← Archive
IN FORCE SEZ / EOU / FTWZ

यूएसी बैठक एचसीएल आईटी सिटी का कार्यवृत्त 09-08-19 को आयोजित

Reliability

In force — no superseding record on file.

Document text

GOVERNMENT OF INDIA MIN. OF COMMERCE & INDUSTRY, DEPTT. OF COMMERCE CEN OFFICE OF THE DEVELOPMENT COMMISSIONER GH NOIDA SPECIAL ECONOMIC ZONE mee NOIDA DADRI ROAD, PHASE-II, NOIDA-201305 DISTT. GAUTAM BUDH NAGAR (UP)

aaa,

  1. dere, afore ena, afore va seer Harry, aN GLH, See staat, aS Feel -110001 | 2. Wasa Herferdern freer cara, 117/444. THAT, HAGL[—][ 208025][(SAX][ WaT)] | 3. saree, aha erews Ud alter Seure oom, 7-0, 5- aretha AML, TAH — 226001 (SAX Ha) | 4. Sara eee, HTH, Lar4, ararany ara, 5- areller HTef, TeTAS— 226001 (SAL Wael) | ag feeeitl

  2. att watedo Pig, Hyaa Uta, ase Clo ud sta Terae Asa, HAT AAT-31231, AM ore aeTAN eMeAT a (waa saat), THATH, (FAC War) |

  3. at wdtor wan, 30 AeTTdtr, Foto Sag ea SRR feats, 10 - sel Art, TMAH[-][226001][(SAT] weer) |

  4. faareadi, to wae alo vate 3Se Ste FEI AUAH Uo foro, 806, Feel, 96, ates cote, 7g eel— 1100191

  • faea: Rater 09.08.2019 Fi 3ed 12:30 at aiethe sla, wenaiere saa, atest faste site ata atest a HAS VaoPtoucte sSodte ACI TWAS we fero A Wa Hoel Va ALANS,UH TARA HA, Tray aaa | fasts aifite ata fr aon aT - ra

  • aelad, smied faye & aeasl A sto ve dt fae, fawn sara, arest fasts aifite ata fr sreaarar A feerar

  • 09/08/2019 i Ute 12:30 act Ueataet Bla, Weft staat, atest faete anita ata, atest A sali vader arse ft AEA vie fro HM ar HAT Us AES, aH Taha Hel, Feary VS, TTAS (aT vax!) fEra amsay/ argdisve fate anfter ata A arepaitaat Blair At dow an Higa Weer F |

==> picture [2 x 31] intentionally omitted <==

----- Start of picture text -----<br> .<br>----- End of picture text -----<br>

==> picture [90 x 74] intentionally omitted <==

----- Start of picture text -----<br> sraare,<br>(rater }/<br>ao fenre sare<br>----- End of picture text -----<br>

re text -----**<br>

==> picture [90 x 74] intentionally omitted <==

----- Start of picture text -----<br> sraare,<br>(rater }/<br>ao fenre sare<br>----- End of picture text -----<br>

Tera (AHA HTT (TATeT) - wreiga A var oe Eat separa Sa Meret F |

ee Tel. Zone Office ;: 0120 - 3021444 -446 (4 Lines), Fax : 2562314, 2567276 City Office : State Trading Corporation of India Ltd.4" Floor, Jawahar Vyapar Bhawan, Tolstoy Marg, New Delhi-110001 E-mail : < dc@nsez.gov.in> : Website: < www.nsez.govin >

=

Minutes of Approval Committee meeting of HCL IT City Lucknow Pvt. Ltd. held on 09.08.2019 Ho vada 3184 HAY aaa We fo H wEas, (sar weer) Rea arsdvansdiécaaets afte aa HM aeaqHlad alate Fr Retr 09.08.2019 Ht Hoea 12:30 ast BEA Slot, Wears Hae, AST facts after ata, atest (Sax Weer) A slo veto do fuer, rare sare Hr sreaarar A sraifora dow Fr ariga|

The following members of the Approval Committee were present during the meeting:-

  • (i). Shri M.B. Singh, Jt. Secretary, IT & Electronics Deptt. Govt. of U.P.

  • (ii). Shri Praveen Kumar, DGM, U.P. Electronics Corp. Ltd.

  • (iii). Shri H.D. Pandey, Asstt. DGFT, Kanpur

  • (iv). Shri Kishor Kumar Chauhan, Supdt., Customs, Lucknow

  • (v). Shri D.K. Sharma, General Manager-Commercial, HCL IT City Lucknow Pvt. Ltd.Representative of SEZ Developer, Special invitee.

