Free Trade and Warehousing Zone shall be given on lease only to the entrepreneurs holding valid Letter of Approval issued under Rule 19 and [the lease period shall not be less than five years but notwithstanding any other condition in the lease deed, the lease rights would cease to exist in case of the expiry or cancellation of the Letter of Approval:]
PROVIDED that the Developer may, with the prior approval of the Approval Committee, grant on lease land or built-up space, for creating facilities such as canteen, public telephone booths, first aid centres,
that the Developer may, with the prior approval of the Approval Committee, grant on lease land or built-up space, for creating facilities such as canteen, public telephone booths, first aid centres, creche and such other facilities as may be required for the exclusive use of the Unit. Sr. No. Name of the Vendor Activity Location Area to be Leased (Sq ft) 1 M/s Instant Retail India Limited Required for Vending machine facility for employees working in SEZ campus. Café, Ground Floor, Tower A, NSPL, Blue Ridge Township Near Cognizant, Near Rajiv Gandhi Infotech Park, Hinjewadi Phase - 1, Pune 411 057. 50 Sq. Ft. (4 X 4 feet Machine) Other information: M/s. Nalanda Shelter Pvt Ltd., (Developer) has been granted Formal Approval bearing No. F.1/14/2017- SEZ dated 31.03.2017 The Developer has enclosed following document:
Copy of Fire NOC from MIDC – Tower ‘A’, Copy of Developer Approval, Copy of Letter of confirmation of availability of space, Certified true copy of the Board’s Resolution passed by the Board of Directors at their meeting held on 27.02.2024 for authorizing Ms Sanjuna Sudhakaran as authorized signatory. The Developer submitted that there shall not be any live cooking activity carried out in the Café area. The Vending will dispense pre-packaged food products. The Service Provider will obtain all necessary licenses and approvals required to operate their vending machine services in compliance with applicable regulations. The Developer will execute Service Agreement with the Vendor. e.
ain all necessary licenses and approvals required to operate their vending machine services in compliance with applicable regulations. The Developer will execute Service Agreement with the Vendor. e. Recommendation: The committee may kindly consider the proposal of the Developer for approval for Vending Machine Setup in Tower ‘A’ Café Area at Nalanda Shelter Private Limited, aVance – II in SEZ premises, in terms of Rule 11 (5) of SEZ Rules, 2006
a. Proposal : Proposal dated 21.04.2025 received on 02.05.2025 submitted by M/s. Aptiv Components India Private Limited, located in Nalanda Shelter Pvt Ltd., - SEZ for Addition in area admeasuring 24,027 Sq. ft. along with revision in projections. Approval of the Approval Committee for Addition of area admeasuring 24,024 Sq. Ft with Revision in projection in terms of Rule 19(2) of SEZ Rules, 2006
Notification :-
As per First Proviso to Rule 19(2) of SEZ Rules,2006
“PROVIDED that the Approval Committee may also approve proposals for broad banding, diversification, enhancement of capacity of production, change in the items of manufacture or service activity, if it meets the requirements of rule 18”
Location / area proposed to be added : Existing address and area Area proposed to be added Total area after addition Unit No. 1 & 4, 10th floor, Tower ‘A’, Nalanda Shelter Private Limited – SEZ, Rajiv Gandhi Infotech Park – Phase I, Hinjewadi, Pune 411 057 Unit No.
rea proposed to be added Total area after addition Unit No. 1 & 4, 10th floor, Tower ‘A’, Nalanda Shelter Private Limited – SEZ, Rajiv Gandhi Infotech Park – Phase I, Hinjewadi, Pune 411 057 Unit No. 3, 10th floor, Tower ‘A’, Nalanda Shelter Private Limited – SEZ, Rajiv Gandhi Infotech Park – Phase I, Hinjewadi, Pune 411 057 Unit No. 1, 3 & 4, 10th floor, Tower ‘A’, Nalanda Shelter Private Limited – SEZ, Rajiv Gandhi Infotech Park – Phase I, Hinjewadi, Pune 411 057 Admeasuring area of 66,572 Sq. ft. Admeasuring area of 24,027 Sq. ft. Admeasuring area of 90, 599 Sq. ft. Existing & Revision in Projection: Sr. No. Item Existing Area & Projections as per New Unit Application Total Revised Projections Post Proposed addition of Location
01 Area (Built up area)
66,572 Sq. ft. or 6184.54 Sq. Meters 90,599 Sq. Ft. or 8416.65 Sq. Mtrs Projections of Investment and Employment: (Rs. In Crores) Sr. No Item Existing Projection Total Revised Projection 1. Employment
TOTAL Men Women Men Women 465 155 640 230 620 870 2. Investment-Plant and Machinery/Capital Goods (Rs. in Crores) i. Indigenous Capital Goods 22.82 30.29 ii. Imported Capital Goods 4.03 4.03
Total 26.85 34.32 3. Services
i. Indigenous Services 115.33 116.16 ii. Imported Services 5.11 5.11
Total 120.44 121.27
Approved Projection: (Rs. In Crores)
1st 2nd 3rd 4th 5th Total FOB value of Exports 67.96 81.80 92.01 103.79 134.60 480.16 FE Outgo 3.93 1.02 1.08 1.63 1.48 9.14 NFE Earnings 64.03 80.78 90.93 102.16 133.12 471.02 Proposed Revision of Projection : (Rs.
5th Total FOB value of Exports 67.96 81.80 92.01 103.79 134.60 480.16 FE Outgo 3.93 1.02 1.08 1.63 1.48 9.14 NFE Earnings 64.03 80.78 90.93 102.16 133.12 471.02 Proposed Revision of Projection : (Rs. In Crores)
1st 2nd 3rd 4th 5th Total FOB value of Exports 46.22 66.69 108.68 120.46 151.26 493.31 FE Outgo 0.23 0.00 2.53 2.91 3.48 9.14 NFE Earnings 45.99 66.69 106.15 117.55 147.78 484.16 Proposal & Reason for Addition of Location : Since the unit is operational of Nalanda Shelter Pvt. Ltd. – SEZ, their business is growing with additional requirements of employees and due to growing business demand and progressive future prospect, the Company management has decided to avail additional premises in the same SEZ for permanent nature to operate at bigger space and for the same they have received a signed Letter of Intent from the Developer. Other Information: - M/s. Aptiv Components India Private Limited bearing LOA No. SEEPZ-SEZ/NSPL- SEZ/ACIPL/11/2022-23/850 DATED 14.11.2022 (Original LOA) located at Unit 1 & 4, 10th floor, Tower ‘A’, Nalanda Shelter Private Ltd., - SEZ, Near Rajiv Gandhi Infotech Park, Phase I,
SEEPZ-SEZ/NSPL- SEZ/ACIPL/11/2022-23/850 DATED 14.11.2022 (Original LOA) located at Unit 1 & 4, 10th floor, Tower ‘A’, Nalanda Shelter Private Ltd., - SEZ, Near Rajiv Gandhi Infotech Park, Phase I,
Hinjewadi, Pune 411057. Date of Commencement: 01.08.2023 LOA is valid upto: 31.07.2028 The unit has submitted the following documents with the application: i. Form F3 for additional location filed through SEZ Online system. ii. Letter of offer dated 16.04.2025 signed with Developer of SEZ for proposed additional location; iii. Copy of LOA iv. Copy of Board Resolutions v. List of Imported and Indigenous Capital Goods. e. Recommendation: Approval Committee may kindly consider the proposal submitted by the unit for addition of area to the existing operational area with revision in projection in terms of Rule 19(2) of SEZ Rules, 2006
AGENDA FOR MEETING OF THE APPROVAL COMMITTEE FOR IT/ITES AT PUNE OF M/S. EON KHARADI INFRASTRUCTURE PVT. LTD.-SEZ, PHASE I.
TIME : 12:00 P.M.
ING OF THE APPROVAL COMMITTEE FOR IT/ITES AT PUNE OF M/S. EON KHARADI INFRASTRUCTURE PVT. LTD.-SEZ, PHASE I.
TIME : 12:00 P.M.
