Agenda for Approval Committee meeting for EOU and SEZ under Pune Cluster scheduled on 24th February, 2026. — 01-embassy-sez
In force — no superseding record on file.
SEEPZ SPECIAL ECONOMIC ZONE ANDHERI (EAST), MUMBAI.
AGENDA FOR MEETING OF THE APPROVAL COMMITTEE FOR SECTOR SPECIFIC SPECIAL ECONOMIC ZONE FOR IT/ITES AT PUNE OF M/S. EMBASSY PUNE TECHZONE PVT. LTD.-SEZ
DATE : 24.02.2026
TIME : 12.00 PM
MEETING OF THE APPROVAL COMMITTEE FOR SECTOR SPECIFIC SPECIAL ECONOMIC ZONE FOR IT/ITES AT PUNE, UNDER THE CHAIRMANSHIP OF DEVELOPMENT COMMISSIONER, SEEPZ-SEZ ON 24.02.2026
INDEX
Agenda Item No.
Subject
Agenda Item No. 01: -
Confirmation of the Minutes of the
meeting held on 02.01.2026
Agenda Item No. 02: -
Action taken report for the Minutes of
the meeting held on 02.01.2026.
Agenda Item No. 03: -
Application for approval for Revision
in Financial projections. Submitted by
M/s. Volkswagen Group Technology
Solutions India Pvt Ltd,
Agenda Item No. 04: -
Application for Approval for Revision
in Financial projections submitted by
M/s. HCL Technologies Ltd.
Agenda Item No.05: -
Monitoring of Performance of M/s.
Flextronics Technologies India Pvt.
Ltd.
Agenda Item No.06:-
Monitoring of Performance of M/s.
CalSoft Pvt. Ltd.
Agenda Item No.07:-
Monitoring of Performance of M/s.
Connectwise LLP.
logies India Pvt. Ltd. Agenda Item No.06:- Monitoring of Performance of M/s. CalSoft Pvt. Ltd. Agenda Item No.07:- Monitoring of Performance of M/s. Connectwise LLP.
मेसस एबेसी पुणे टेकजोन ाइवेट लिमटेड-एसईजेड, पुणे के आईटी/आईटीईएस के लए सेटर िवश िवशेष आ!थक
#े$ के लए #े$ीय िवकास आयु& एसईईपीजेड-एसईजेड, मुंबई क( अ*य#ता म, 02.01.2026 को आयो-जत अनुमोदन
सिम/त क( 107 व0 बैठक के कायवृ4।
1
एसईजेड का नाम
मेसस एबेसी पुणे टेकजोन ाइवेट लिमटेड-एसईजेड, पुणे
2
सेटर
आईटी/आईटीईएस
3
बैठक सं6या
107 व0
4
तारीख
02.01.2026
उप9:थत सद:य:
;.
नाम और पदनाम (एस/=ी.)
िवभाग
1
=ीमती िमतल िहरेमठ
संयु& िवकास आयु&
पुणे A:टर एसईजेड, पुणे
2
=ी अभनव राठी
उप आयु&, आयकर िवभाग
आयकर िवभाग से नािमत
3
=ी हाBन िबलाल. उप. िवदेश Cयापार
महािनदेशक
पुणे डीजीएफटी िवभाग से नािमत
4
=ी. संजय बांगर, उप उEोग िनदेशक,
पुणे #े$
महाराF सरकार से नािमत
5
=ी नवनाथ अवताडे, उप #े$ीय
अ/धकारी
महाराF दूषण िनयं$ण बोड से नािमत
6
=ी धवल शकI , अधी#क
सीमा शुJक िवभाग के नािमत Cयि&, पुणे
िवशेष आमंि$त सद:य:
;.
नाम और पदनाम (=ी.)
िवभाग
1
=ी.