Besides, during the meeting i) Shri Rajesh Kumar, DDC & ii) Shri Prakash Chand Upadhyay, ADC were also present to assist the Approval Committee. > At the outset, the Chairman welcomed the participants. After brief introduction, the Chairman enquired about the performance of SEZ. The representatives of the developer informed that the total notified area of SEZ is 24.69 hectare and total area has been demarcated as processing area. They further mentioned that construction of 02 Towers comprising of 6.82 lakhs Saft. have been completed and 3° Tower of 1% Phase is under construction.

l area has been demarcated as processing area. They further mentioned that construction of 02 Towers comprising of 6.82 lakhs Saft. have been completed and 3° Tower of 1% Phase is under construction. It was further informed by the ° representatives of the developer that presently employment for 3300 persons has been generated with export of Rs.175 Crore during the financial year 2018-19. The representative of the developer further informed that the expected export projection is Rs.200 Crore during financial year 2019-20 and total employment generation will be approx. 5500 persons by end of FY 2019-20. The Approval Committee observed that exports in the SEZ is not satisfactory as compare to the area notified for SEZ and duty free goods / services granted to the developer by the Approval Committee, since inception. DC directed the representative of the developer to apprise the same to their higher management for taking effective steps for the growth of exports & employment generation from SEZ.

Thereafter, each items included in the agenda were taken up for deliberation one by one. After detailed deliberations amongst the members of the Approval Committee as well as interaction with the applicants / representatives of the developers/ units, the following decisions were taken:-

01. fee 27/12/2018 # areata stetatant aia Ht dow Ht artga ar separate

:-

The Approval Committee was informed that no reference against the decisions of the Approval Committee held on 27/12/2018 was received from any of the members of the Approval Committee or Trade and therefore, Minutes of the Meeting held on 27/12/2018 were ratified. by Page 1 of5

Minutes of Approval Committee meeting of HCL IT City Lucknow Pvt. Ltd. held on 09.08.2019

!'

2. Ho wadiva ansdt Fadl aaas We fete, fAarrHat wr faery aifeten ata A aiflpa Waleed F fore ararait Fr wet fr Hot sr Weare|

2.1. It was brought to the notice of the Approval Committee that M/s. HCL IT City Lucknow Pvt. Ltd., Developer had submitted two proposals for approval of list of materials to carry on following authorized operations in its IT/ITES SEZ at Village Kanjehara & Mastemau, Chack Gajaria Farms, Sultanpur Road, Lucknow (Uttar Pradesh):-

|S<br>N<br>°|Name ofAuthorized Operation|S. No. atdefault list | Estimated Cost<br>ofAuth. Opr. as per<br>(Rupees in<br>Inst. No. 50& 54<br>lakhs)|S. No. atdefault list | Estimated Cost<br>ofAuth. Opr. as per<br>(Rupees in<br>Inst. No. 50& 54<br>lakhs)|S. No. atdefault list | Estimated Cost<br>ofAuth. Opr. as per<br>(Rupees in<br>Inst. No. 50& 54<br>lakhs)|
|---|---|---|---|---|
|Proposal||pe|||
|1.|| Construction of all types of building in Processing|22||4089.32|
||area as approved by UAC||||
|2.|| Electrical,<br>Gas<br>and<br>Petroleum<br>Natural<br>Gas|04||2290.35|
||Distribution<br>Network<br>including<br>necessary<br>sub-||||
||stations of appropriate capacity, pipeline network||||
||etc.||||
|3.|| Solid and liquid waste collection, treatment and|03||0.45|
||disposal<br>plants<br>including<br>pipelines<br>&<br>other||||
||necessary infrastructure for sewage and garbage||||
||disposal, sewage treatment plants.||||
|4.|| Fire protection system with sprinklers,<br>fire and|07||334.06|
||smoke detector.||||
|5.||Water<br>treatment<br>plant,<br>water<br>supply<br>lines|02||89.09|