MEETING OF THE APPROVAL COMMITTEE FOR DEVELOPMENT COMMISSIONER, SEEPZ-SEZ ON 09.05.2025
INDEX
Agenda Item No.
Subject Agenda Item No. 01 :- Confirmation of the Minutes of the meeting held on 21.03.2025 Agenda Item No. 02 :- Action taken report for the Minutes of the meeting held on 21.03.2025 Agenda Item No. 03 :- Monitoring of Performance for M/s. Company3 Method India Pvt. Ltd. Agenda Item No. 04 :- Monitoring of Performance for M/s. UPS Logistics Pvt. Ltd. Agenda Item No. 05 :- Monitoring of Performance for M/s. Vodafone India Services Pvt. Ltd. Agenda Item No. 06 :- Application for Change in Board of Directors submitted by M/s. LTIMindtree Ltd Agenda Item No. 07 :- Application for Change in Board of Directors of submitted by M/s. Vodafone India Services Pvt. Ltd.
Directors submitted by M/s. LTIMindtree Ltd Agenda Item No. 07 :- Application for Change in Board of Directors of submitted by M/s. Vodafone India Services Pvt. Ltd.
मैसस ईओएन खराडी इंाटचर ा. लिमटेड-चरण- I एसईजेड, खराड़ी, पुणे, के आईटी-आईटीईएस सेटर के िव#श% िवशेष आ'थक )े* के लए )ेीय िवकास आयु, सी-ज़-एसईजेड, मुंबई क0 अ2य)ता म4 21.03.2025 को आयो6जत अनुमोदन सिम8त क0 126 व9 बैठक का िववरण। 1 एसईजेड का नाम मैसस.ईओएन खराडी इंाटचर ा. लिमटेड-एसईजेड, चरण I 2 )े आईटी/आईटीईएस 3 मी<टग नं 126 वी 4 तारीख 21.03.2025
उप?थत सदय:
@.
नाम और पदनाम (एस/Bी.)
िवभाग
1
Bीमती िमतल िहरेमठ
संयु, िवकास आयु,
पुणे Eटर एसईजेड, पुणे
2
Bी संजय बांगर,उप िनदेशक उFोग
महारा% सरकार से नािमत
3.
Bीमती अचना परब
सहायक आयु,, आयकर िवभाग
आयकर िवभाग से नािमत
4.
Bी काGतकेय लंगोटे, उप-)ेीय
अ8धकारी
महारा% दूषण िनयंण बोड से नािमत
5.
Bीमती पुJपा गंगावणे, एफटीडीओ
6
Bी धवल एस #शकL , अधी)क
सीमा शुMक िवभाग पुणे नािमत
िवशेष आमंि*त :
@.
नाम एवं पदनाम(Bी/ Bीमती)
िवभाग
1
Bी.
ंगोटे, उप-)ेीय अ8धकारी महारा% दूषण िनयंण बोड से नािमत 5. Bीमती पुJपा गंगावणे, एफटीडीओ 6 Bी धवल एस #शकL , अधी)क सीमा शुMक िवभाग पुणे नािमत िवशेष आमंि*त : @. नाम एवं पदनाम(Bी/ Bीमती) िवभाग 1 Bी. शNभू दयाल मीना, िविनOद% अ8धकारी सी-ज़-एसईज़ेड, पुणे Eटर
एज4डा आइटम नंबर 01: िदनांक 21.02.2025 को आयो6जत 125 व9 बैठक के कायवृQ क0 पुि%
िवचारिवमश के बाद, सिम8त ने 21.02.2025 को आयो6जत अनुमोदन सिम8त क0 125 व9 बैठक के कायवृQ क0 पुि% क0।
एज4डा आइटम नंबर 02: 21.02.2025 को आयो6जत बैठक के कायवृQ के लए क0 गई कारवाई Rरपोट।
िवचार-िवमश के बाद, सिम8त ने 21.02.2025 को आयो6जत बैठक के लए क0 गई कारवाई Rरपोट नोट क0 है।
एज4डा आइटम नंबर 03: मेसस एलटीआईमाइंडटी लिमटेड के दशन क0 िनगरानी
िवचार-िवमश के बाद, सिम8त ने एसईजेड िनयम, 2006 के िनयम 54 के संदभ म4, पहली Sलॉक अव8ध के पहले 2 वषU यानी िवQ वष
2022-23 और 2023-24 के लए यूिनट के दशन को नोट िकया। जैसा िक नीचे िवतार से बताया गया है:
यूिनट ने थम Sलॉक अव8ध के पहले 2 वषU यानी 2022-23 और 2023-24 म4 59.88 करोड़ Vपये के अनुमािनत िनयात के
मुकाबले 15.79 करोड़ Vपये का िनयात हा6सल िकया है और संचयी आधार 15.20 करोड़ Vपये का सकाराWमक एनएफई
हा6सल िकया है जो 96.44% है ।
यूिनट ने थम Sलॉक अव8ध म4 अनुमािनत रोजगार 450 के मुकाबले 274 कमचाRरयX (पुVष-171, मिहला-103) का रोजगार
हा6सल िकया है।
एज4डा आइटम नंबर 04: मेसस एमफै6सस लिमटेड के दशन क0 िनगरानी
िवचार-िवमश के बाद सिम8त ने एसईजेड िनयम 2006 के िनयम 54 के संदभ म4 3 Sलॉक अव8धयX यानी िवQ वष 2017-18 से िवQ
वष 2023-24 के लए यूिनट के दशन को नोट िकया, जैसा िक नीचे िवतार से बताया गया है।
दूसरे Sलॉक अव8ध का अं8तम वष यानी िवQ वष 2017-18
के िनयम 54 के संदभ म4 3 Sलॉक अव8धयX यानी िवQ वष 2017-18 से िवQ वष 2023-24 के लए यूिनट के दशन को नोट िकया, जैसा िक नीचे िवतार से बताया गया है। दूसरे Sलॉक अव8ध का अं8तम वष यानी िवQ वष 2017-18 तीसरे Sलॉक अव8ध के 5 वष यानी िवQ वष 2018-19 से िवQ वष 2022-23 चौथे Sलॉक अव8ध का पहला वष यानी िवQ वष 2023-24 एसईजेड िनयम 2006 के िनयम 54 के अनुसार नीचे िवतार से बताया गया है
यूिनट ने 468.51 करोड़ Vपये के अनुमािनत िनयात के मुकाबले 338.26 करोड़ Vपये का िनयात हा6सल िकया है और
1444.05 करोड़ Vपये का सकाराWमक एनएफई हा6सल िकया है, जो िक िZतीय Sलॉक अव8ध के 5व4 वष यानी िवQ वष
2017-18 म4 संचयी आधार पर 97.11% है।
यूिनट ने 1953.63 करोड़ Vपये के अनुमािनत िनयात के मुकाबले 3284.61 करोड़ Vपये का िनयात हा6सल िकया है और
3260.05 करोड़ Vपये का सकाराWमक एनएफई हा6सल िकया है, जो तीसरे Sलॉक अव8ध यानी िवQ वष 2018-19 से
2022-23 के 5 वषU म4 संचयी आधार पर 99.25% है।
यूिनट ने 800.00 करोड़ Vपये के अनुमािनत िनयात के मुकाबले 1218.71 करोड़ Vपये का िनयात राजव हा6सल िकया है
और 1210.03 करोड़ Vपये का सकाराWमक एनएफई हा6सल िकया है, जो चौथे Sलॉक अव8ध के पहले वष यानी िवQ वष
2023-24 म4 संचयी आधार पर 99.29% है।
यूिनट ने 4200 के अनुमािनत रोजगार के मुकाबले 2899 कमचाRरयX (पुVष-1875 मिहला-1024) को रोजगार हा6सल
िकया है।
यूिनट को सही पRरशोधन मूMय और एनएफई को अFतन करने के लए िवQ वष 2017-18 से िवQ वष 2022-23 क0
अव8ध के लए अपने एपीआर को संशो8धत का िनदLश िदया। है।
सिम8त ने पाया िक इकाई ने भारतीय Vपये म4 ा[ भुगतान के आधार पर डीटीए म4 सेवाएं दान क0 ह\ , 6जनका िववरण नीचे