F सरकार से नािमत 5 =ी नवनाथ अवताडे, उप #े$ीय अ/धकारी महाराF दूषण िनयं$ण बोड से नािमत 6 =ी धवल शकI , अधी#क सीमा शुJक िवभाग के नािमत Cयि&, पुणे िवशेष आमंि$त सद:य: ;. नाम और पदनाम (=ी.) िवभाग 1 =ी. शभू दयाल मीना िविनLद अ/धकारी सीMज़-एसईज़ेड, पुणे A:टर एज,डा आइटम नंबर 01: 31.10.2025 को आयो-जत 106 व0 बैठक के कायवृ4 क( पुि । िवचार-िवमश के बाद, सिम/त ने 31.10.2025 को आयो-जत 106व0 अनुमोदन सिम/त क( बैठक के कायवृ4 क( पुि क(। एज,डा आइटम नंबर 02: िदनांक 31.10.2025 को आयो-जत 106 व0 बैठक के संदभ मे क( गयी कायवाई क( Pरपोट । िवचार-िवमश के बाद, सिम/त ने 31.10.2025 को आयो-जत अनुमोदन सिम/त क( 106 व0 बैठक के संदभ मे क( गयी कायवाई क( Pरपोट को नोट िकया। एज,डा िवषय ; 03: मेसस एलटीआईमाइंडटFी लिमटेड Qारा अपने एसईजेड पPरसर के भीतर अपने कमचाPरयR के बSR के लए ‘ने:ट एंड नचर’ नामक एक समLपत :थान के आवंटन हेतु आवेदन :तुत िकया गया है।”
िव:तृत िवचार-िवमश के उपरांत, सिम/त Qारा एसईजेड िनयम, 2006 के िनयम 11(5) के ावधानR तथा िदनांक 11.06.2019 के िनदIश सं6या 95 के साथ पिठत, एबेसी पुणे टेकज़ोन ा. ल.–एसईजेड म, कायरत अपने कमचाPरयR के बSR के लए एसईजेड पPरसर के भीतर ‘ने:ट एंड नचर’ नामक समLपत :थान के आवंटन हेतु इकाई के :ताव को, नीचे उ-Tखत िववरणानुसार, अनुमोिदत िकया गया।”
:थान #े$फल (वग फुट म,). व:तुओं का िववरण / मा$ा एलटीआई माइंडटFी लिमटेड, चतुथ एवं पंचम तल, नाइल िबVJडग, एबेसी ऑिफस पास ा.
हेतु इकाई के :ताव को, नीचे उ-Tखत िववरणानुसार, अनुमोिदत िकया गया।”
:थान #े$फल (वग फुट म,). व:तुओं का िववरण / मा$ा एलटीआई माइंडटFी लिमटेड, चतुथ एवं पंचम तल, नाइल िबVJडग, एबेसी ऑिफस पास ा. ल.–एसईजेड, Mलॉट सं6या 3A, Yहजवाड़ी, फेज–II, आरजीआईपी, पुणे – 411057 200 वग फुट (i) बेबी ि;ब – 02 नग (ii) टेबल एवं कुस[ – 02 सेट एवं बSR के खलौने यह अनुमोदन एसईजेड िनयम, 2006 के िनयम 11(5) तथा िनदIश सं6या 95 िदनांक 11.06.2019 के िनधाPरत शत] के अधीन होगा।” एज,डा िवषय ; 04: मेसस Yक/डFल सॉJयूशंस ा. ल. Qारा िनदेशक मंडल अथवा मुख बंधक(य काLमकR म, पPरवतन हेतु आवेदन :तुत िकया गया है। िव:तृत िवचार-िवमश के उपरांत, सिम/त Qारा उEोग एवं वाण^य मं$ालय Qारा जारी िदनांक 18.10.2021 के िनदIश सं6या 109 के
अनुसार, िनदेशक मंडल म, पPरवतन संबंधी :ताव को अनुमोिदत िकया गया।” अनुमोिदत िनदेशक मंडल क( सूची: ;म सं िनदेशक का नाम पदनाम िनयुि& क( /तथ 1. =ी _लगराजु :वाकर बंध िनदेशक
=ी सुबाश व,िकटरामन िनदेशक
सु=ी र-जता `सह िनदेशक
=ी सौरभ अव:थी अ/तPर& िनदेशक 01.08.2025 5. =ी =ीधर ओ कंपनी स/चव 15.04.2025 यह अनुमोदन उEोग एवं वाण^य मं$ालय Qारा जारी िनदIश सं6या 109 म, िनधाPरत शत] के अधीन होगा। अ*य# को धaयवाद bापन के साथ बैठक समाc हुई।
Minutes of the 107th Meeting of the Approval Committee held under the Chairmanship of Zonal Development Commissioner SEEPZ-SEZ, Mumbai for Sector Specific Special Economic Zone for IT/ITES of M/s. Embassy Pune TechZone Pvt. Ltd.-SEZ, Pune, held on 02.01.2026 Name of the SEZ M/s. Embassy Pune TechZone Pvt. Ltd.-SEZ Sector IT/ITES Meeting No. 107th Date 02.01.2026 Members present: Sr No Name and Designation (S/Shri.) Department 1 Smt.
, held on 02.01.2026 Name of the SEZ M/s. Embassy Pune TechZone Pvt. Ltd.-SEZ Sector IT/ITES Meeting No. 107th Date 02.01.2026 Members present: Sr No Name and Designation (S/Shri.) Department 1 Smt. Mital Hiremath, Jt. Development Commissioner Pune Cluster SEZ, Pune 2 Shri. Abhinav Rathi, Dy. Commissioner, IT Nominee of Income Tax, Pune 3 Shri Harooon Bilal, Dy. Director General of Foreign Trade Nominee of DGFT, Pune 4 Shri. Sanjay Bangar, Dy. Director of Industries, Pune Region Nominee of Govt. of Maharashtra 5 Shri Navnath Awatade, Sub Regional Officer Nominee of Maharashtra Pollution Control Board 6 Shri. Dhaval Shirke, Superintendent Nominee of Customs, Pune Special Invitee
Sr. No. Name and Designation Department 1 Shri. Shambhu Dayal Meena SEEPZ-SEZ, Pune Cluster Agenda Item No.01: Confirmation of the Minutes of the 106th meeting held on 31.10.2025 After deliberation, the Committee confirmed the minutes of the 106 th meeting of Approval Committee held on 31.10.2025. Agenda Item No.02: Action taken report for the Minutes of the 106 th meeting of Approval Committee held on 31.10.2025. After deliberation, the Committee noted the action taken report for the meeting held on 31.10.2025.
n taken report for the Minutes of the 106 th meeting of Approval Committee held on 31.10.2025. After deliberation, the Committee noted the action taken report for the meeting held on 31.10.2025.