osal, sewage treatment plants.||||
|4.|| Fire protection system with sprinklers,<br>fire and|07||334.06|
||smoke detector.||||
|5.||Water<br>treatment<br>plant,<br>water<br>supply<br>lines|02||89.09|
||(dedicated<br>lines up<br>to<br>source), sewage<br>lines,||||
||storm<br>water<br>drains,<br>and<br>water<br>channels<br>of||||
||appropriate capacity.|||;|
||Telecom<br>and<br>other<br>communication<br>facilities|05||54.93|
||including internet connectivity.||||
||Air Conditioning of Processing Area|||1390.37|
|| 8. |Access control and monitoring system<br>| ||||Total:|317.29<br>8565.86|
|Proposal-ll|||||
|1.|| Construction of all types of building in Processing|22||110.00|
||area as approved by UAC||||
|Totals**|**<br>110.00<br>es<br>|<br>GrandTotal:<br>__8675.86|||||
|2.2.|Itwas informed that Developer has proposed ‘12 Nos. Elevator, 1020 KG’ at SI. No. 97 under||||
|the authorized operation namely “Electrical, Gas and Petroleum Natural|||Gas Distribution Network||
|including necessary sub-stations of appropriate capacity, pipeline network etc.” (Annexure-Il), which|||||
|arenotrelatedtoproposedauthorizedoperation.|||||

2.3. Shri D.K. Sharma, GM-Commercial, Shri Sanjeev Shukla, AGM, Shri Neeraj Kumar, Manager-Finance & Shri Uttam Kumar Debnath, Asstt. Manager appeared before the Approval Committee on behalf of the developertu and explained the requirement of proposedPage 2items. of 5

:

Kumar, Manager-Finance & Shri Uttam Kumar Debnath, Asstt. Manager appeared before the Approval Committee on behalf of the developertu and explained the requirement of proposedPage 2items. of 5

:

Minutes of Approval Committee meeting oFHCL IT City Lucknow Pvt. Ltd. held on 09.08.2019 Representative of the developer informed that they have submitted rectified Chartered Engineer’s Certificate and list of materials wherein ‘12 Nos. Elevator, 1020 KG’ has been included under the default authorized operation namely “Construction of all type of buildings in processing area as approved by the Unit Approval Committee”.

2.4. After due deliberations, the Approval Committee approved the proposed list of materials.

3. do vadiva aiédt fad aaa oe feo, frarrHal a faety anfile aa & waeecraa a wading de ar vdiva aefter Fait Het HT Weal |

3.1. It was brought to the notice of the Approval Committee that M/s. HCL IT City Lucknow Pvt. Ltd, Developer has submitted proposal for installation of one ATM Machine of HDFC Bank over an area approx. 80 Saft. at Ground floor, Cafeteria in the processing area of SEZ, for exclusive use by HCL employees.

3.2. The Committee examined the proposal and observed that proviso to Rule 11(5) of SEZ Rules, 2006 provides as under:-

‘The Developer may, with the prior approval of the Approval Committee, grant on lease land or built up space, for creating facilities such as canteen, public telephone booths, first aid centres, créche and such other facilities as may be required for the exclusive use of the Unit’.

3.3. Approval Committee further observed that ‘Space for Bank/ATMs’ is listed as a default authorized operation in Instruction No.50 dated 15.03.2010 issued by DOC...

3.4. Shri D.K. Sharma, GM-Commercial, Shri Sanjeev Shukla, AGM, Shri Neeraj Kumar, Manager-Finance & Shri Uttam Kumar Debnath, Asstt. Manager appeared before the Approval Committee on behalf of the developer and explained the proposal. 3.5. After due deliberations, the Approval Committee approved the proposal, subject to condition that no tax / duty benefit, shall be available to M/s. HDFC Bank Ltd. to setup, operate & maintain such facility in the processing area of the SEZ and this facility shall be used exclusively by the employees of SEZ & units located therein.

04. do vadiva tanitaicitar fafaes ar Sdt sears Canta Heat HT Haat

4.1. It was brought to the notice of the Approval Committee that M/s. HCL Technologies Ltd. had submitted a proposal for setting up its 8" unit over an area of 4748.87 Sqmt. at fourth floor, IT Block-01 in the IT/ITTES SEZ of M/s. HCL IT City Lucknow Pvt. Ltd., at Village- Kanjehara & Mastemau, Chack Gajaria Farms, Sultanpur Road, Lucknow, (U.P) to undertake service activities i.e. ‘IT/TES namely Computer Software Services, Including Information Enabled Services Such As Back-Office Operations, Call Centres, Content Development Or Animation, Data Processing, ty Page 3 of 5

Minutes of Approval Committee meeting of HCL IT City Lucknow Pvt. Ltd. held on 09.08.2019

Engineering and Design, Graphic Information System Services, Human Resources Services, Insurance Claim Processing, Legal Data Bases, Medical Transcription, Payroll, Remote Maintenance, Revenue Accounting, Support Centres and Web-Site Services, Off-Shore Banking Services, Professional Services, distribution services (excluding retail services) and financial services’ with projected exports of Rs. 35598.81 lakhs and the cumulative NFE of Rs. 34883.19 lakhs over a period of five years. It was also informed that the investment of Rs. 650.56 lakhs towards imported capital goods; Rs.2329.31 Lakhs towards Indigenous capital goods and other cost of project shall be met from Reserve & Surplus of the company. Further, it was informed that the applicant has furnished copy of MOU dated 15.07.2019 signed with SEZ Developer for allotment of proposed space.

t shall be met from Reserve & Surplus of the company. Further, it was informed that the applicant has furnished copy of MOU dated 15.07.2019 signed with SEZ Developer for allotment of proposed space.