िदया गया है:
िवQ वष
डीटीए िब@ी Vपये म4 करोड़
2017-18
19.45
2018-19
24.66
2019-20
8.69
2020-21
7.62
2021-22
6.77
2022-23
4.39
2023-24
ा[ भुगतान के आधार पर डीटीए म4 सेवाएं दान क0 ह\ , 6जनका िववरण नीचे िदया गया है: िवQ वष डीटीए िब@ी Vपये म4 करोड़ 2017-18 19.45 2018-19 24.66 2019-20 8.69 2020-21 7.62 2021-22 6.77 2022-23 4.39 2023-24 9.31 कुल 80.88
चूंिक भारतीय Vपये के बदले डीटीए म4 सेवाएं दान करना एसईजेड अ8धिनयम 2005 क0 धारा 2(जेड) म4 दी गई पRरभाषा के अनुसार सेवाओं के ]प म4 यो^य नह9 है, इसलए यूिनट ने एसईजेड अ8धिनयम और िनयमX के ावधानX का उ_ंघन िकया है और इसलए सिम8त ने िवचार-िवमश के बाद इकाई के खलाफ कारवाई शु] करने और एसईजेड अ8धिनयम/िनयमX के िव#भa ावधानX और िवदेशी bयापार (िवकास और िविनयमन) अ8धिनयम 1992 के तहत उ_ंघन के लए कारण बताओ नोिटस जारी करने का िनदLश िदया। एज4डा आइटम नंबर 05: मेसस कॉिcज4ट टेनोलॉजी सॉMयूशंस इं8डया ाइवेट लिमटेड Zारा िनदेशक मंडल म4 पRरवतन के अनुमोदन के लए आवेदन । िवचार-िवमश के बाद, सिम8त ने एमओसीआई Zारा जारी िदनांक 18.10.2021 के िनदLश संdया 109 के अनुसार िनदेशक मंडल म4 पRरवतन के लए यूिनट के ताव को मंजूरी दे दी, 6जसका िववरण नीचे िदया गया है: िनदेशक मंडल क0 अनुमोिदत सूची:
@मांक िनदेशकX का नाम पद का नाम अपॉइंटम4ट क0 8त#थ 1 Bी राजेश वाRरयर सीएमडी 10.09.2024 2 Bी मनीष eसघवी सीएफओ और पूणकालक िनदेशक 13.12.2024 3 Bी नारायणन टी पूणकालक िनदेशक 27.09.2019 यह अनुमोदन वा#णfय एवं उFोग मं*ालय Zारा जारी िनदLश संdया 109 म4 िनधाRरत शतU के अधीन है। एज4डा आइटम नंबर 06: मेसस िटएटोवेरी िफनटेक इं8डया ाइवेट लिमटेड Zारा िनदेशक मंडल म4 पRरवतन के अनुमोदन के लए आवेदन ।
दन वा#णfय एवं उFोग मं*ालय Zारा जारी िनदLश संdया 109 म4 िनधाRरत शतU के अधीन है। एज4डा आइटम नंबर 06: मेसस िटएटोवेरी िफनटेक इं8डया ाइवेट लिमटेड Zारा िनदेशक मंडल म4 पRरवतन के अनुमोदन के लए आवेदन ।
िवचार-िवमश के बाद, सिम8त ने एमओसीआई Zारा जारी िदनांक 18.10.2021 के िनदLश संdया 109 के अनुसार
िनदेशक मंडल म4 पRरवतन के लए यूिनट के ताव को मंजूरी दे दी, 6जसका िववरण नीचे िदया गया है:
िनदेशक मंडल क0 अनुमोिदत सूची:
@मांक
िनदेशकX का नाम
पद का नाम
अपॉइंटम4ट क0 8त#थ
1
अgनी बा
िनदेशक
14/12/2022
2.
पासी कालेवी मौनो
िनदेशक
22/08/2023
3.
अिवनाश अजीत देशपांडे
िनदेशक
21/11/2024
यह अनुमोदन वा#णfय एवं उFोग मंालय Zारा जारी िनदLश संdया 109 म4 िनधाRरत शतU के अधीन है।
एज4डा आइटम नंबर 07: : मेसस @े8डट सुइस सOवसेज (इं8डया) ाइवेट लिमटेड Zारा नाम म4 पRरवतन क0 मंजूरी, िनदेशकX क0
तािवत सूची के लए आवेदन
िवचार-िवमश के बाद, सिम8त ने MOC&I Zारा जारी िनदLश 109 िदनांक 18.10.2021 के अनुसार, यूिनट का नाम म4 पRरवतन
और िनदेशकX क0 सूची के ताव को िनNनानुसार मंजूरी दे दी:
यूिनट का िपछला नाम
यूिनट का नया नाम
मेसस @े8डट सुइस सOवसेज (इं8डया) ाइवेट
लिमटेड
मेसस यूबीएस िबजनेस सॉMयूशंस (इं8डया)
ाइवेट लिमटेड
िनदेशकX क0 तािवत सूची नीचे दी गई है।
िनदेशक मंडल क0 अनुमोिदत सूची:
@मांक
िनदेशकX का नाम
पद का नाम
दीन @मांक
1
हेराMड होट एगर
िनदेशक
08089849
2.
िवशांक पटेल
िनदेशक
08513882
3.
अनुभव अiवाल
िनदेशक
06711041
4.
सेरेना े िटएसेन
िनदेशक
08633796
5.
मथायस शैक
िनदेशक
09664269
यह अनुमोदन वा#णfय एवं उFोग मं*ालय Zारा जारी िनदLश संdया 109 म4 िनधाRरत शतU के अधीन है। एनसीएलटी के आदेश के
अनुसार, उपरो, पRरवतन 1 अैल 2025 से भावी हXगे।
अ2य) को धjयवाद kापन के साथ बैठक समा[ हुई।
ह अनुमोदन वा#णfय एवं उFोग मं*ालय Zारा जारी िनदLश संdया 109 म4 िनधाRरत शतU के अधीन है। एनसीएलटी के आदेश के अनुसार, उपरो, पRरवतन 1 अैल 2025 से भावी हXगे। अ2य) को धjयवाद kापन के साथ बैठक समा[ हुई।
Minutes of the 126th Meeting of the Approval Committee held under the Chairmanship of Zonal Development Commissioner SEEPZ-SEZ, Mumbai for Sector Specific Special Economic Zone for IT/ITES of M/s. EON Kharadi Infrastructure Pvt. Ltd.–Phase-I SEZ, Kharadi, Pune, held on 21.03.2025 1 Name of the SEZ M/s. EON Kharadi Infrastructure Pvt. Ltd.-SEZ, Phase I 2 Sector IT/ITES 3 Meeting No. 126th Meeting 4 Date 21.03.2025
Members present: Sr No. Department 1 Smt. Mital Hiremath 2 Shri. Sanjay Bangar Region
3 Smt. Archana Parab, 4 Kartikeya Langote, Sub-Regional Officer Maharashtra Pollution Control Board. 5 6 Shri. Dhaval Shirke, Superintendent Special Invitee: Sr Department 1 Shri. Shambhu Dayal Meena Specified Officer
Agenda Item No.01: Confirmation of the Minutes of the 125th meeting held on 21.02.2025
After deliberation, the Committee confirmed the minutes of the 125th meeting of Approval Committee held on 21.02.2025.
Agenda Item No.02: Action taken report for the minutes of the meeting held on 21.02.2025. After deliberation, the Committee has noted the Action taken report for the meeting held on 21.02.2025. Agenda Item No.03: Monitoring of Performance for M/s. LTIMindtree Limited After deliberation, the committee noted the performance of the unit for first 2 years of 1st Block period i.e. FY 2022-23 and 2023-24., in terms of Rule 54 of SEZ Rules, 2006.