Agenda Item No.03: Application submitted by M/s. LTIMindtree Limited for allocating a dedicated space named ‘Nest and Nurture’ for children of their employees , within their SEZ premises. After deliberation, the Committee approved the proposal of the unit for allocation of dedicated space named Nest and nurture for children of their employees within SEZ premises working at Embassy Pune Techzone Pvt Ltd.-SEZ, in terms of in terms of Rule 11(5) of SEZ Rules, 2006, read with Instruction No. 95 dated 11.06.2019 as detailed below:
Location Area in Sq, ft. Item Name/ Quantity LTI Mindtree Ltd. 4th ,5th Floor, Nile Building, Embassy Office Parks Pvt Ltd-SEZ, Plot No 3A, Hinjewadi, Phase II, RGIP, Pune - 411057. 200 Sq.ft 02 baby crib, 02 Table and chair & few toys The approval is subject to the conditions laid down in terms of Rule 11(5) of SEZ Rules, 2006 and Instruction No. 95 dated 11.06.2019. Agenda Item No.04 : Application submitted by M/s. Kyndryl Solutions Pvt Ltd for Change in Board of Directors or Key Managerial Personnel. After deliberation, the Committee approved the proposal for Change in Board of Directors in terms of Instruction No. 109 dated 18.10.2021, issued by MOC&I. Approved List of Board Of Directors:
Sr. No. Name of Director Designation Date of Appointment 1. Mr. Lingraju Swakar Managing Director
Mr. Subash Venkitaraman Director
Ms.
ued by MOC&I. Approved List of Board Of Directors:
Sr. No. Name of Director Designation Date of Appointment 1. Mr. Lingraju Swakar Managing Director
Mr. Subash Venkitaraman Director
Ms. Rajita Singh Director
Mr. Saurabh Awasthi Additional Director 01.08.2025 5. Mr. Shridhar O Company Secretary 15.04.2025 The approval is subject to the conditions laid down in Instruction No. 109 issued by MOC&I. Meeting ended with a vote of thanks to the Chair.
signaturerectangle-1-186 (bानेdर बी. पाटील, आयएएस) (Dnyaneshwar B. Patil, IAS) अ*य#-सह- िवकास आयु& Chairman-cum- Development Commissioner Digitally signed by Dnyaneshwar Bhalchandra Patil Date: 2026.01.27 16:21:21 IST % DSUnknown q 1 G 1 g 0.1 0 0 0.1 9 0 cm 0 J 0 j 4 M []0 d 1 i 0 g 313 292 m 313 404 325 453 432 529 c 478 561 504 597 504 645 c 504 736 440 760 391 760 c 286 760 271 681 265 626 c 265 625 l 100 625 l 100 828 253 898 381 898 c 451 898 679 878 679 650 c 679 555 628 499 538 435 c 488 399 467 376 467 292 c 313 292 l h 308 214 170 -164 re f 0.44 G 1.2 w 1 1 0.4 rg 287 318 m 287 430 299 479 406 555 c 451 587 478 623 478 671 c 478 762 414 786 365 786 c 260 786 245 707 239 652 c 239 651 l 74 651 l 74 854 227 924 355 924 c 425 924 653 904 653 676 c 653 581 602 525 512 461 c 462 425 441 402 441 318 c 287 318 l h 282 240 170 -164 re B Q
786 365 786 c 260 786 245 707 239 652 c 239 651 l 74 651 l 74 854 227 924 355 924 c 425 924 653 904 653 676 c 653 581 602 525 512 461 c 462 425 441 402 441 318 c 287 318 l h 282 240 170 -164 re B Q
Action Taken for Approval Committee held on 02-01-2026 Agenda Item No. Subject Remarks Agenda Item No. 01 Confirmation of the Minutes of the 106th Meeting held on 31-10-2025 Minutes of the meeting held on 31.10.2025 confirmed by the Approval Committee. Agenda Item No. 02 Application for setting up cafeteria,gymnasium and recreation of area(M/s. LTIMindtree Limited) The Approval letter was sent to unit on 29.01.2026 Agenda Item No. 03 Application for change in list of directors/ partners(M/s. Kyndryl Solutions Pvt Ltd ) The Approval letter was sent to unit on 29.01.2026
GOVERNMENT OF INDIA, OFFICE OF THE DEVELOPMENT COMMISSIONER, SEEPZ SPECIAL ECONOMIC ZONE, GOVT. OF INDIA, ANDHERI (EAST), MUMBAI
AGENDA NOTE FOR CONSIDERATION OF APPROVAL COMMITTEE
a. Proposal :
Proposal dated 09.02.2026 submitted by M/s. Volkswagen Group Technology Solutions India Pvt Ltd, SEZ Unit located at
Embassy TechZone Hinjewadi- SEZ for approval of Revision in Financial projections for 3rd Block period FY 2024-25 to
FY 2028-29.