4.2. Shri D.K. Sharma, GM-Commercial, Shri Sanjeev Shukla, AGM, Shri Neeraj Kumar, Manager-Finance & Shri Uttam Kumar Debnath, Asstt. Manager appeared before the Approval Committee on behalf of the applicant and explained the proposal. The representative of the unit informed that they will make this unit operational before 31% March, 2020.

4.3. After due deliberations, the Approval Committee approved the proposal.

  1. Heo vadiva eaatcisitr fees ar veafaa edt garg & fore 67 fBwiee Sarat Fr qet va 02 afatted darsit & areptaet aT Wear | 5.1. _ It was brought to the notice of the Approval Committee that M/s. HCL Technologies Ltd. had submitted a proposal for approval of uniform list of 67 nos. default services and approval of following 02 Nos. additional services in respect of proposed 8" unit in the IT/ITES SEZ of M/s. HCL IT City Lucknow Pvt. Ltd., at Village- Kanjehara & Mastemau, Chack Gajaria Farms, Sultanpur Road, Lucknow, (U.P):-
No. the unit
vendors for procurement of input services which are used for
: provision of output service. Further, vendors are also hired
for promotion and marketing ofservice provided by HCL.
Operations.

5.2. _ It was informed that the unit has also submitted brief justification for requirement of each service listed in uniform list of 67 nos. default services.

provided by HCL.| |||Operations.|

5.2. _ It was informed that the unit has also submitted brief justification for requirement of each service listed in uniform list of 67 nos. default services.

5.3. It was informed that vide Instruction No.79 dated 19.11.2013 and subsequent letter dated 19.06.2014 & dated 09.07.2014, Deptt. of Commerce had issued a uniform list of 66 nos. of default services which may ordinarily be permitted by all UACs unless anything to the contrary is noticed. As per Instruction No.79, other services which are not included in the uniform list may be decided by ag fy. Page 4 of 5

Minutes of Approval Committee meeting of HCL IT City Lucknow Pvt. Ltd. held on 09.08.2019 UAC on merit. It was further informed that vide Instruction No. 94 dt.08.05.2019, DOC had included “Management and Business Consultant Services” in the default services, subject to the condition that exemption for “Management and Business Consultant Services” would be limited to the value of services availed or consumed by the SEZ entity only and that the unit shall produce evidence to that effect to the satisfaction of the authorities concerned that the said service was consumed in related to their authorized operations only.

  1. Shri D.K. Sharma, GM-Commercial, Shri Sanjeev Shukla, AGM, Shri Neeraj Kumar, Manager-Finance & Shri Uttam Kumar Debnath, Asstt. Manager appeared before the Approval Committee on behalf of the unit and explained the requirement of proposed services.

, AGM, Shri Neeraj Kumar, Manager-Finance & Shri Uttam Kumar Debnath, Asstt. Manager appeared before the Approval Committee on behalf of the unit and explained the requirement of proposed services.

5.5. After due deliberations, keeping in view the justification given by the unit, the Approval Committee approved the uniform list of 67 nos. default services for exclusive use by the unit for their authorized operations within the SEZ only, subject to compliance of Instruction No.79 dated 19.11.2013 & Instruction No. 94 dt.08.05.2019 issued by DOC. The Approval Committee also approved the following additional services in respect of said unit:-

  • (i) Business Auxiliary Services — Exclusively for works related to authorized operations carried out within the SEZ.

  • (ii) Event management service — Specifically for the event related with recruitment of employees and promotional events related to authorized operations carried out within the SEZ and these events would be organized within the SEZ only.

==> picture [410 x 114] intentionally omitted <==

----- Start of picture text -----<br> The meeting ended with a vote of thanks to the Chair. AVA<br>Ae<br>(STo Ueto ato FAereat)<br>frat sara<br>----- End of picture text -----<br>

|

Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.

Analysis

No analysis generated for this document yet (analysis runs over brief docs + on-demand). Run build_analysis.py --ids 4880 --apply.

Citation copied