/s. LTIMindtree Limited After deliberation, the committee noted the performance of the unit for first 2 years of 1st Block period i.e. FY 2022-23 and 2023-24., in terms of Rule 54 of SEZ Rules, 2006. As detailed below: The Unit has achieved export revenue of Rs. 15.79 Crores as against projected export of Rs. 59.88 Crores and achieved cumulative NFE of Rs. 15.20 Crores which is 96.44 % in first 2 years of 1st block period i.e. 2022-23 and 2023-24. The unit has achieved employment of 274 employees (Men-171,Women-103) against the projected employment of 450 Agenda Item No.04: Monitoring of Performance for M/s. Mphasis Limited After deliberation, the committee noted the performance of the unit for 3 Block Periods i.e. FY 2017-18 to FY 2023-24. in terms of Rule 54 of SEZ Rules, 2006. As detailed below: Last year of 2nd Block Period i.e. FY 2017-18 5 years of 3rd Block Period from FY 2018-19 to FY 2022-23 First year of 4th Block Period i.e. FY 2023-24
The Unit has achieved export revenue of Rs. 338.26 Crores as against the projected export of Rs.
468.51 Crores and achieved positive NFE of Rs. 1444.05 Crores which is 97.11 % on cumulative
basis in 5th Year of 2nd Block Period i.e. FY 2017-18.
The Unit has achieved export revenue of Rs.3284.61 Crores as against the projected export of Rs.
1953.63 Crores and achieved positive NFE of Rs. 3260.05 Crores which is 99.25% on cumulative
basis in 5 years of 3rd Block Period i.e. FY 2018-19 To 2022-23.
The Unit has achieved export revenue of Rs.
53.63 Crores and achieved positive NFE of Rs. 3260.05 Crores which is 99.25% on cumulative
basis in 5 years of 3rd Block Period i.e. FY 2018-19 To 2022-23.
The Unit has achieved export revenue of Rs. 1218.71 Crores as against the projected export of Rs.
800.00 Crores and achieved positive NFE of Rs. 1210.03 Crores which is 99.29% on cumulative
basis in 1st year of 4th Block Period i.e. FY 2023-24.
The unit has achieved employment of 2899 employees (Men-1875, Women-1024) against the
projected employment of 4200.
The unit is directed to revise its APR for the period FY 2017-18 to FY 2022-23 to update the correct
amortized value and net foreign exchange earnings.
The Committee observed that the unit has provided services in DTA against the payments received in INR as detailed below: F.Y. DTA Sale in INR in Cr 2017-18 19.45 2018-19 24.66 2019-20 8.69 2020-21 7.62 2021-22 6.77 2022-23 4.39 2023-24 9.31 Total 80.88
Since providing of “Services” in DTA against INR does not qualify as ‘Services’ as per definition given in Section 2(z) of the SEZ Act, 2005, Unit has violated the provisions of SEZ Act & Rules and hence Committee after deliberation, directed to initiate action against the unit and to issue Show Cause Notice for violation of various provision of SEZ Act / Rules and under Foreign Trade (Development and Regulation) Act, 1992. Agenda Item No.05: Application for approval of change in board of directors submitted by M/s. Cognizant Technology Solutions India Pvt.
and under Foreign Trade (Development and Regulation) Act, 1992. Agenda Item No.05: Application for approval of change in board of directors submitted by M/s. Cognizant Technology Solutions India Pvt. Ltd. After deliberation, the committee approved the proposal of the unit for change in Board of Directors, in terms of Instruction No. 109 dated 18.10.2021 issued by MOCI, as detailed below: Approved List of Board of Directors: Sr. No Name of Directors Designation Date of Appointment 1 Mr. Rajesh Varrier CMD 10.09.2024 2 Mr. Manish Singhvi CFO & Whole Time Director 13.12.2024 3 Mr. Narayanan T Whole Time Director 27.09.2019 The approval is subject to the conditions laid down in Instruction No. 109 issued by MOC&I. Agenda Item No.06: Application for approval of change in board of directors submitted by M/s. Tietoevry Fintech India Pvt. Ltd. After deliberation, the committee approved the proposal of the unit for change in Board of Directors, in terms of Instruction No. 109 dated 18.10.2021 issued by MOCI, as detailed below: Approved List of Board of Directors: Sr. No Name of the Directors Designation Date of Appointment 1 Ashwani Batra Director 14/12/2022 2. Pasi Kalevi Mauno Director 22/08/2023 3. Avinash Ajit Deshpande Director 21/11/2024 The approval is subject to the conditions laid down in Instruction No. 109 issued by MOC&I. Agenda Item No.07: Application for approval of Change in Name and Proposed List of Directors Submitted by M/s. Credit Suisse Services (India) Pvt.
ns laid down in Instruction No. 109 issued by MOC&I. Agenda Item No.07: Application for approval of Change in Name and Proposed List of Directors Submitted by M/s. Credit Suisse Services (India) Pvt. Ltd. After deliberation, the Committee approved the proposal for Change in Name of the Company and list of Directors in terms of Instruction No. 109 dated 18.10.2021 as detailed below:
Previous Name of the Unit New Name of the Unit M/s. Credit Suisse Services (India) Pvt. Ltd M/s. UBS Business Solutions (India) Pvt. Ltd. Approved List of Directors: Sr. No Name Designation DIN 1 Harald Horst Egger Director 08089849 2 Vishank Patel Director 08513882 3 Anubhav Agarwal Director 06711041 4 Seraina Frey Tiessen Director 08633796 5 Matthias Schacke Director 09664269 The approval is subject to the conditions laid down in Instruction No. 109 issued by MOC&I. As per the NCLT order above changes will be effective from 1st April 2025.
(kानेgर बी. पाटील, आईएएस) अ2य) एवं िवकास आयु, Chairman-cum- Development Commissioner
signaturerectangle-1-186 Patil Date: 2025.03.28 15:11:27 IST % DSUnknown q 1 G 1 g 0.1 0 0 0.1 9 0 cm 0 J 0 j 4 M []0 d 1 i 0 g 313 292 m 265 625 l 100 625 l 313 292 l h 308 214 170 -164 re f 0.44 G 1.2 w 1 1 0.4 rg 287 318 m 239 651 l 74 651 l 287 318 l h 282 240 170 -164 re B Q
0.1 0 0 0.1 9 0 cm 0 J 0 j 4 M []0 d 1 i 0 g 313 292 m 265 625 l 100 625 l 313 292 l h 308 214 170 -164 re f 0.44 G 1.2 w 1 1 0.4 rg 287 318 m 239 651 l 74 651 l 287 318 l h 282 240 170 -164 re B Q
Agenda Item No. Subject Remarks Agenda Item No. 02 Application for Monitoring of Performace(M/s. LTIMindtree Limited) on 28.03.2025. Agenda Item No. 03 Application for Change of List of Directors/Partners(M/s. Tietoevry Fintech India Pvt. Ltd.) on 28.03.2025. Agenda Item No. 04 Application for Change of List of Directors/Partners(M/s. Cognizant Technology Solutions India Pvt. Ltd.) on 28.03.2025. Agenda Item No. 05 Application for Change of Name(M/s. Credit Suisse Services (India) Pvt. Ltd.) on 28.03.2025. Agenda Item No. 06 Application for Monitoring of Performace(M/s. Mphasis Limited) on 28.03.2025.
Year Export F.E. OUTGO
Projected
Actual Raw Material (Goods/Services) C.G. import Other outflow Projected Actual Projected Actual Actual 2020-21 218.08 137.75 0.00 0.00 50.81 0.00 0.52 TOTAL 218.08 137.75 0.00 0.00 50.81 0.00 0.52
a. Proposal : Monitoring of the performance of M/s. Company3 Method India Pvt. Ltd. an IT/ITES unit located in M/s. EON Kharadi Infrastructure Pvt. Ltd.-Phase-I-SEZ, for Last year of 2nd Block period i.e. FY 2020-21 and First Three Years of 3rd Block Period i.e. FY 2021-22 to 2023-24. Monitoring of the performance of the unit for Last year of 2nd Block period i.e. FY 2020-21 and First Three Years of 3rd Block Period i.e.
