SEEPZ SPECIAL ECONOMIC ZONE ANDHERI (EAST), MUMBAI.

AGENDA FOR MEETING OF THE APPROVAL COMMITTEE FOR SECTOR SPECIFIC SPECIAL ECONOMIC ZONE FOR IT/ITES AT PUNE OF M/S. KRC INFRASTRUCTURE & PROJECTS PVT. LTD. AND GERA DEVELOPMENT PVT. LTD.

DATE : 01.07.2026

TIME : 11.00 A.M.


MEETING OF THE APPROVAL COMMITTEE FOR SECTOR SPECIFIC SPECIAL ECONOMIC ZONE FOR IT/ITES AT PUNE, UNDER THE CHAIRMANSHIP OF DEVELOPMENT COMMISSIONER, SEEPZ-SEZ ON 01.07.2026

INDEX

Agenda Item No.

Subject

Agenda Item No. 01: - Confirmation of the Minutes of the meeting held on 24.02.2026 Agenda Item No. 02: - Action taken report for the Minutes of the meeting held on 24.02.2026 Agenda Item No. 03:- Monitoring of performance of M/s. Maveric Systems Limited


मैसस केआरसी इं ाटचर एंड ोजेट ा. लिमटेड और मैसस गेरा डेवलपमट ा. लिमटेड एसईजेड खराड़ी, पुणे, के आईटी-आईटीईएस सेटर के िव%श' िवशेष आ)थक +े, के लए +े,ीय िवकास आयु. सी/ज़-एसईजेड, मुंबई क2 अ4य+ता म 24.02.2026 को आयो6जत अनुमोदन सिम9त क2 43 व: बैठक का कायवृ=। 1 एसईजेड का नाम मैसस केआरसी इं ाटचर एंड ोजेट ा. लिमटेड और मैसस गेरा डेवलपमट ा. लिमटेड एसईजेड 2 सेटर आईटी/आईटीईएस 3 बैठक सं@या 43 वी 4 तारीख 24.02.2026 उपBथत सदय: C. नाम और पदनाम (एस/Dी.)
िवभाग 1 Dीमती िमतल िहरेमठ संयु. िवकास आयु. पुणे Gटर एसईजेड, पुणे 2 Dी. अ%भनव राठी उप आयु., आयकर िवभाग आयकर िवभाग से नािमत 3 Dी. संजय बांगर, उप उHोग िनदेशक, पुणे +े, महारा' सरकार से नािमत 4 Dी. /लेटो लोबो, सहायक िवदेश Iयापार महािनदेशक पुणे डीजीएफटी िवभाग से नािमत 5 Dी.

अ%भनव राठी उप आयु., आयकर िवभाग आयकर िवभाग से नािमत 3 Dी. संजय बांगर, उप उHोग िनदेशक, पुणे +े, महारा' सरकार से नािमत 4 Dी. /लेटो लोबो, सहायक िवदेश Iयापार महािनदेशक पुणे डीजीएफटी िवभाग से नािमत 5 Dी. धवल %शकL , अधी+क सीमा शुMक िवभाग, पुणे से नािमत 6 Dी. नवनाथ अवताडे, उप +े,ीय अ9धकारी महारा' दूषण िनयं,ण बोड से नािमत िवशेष आमंि,त सदय: C. नाम और पदनाम (Dी.)
िवभाग 1 Dी. शOभू दयाल मीना िविनPद' अ9धकारी सी/ज़-एसईज़ेड, पुणे Gटर एजडा आइटम नंबर 01: िदनांक 12.09.2025 को आयो6जत 42 व: बैठक के कायवृ= क2 पुि' । िवचार-िवमश के बाद, सिम9त ने 12.09.2025 को आयो6जत अनुमोदन सिम9त क2 42 व: बैठक के कायवृ= क2 पुि' क2। एजडा आइटम नंबर 02: 12.09.2025 को आयो6जत बैठक के कायवृ= के लए क2 गई कारवाई Qरपोट। िवचार-िवमश के बाद, सिम9त ने 12.09.2025 को आयो6जत बैठक के लए क2 गई कारवाई Qरपोट नोट क2 है। एजडा आइटम नंबर 03: मेसस माइंडCेट इं9डया ाइवेट लिमटेड के दशन क2 िनगरानी। िवचार-िवमश के बाद, सिम9त ने एसईजेड िनयम, 2006 के िनयम 54 के अनुसार, थम Rलॉक अव9ध के 5 वषT (अथात िव=ीय वष 2020-21 से िव=ीय वष 2024-25) के लए इकाई के दशन को नोट िकया । िववरण इस कार है: इकाई ने 259.00 करोड़ Uपये के अनुमािनत िनयात के मुकाबले 233.77 करोड़ Uपये का िनयात राजव ाV िकया है तथा थम Rलॉक अव9ध अथात् िव=ीय वष 2020-21 से 2024-25 तक के 5 वषT म 231.58 करोड़ Uपये का सकाराXमक एनएफई (NFE) ाV िकया है, जो िक संचयी आधार पर 99.07% है। एसओ क2 Qरपोट के अनुसार िदनांक 31.03.2025 तक इकाई ने 254 (पुUष-106, मिहला-148) रोजगार सृ6जत िकया है। अनुमोदन सिम9त ने अनुमोिदत अनुमानZ क2 तुलना म रोजगार उपलBRध म कमी का सं[ान लया तथा इकाई को िनदLश

