IN FORCE SEZ / EOU / FTWZ undated

नोएडा और ग्रेटर नोएडा एसईजेड में यूनिट अनुमोदन समिति की बैठक का कार्यवृत्त 19/03/2020 पर आयोजित

Document text

feet : 19/03/2020

==> picture [51 x 54] intentionally omitted <==

----- Start of picture text -----<br> Zecm<br>e Coe<br>----- End of picture text -----<br>

==> picture [22 x 9] intentionally omitted <==

----- Start of picture text -----<br> ain fare<br>----- End of picture text -----<br>

MIN. OF COMMERCE & INDUSTRY, DEPTT. OF COMMERCE OFFICE OF THEGOVERNMENTDEVELOPMENTOF INDIACOMMISSIONER NOIDA SPECIAL ECONOMIC ZONE NOIDA DADRI ROAD, PHASE-II, NOIDA-201305 DISTT. GAUTAM BUDH NAGAR (UP)

Toe, 10/20/2007-SEZ/

Bar Ft,

  • 1, 30 Afaa, ares fears, afttssva sult HATA, Ia ALG, Seiler saat, AS esit- 110001 | 2. aioe aerfereernfacer cara, aftreava stile Aarera, 'w fear, saver sraaz, 37S Th wee, as esi— 110002 | 201306.
  1. Weller HAF, HAH, conte B- U-2 ZY, WAHL saat, ACT 24, AEST |

  2. Awa wrederet arta, =z siherenr aitentferer Perret writrencor, EE wenafetaysaat,ACT6, AST (SAT weer)|

  3. Wer arto site, dex atvsr sibentferen feenre oniteneer, coeaf 01, aAtetotUreh -4, dex aitesr, attaar Fae AN, (TAL WEN)|

  4. Agrratren, Foret Sear aie, oteeeFH UT ALATT WET AST (SAL WSR) | 9. SHCA, FrrarertGat frre wiraer sitesaft 2 Vs Ah areig arfea Hiatal Wait 203131 10. Waftrafaery airftten ata fanart|

  • fava: feet 19/03/2020 # Yate 11.45 Tat weraferen sae, atest facts anfeleata, atest a aratistaatest, dex aAlUsl Va Galt (Sax Weer) A ere fro favre ania dat M sarales wiaria dow ar ariga - vag deelill

aelad,

sna fara & deat F sto ver at Meret, rare arya, atest fate anfiter ata at arezerar a eta 19/03/2020 a Yalect 11.45 got wereieey saat, atest fete aifeterata, atest A aratferasrratfsra atest Pex atest Ua Galt (SAX Weer) FH feet fersht feeds anita eat A arepataat alae dow ar wriga dere 8]

Taare,

"202-0 3 fare set

afatenr-: eraanne syra (Tee) - HGe A wa wie Pat separa oe Borsa & |

Tel. Zone Office : 0120 - 3021444 -446 (4 Lines), Fax : 2562314, 2567276 City Office : State Trading Corporation of India Ltd.4" Floor, Jawahar Vyapar Bhawan, Tolstoy Marg, New Delhi-110001 E-mail : < dce@nsez.gov.in > : Website: < www.nsez.gov.in >

arest faeryGTairfttar faeryGTairfttarGTairfttarairfttar aw[[sreqeaer]] INmes,ter terBYHrter terBYHr terBYHrBYHrHr a mes,ter terBYHrter terBYHr terBYHrBYHrHr FeRevieRevieesr 19/03/2020 1910372020 ake wat asr 19/03/2020 1910372020 ake wat a 19/03/2020 1910372020 ake wat a 1910372020 ake wat a a itriri e esr 19/03/2020 1910372020 ake wat asr 19/03/2020 1910372020 ake wat a 19/03/2020 1910372020 ake wat a 1910372020 ake wat a at1Reerersirattarerserait fatatt1Reerersirattarerserait fatattReerersirattarerserait fatattsirattarerserait fatattserait fatatt tomedoarfarebe HYBYanfifer rtarelger atat ||doarfarebe HYBYanfifer rtarelger atat ||farebe HYBYanfifer rtarelger atat || HYBYanfifer rtarelger atat ||BYanfifer rtarelger atat ||anfifer rtarelger atat || rtarelger atat ||arelger atat || atat ||