Three Years of 3rd Block Period i.e. FY 2021-22 to 2023-24. Monitoring of the performance of the unit for Last year of 2nd Block period i.e. FY 2020-21 and First Three Years of 3rd Block Period i.e. FY 2021-22 to 2023-24., in terms of Rule 54 of SEZ Rules, 2006. Notification :- Performance as compared to projections: Last year of 2nd Block period i.e. FY 2020-21 Approved Projections: (Rs. In Cr.)
2016-17 2017-18 2018-19 2019-20 2020-21 TOTAL FOB value of export 115.22 134.86 157.19 185.46 218.08 810.81 FE outgo 11.14 12.25 13.48 13.94 14.22 65.03 NFE 104.08 122.61 143.71 171.52 203.87 745.79 Performance as compared to projections: (Rs. In Cr.) Cumulative NFE achieved: (Rs. in Cr.) Year Cumulative NFE Achieved Cumulative % NFE Achieved 2020-21 631.63 96.30%
Year Export F.E. OUTGO
Projected
Actual Raw Material (Goods/Services) C.G. import Other outflow Projected Actual Projected Actual Actual 2021-22 172.60 172.60 0.00 0.00 24.31 0.01 37.10 2022-23 182.64 182.64
0.00 1.02 2023-24 152.25 167.39
-1.82 0.79 TOTAL 507.49 522.63 0.00 0.00 24.31 -1.81 38.91
Performance as compared to projections: 3 years of 3rd Block period i.e. FY 2021-22 to 2023-24 Approved Projections: (Rs. In Cr.)
2021-22 2022-23 2023-24 2024-25 2025-26 TOTAL FOB value of export 151.70 166.86 183.55 201.91 222.10 926.12 FE outgo 11.50 12.10 12.73 13.40 14.10 63.83 NFE 140.20 154.76 170.82 188.51 208.00 862.29 Revised Projections: (At the time of Partial Deletion) (Rs.
ort 151.70 166.86 183.55 201.91 222.10 926.12 FE outgo 11.50 12.10 12.73 13.40 14.10 63.83 NFE 140.20 154.76 170.82 188.51 208.00 862.29 Revised Projections: (At the time of Partial Deletion) (Rs. In Cr.)
2021-22 (Actual) 2022-23 (Actual) 2023-24 2024-25 2025-26 TOTAL FOB value of export 172.60 182.64 152.25 163.38 179.51 850.38 FE outgo 37.10 1.38 5.09 5.36 5.64 54.57 NFE 135.50 181.26 147.16 158.02 173.87 795.81 Performance as compared to projections: (Rs. In Cr.) Cumulative NFE achieved: (Rs. in Cr) Year Cumulative NFE Achieved Cumulative % NFE Achieved 2021-22 131.86 76.40% 2022-23 310.23 87.33% 2023-24 473.90 90.68% Employment Achievement:
Approved Achieved Men 1428 1219 Women 147 123 Total 1575 1342
Name of The Unit M/s Company3 Method India Pvt. Ltd.
LOA No. & Date SEEPZ-SEZ/EKIPL-SEZ/DIPL/10/2011- 12/4053 Dated 18.03.2011 Location of Unit 7th Floor, Cluster D, Wing2, and 3, EON Free Zone, M/s. EON Kharadi Infrastructure Pvt. Ltd.-SEZ, Phase-I, Kharadi, Pune-411014. Validity of LOA 15.05.2026 IT & ITES 16.05.2011 Execution of BLUT Rs. 101.87 Crores. NA Labour Dues NA
NA Pending Show Cause Notice/ Eviction Order/Recovery Notice/ Recovery Order issued, if any NA Projected employment for the block period No.
tion of BLUT Rs. 101.87 Crores. NA Labour Dues NA
NA Pending Show Cause Notice/ Eviction Order/Recovery Notice/ Recovery Order issued, if any NA Projected employment for the block period No. of employees as on 31.03.2024 1342 (Men-1219, Women-123) 56,096.44 .Sq.ft 41.80 Sq.ft
Building NA Plant & Machinery 138.27 Crores Rule 34 (unutilized goods) NA NA otherwise.
Yes
The Specified Officer report vide letter dated 11.04.2025 has reported as detailed below:
EXPORT (Rs. In Cr)
Year/
Period
Figures
reported
in
APR
Figures as per
Softex/
Customs
Records
Difference if
any
Reason for Difference/Remark
(1)
(2)
(3)
(4)
(5)
2020-21 137.75 139.66 -1.91 Difference is due to exchange rate 2021-22 172.60 174.17 -1.57 2022-23 182.63 184.27 -1.64 2023-24 167.36 168.93 -1.57 IMPORT (Capital Goods including procurement done on IUT (from SEZ, EOU, STPI, EHTP) basis.) (Rs. In Cr) Year/Period Figures reported in APR (FOB Value) Figures as per Customs Records Difference if any (1) (2) (3) (4) (5) 2020-21 -0.10 0.00 (-0.10) The Actual Import Procurement is Rs Nil as per CUSTOMS Records for the Year. Difference is due to transfer of goods under IUT from SEZ to STPI. 2021-22 0.02 0.95 (-0.93) The Actual Import Procurement is Rs 0.95 Crores as per CUSTOMS Records for the Year. Difference is due to procurement of goods duty free from DTA.
nder IUT from SEZ to
STPI.
2021-22
0.02
0.95
(-0.93)
The Actual Import Procurement is
Rs 0.95 Crores as per CUSTOMS
Records for the Year.
Difference is due to procurement of
goods duty free from DTA. This
was not reflected in the financials
under imports head, hence the
difference.
2022-23
0.00
1.72
1.70
Actual Import Procurement is Rs
0.02 Crores as per CUSTOMS
Records for the Year.
The balance import figures 0f Rs.
1.70 lakhs shown as per customs
record is in respect of imports
received free of cost for testing
purpose.
2023-24
29.21
0.01
29.20
The Actual Import Procurement is
Rs 0.01 crores as per CUSTOMS
Records for the Year.
Difference is due to Cumulative
value reported in APR, the figures
mainly pertain to the previous
years.
Raw Material (Rs. In Cr)
Year/Period
Figures
reported in
APR (FOB
Value)
Figures as
per
Customs
Records
Difference if
any
(1)
(2)
(3)
(4)
(5)
2022-23 To 2023-24 0.00 0.00 0.00
BLUT (Rs in Cr) 1 Value of BLUT Executed (Duty foregone) (including for CG/ Raw Material/ Services) BLUT amount:
Date of Acceptance BLUT Amount 05.04.2011 2.85 Crore 02.02.2013 19.75 Crore 19.12.2016 20.17 Crore 20.08.2021 59.10 Crore Total 101.87 Crore 2 services procured Category Wise: Year Wise:
FY Goods Imported & Indigenous Services Imported & Indigenous 2020-21 0.06 3.36 2021-22 0.12 2.64 2022-23 0.10 3.63 2023-24 0.21 3.10 Total 0.49 12.73
(d) Employment made as on date (31.03.2024) (as on end of block period/ year up to Men: 1219 Women: 123 Total No Employment :1342
0.12 2.64 2022-23 0.10 3.63 2023-24 0.21 3.10 Total 0.49 12.73
(d) Employment made as on date (31.03.2024) (as on end of block period/ year up to Men: 1219 Women: 123 Total No Employment :1342 The same has been verified from their Online MPR. (e) Details of Pending Foreign Remittance (as on 31.03.2024) Bank/ RBI has been obtained. No foreign remittance is pending.
