IN FORCE SEZ / EOU / FTWZ
Agenda for Approval Committee meeting for SEZ Pune Cluster to be held on 28 March 2024.
Document text
This source is a ZIP archive served with a .pdf extension. It contains 13 PDF document(s), extracted and converted individually. The text is in those documents, not here.
Contents
- 00-embassy-pune-techzone-pvt-ltd-sez
- 01-eon-kharadi-phase-i
- 02-eon-kharadi-phase-ii
- 03-infosys-ltd-developer-ii
- 04-krc-gera-sez
- 05-magarpatta-city-sez
- 06-manjri-stud-farm-pvt-ltd-sez
- 07-midc-kesurdi
- 08-midc-pune-sez
- 09-midc-aurangabad
- 10-nalanda-shelters-pvt-ltd-sez
- 11-qubix-business-park-pvt-ltd-sez
- 12-serum-biopharma-park-sez
Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.
Analysis
No analysis has been generated for this document yet.