b. Specific Issue on which decision of AC is required: -
Approval of the UAC for revision in Financial projection for 3 rd Block period i.e from FY 2024-25 to FY 2028-29 under
Rule 19(2) of SEZ Rules, 2006
c.
Issue on which decision of AC is required: -
Approval of the UAC for revision in Financial projection for 3 rd Block period i.e from FY 2024-25 to FY 2028-29 under
Rule 19(2) of SEZ Rules, 2006
c. Relevant provisions of SEZ Act, 2005 & Rules, 2006/Instruction/
Notification :-
As per first proviso to Rule 19(2) of SEZ Rules, 2006
“Provided that the Approval Committee may also approve proposals for broad- banding, diversification, enhancement of
capacity of production, change in the items of manufactures or service capacity, if it meets the requirements of Rule 18”
d. Other Information: -
Approved and Proposed revision in Investment & Employment for 3rd Block (2024-25 to 2028-29) (Rs. In Cr)
Capital Goods
Approved projection
Proposed
Revision
in
projection
Indigenous
Plant
and
machinery
5.00
15.00
Imported
Plant
and
Machinery
0.50
15.50
TOTAL
5.50
30.50
Indigenous Services
216.06
216.06
Imported Services
92.17
254.32
TOTAL
308.23
470.38
Employment
Men - 700
Men – 910
Women - 300
Women- 390
Total
1000
1300
Approved Export Projections: (Rs. in Cr)
Sr.No
2024-25
2025-26
2026-27
2027-28
2028-29
Total
Total in USD in
Thousands
1.
FOB Value
of exports
444.85
284.17
329.53
389.57
454.25
1902.37
2,17,141.86
2.
FE Outgo
29.71
15.48
14.97
15.88
16.63
92.67
10,577.00
3.
NFE
415.14
268.69
314.56
373.72
437.61
1809.72
2,06,564.86
. FOB Value of exports 444.85 284.17 329.53 389.57 454.25 1902.37 2,17,141.86 2. FE Outgo 29.71 15.48 14.97 15.88 16.63 92.67 10,577.00 3. NFE 415.14 268.69 314.56 373.72 437.61 1809.72 2,06,564.86
Proposed Revised Export Projections: (Rs. in Cr)
Sr.No
2024-25
(Actual)
2025-26
2026-27
2027-28
2028-29
Total
Total in USD in
Thousands
1.
FOB Value
of exports
544.38
284.17
362.48
428.56
499.67
2119.25
2,33,552.08
2.
FE Outgo
48.32
68.88
48.88
50.88
52.88
269.82
29,735.08
3.
NFE
496.06
215.29
313.60
377.68
446.79
1849.43
2,03,817.01
Other Information:
LOA No. SEEPZ-SEZ/PEPPL-SEZ/VIPL/08/2014-15/5846 dated 15.05.2014
DCP : 06.06.2014
LOA valid till:05.06.2029
Location: 9th and 10th floor, Wing B, Block Congo, Plot no PL03, Embassy Pune Tech Zone Pvt Ltd-SEZ, RGIP,
Hinjewadi, Phase II, Pune-411057
Existing Block Period – FY 2024-25 to FY 2028-29
Reason for revision in projection:
The unit has stated in their application that the revision is undertaken to better align the company’s financial roadmap with
actual performance trends, updated forecasts, increased revenue expectations and recent cost related and corporate
developments.
e. Recommendation:
Approval Committee may like to consider the proposal of the unit for revision in projection under Rule 19(2) of SEZ Rules,
2006.
. Recommendation: Approval Committee may like to consider the proposal of the unit for revision in projection under Rule 19(2) of SEZ Rules, 2006.