(f) Whether all Softex has been filed for office / RBI and if approved, whether Yes
(g) Softex and reasons for pendency. Yes
(h) Cancellation of softex No (i) DTA/SEZ/EOU/STPI etc. against during the period. If yes, details thereof (year wise details to be provided)
No (j) has updated the BLUT ledger Module in SEZ Online. NA (k) Payment of Duty, or otherwise? value of assets and duty discharged No (l) the same or other SEZ. details of the unit with whom the sharing is being made, and the payment terms UAC/DC office, the date of UAC/ Approval letter to be indicated No (m) processed for approval by the SO Office. Yes
Z. details of the unit with whom the sharing is being made, and the payment terms UAC/DC office, the date of UAC/ Approval letter to be indicated No (m) processed for approval by the SO Office. Yes
(n) Whether unit has filed all DTA by them during the monitoring period for the relevant period: Yes (o) the date of submission of monitoring report No IDs pending for OOC (p) Has the unit set up any cafeteria/ canteen/ food court in unit premises? If yes, whether permission from UAC/DC office has been issued, or otherwise. Whether unit has availed any duty paid goods/services for setting up such facility? duty/ tax benefit availed? details to be given including amount of duty/ tax recovered or yet to be recovered No (q) provisions of law has been noticed/ during the period under monitoring. No e. Recommendation: The Unit has achieved export revenue of Rs. 137.75 Crores as against the projected export of Rs. 218.08 Crores and achieved positive NFE of Rs. 631.61 Crores which is 96.30 % on cumulative basis in Last year of 2nd Block period i.e. FY 2020-21 during the period FY 2016-17 to 2020-21. The Unit has achieved export revenue of Rs. 522.63 Crores as against the projected export of Rs. 507.49 Crores and achieved positive NFE of Rs. 473.90 Crores which is 90.68% on cumulative basis in Three Years of 3rd Block Period i.e.
ue of Rs. 522.63 Crores as against the projected export of Rs. 507.49 Crores and achieved positive NFE of Rs. 473.90 Crores which is 90.68% on cumulative basis in Three Years of 3rd Block Period i.e. FY 2021-22 to 2023-24 during the period FY 2021-22 to 2025-26 As per SO report the unit has achieved employment of 1342 employees (Men-1219, Women-123) Approval committee may kindly monitor the performance of the Unit for for Last year of 2nd Block period i.e. FY 2020-21 and First Three Years of 3rd Block Period i.e. FY 2021-22 to 2023-24.in terms of Rule 54 of SEZ Rules, 2006.
Year Export F.E. OUTGO
Projected
Actual Raw Material (Goods/Services) C.G. import Other outflow Projected Actual Projected Actual Actual 202021 53.20 49.69 0.00 0.00 4.00 0.21 1.58 TOTAL 53.20 49.69 0.00 0.00 4.00 0.21 1.58
a. Proposal : Monitoring of the performance of M/s. UPS Logistics Pvt. Ltd.., a IT/ITES Enabled Services located at M/s. EON Kharadi Infrastructure Pvt. Ltd. Phase-I for Last Year of 1st Block Period i.e. 2020-21 and First Three Years of 2nd Block Period i.e. 2021-22 to 2023-24. Monitoring of the performance of the unit for Last Year of 1st Block Period i.e. 2020-21 and First Three Years of 2nd Block Period i.e. 2021-22 to 2023-24. in terms of Rule 54 of SEZ Rules, 2006. Notification :- Performance as compared to projections: for 1st Block Period FY 2016-17 to 2020-21 Approved Projections: (Rs.
e. 2021-22 to 2023-24. in terms of Rule 54 of SEZ Rules, 2006. Notification :- Performance as compared to projections: for 1st Block Period FY 2016-17 to 2020-21 Approved Projections: (Rs. In Cr.)
2016-17 2017-18 2018-19 2019-20 2020-21 TOTAL FOB value of export 16.37 25.04 39.38 46.28 53.20 180.27 FE outgo 1.02 0.74 1.21 1.13 1.29 5.39 NFE 15.35 24.30 38.17 45.15 51.91 174.88 Performance as compared to projections: (Rs. In Cr.) Cumulative NFE achieved: (Rs. in Cr.) Year Cumulative NFE Achieved Cumulative % NFE Achieved 2020-21 179.46 96.04%
Year Export F.E. OUTGO
Projected
Actual Raw Material (Goods/Services) C.G. import Other outflow Projected Actual Projected Actual Actual 2021-22 46.20 50.20 0.00 0.00 0.08 0.01 1.66 2022-23 53.17 54.30 0.00 0.00 0.13 2.93 2023-24 54.67 52.01 0.00 0.00 0.00 2.04 TOTAL 154.04 156.51 0.00 0.00 0.08 0.14 6.63 Performance as compared to projections: for 2nd Block Period FY 2021-22 to 2025-26 Approved Projections: (Rs. In Cr.)
2021-22 2022-23 2023-24 2024-25 2025-26 TOTAL FOB value of export 46.20 53.17 54.67 56.23 57.86 268.13 FE outgo 1.19 1.21 1.21 1.21 1.21 6.04 NFE 45.00 51.96 53.46 55.02 56.64 262.08 Performance as compared to projections: (Rs. In Cr.) Cumulative NFE achieved: (Rs. in Cr.) Year Cumulative NFE Achieved Cumulative % NFE Achieved 2021-22 48.30 96.21% 2022-23 99.41 95.13% 2023-24 149.12 95.28% Employment Achievement
Approved Achieved Men 293 266 Women 139 121 Total 432 387 LOA No.
ative NFE Achieved Cumulative % NFE Achieved 2021-22 48.30 96.21% 2022-23 99.41 95.13% 2023-24 149.12 95.28% Employment Achievement
Approved Achieved Men 293 266 Women 139 121 Total 432 387 LOA No. & Date SEEPZ/EKIPL-SEZ/ULPL.27/2015- 16/15574 Dated 29.09.2015 Location of Unit 5th Floor, wing1, Cluster E, EON Kharadi Infrastructure Pvt. Ltd.-SEZ, Phase-I, Plot No.1, S. No. 77, MIDC Kharadi Knowledge Park, Pune-411014. Validity of LOA 03.04.2026 IT & ITES 04.04.2016 Execution of BLUT Rs. 14.13 Crores NA Labour Dues NA
NA
issued, if any NA 387 (Men-266, Women-121) 26248 Sq.ft 62 Sq.ft
Building
Plant & Machinery 6.16 Rule 34 (unutilized goods) NA NA otherwise.
Yes The Specified Officer report vide letter dated 26.03.2025 has reported as detailed below: EXPORT (Rs. In Cr) Year/ Period Figures reported in APR Figures as per Softex/ Customs Records Difference if any (1) (2) (3) (4) (5) 2020-21 49.70 48.62 1.08 During the year Credit Note of Rs. 0.60 Crore has been issued by the unit. Balance difference of Rs. 0.48 Crore is due to Exchange Rate variation. 2021-22 50.20 49.81 0.39 During the year Credit Note of Rs. (0.14) Crore has been issued by the unit.
Balance difference of Rs. 0.53 Crore is due to Exchange Rate variation. 2022-23 54.30 54.38 (0.08) During the year Credit Note of Rs. (0.41) Crore has been issued by the unit. Balance difference of Rs. 0.33 Crore is due to Exchange Rate variation.
change Rate variation. 2022-23 54.30 54.38 (0.08) During the year Credit Note of Rs. (0.41) Crore has been issued by the unit. Balance difference of Rs. 0.33 Crore is due to Exchange Rate variation.