: $a aw[[sreqeaer]] a a itriri e ake wat a wat a a fatatt arest faeryGTairfttar faeryGTairfttarGTairfttarairfttar INmes,ter terBYHrter terBYHr terBYHrBYHrHr FeRevieRevieesr 19/03/2020 1910372020 ake wat asr 19/03/2020 1910372020 ake wat a 19/03/2020 1910372020 ake wat a 1910372020 ake wat a at1Reerersirattarerserait fatatt1Reerersirattarerserait fatattReerersirattarerserait fatattsirattarerserait fatattserait fatatt tomedoarfarebe HYBYanfifer rtarelger atat ||doarfarebe HYBYanfifer rtarelger atat ||farebe HYBYanfifer rtarelger atat || HYBYanfifer rtarelger atat ||BYanfifer rtarelger atat ||anfifer rtarelger atat || rtarelger atat ||arelger atat || atat || aest, Hex attest sit Gott A feet fart fade anther atat a aaer a srqmtar a St Rae 19.03.2020 # Yalect 11:45 at AeAoret Viet, Tears staat, aresr Paste arta ata, ATTST (SAT Weer) H sto ote do Rierer, feemre srgaat A sitaeran a satis dow wr erigar |

The following members of Approval Committee were present during the meeting:-

  • (i) Shri S. S. Shukla, Joint Development Commissioner, NSEZ. (ii) Shri Shyopat Singh, Asstt. Commissioner (Customs), Noida. (iii) Shri Chaman Lal, FTDO, O/o Addl. DGFT, CLA, New Delhi.

  • (iv) Ms. Sandhya Marurya, Income Tax Officer, Noida

  • (v) Shri Mukesh Goyal, Manager, Noida Authority

  • (vi) Md. H.U. Farooq, Asstt. Manager, Noida Authority

  • (vii) Representative of SEZ Developer concerned, Special Invitee.

oo Besides, during the meeting i) Shri Rajesh Kumar, DDC, ii) Shri S.K. Tyagi, Specified Officer (In-Charge) & iii) Shri Prakash Chand Upadhyay, ADC were also present to assist the Approval Committee.

“se At the outset, the Chairman welcomed the participants. After brief introduction, each items included in the agenda were taken up for deliberation one by one. After detailed deliberations amongst the members of the Approval Committee as well as interaction with the applicants / representatives of the developers / units, the following decisions were taken:-

1. ‘fete 06.03.2020 or satis areptaat afarie ht soon ht area ar areprarehar

The Approval Committee was informed that no reference against the decisions of the Approval Committee held on 06.03.2020 was received from any of the members of the Approval Committee or Trade and therefore, Minutes of the Meeting held on 06.03.2020 were ratified. 2. He divaea gefecuet (sa) wede fates ar to arat somes wede PARES A calic we 21 aeerCaraiir-4, Tex aAteaT (SER Maer) H Rarer age TST Ree anther ata at gang Ear Fy aTaaT |

2.1. It was brought to the notice of the Approval Committee that M/s. CNH Industrial (India) Private Limited has submitted a proposal for setting up of unit over an area of 1000 Sqft. (approx. 92.90 Sqmt.) on Ground floor, Tower-2 in the IT/ITES SEZ of M/s. Artha Infratech Pvt. Ltd. at Plot No. 21, Sector-Techzone IV, Greater Noida (Uttar Pradesh) to undertake service activities i.e. ‘Back Office Operations, Engineering & design services’ with projected exports of Rs.45114.30 lakhs and cumulative NFE of Rs.33835.72 lakhs over a period of five years. It was also informed that the applicant has proposed investment of Rs.5000 lakhs towards imported capital goods; Rs.4500 lakhs towards indigenous capital goods, Rs.2000 lakhs towards imported raw materials; Rs.1000 lakhs towards indigenous raw materials and the cost of project shall be met from the internal accruals. It was further informed that applicant has submitted copy of letter of provisional offer of space dated o</ 9) Page 1 of 4

ates, dex aitesr site aatt a Rarer fetal faete aiftar abst a aealearafetter ar feet 19/03/2020at sralterr dow # arefger | 17.03.2020 issued by M/s. Artha Infratech Pvt. Ltd., developer for allotment of 1000 Saft. (approx. 92.90 Sqmt.) on Ground floor, Tower-2. It was further informed that the SEZ Developer, M/s. Artha Infratech Pvt. Ltd. vide its letter dated 18.03.2020 has also given its consent to provide 50000 Saft. space to the applicant unit during the year 2020-2021.