एसओ क2 Qरपोट के अनुसार िदनांक 31.03.2025 तक इकाई ने 254 (पुUष-106, मिहला-148) रोजगार सृ6जत िकया है। अनुमोदन सिम9त ने अनुमोिदत अनुमानZ क2 तुलना म रोजगार उपलBRध म कमी का सं[ान लया तथा इकाई को िनदLश िदया िक वह कमचाQरयZ क2 सं@या बढ़ाए और आगामी Rलॉक अव9ध म LOA के नवीनीकरण के समय यथाथवादी अनुमान तुत करे। एजडा आइटम नंबर 04: मेसस बीपी िबज़नेस सॉMयूशंस इं9डया ा. ल. के दशन क2 िनगरानी। िवचार-िवमश के बाद, सिम9त ने एसईजेड िनयम, 2006 के िनयम 54 के अनुसार, थम Rलॉक अव9ध अथात् िव=ीय वष 2020- 21 से 2024-25 के लए इकाई के दशन को नोट िकया । िववरण इस कार है: इकाई ने 3853.50 करोड़ Uपये के अनुमािनत िनयात के मुकाबले 2794.33 करोड़ Uपये का िनयात राजव हा6सल िकया है तथा थम Rलॉक अव9ध अथात् िव=ीय वष 2020-21 से 2024-25 तक के 5 वषT म 2618.84 करोड़ Uपये का सकाराXमक एनएफई (NFE) ाV िकया है, जो िक संचयी आधार पर 93.72% है। एसओ क2 Qरपोट के अनुसार िदनांक 31.03.2025 तक इकाई ने 1703 (पुUष-1022, मिहला-681) रोजगार सृ6जत िकया है।

अनुमोदन सिम9त ने एपीआर (APR) म दशाए गए िनयात के आंकड़Z और SOFTEX प,Z म दशाए गए आंकड़Z के बीच अंतर का सं[ान लया तथा िनPद' अ9धकारी को इस मामले क2 जांच करने के िनदLश िदए। अ4य+ को ध]यवाद [ापन के साथ बैठक समाV हुई। Minutes of the 43rd Meeting of the Approval Committee held under the Chairmanship of Zonal Development Commissioner SEEPZ-SEZ, Mumbai for Sector Specific Special Economic Zone for IT/ITES of M/s. KRC Infrastructure Pvt. Ltd. & Gera Development Pvt. Ltd- SEZ., Pune, held on 24.02.2026 1 Name of the SEZ M/s. KRC Infrastructure and Project Pvt. Ltd. & M/s Gera Develpment Pvt. Ltd.