2023-24 52.01 52.64 (0.64) During the year Credit Note of Rs. (1.10) Crore has been issued by the unit. Balance difference of Rs. 0.46 Crore is due to Exchange Rate variation. IMPORT (Capital Goods including procurement done on IUT (from SEZ, EOU, STPI, EHTP) basis.) (Rs. In C) Year/Period Figures reported in APR (CIF Value) Figures as per Customs Records (Actual) Difference if any (1) (2) (3) (4) (5) 2020-2021 2.43 0.21 2.22 Difference is due to Cumulative value reported in APR. 2021-2022 2.44 0.01 2.43 2022-2023 2.58 0.14 2.44 2023-2024 2.58 0.00 2.58 Raw Material (Rs. In Cr) Year/Period Figures reported in APR (FOB Value) Figures as per Customs Records Difference if any (1) (2) (3) (4) (5) 2020-21 To 2023-24 0.00 0.00 0.00
BLUT (Rs Cr) 1
Material/ Services) BLUT amount:
Date of Acceptance BLUT Amount 11.12.2015 1.18 Crore 02.12.2019 1.40 Crore 20.05.2021 10.78 Crore 14.07.2023 0.77 Crore Total 14.13 Crore
(Rs Cr) 1
Material/ Services) BLUT amount:
Date of Acceptance BLUT Amount 11.12.2015 1.18 Crore 02.12.2019 1.40 Crore 20.05.2021 10.78 Crore 14.07.2023 0.77 Crore Total 14.13 Crore
2 services procured
Category Wise:
Year Wise:
FY Goods Imported & Indigenous Services Imported & Indigenous 2020-21 0.34 0.74 2021-22 0.09 0.85 2022-23 0.13 0.97 2023-24 0.02 0.51 Total 0.58 3.07
(d) Employment made as on date (31.03.2024) Men: 266 Women: 121 Total No Employment: 387 Nos The same has been verified from their Online MPR. (e) (as on 31.03.2024) No foreign remittance is pending. (f) Yes
(g) Yes
(h) No (i) DTA/SEZ/EOU/STPI etc. against during the period. to be provided)
No (j) SEZ Online. NA
(k) Yes. Below are the details of the same: (Rs. In Crore) FY Value Duty Payable 2020-21 0.009 0.004 2021-22 0.004 0.002 2022-23 0.112 0.035 Total 0.125 0.040
No (m) Office. Yes (n) Yes (o) report No IDs pending for OOC
(p) canteen/ food court in unit premises? If yes, whether permission from otherwise. facility? No (q) NA e. Recommendation: The Unit has achieved export revenue of Rs. 49.69 Crores as against the projected export of Rs. 53.20 Crores and achieved positive NFE of Rs. 179.46 Crores which is 96.04 % on cumulative basis in 5th Year of 1st Block Period i.e. FY 2020-21. The Unit has achieved export revenue of Rs.156.51 Crores as against the projected export of Rs. 154.04 Crores and achieved positive NFE of Rs. 149.12 Crores which is 95.28% on cumulative basis in 3 years of 2nd Block Period i.e.
venue of Rs.156.51 Crores as against the projected export of Rs. 154.04 Crores and achieved positive NFE of Rs. 149.12 Crores which is 95.28% on cumulative basis in 3 years of 2nd Block Period i.e. FY 2021-22 to 2023-24. As per SO report the unit has achieved employment of 387 employees (Men-266, Women-121) Approval committee may kindly monitor the performance of the Unit for Last Year of 1st Block Period i.e. 2020-21 and First Three Years of 2nd Block Period i.e. 2021-22 to 2023-24. in terms of Rule 54 of SEZ Rules, 2006. in terms of Rule 54 of SEZ Rules, 2006.
Year Export F.E. OUTGO
Projected
Actual Raw Material (Goods/Services) C.G. import Other outflow Projected Actual Projected Actual Actual 2019-20 767.91 822.66 0.00 0.00 27.69 4.47 41.96 TOTAL 767.91 822.66 0.00 0.00 27.69 4.47 41.96
a. Proposal : Monitoring of the performance of M/s. Vodafone India services Pvt. Ltd., a IT/ITES Enabled Services located at M/s. EON Kharadi Infrastructure Pvt. Ltd. Phase-I for Last Year of 2nd Block Period i.e. 2019-20 and First Four Years of 3rd Block Period i.e. 2020-21 to 2023-24. Monitoring of the performance of the unit for Last Year of 2nd Block Period i.e. 2019-20 and First Four Years of 3rd Block Period i.e. 2020-21 to 2023-24.in terms of Rule 54 of SEZ Rules, 2006. Notification :- Performance as compared to projections: for 2nd Block Period FY 2015-16 to FY 2019-20 Approved Projections: (Rs.
2020-21 to 2023-24.in terms of Rule 54 of SEZ Rules, 2006. Notification :- Performance as compared to projections: for 2nd Block Period FY 2015-16 to FY 2019-20 Approved Projections: (Rs. In Cr.)
2015-16 2016-17 2017-18 2018-19 2019-20 TOTAL FOB value of export 601.33 637.76 677.59 720.93 767.91 3405.52 FE outgo 64.89 66.81 68.96 76.43 77.48 354.57 NFE 536.44 570.95 608.63 644.50 690.43 3050.95 Performance as compared to projections: (Rs. In Cr.) Cumulative NFE achieved: (Rs. in Cr.) Year Cumulative NFE Achieved Cumulative % NFE Achieved 2019-20 3297.17 94.56%
Year Export F.E. OUTGO
Projected
Actual Raw Material (Goods/Services) C.G. import Other outflow Projected Actual Projected Actual Actual 2020-21 733.46 751.98 0.00 0.00 84.97 101.41 7.45 2021-22 760.52 780.74
96.32 18.30 2022-23 772.48 996.21
-172.37 37.54 2023-24 793.29 1790.21
-3.91 27.78 TOTAL 3059.75 4319.14 0.00 0.00 84.97 21.45 91.07 Performance as compared to projections: for 3rd Block Period FY 2020-21 to FY 2024-25 Approved Projections: (Rs. In Cr.)
2020-21 2021-22 2022-23 2023-24 2024-25 TOTAL FOB value of export 733.46 760.52 772.48 793.29 817.07 3876.82 FE outgo 47.52 54.85 55.09 55.51 55.98 268.95 NFE 685.94 705.67 717.39 737.78 761.09 3607.87 Performance as compared to projections: (Rs. In Cr.) Cumulative NFE achieved: (Rs.
7.07 3876.82 FE outgo 47.52 54.85 55.09 55.51 55.98 268.95 NFE 685.94 705.67 717.39 737.78 761.09 3607.87 Performance as compared to projections: (Rs. In Cr.) Cumulative NFE achieved: (Rs. in Cr.) Year Cumulative NFE Achieved Cumulative % NFE Achieved 2020-21 725.44 96.47% 2021-22 1460.59 95.29% 2022-23 2409.79 95.29% 2023-24 4163.97 96.41% Employment Achievement
Approved Achieved Men 2629 3736 Women 899 1717 Total 3528 5453 LOA No. & Date SEZ/PUNE/2W/2010-11/6875 Dated 30.04.2010 Location of Unit Ground to 4th Floor, Wing3, Cluster D, EON Kharadi Infrastructure Pvt. Ltd., Plot No.1, Survey No.77, MIDC Knowledge Park Kharadi Pune-411014. Validity of LOA 31.07.2025 IT & ITES 01.08.2010 Execution of BLUT Rs. 239.60 Crores NA Labour Dues NA
NA
issued, if any NA 5453 (Men-3736, Women-1717)
Building
Plant & Machinery 163.96 Rule 34 (unutilized goods) NA NA otherwise.
Yes
The Specified Officer report vide letter dated 11.04.2025 has reported as detailed below:
EXPORT (Rs. In Cr)
Year/
Period
Figures
reported
in
APR
Figures as per
Softex/
Customs
Records
Difference if
any
(1)
(2)
(3)
(4)
(5)
2019-20
822.66
1,048.99
226.33
During the year 2019-2020, audit
adjustment of Rs. (235.03) Crore
has been made.
Balance difference of Rs. 8.70 Crore
is due to Exchange Rate variation.
2020-21
751.98
757.85
5.87
During the year 2020-2021, audit
adjustment of Rs. (17.43) Crore has
been made.
Balance difference of Rs. 11.26
Crore is due to Exchange Rate
variation
1,07,880 Sq.ft
19.78 Sq. ft.
51.98 757.85 5.87 During the year 2020-2021, audit adjustment of Rs. (17.43) Crore has been made. Balance difference of Rs. 11.26 Crore is due to Exchange Rate variation 1,07,880 Sq.ft 19.78 Sq. ft.
