← Archive
IN FORCE SEZ / EOU / FTWZ

यूएसी बैठक एचसीएल आईटी सिटी का कार्यवृत्त 26-05-20 को आयोजित

Reliability

In force — no superseding record on file.

Document text

==> picture [32 x 30] intentionally omitted <==

----- Start of picture text -----<br> ~<br>CGE<br>ante<br>----- End of picture text -----<br>

WI. F.10/07/2015-vasats /

GOVERNMENT OF INDIA MIN. OF COMMERCE & INDUSTRY, DEPTT. OF COMMERCE OFFICE OF THE DEVELOPMENT COMMISSIONER NOIDA SPECIAL ECONOMIC ZONE NOIDA DADRI ROAD, PHASE-II, NOIDA-201305 DISTT. GAUTAM BUDH NAGAR (UP)

feat: 01/06/2020

aaa,

  1. 30 afte (wages), aftrse ene, afterve sult Aarts, ANA ATH, Sev saet, TS Ere -110001 | 2. ayaa aerfercersh Ferccer Saray, 117/ee-444. aHTHTAA, HIATT— 208025 (SAT TaRW) | 3. aye, Ha ees, 7-0, 5- area Al, AGawH[—][ 226001][(SAC][ Fae)] | 4, Aya AGA, HTH, Lor— 4, Sey Heer, 5- aeellen AV, AAAS— 226001 (SAT TERN) | alg feel

  2. dara afea, argo do ud gceciirreT fase, Hat qAT-312 31, aft caer TeIGT IA staat (Tete seer), WATS, (JAC TA) |

  3. STATA, Forte stactierra HTT fereres, 10 - arelley art, MeSH— 226001 (SAC Tae) | 8. faaraaal, te veo elo vate 31S lo Al ATA Uo fere, 806, Raenre, 96, age cote, ag frei— 1100191

fava: Raia 26/05/2020 Hi 3UEA 12:30 oat Aa aida & mega S salsa Taolovete ssedlo fact WAS Wo fro A aA F wa aah ret waar / rs siftte ata Fr aon aT : Cl

aelad,

sWiead fay H Teast F sto veto ato ere fears se, arest faery airftter ata At sreaarar a wader ager Ret eeewe fero AT Tat Hotel Va AAAS, oH wolhtar wre, TrargaVs, TeAH (SAC Weer) rat airgey/ arrgeiorer feeds arfiter ata ahr atepsitaat Ufa fer Hr Peete 26.05.2020 ar sae 12:30 sot fatsatpres hAer & aera S HeAlfeard son HT HrGa Were F |

;

==> picture [107 x 71] intentionally omitted <==

----- Start of picture text -----<br> ee<br>7h)<br>ove<br>(Trot 3 )<br>So fers ayraT<br>----- End of picture text -----<br>

wiafert-:

Uelaey Prawre HTT (TATA) - HAGA Ht Vay whe Ear srepare Se Aetee

|

Tel. Zone Office : 0120 - 3021444 -446 (4 Lines), Fax : 2562314, 2567276 City Office : State Trading Corporation of India Ltd.4" Floor, Jawahar Vyapar Bhawan, Tolstoy Marg, New Delhi-110001 E-mail : < de@nsez.gov.in > : Website: < www.nsez.gov.in >

vale of Approval Committee meeting of HCL IT City Lucknow Pvt. Ltd. held on 26/05/2020 Sto Ute flo flan, fara age, ater fate arta aa Ft aeaerat # Ao waelivaasst AAT AGS Wo fo F Aas, (Sax wea) F fea argdversteva facts afte aa At aquired afata at feria 26.05.2020 at arrest 12:30 at fafear atcha & aera @ area dow ar artae |

The following members of the Approval Committee were present during the meeting:-

  • (i). Shri S. S. Shukla, Joint Development Commissioner, NSEZ (physically present in NSEZ).

  • (i) | Shri Praveen Kumar, DGM, UPLC., Govt. of Uttar Pradesh (present through video conferencing).

  • (ii). Shri Himanshu Pandey, Asstt. DGFT, Kanpur Pradesh (present through video conferencing).

  • (ii) | Shri Kishor Kumar Chauhan, Supdt., Customs, Lucknow (present through video conferencing).

  • (iii) Shri D.K. Sharma, General Manager-Commercial, HCL IT City Lucknow Pvt. Ltd.Representative of SEZ Developer, Special invitee (present through video conferencing).

Besides, i) Shri Rajesh Kumar, DDC & ii) Shri Prakash Chand Upadhyay, ADC were present in NSEZ Office and participated in the meeting through video conferencing to assist the Approval Committee.