T/ITES of M/s. KRC Infrastructure Pvt. Ltd. & Gera Development Pvt. Ltd- SEZ., Pune, held on 24.02.2026 1 Name of the SEZ M/s. KRC Infrastructure and Project Pvt. Ltd. & M/s Gera Develpment Pvt. Ltd. SEZ 2 Sector IT/ITES 3 Meeting No. 43rd 4 Date 24.02.2026 Members present: Sr No Name and Designation (S/Shri.) Department 1 Smt. Mital Hiremath, Jt. Development Commissioner Pune Cluster SEZ, Pune 2 Shri. Abhinav Rathi, Dy. Commissioner, IT Nominee of Income Tax, Pune 3 Shri. Sanjay Bangar, Dy. Director of Industries, Pune Region Nominee of Govt. of Maharashtra 4 Shri Plato Lobo, Asstt. Director General of Foreign Trade Nominee of DGFT, Pune 5 Shri. Dhaval Shirke, Superintendent Nominee of Customs, Pune 6 Shri Navanath Awatade, Sub Regional Officer Nominee of Maharashtra Pollution Control Board Special Invitee: Sr Name and Designation Department 1 Shri. Shambhu Dayal Meena Specified Officer SEEPZ-SEZ, Pune Cluster Agenda Item No.01: Confirmation of the Minutes of the 42nd meeting held on 12.09.2025
After deliberation, the Committee confirmed the minutes of the 42nd meeting of Approval Committee held on 12.09.2025.
Agenda Item No.02: Action taken report for the minutes of the meeting held on 12.09.2025 After deliberation, the Committee has noted the Action taken report for the meeting held on 12.09.2025. Agenda Item No.03: Monitoring of performance of M/s. Mindcrest India Pvt. Ltd. After deliberation, the committee noted the performance of the unit for 5 years of the 1st Block Period i.e. FY 2020-21 to FY 2024-25., in terms of Rule 54 of SEZ Rules, 2006.

dcrest India Pvt. Ltd. After deliberation, the committee noted the performance of the unit for 5 years of the 1st Block Period i.e. FY 2020-21 to FY 2024-25., in terms of Rule 54 of SEZ Rules, 2006. As detailed below: The Unit has achieved export revenue of Rs. 233.77 Crores as against the projected export of Rs. 259.00 Crores and achieved positive NFE of Rs. 231.58 Crores which is 99.07 % on cumulative basis in 5 years of 1st Block Period i.e. FY 2020-21 to FY 2024-25. As per SO report the unit has generated employment of 254 (Men-106, Women-148) as on 31.03.2025. The Approval Committee has noted the shortfall in Employment achievement as compared to the approved projections and directed the unit to increase the employee headcount and to give realistic projections during the renewal of LOA in upcoming block period.

Agenda Item No.04: Monitoring of performance of M/s. BP Business Solutions India Pvt. Ltd. After deliberation, the committee noted the performance of the unit for the 1st Block Period i.e. FY 2020-21 to FY 2024-25., in terms of Rule 54 of SEZ Rules, 2006. As detailed below: The Unit has achieved export revenue of Rs. 2794.33 Crores as against the projected export of Rs. 3853.50 Crores and achieved positive NFE of Rs. 2618.84 Crores which is 93.72 % on cumulative basis in 1st Block Period i.e.

xport revenue of Rs. 2794.33 Crores as against the projected export of Rs. 3853.50 Crores and achieved positive NFE of Rs. 2618.84 Crores which is 93.72 % on cumulative basis in 1st Block Period i.e. FY 2020-21 to FY 2024-25. As per SO report the unit has generated employment of 1703 (Men-1022, Women-681) as on 31.03.2025. The Approval Committee has noted the difference in the Export figures reported in the APR vis-à-vis the SOFTEX forms and directed the Specified Officer to examine the same. Meeting ended with a vote of thanks to the Chair. signaturerectangle-1-186 ([ाने^र बी. पाटील, आयएएस) (Dnyaneshwar B. Patil, IAS) अ4य+-सह- िवकास आयु. Chairman-cum- Development Commissioner Digitally signed by Dnyaneshwar Bhalchandra Patil Date: 2026.03.20 11:40:29 IST % DSUnknown q 1 G 1 g 0.1 0 0 0.1 9 0 cm 0 J 0 j 4 M []0 d 1 i 0 g 313 292 m 313 404 325 453 432 529 c 478 561 504 597 504 645 c 504 736 440 760 391 760 c 286 760 271 681 265 626 c 265 625 l 100 625 l 100 828 253 898 381 898 c 451 898 679 878 679 650 c 679 555 628 499 538 435 c 488 399 467 376 467 292 c 313 292 l h 308 214 170 -164 re f 0.44 G 1.2 w 1 1 0.4 rg 287 318 m 287 430 299 479 406 555 c 451 587 478 623 478 671 c 478 762 414 786 365 786 c 260 786 245 707 239 652 c 239 651 l 74 651 l 74 854 227 924 355 924 c 425 924 653 904 653 676 c 653 581 602 525 512 461 c 462 425 441 402 441 318 c 287 318 l h 282 240 170 -164 re B Q

786 365 786 c 260 786 245 707 239 652 c 239 651 l 74 651 l 74 854 227 924 355 924 c 425 924 653 904 653 676 c 653 581 602 525 512 461 c 462 425 441 402 441 318 c 287 318 l h 282 240 170 -164 re B Q