2021-22 780.74 767.39 (13.35) During the year 2021-2022, audit adjustment of Rs. (2.65) Crore has been made. Also during the year 2021-2022, Credit Note of Rs. (0.45) Crore was raised. Balance difference of Rs. 16.45 Crore is due to Exchange Rate variation. 2022-23 996.21 1,103.03 106.82 During the year 2023-2024, audit adjustment of Rs. (85.40) Crore has been made. Also during the year 2022-2023, Credit Note of Rs. (35.71) Crore was raised. Balance difference of Rs. 14.29 Crore is due to Exchange Rate variation. 2023-24 1,790.21 1,846.59 (56.38) During the year 2023-2024, audit adjustment of Rs. 73.67 Crore has been made. Also during the year 2023-2024, Credit Note of Rs. (162.54) Crore was raised. Balance difference of Rs. 32.49 Crore is due to Exchange Rate variation. Note-On perusal of the submissions made by the unit it is observed that they have made audit adjustments in each of the above years. During the scrutiny of the APR’s filed, it has been observed that the FOB Value for each of the years from 2019-20 to 2023-24 include the income proceeds of exports of their non-SEZ units. Hence the unit needs to file revised Softex and APR’s for the above periods showing the correct values of the exports done and the correct foreign exchange earned during the year. IMPORT( Rs.
ile revised Softex and APR’s for the above periods showing the correct values of the exports done and the correct foreign exchange earned during the year. IMPORT( Rs. In Cr)
Year/Period Figures reported in APR (FOB Value) Figures as per Customs Records Difference if any (1) (2) (3) (4) (5) 2019-20 4.47 4.66 -0.19 The Actual Import Procurement is Rs 4.66 as per CUSTOMS Records for the Year. Difference is due to Cumulative value reported in APR.
2020-21 101.41 11.96 89.45 The Actual Import Procurement is Rs 11.96 Crores as per CUSTOMS Records for the Year. The difference is due to Cumulative value reported in APR. 2021-22 96.32 9.37 86.95 The Actual Import Procurement is Rs 9.37 Crores as per CUSTOMS Records for the Year. The difference is due to Cumulative value reported in APR. 2022-23 94.72 4.01 90.71 The Actual Import Procurement is Rs 4.01 crores as per CUSTOMS Records for the Year. The difference is due to Cumulative value reported in APR. 2023-24 82.54 0.07 82.47 The Actual Import Procurement is Rs 0.07 crores as per CUSTOMS Records for the Year. The difference is due to Cumulative value reported in APR. Raw Material (Rs.
-24 82.54 0.07 82.47 The Actual Import Procurement is Rs 0.07 crores as per CUSTOMS Records for the Year. The difference is due to Cumulative value reported in APR. Raw Material (Rs. In Cr) Year/Period Figures reported in APR (FOB Value) Figures as per Customs Records Difference if any (1) (2) (3) (4) (5) 2019-20 To 2023-24 0.00 0.00 0.00
BLUT (Rs in Cr) 1 Value of BLUT Executed (Duty Material/ Services) BLUT amount:
Date of Acceptance BLUT Amount 16.11.2020 121.35 Crore 26.06.2023 62.90 Crore 07.10.2024 55.35 Crore Total 239.60 Crore
2 services procured
Category Wise:
Year Wise:
FY Goods Imported & Indigenous Services Imported & Indigenous 2019-20 0.83 19.13 2020-21 3.02 32.20 2021-22 2.27 14.28 2022-23 1.45 17.05 2023-24 1.11 14.51 Total 8.67 97.16 (d) Employment made as on date (31.03.2024) Men: 3736 Women: 1717 Total No Employment :5453 The same has been verified from their Online MPR. (e) (as on 31.03.2024) No foreign remittance is pending. (f) Yes
(g) All the Softex Forms till March 2024 has been certified except for the month of April, 2022. The unit has been asked to map the same to the current officer. (h) No (i) DTA/SEZ/EOU/STPI etc. against during the period. to be provided)
No (j) SEZ Online. NA
pt for the month of April, 2022. The unit has been asked to map the same to the current officer. (h) No (i) DTA/SEZ/EOU/STPI etc. against during the period. to be provided)
No (j) SEZ Online. NA
(k)
Yes, (Rs. In Crore) FY Value Duty Payable 2021-22 0.26 0.11 2022-23 0.03 0.01 2023-24 2.45 0.89 (l) No (m) Office. Yes (n) Whether unit has filed all DTA Yes (o) report No IDs pending for OOC (p) canteen/ food court in unit premises? If yes, whether permission from otherwise. facility?
No
(q) No e. Recommendation: The Unit has achieved export revenue of Rs. 822.66 Crores as against the projected export of Rs767.91 Crores and achieved positive NFE of Rs. 3297.17 Crores which is 94.56 % on cumulative basis in Last Year of 2nd Block Period i.e. FY 2019-20. The Unit has achieved export revenue of Rs.4319.14 Crores as against the projected export of Rs. 3059.75 Crores and achieved positive NFE of Rs. 4163.97 Crores which is 96.41% on cumulative basis in 3 years of 2nd Block Period i.e. FY 2021-22 to 2023-24. The Unit is required to revise the APRs to fill the correct Amortize value during FY 2019-20 to 2023-24. As per SO report the unit has achieved employment of 5453 employees (Men-3736, Women- 1717) Approval committee may kindly monitor the performance of the Unit for for Last Year of 2nd Block Period i.e. 2019-20 and First Four Years of 3rd Block Period i.e. 2020-21 to 2023-24. in terms of Rule 54 of SEZ Rules, 2006. in terms of Rule 54 of SEZ Rules, 2006.
20 and First Four Years of 3rd Block Period i.e. 2020-21 to 2023-24. in terms of Rule 54 of SEZ Rules, 2006. in terms of Rule 54 of SEZ Rules, 2006.
a. Proposal : Proposal dated 20.03.2025 & 16.04.2025 submitted by M/s. LTIMindtree Limited., IT/ITES unit located in M/s. EON Kharadi Infrastructure Pvt. Ltd.- SEZ Phase-I for Change in the Board of Director. Approval of the Committee for Change in Board of Director, in terms of Instruction No. 109 dated 18.10.2021, as detailed below: Notification :- As per para (i) of Instruction no. 109, dated 18.10.2021, “Reorganization including change of name, Change of Shareholding pattern, business transfer arrangements, court approved mergers and demergers, change of constitution, Change of Directors, etc. may be undertaken by the Unit Approval Committee (UAC) concerned subject to the condition that the Developer/Co-developer/ Unit shall not opt out or exit out of the Special Economic Zone and continues to operate as a going concern. All liabilities of the Developer/Co-Developer/Unit shall remain unchanged on such reorganization.” … Previous List of Board of Director: Sr. No. Name of Director Designation Date of Cessation 1. Mr. A M Naik Non-Executive Chairman 26/06/2024 2. Mr.Rajnish Kumar 27/07/2023 3. Mr.Sudhir Chaturvedi President-Sales and Whole Time director 27/01/2025 4. Mr. Sekharipuram Narayanan Subrahmanyan Non-Executive Vice Chairman
Mr.
an 26/06/2024 2. Mr.Rajnish Kumar 27/07/2023 3. Mr.Sudhir Chaturvedi President-Sales and Whole Time director 27/01/2025 4. Mr. Sekharipuram Narayanan Subrahmanyan Non-Executive Vice Chairman
Mr. R Shankar Raman Non-Executive Director
Mr.Nachiket Deshpande Chief Operating Officer and Whole time Director
Sanjeev Aga
Mr.James Varghese Abraham
9 Mr. Vinayak Chatterjee Independent Director
10 Mr. Debashish Chatterjee Chief Executive Officer and Managing Director
11 Ms. Apurva Purohit
Mr. Bijou Kurien
Mr. Chandrasekaran Ramakrishnan
Proposed List of Board of Director: Sr. No. Name of Director Designation Date of Appointment 1. Mr. Sekharipuram Narayanan Subrahmanyan Non-Executive Vice Chairman 10.01.2015 2. Mr. Ramamurthi Shankar Raman Non-Executive Director 28.10.2015 3. Mr. Debashish Chatterjee Chief Executive Officer and Managing Director 14.11.2022 4. Mr.Nachiket Deshpande Chief Operating Officer and Whole time Director 02.05.2019 5. Mr. Sa
Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.
No analysis generated for this document yet (analysis runs over brief docs + on-demand). Run build_analysis.py --ids 5867 --apply.