2.2. Mr. Davide Beccaria, CFO & Mr. Amardeep Kanodia, Tax Manager of M/s. CNH Industrial (India) Private Limited appeared before the Approval Committee. Besides, Shri S.K. Gupta, Director and Shri Shagun Gupta, Director of M/s. Artha Infratech Pvt. Ltd. (SEZ Developer) also appeared before the Approval Committee. The representative informed that M/s. CNH Industrial (India) Private Limited had incorporated in India in 1992. They informed they have facilities in Indore and other places in India. About 600 Million Doller investment have been made in India and about 3000 employment has been provided. It has also been informed the Group turnover is around 02 Billion Dollars. They want to create R&D centre in India. Initially the unit proposed in DLF SEZ, Gurugram however subsequently they realized that they have better options in Artha SEZ and its will be near to their already existing plant of Holland Tractors in Greater Noida. They further informed that there will be a fresh investment by internal accruals of M/s. CNH Industrial (India) Private Limited. Further, they further informed that the proposed SEZ unit will provide engineering & design services to its own group companies globally. On being asked about requirement of area of 1000 Sqft. against proposed employment of 1200 Nos., the representative of the applicant informed that 1000 Saft. have been taken initially to start business operations from SEZ with 15 employee which could increase up to 1200 during the course of 5 years for which they have approached to the SEZ developer and the developer has given consent to allot additional 50000 Sqft. area in SEZ, during the FY 2020-2021.

  • 2.3. After due deliberations, the Approval Committee approved the proposal. 3. He cermaccdl afadar fortes & core Ho 01, Arex-157, Alvst (Sat Veer) A atfewrss anser / ansdtéva faets afte ata ar atvst waiter qanr seated aria & aeaeer A |

3.1. It was brought to the notice of the Approval Committee that the Developer, M/s. Tata Consultancy Services Ltd. has been granted LOA No. K-43016(11)/1/2020-SEZ dated 06.03.2020 by the DOC for setting up a IT/ITES SEZ over an area of 19.90 Hectares at Plot No. 01, Sector-157, Noida (Uttar Pradesh). DOC has notified an area of 19.9001 hectares land and constitution of Approval Committee in respect of said SEZ vide Gazette Notification No. S.0.1089(E) dated 13.03.2020. It was informed that M/s. Tata Consultancy Services Ltd., Developer vide its letter dated 16.03.2020 has submitted copy of the approval of Map (arerfera) in respect of said SEZ project issued by Noida Authority vide letter No. atvst/eatefere/2020/BP-12900/613 dated 05.03.2020. It was informed that the said Map has been approved by Noida Authority with a validity period of 5 years and subject to conditions mentioned therein.

==> picture [3 x 12] intentionally omitted <==

----- Start of picture text -----<br> '<br>----- End of picture text -----<br>

AAT

Page 2 of 4

,

aber, dee aesr site aott at Reever Fart faeby ainfttar stat a weer ane HY Pear 19/03/2020 at xraitart doa a arte |

3.2. Shri Mukesh Goyal, Manager, Noida Authority informed that the said Building plan has been approved by the Noida Authority and the developer can start construction activity immediately.

3.3. Shri S.K. Nair, SGM & Shri Devender Sharma, Sr. Manager of M/s. Tata Consultancy Services Ltd. appeared before the Approval Committee. Shri Nair informed the Approval Committee that the project is for 4.1 million Sqmt. and initial approval for Phase-| has been obtained with approved drawings for 1.77 million Sqmt. He further informed that boundary wall of notified SEZ land is under construction and initial development of 01 Block of 1691 Sqmt. as Initial Development Centre (IDC) building is completed for 200 associates and they are awaiting for part occupancy certificate. He informed that the said construction has already been done, without taking any tax/duty benefit on it. He further informed that TCS will not be claiming the Customs / GST benefits for the development of said SEZ. Further, he informed that 100% construction activity to be done within 3-5 years.