GOVERNMENT OF INDIA, OFFICE OF THE DEVELOPMENT COMMISSIONER, SEEPZ SPECIAL ECONOMIC ZONE, GOVT. OF INDIA, ANDHERI (EAST), MUMBAI
AGENDA NOTE FOR CONSIDERATION OF APPROVAL COMMITTEE
a. Proposal :
Proposal dated 27.01.2026 submitted by M/s. HCL Technologies Ltd, SEZ Unit located at Embassy TechZone Hinjewadi-
SEZ for approval of Revision in Financial projections for 2nd Block period FY 2024-25 to FY 2028-29.
b. Specific Issue on which decision of AC is required: -
Approval of the UAC for revision in Financial projection for 2 nd Block period i.e from FY 2024-25 to FY 2028-29 under
Rule 19(2) of SEZ Rules, 2006
c. Relevant provisions of SEZ Act, 2005 & Rules, 2006/Instruction/
Notification :-
As per first proviso to Rule 19(2) of SEZ Rules, 2006 “Provided that the Approval Committee may also approve proposals
for broad- banding,diversification, enhancement of capacity of production, change in the items of manufactures or service
capacity, if it meets the requirements of Rule 18”
d. Other Information: -
Approved and Proposed revised Investment & Employment for 2nd Block (2024-25 to 2028-29) (Rs.
s of manufactures or service capacity, if it meets the requirements of Rule 18” d. Other Information: - Approved and Proposed revised Investment & Employment for 2nd Block (2024-25 to 2028-29) (Rs. In Cr) Capital Goods Approved Projection Proposed Renewed Projections
Indigenous Plant and machinery 12.21 12.21
Imported Plant and Machinery 27.92 1,665.46
TOTAL 40.13 1677.67
Indigenous Services 45.97 45.97
Imported Services 0.00 0.00
TOTAL 45.97 45.97
Employment Men - 650 Men – 680
Women – 250 Women – 270
Total 900 950
Approved Export Projections : for FY 2024-25 to FY 2028-29 (Rs. in Cr) Sr.No Year 2024-25 2025-26 2026-27 2027-28 2028-29 Total Total in USD in Thousands 1. FOB Value of exports 752.89 752.89 752.89 752.89 752.89 3,764.45 4,51,101.57 2. FE Outgo 19.01 2.83 2.02 2.02 2.03 27.91 3,345.71 3. NFE 733.88 750.06 750.87 750.87 750.86 3,73,6.52 4,47,755.87
Proposed Revised Export Projections: For FY 2024-25 to FY 2028-29 (Rs. in Cr) Sr.No Year 2024-25 2025-26 2026-27 2027-28 2028-29 Total Total in USD in Thousands 1. FOB Value of exports 752.89 1,116.73 1,116.73 1,116.73 1,116.73 5,219.81 5740.95 2. FE Outgo 19.01 1640.37 2.02 2.03 2.03 1,665.46 1831.74 3. NFE 733.88 (523.64) 1,114.70 1,114.70 1,114.70 3,554.35 3909.21 Other Information: LOA No.
73
1,116.73
1,116.73
1,116.73
5,219.81
5740.95
2.
FE Outgo
19.01
1640.37
2.02
2.03
2.03
1,665.46
1831.74
3.
NFE
733.88
(523.64)
1,114.70
1,114.70
1,114.70
3,554.35
3909.21
Other Information:
LOA No. SEEPZ-SEZ/PEPPL-SEZ/HCLTL/27 2019-20/1667 dated 06.06.2019
DCP: 03.09.2019
LOA valid till: 02.09.2029
Location: 2nd Floor, Mekong Building, Embassy Pune Tech Zone Pvt Ltd-SEZ, RGIP, Hinjewadi, Phase II, Pune-
411057
Existing Block Period –FY 2024-25 to FY 2028-29
Reason for revision in projection:
The unit in their application has stated that they intend to procure Intellectual Property (IP/Software license). The cost
of the said Software IP is INR 1,637 crore (USD 180 Million).
The Unit has also stated that the Proposed Software IP being downloaded will enable HCL Software’s data vision to
meet the growing demand for Metadata Management, data catalog and data governance solutions. It will further
accelerate the Agentic Business Intelligence roadmap of Actian’s customers by providing embedded analytics and
pixel-perfect reporting capabilities.
The procurement is expected to increase their export revenue by INR 363.89 Crore (40 Million) per annum.
Additionally, this will generate employment for 50 new individuals during the remaining period of the current block.
e. Recommendation:
UAC may like to consider the justification given by the unit towards higher import value compared to projected, and
consider the proposal of the unit for revision in projection under Rule 19(2) of SEZ Rules, 2006.
rds higher import value compared to projected, and consider the proposal of the unit for revision in projection under Rule 19(2) of SEZ Rules, 2006.
GOVERNMENT OF INDIA, OFFICE OF THE DEVELOPMENT COMMISSIONER, SEEPZ SPECIAL ECONOMIC ZONE, GOVT. OF INDIA, ANDHERI (EAST), MUMBAI
AGENDA NOTE FOR CONSIDERATION OF APPROVAL COMMITTEE
a. Proposal :
Monitoring of the performance of M/s. Flextronics Technologies India Pvt Ltd. an IT/ITES unit located in Embassy Pune
TechZone Pvt. Ltd-SEZ, for 2nd year i.e FY 2024-25 of 3 rd Block period (FY 2023-24 to FY 2027-28).
b. Specific Issue on which decision of AC is required: -
Monitoring of the performance of the unit for 2nd year i.e FY 2024-25 of 3 rd Block period (FY 2023-24 to FY 2027-28), in
terms of Rule 54 of SEZ Rules, 2006.
c. Relevant provisions of SEZ Act, 2005 & Rules, 2006/Instruction/
Notification :-
As per Rule 54 of SEZ Rules, 2006
“Performance of the Unit shall be monitored by the Approval Committee as per the guidelines given in Annexure appended
to these rules”.
d. Other Information: -
Approved Projections: (3rd Block Period) (Rs. In Cr.)