Action Taken for Approval Committee held on 24-02-2026 Agenda Item No. Subject Remarks Agenda Item No. 01 Confirmation of the Minutes of the 42nd Meeting held on 12-09-2025 Minutes of the meeting held on 12.09.2025 confirmed by the Approval Committee. Agenda Item No. 02 Application for Monitoring of Performance(M/s. Mindcrest India Pvt. Ltd.) Approval letter is issued to the Unit on 23.03.2026 Agenda Item No. 03 Application for Monitoring of Performance(M/s. BP Business Solutions India Pvt. Ltd.) Approval letter is issued to the Unit on 23.03.2026

GOVERNMENT OF INDIA, OFFICE OF THE DEVELOPMENT COMMISSIONER, SEEPZ SPECIAL ECONOMIC ZONE, GOVT. OF INDIA, ANDHERI (EAST), MUMBAI


AGENDA NOTE FOR CONSIDERATION OF APPROVAL COMMITTEE


a. Proposal : Monitoring of the performance of M/s. Maveric Systems Limited, an IT/ITES unit located in M/s. KRC Infrastructure and Projects Pvt. Ltd. and M/s. Gera Development Pvt. Ltd.-SEZ, for 1st Block Period i.e. FY 2022-23 to FY 2026-27 (upto May-2026). b. Specific Issue on which decision of AC is required: -
Monitoring of the performance of the unit for 1st Block Period i.e. FY 2022-23 to FY 2026-27 (upto May-2026), in terms of Rule 54 of SEZ Rules, 2006. c.

Issue on which decision of AC is required: -
Monitoring of the performance of the unit for 1st Block Period i.e. FY 2022-23 to FY 2026-27 (upto May-2026), in terms of Rule 54 of SEZ Rules, 2006. c. Relevant provisions of SEZ Act, 2005 & Rules, 2006/Instruction/
Notification :- As per Rule 54 of SEZ Rules, 2006, “Performance of the Unit shall be monitored by the Approval Committee as per the guidelines given in Annexure appended to these rules”. d. Other Information: - Performance as compared to projections for 1st Block Period (FY 2022-23 to FY 2026-27) Approved Projections: 1st Block Period (FY 2022-23 to FY 2026-27)
(Rs. In Cr.)

2022-23 2023-24 2024-25 2025-26 2026-27 TOTAL FOB value of export 20.22 49.90 57.39 58.59 58.59 244.69 FE outgo 6.36 3.89 4.38 6.15 4.50 25.28 NFE 13.86 46.01 53.01 52.44 54.09 219.41 Performance as compared to projections: (Rs. In Cr.) Year Export F.E. OUTGO

Projected

Actual Raw Material (Goods/Services) C.G. import Other outflow Projected Actual Projected Actual Actual 2022-23 20.22 1.48 0.00 0.00 8.15 2.88 0.06 2023-24 49.90 39.01 1.65 3.46 2024-25 57.39 30.73 0.00 0.03 2025-26 58.59 25.22 0.00 0.00 2026-27 (up to May 2026) 58.59 0.90 0.00 0.00 TOTAL 244.69 97.34 0.00 0.00 8.15 4.53 3.55

.00 8.15 2.88 0.06 2023-24 49.90 39.01 1.65 3.46 2024-25 57.39 30.73 0.00 0.03 2025-26 58.59 25.22 0.00 0.00 2026-27 (up to May 2026) 58.59 0.90 0.00 0.00 TOTAL 244.69 97.34 0.00 0.00 8.15 4.53 3.55

Cumulative NFE achieved: (Rs. In Cr) Year Cumulative NFE Achieved Cumulative % NFE Achieved 2022-23 1.13 76.71% 2023-24 36.24 89.49% 2024-25 66.48 93.35% 2025-26 91.25 94.62% 2026-27 (up to May 2026) 91.70 94.20% Employment Achievement: Projected Achieved as on 31.05.2026 Male 230 Male 92 Female 121 Female 46 TOTAL 351 TOTAL 138 Information: Name of The Unit M/s. Maveric Systems Limited LOA No. & Date SEEPZ-SEZ/NEW-SEZ/KRC- SEZ/MSL/06/2021-22/1083 dated 06.12.2021 Location of Unit Unit No.102, 1st Floor, Building No. B6 R4,KRC Infrastructure and Project Pvt. Ltd.- SEZ,Sr. No.65 Comprising of 65-1,65-2, and 65-3,Village Kharadi taluka haveli Dist- Pune- 411014. Validity of LOA 31.10.2027 Item(s) of manufacture/ Services IT & ITES Date of commencement of production 01.11.2022 Execution of BLUT Rs. 22.53 Crores. Outstanding Rent dues NA Labour Dues NA Validity of Lease Agreement 18.01.2027 Pending CRA Objection, if any NA Pending Show Cause Notice/ Eviction Order/Recovery Notice/ Recovery Order issued, if any NA Employment made as on date (31.05.2026) 138 (Men-94, Women-46) Area allotted (in sq.ft.) 28,000.Sq.ft Area available for each employee per sq.ft. basis (area / no. of employees) 202.89 Sq.ft Investment till date