3.4. After due deliberations, the Approval Committee took note of the Building plan approval in respect of IT/ITES SEZ of M/s. Tata Consultancy Services Ltd. at Plot No. 01, Sector-157, Noida (Uttar Pradesh) on the basis of the approval issued by Noida Authority vide letter No. atvst/aoatefere/2020/BP-12900/613 dated 05.03.2020, subject to conditions mentioned therein.

  1. Ho cermacedt fads feraes ar to creer Haceal Uladar feriAes H coe Wo 01, Arex-157,aANVST (FAT Geer) a alfewrss arset / ssdisva faery sirite ata A saHrs Cala Hier HT WaT | 4.1. It was brought to the notice of the Approval Committee that M/s. Tata Consultancy Services Limited has submitted a proposal for setting up of unit over an area of 441154.92 Sqmt. (4748552.04 Sqft.) super Built-up area in the recently notified IT//TES SEZ of M/s. Tata Consultancy Services Limited at Plot No. 01, Sector-157, Noida (Uttar Pradesh) to undertake service activities i.e. ‘Computer Software Services IT Enabled Services such as Back-Office Operations, Data Processing, Engineering and Design, Remote Maintenance and support centres. Computer and Related Services, Data Services, Research and Development Services, Legal Services, Accounting, Auditing and BookKeeping Services, Taxation Services’ with projected exports of Rs.2235000 lakhs and cumulative NFE of Rs.1603172 lakhs over a period of five years. It was also informed that the applicant has proposed investment of Rs.84923 lakhs towards imported capital goods; Rs.67230 lakhs towards indigenous capital goods and the cost of project shall be met from the internal resources of the company. It was further informed that applicant has submitted copy of letter of provisional offer of space dated 02.03.2020 issued by M/s. Tata Consultancy Services Ltd., SEZ developer for allocated 441154.92 Sqmt. Super Built-up area for this proposed SEZ unit. It was further informed that a breakup details of the built-up space in Software Development Block Tower-1, 2, 3, 4 & 5, IDC Block, Utility Block, Temporary Gate House, Gate House, Guard Room, Transit Hub & Welcome Block proposed to be allotted to this proposed SEZ unit, has also been submitted.

ae

Page 3 of4

,

athosr, dex aatesr site aott at feerer fatal frebe ainftfer ata a& sreeneartate BY featiee 19/03/2020ab sirattarr dow a aretger |

,

4.2. Shri S.K. Nair, SGM & Shri Devender Sharma, Sr. Manager of M/s. Tata Consultancy Services Ltd. appeared before the Approval Committee. Shri Nair informed the Approval Committee that the project is for 4.1 million Sqmt. and initial approval for Phase-| has been obtained with approved drawings for 1.77 million Sqmt. He further informed that boundary wall of notified SEZ land is under construction and initial development of 01 Block of 1691 Sqmt. as Initial Development Centre (IDC) building is completed to accommodate 200 employees and they are awaiting for occupancy for the same. He informed that this project is vis-a-vis for 30,000 associates which can be scaled upto 40,000 associates. The first phase will accommodate approximately 18,000 associates. The overall project cost is expected to be around 2400 crores. He further informed that TCS will not be claiming the Customs / GST benefits for the development of said SEZ. Approval Committee took note of this. Further, he informed that DG(Systems) will issue Port-Code in respect of this SEZ within next 1-2 days.

4.3. After due deliberations, the Approval Committee approved the proposal, subject to following terms & conditions:-

  • (i) | The construction of Boundary wall shall be completed as per the provisions of Rule 11(2) of SEZ Rules, 2006, prior to the commencement of activities by the SEZ unit.

  • (ii) | The unit will commence operation only after receipt of Occupancy Certificate by the SEZ Developer.

  • (iii) Operationalization of SEZ unit shall be done only after allocation of Port-Code by DG (Systems) in respect of this SEZ.

==> picture [260 x 101] intentionally omitted <==

----- Start of picture text -----<br> The meeting ended with a vote of thanks to the Chair.<br>0B [oneal]<br>(Ho THe1Weel)<br>----- End of picture text -----<br>

==> picture [112 x 90] intentionally omitted <==

----- Start of picture text -----<br> aeweA<br>(SI°CUWere dio Feet)<br>----- End of picture text -----<br>

Page 4 of 4

Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.

Analysis

No analysis has been generated for this document yet.

Citation copied