2023-24 2024-25 2025-26 2026-27 2027-28 TOTAL FOB Value of Exports 211.47 228.05 247.89 269.20 291.59 1248.20 FE Outgo 1.51 1.66 1.82 2.00 2.20 9.19 NFE 209.96 226.39 246.07 267.20 289.39 1239.01 Performance as compared to projections: For FY 2024-25 (Rs. In Cr.) Year Export F.E. OUTGO
Projected
Actual Raw Material (Goods/Services) C.G.
9.19 NFE 209.96 226.39 246.07 267.20 289.39 1239.01 Performance as compared to projections: For FY 2024-25 (Rs. In Cr.) Year Export F.E. OUTGO
Projected
Actual Raw Material (Goods/Services) C.G. import Other outflow Projected Actual Projected Actual Actual 2024-25 228.05 187.31 0.00 0.00 0.00 7.38 0.00 Total 228.05 187.31 0.00 0.00 0.00 7.38 0.00 Cumulative NFE achieved: (Rs. in Cr) Year Cumulative NFE Achieved Cumulative % NFE Achieved 2024-25 380.29 99.12% Employment: (As per APR)
Projected Employment Achieved Employment Men 917 669
Women 516 392 Total 1433 1061 Other Information: LOA No. & Date SEEPZ/PEPPL-SEZ/FTIPL/06/2013-14/1601 dated 05.02.2014 Location of Unit 3rd Floor in Wing A and 7 th Floor in Wing A & B, Building Rhine (1.5), Embassy Pune TechZone Pvt Ltd.-SEZ, Plot No 03A, RGIP, Phase-II, Hinjewadi, Pune-411057 Validity of LOA 17.03.2029 Item(s) of manufacture/ Services IT & ITES Date of commencement of production 18.03.2014 Execution of BLUT 54.06 Crores Outstanding Rent dues NA Labour Dues NA Validity of Lease Agreement 05, years Valid till 31.01.2029 Pending CRA Objection, if any NA Pending Show Cause Notice/ Eviction Order/Recovery Notice/ Recovery Order issued, if any NA Projected employment for the block period No. of employees as on 31.03.2025 1433 (Men-917, Women-516) 1061(Men- 669, Women- 392) Area allotted (in sq.ft.) 81,334 Sq. Ft Area available for each employee per sq.ft. basis (area / no. of employees) 76.65 Sq.
es as on 31.03.2025 1433 (Men-917, Women-516) 1061(Men- 669, Women- 392) Area allotted (in sq.ft.) 81,334 Sq. Ft Area available for each employee per sq.ft. basis (area / no. of employees) 76.65 Sq. Ft. Investment till date
Building NA Plant & Machinery 32.09 Crore Quantity and value of goods exported under Rule 34 unutilized goods) NA Value Addition during the monitoring period NA Whether all the APRs being considered now has been filed well within the time limit, or otherwise. If no, details of the Year along with no of days delayed to be given. Yes The Specified Officer report vide letter dated 23.01.2026 has submitted reported as detailed below: EXPORT (Rs. In Crores) Year/ Period Figures reported in APR Figures as per Softex/ Customs Records Difference if any Reason for Difference/Remark (1) (2) (3) (4) (5) 2024-25 187.31 188.20 -0.89 On account of Exchange Rate variation Rs. 0.89 Total Rs. 0.89 IMPORT
FY Op. Bal Goods Imported & Indigenous Services Imported & Indigenous Cl. Bal. 24-25 43.90 0.38 0.74 42.78 Total
0.38 0.74
(Capital Goods including procurement done on IUT (from SEZ, EOU, STPI, EHTP) basis. (Rs. In Cr) Year/Period Figures reported in APR (CIF Value) Figures as per Customs Records Difference if any Reason for Difference/Remark (1) (2) (3) (4) (5) 2024-25 0.00 0.00 0.00
Raw Material (Rs.