Building

Plant & Machinery Rs.

4, Women-46) Area allotted (in sq.ft.) 28,000.Sq.ft Area available for each employee per sq.ft. basis (area / no. of employees) 202.89 Sq.ft Investment till date

Building

Plant & Machinery Rs. 9.87 Crores Quantity and value of goods exported under Rule 34 (unutilized goods) NA Value Addition during the monitoring period NA

Whether all the APRs being considered now has been filed well within the time limit, or otherwise.

If no, details of the Year along with no of days delayed to be given. Yes

The Specified Officer vide letter dated 29.06.2026 has submitted his report in the prescribed format for the period from FY 2022-23 to FY 2026-27 (up to May-2026), as under: -

EXPORT From the year 2022-2023 to 2026-2027(upto May 2026) (Rs. In Crore) Year/ Period Figures reported in APR (FOB Value) Figures as per Softex / Customs Records Difference, if any Reason for Difference / Remarks 2022-2023 1.48 0.82 0.65 During the year, Provided Onsite Service to client amounting to Rs. 0.65 Crore. 2023-2024 39.01 18.00 21.01 During the year, Provided Onsite Service to client amounting to Rs. 22.06 Crore. Also, Credit Note raised amounting to Rs. (0.17) Crore. Balance difference of Rs. (0.86) Crore is due to Exchange Rate Variation. 2024-2025 30.73 12.87 17.86 During the year, Provided Onsite Service to client amounting to Rs. 17.86 Crore. 2025-2026 25.22 13.02 12.20 During the year, Provided Onsite Service to client amounting to Rs.

25 30.73 12.87 17.86 During the year, Provided Onsite Service to client amounting to Rs. 17.86 Crore. 2025-2026 25.22 13.02 12.20 During the year, Provided Onsite Service to client amounting to Rs. 12.32 Crore Balance difference of Rs. (0.12) Crore is due to Exchange Rate Variation. 2026- 2027(Part) 0.90 0.49 0.41 During the year, Provided Onsite Service to client amounting to Rs. 0.42 Crore Balance difference of Rs. (0.01) Crore is due to Exchange Rate Variation.

Import (Capital Goods including procurement done on IUT (from SEZ, EOU, STPI, EHTP) basis: From the year 2022-2023 to 2026-2027(Part) (Rs. In Crore) Year/ Period Figures as per APR Figures as per SEZ Online / Customs Records Difference, if any Reason for Difference / Remarks 2022-2023 2.88 2.88 0.00 NA 2023-2024 1.65 1.65 0.00 NA 2024-2025 0.00 0.00 0.00 NA 2025-2026 0.00 0.00 0.00 NA 2026- 2027(Part) 0.00 0.00 0.00 NA BLUT: 1 Value of BLUT Executed (Duty foregone) (including for CG / Raw Material / Services) TOTAL Duty value of BLUT Executed in Crore: F. No. SEEPZ-SEZ/NEWSEZ/KRC-SEZ/MSL/ 06/2021-22/1319 dated 16.02.2022. Rs. 22.53 Crore

Total: Rs. 22.53 Crore

Total Duty Foregone on goods & services procured Category Wise:

Year Wise (Rs. In Crore) F.Y. Goods Services Imp.