Besides, i) Shri Rajesh Kumar, DDC & ii) Shri Prakash Chand Upadhyay, ADC were present in NSEZ Office and participated in the meeting through video conferencing to assist the Approval Committee.

At the outset, the Chairman welcomed the participants. After brief introduction, the Chairman enquired about the performance of SEZ. Shri D.K. Sharma, Associate Director of M/s. HCL IT City Lucknow Pvt. Ltd. (SEZ Developer) joined the meeting through video conferencing and informed that they have 24.69 hectare area of SEZ out of which approx. 8.68 lakhs Sqft. has been constructed/ developing under Phase-1 which comprises of IT Block-01, IT Block 02, IT Block 03, Café, Utility Blocks & Customs office etc. Further, he informed that from the HCL Technologies LtdSEZ Units have exported services of approx. Rs.359 Crores during FY 2019-20 from this SEZ. The present manpower is approx. 4000 and most of them are presently Working From Home (WFH). Approximately 80 — 200 employees are working form SEZ campus.

Thereafter, each items included in the agenda were taken up for deliberation one by one. After detailed deliberations amongst the members of the Approval Committee as well as interaction with the applicants / representatives of the developers / units, the following decisions were taken:-

ter detailed deliberations amongst the members of the Approval Committee as well as interaction with the applicants / representatives of the developers / units, the following decisions were taken:-

  1. ferettee 28/01/2020 at arrester stepalaet afar At dow A areiga ar srepearet :- The Approval Committee was informed that no reference against the decisions of the Approval Committee held on 28/01/2020 was received from any of the members of the Approval Committee or Trade and therefore, Minutes of the Meeting held on 28/01/2020 were ratified. dyeh — Page 1 of2

Minutes of Approval Committee meeting of HCL IT City Lucknow Pvt. Ltd. held on 26/05/2020

==> picture [7 x 11] intentionally omitted <==

----- Start of picture text -----<br> /<br>----- End of picture text -----<br>

2. do vadive anédt fact waa oe feo, arrHat wr fasts anit ata A HHA Aalst w fore aera hr at Ar Aol aT weara|

2.1. It was brought to the notice of the Approval Committee that M/s. HCL IT City Lucknow Pvt. Ltd., Developer had submitted three proposals for approval of list of materials to carry on following authorized operations in its IT/TES SEZ at Village Kanjehara & Mastemau, Chack Gajaria Farms, Sultanpur Road, Lucknow (Uttar Pradesh):-

==> picture [493 x 275] intentionally omitted <==

----- Start of picture text -----<br> S. Authorized Operation SI. No. at default list .<br>No. of Authorized Estimated<br>Operations as per :<br>Inst. No. 50 &54 | (Rs: in lakhs)<br>.<br>(i) Construction of all types of buildings in processing 22 298.09<br>area as approved by the Unit Approval Committee<br>Access control and monitoring system.<br>Electrical, Gas and Petroleum Natural Gas 04 125.00<br>itt) Distribution Network including necessary § sub-<br>stations of appropriate capacity, pipeline network<br>etc.<br>TotalsProposal-ll | 483.00<br>(iv) Construction of all types of buildings in processing 22 20.00<br>area as approved by the Unit Approval Committee.<br>Proposal-Ill<br>(v) Construction of all types of buildings in processing 22 67.50<br>area as approved by the Unit Approval Committee.<br>rand Total: | [520.50]<br>----- End of picture text -----<br>

sal-Ill<br>(v) Construction of all types of buildings in processing 22 67.50<br>area as approved by the Unit Approval Committee.<br>rand Total: | [520.50]<br>----- End of picture text -----<br>

2.2. Shri D.K. Sharma, Associate Director of M/s. HCL IT City Lucknow Pvt. Ltd. joined the meeting through video conferencing and explained the requirement of proposed materials. He informed that the intended goods are required to develop IT Block-02.

2.3. After due deliberations, the Approval Committee approved the proposed list of materials.

The meeting ended with a vote of thanks to the Chair.

==> picture [86 x 80] intentionally omitted <==

----- Start of picture text -----<br> jot<br>(THe THe Vere)<br>A ) T 3 Fe)<br>----- End of picture text -----<br>

==> picture [114 x 110] intentionally omitted <==

----- Start of picture text -----<br> “<br>A\ _<br>(S10 Tero ato FRerer)<br>°<br>----- End of picture text -----<br>

Page 2 of 2

Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.

Analysis

No analysis generated for this document yet (analysis runs over brief docs + on-demand). Run build_analysis.py --ids 4898 --apply.

Citation copied