. In Cr) Year/Period Figures reported in APR (CIF Value) Figures as per Customs Records Difference if any Reason for Difference/Remark (1) (2) (3) (4) (5) 2024-25 0.00 0.00 0.00
Raw Material (Rs. In Cr) Year/Period Figures reported in APR (FOB Value) Figures as per Customs Records Difference if any Reason for Difference/Remark (1) (2) (3) (4) (5) 2024-25 0.00 0.00 0.00
BLUT (Amount in ‘Crores’) 1 Value of BLUT Executed (Duty foregone) (including for CG/ Raw Material/ Services) Value of Additional BLUT executed Year: Date of acceptance BLUT amount: TOTAL value of BLUT Executed Date of Acceptance BLUT Amount 15th May, 2014 7.29 03rd Nov., 2016 8.50 8th July, 2019 33.92 10th May, 2024 4.35 Total 54.06 2 Total Duty Foregone on goods & services procured Category Wise: Year Wise: (d) Employment made as on date (31.03.2025) (as on end of block period/ year up to which monitoring is being done) FY Male Female Total Projection 917 516 1433 ACTUAL 2024-25 669 392 1061 Total No Employment :1061 nos. (e) Details of Pending Foreign Remittance beyond Permissible period, if any (as on 31.03.2025) To cross-check the same and verify whether necessary permission from AD Bank/ RBI has been obtained. No foreign remittance is pending as on 31.03.2025
(f) Whether all Softex has been filed for the said period. If no, details thereof. SO to also check whether unit has obtained Softex condonation from DC office / RBI and if approved, whether they have filed such pending Softex. Yes
iled for the said period. If no, details thereof. SO to also check whether unit has obtained Softex condonation from DC office / RBI and if approved, whether they have filed such pending Softex. Yes
(g) Whether all Softex has been certified, if so till which month has the same been certified. If not, provide details of the Softex and reasons for pendency. All Softex have been certified till 31-03-2025
(h) Whether unit has filed any request for Cancellation of softex No. (i) Whether any Services provided in DTA/SEZ/EOU/STPI etc. against payment in INR in r/o IT/ITES Unit during the period. If yes, details thereof (year wise details to be provided)
No (j) SO to verify and certify whether the unit has updated the BLUT ledger Module in SEZ Online. N.A. (k) Has the unit cleared any Capital Goods procured duty free in DTA against Payment of Duty, or otherwise? Full details to be provided along with value of assets and duty discharged F.Y. Assessable Value Duty paid 2024-25 0.21 0.07 Cleared as E-Waste (l) Is the unit sharing any of their infrastructure with other units or are utilizing infrastructure of another unit in the same or other SEZ. If so, details thereof, including the details of the unit with whom the sharing is being made, and the payment terms If approval for sharing of common infrastructure has been obtained from UAC/DC office, the date of UAC/ Approval letter to be indicated No (m) Whether all DSPF for services procured during the said monitoring period under consideration has been filed by the unit and whether the same has been processed for
roval letter to be indicated No (m) Whether all DSPF for services procured during the said monitoring period under consideration has been filed by the unit and whether the same has been processed for approval by the SO Office. Yes. (n) Whether unit has filed all DTA procurement w.r.t. the goods procured by them during the monitoring period for the relevant period: If no, details thereof Yes (o) Details of the request IDs pending for OOC in respect of DTA procurement on the date of submission of monitoring report No Request Id is pending for OOC.
(p) Has the unit set up any cafeteria/ canteen/ food court in unit premises. If yes, whether permission from UAC/DC office has been issued, or otherwise. Whether unit has availed any duty paid goods/services for setting up such facility? If yes, whether unit has discharged such duty/ tax benefit availed? details to be given including amount of duty/ tax recovered or yet to be recovered The unit does not have Cafeteria/Canteen/Food Court facility, however they have Dry Pantry, with no cooking facility. (q) Whether any violation of any of the provisions of law has been noticed/ observed by the Specified Officer during the period under monitoring. N.A. e. Recommendation: The unit has achieved export of Rs. 187.31 Cr. against the projected export of Rs. 228.05 Cr. in FY year 2024-25. The unit has achieved NFE of Rs. 380.29 Cr.
nder monitoring. N.A. e. Recommendation: The unit has achieved export of Rs. 187.31 Cr. against the projected export of Rs. 228.05 Cr. in FY year 2024-25. The unit has achieved NFE of Rs. 380.29 Cr. i.e., 99.12% in FY year 2024-25 on cumulative basis. The unit has achieved employment of 1061 employees (Men-669, Women- 392) Approval committee may kindly monitor the performance of the Unit for 2nd year i.e FY 2024-25 of 3 rd Block period., in terms of Rule 54 of SEZ Rules, 2006.
GOVERNMENT OF INDIA, OFFICE OF THE DEVELOPMENT COMMISSIONER, SEEPZ SPECIAL ECONOMIC ZONE, GOVT. OF INDIA, ANDHERI (EAST), MUMBAI
AGENDA NOTE FOR CONSIDERATION OF APPROVAL COMMITTEE
a. Proposal :
Monitoring of the performance of M/s. CalSoft Pvt Ltd. an IT/ITES unit located in M/s. Embassy Pune TechZone Pvt Ltd-
SEZ, for last year of first block period i.e for FY 2023-24 and 1 st year i.e FY 2024-25 of 2 nd Block period i.e from FY 2024-
25 to 2028-29.
b. Specific Issue on which decision of AC is required: -
Monitoring of the performance of the unit for last year of first block period i.e for FY 2023-24 and 1 st year i.e FY 2024-25 of
2nd Block period (FY 2024-25 to 2028-29), in terms of Rule 54 of SEZ Rules, 2006
c. Relevant provisions of SEZ Act, 2005 & Rules, 2006/Instruction/
Notification :-
As per Rule 54 of SEZ Rules, 2006
“Performance of the Unit shall be monitored by the Approval Committee as per the guidelines given in Annexure appended
to these rules”.
d.