MSL/ 06/2021-22/1319 dated 16.02.2022. Rs. 22.53 Crore

Total: Rs. 22.53 Crore

Total Duty Foregone on goods & services procured Category Wise:

Year Wise (Rs. In Crore) F.Y. Goods Services Imp. & Ind. 2022-2023 0.79 0.82 2023-2024 0.41 0.31 2024-2025 0.00 0.12 2025-2026 0.00 0.68 2026- 2027(upto May 2026)

Total 1.20 1.93

3 Has the Unit procured goods and or services without having sufficient balance in their BLUT. If yes, Month & Year when the BLUT was exhausted Details of the consignments and Total value of Goods procured without having sufficient or nil balance in BLUT No

(d) Employment made as on date (as on end of block period / year up to which monitoring is being done) As on 31.05.2026: Man: 92 Woman: 46 Total: 138 (e) Details of pending Foreign Remittance beyond Permissible period, if any (as on 31.05.2026) To cross-check the same and verify whether necessary permission from AD Bank / RBI has been obtained. No Foreign Remittance beyond permissible period is pending for realization. (f) Whether all softex has been filed for the said period. If no, details thereof. SO to also check whether unit has obtained Softex condonation from DC office / RBI and if approved, whether they have filed such pending Softex. Softex Forms have been filed for the said period (g) Whether all Softex has been certified, if so till which month has the same been certified.

approved, whether they have filed such pending Softex. Softex Forms have been filed for the said period (g) Whether all Softex has been certified, if so till which month has the same been certified. If not, provide details of the Softex and reasons for pendency. All the Softex Forms has been certified. (h) Whether unit has filed any request for Cancellation of Softex NA (i) Whether any Services provided in DTA / SEZ/EOU/STPI etc. against payment in INR in r/o IT/ITES Unit during the period. If yes, details thereof (year wise details to be provided) The unit have not provided any Services in DTA / SEZ / EOU / STPI etc. against payment in INR during the reporting period. (j) SO to verify and certify whether the unit has updated the BLUT ledger Module in SEZ Online.

Updation of the BLUT ledger Module is kept in abeyance as per office order No. SEEPZ/JDC/Pune/01/2022- 23/2151 Dated-16.03.2023. (k) Has the unit cleared any Capital Goods procured duty free in DTA against payment of Duty, or otherwise? Full details to be provided along with value of assets and duty discharged No (l) Is the unit sharing any of their infrastructure with other units or are utilizing infrastructure of another unit in the same or other SEZ? If so, details thereof, including the details of the unit with whom the sharing is being made, and the payment terms If approval for sharing of common infrastructure has been obtained from UAC / DC office, the date of UAC / Approval letter to be indicated No

th whom the sharing is being made, and the payment terms If approval for sharing of common infrastructure has been obtained from UAC / DC office, the date of UAC / Approval letter to be indicated No

(m) Whether all DSPF for services procured during the said monitoring period under consideration has been filed by the unit and whether the same has been processed for approval by the SO Office. The unit have been regularly filing DSPF, however, the remaining few pending service invoices shall be filed shortly. (n) Whether unit has filed all DTA procurement w.r.t. the goods procured by them during the monitoring period for the relevant period. If no, details thereof All DTA Procurements pertaining to the relevant period have been filed from time to time (o) Details of the request IDs pending for OOC in respect of DTA procurement on the date of submission of monitoring report No Request IDs are pending for OOC. (p) Has the unit set up any cafeteria / canteen / food court in unit premises? If yes, whether permission from UAC / DC office has been issued, or otherwise office has been issued, or otherwise Whether unit has availed any duty paid goods / services for setting up such facility? If yes, whether unit has discharged such duty / tax benefit availed? details to be given including amount of duty / tax recovered or yet to be recovered No (q) Whether any violation of any of the provisions of law has been noticed / observed by the Specified Officer during the period under monitoring No e. Recommendation: The unit has achieved export revenue of Rs. 97.34 Crs.

n of any of the provisions of law has been noticed / observed by the Specified Officer during the period under monitoring No e. Recommendation: The unit has achieved export revenue of Rs. 97.34 Crs. against the projected export of Rs. 244.69 Crs. in the 1 st Block Period i.e. FY 2022-23 to FY 2026-27 (upto May-2026). The Unit has also achieved a Positive NFE of Rs. 91.70 Cr as against the Projected NFE of Rs. 219.41 Cr i.e. 41.79% on cumulative basis in the 1 st Block Period i.e. FY 2022-23 to FY 2026-27 (upto May-2026). As per SO report, the unit has achieved employment of 138 employees (Men-92, Women-46) as on 31.05.2026. Approval committee may like to monitor the performance of the Unit for 1 st Block Period i.e. FY 2022-23 to FY 2026-27 (upto May-2026), in terms of Rule 54 of SEZ Rules, 2006.


Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.

Analysis

No analysis generated for this document yet (analysis runs over brief docs + on-demand). Run build_analysis.py --ids 34833 --apply.

Citation copied