/
Notification :-
As per Rule 54 of SEZ Rules, 2006
“Performance of the Unit shall be monitored by the Approval Committee as per the guidelines given in Annexure appended
to these rules”.
d. Other Information: -
Original Approved Projections: (1st block Period) (Rs. In Cr.)
2019-20
2020-21
2021-22
2022-23
2023-24
Total
FOB value of
export
15.68
50.40
60.48
70.56
80.64
277.76
FE outgo
3.49
0.21
0.09
0.33
0.30
4.42
NFE
12.19
50.19
60.39
70.23
80.34
273.34
Performance as compared to projections: FY 2023-24(Rs. In Cr.)
Year
Export
F.E. OUTGO
Projected
Actual Raw Material (Goods/Services) C.G. import Other outflow Projected Actual Projected Actual Actual 2023-24 80.64 86.66 0.00 0.00 4.42 0.00 5.76 Total 80.64 86.66 0.00 0.00 4.42 0.00 5.76
Cumulative NFE achieved:(Rs. in Cr.) Year Cumulative NFE Achieved Cumulative % NFE Achieved 2023-24 220.07 93.88%
Approved Projections: (2ndblock Period) (Rs. In Cr.)
2024-25
2025-26
2026-27
2027-28
2028-29
Total
FOB value of export
93.90
107.99
129.58
161.98
210.57
704.03
FE outgo
9.00
10.50
10.50
11.00
10.00
51.00
NFE
84.90
97.49
119.08
150.98
200.57
653.03
Performance as compared to projections: FY 2024-25(Rs. InCr)
Year
Export
F.E. OUTGO
Projected
Actual Raw Material (Goods/Services) C.G. import Other outflow Projected Actual Projected Actual Actual 2024-25 93.90 78.44 0.00 0.00 7.00 0.00 15.05 Total 93.90 78.44 0.00 0.00 7.00 0.00 15.05
Cumulative NFE achieved:(Rs.
. import Other outflow Projected Actual Projected Actual Actual 2024-25 93.90 78.44 0.00 0.00 7.00 0.00 15.05 Total 93.90 78.44 0.00 0.00 7.00 0.00 15.05
Cumulative NFE achieved:(Rs. in Cr.) Year Cumulative NFE Achieved Cumulative % NFE Achieved 2024-25 63.13 80.49% Employment:
Approved (FY 2024-25 to 2028-29) Achieved FY 2024- 25 Men 230 128 Women 70 33 Total 300 161 Other Information: LOA No. & Date LOA No. SEEPZ-SEZ/EOPPL- SEZ/CPL/25/2018-19/560 dated 25.10.2018 Location of Unit 7th Floor, Wing B, Congo Building and 1 st Floor, Wing B, Mississippi Building, Embassy Pune TechZone Pvt Ltd.-SEZ, RGIP, Hinjewadi, Pune-411057 Validity of LOA 31.07.2029 Item(s) of manufacture/ Services IT & ITES Date of commencement of production 01.08.2019 Execution of BLUT Rs.16.03 Cr. Outstanding Rent dues NA Labour Dues NA Validity of Lease Agreement 30.04.2029 Pending CRA Objection, if any NA Pending Show Cause Notice/ Eviction Order/Recovery Notice/ Recovery Order issued, if any NA Employment for the block period No. of employees as on 31.03.2025 161 (Men-128, Women-33)
n, if any NA Pending Show Cause Notice/ Eviction Order/Recovery Notice/ Recovery Order issued, if any NA Employment for the block period No. of employees as on 31.03.2025 161 (Men-128, Women-33)
Area allotted (in sq.ft.) 24,466 Sq.ft Area available for each employee per sq.ft. basis (area / no. of employees) 151.96 Sq. Ft. Investment till date Building NA Plant & Machinery 0.00 Quantity and value of goods exported under Rule 34 (unutilized goods) NA Value Addition during the monitoring period NA Whether all the APRs being considered now has been filed well within the time limit, or otherwise. If no, details of the Year along with no of days delayed to be given. No, APR for FY 2023-24 filed on 17.01.2025 (Delay of 109 days from the Due date of 30.09.2024) e. Recommendation: The unit in 5 th year i.e. FY 2023-24 of 1 st block period has achieved export revenue of Rs.86.66 Cr. against the projected export of Rs. 80.64 Cr. The unit has achieved positive NFE of Rs. 220.07 Cr. in FY 2023-24 which is 93.88 % on cumulative basis for the first block period. The unit in 1 st year i.e. FY 2024-25 of 2 nd block period has achieved export revenue of Rs.78.44 Cr. against the projected export of Rs. 93.90 Cr.. The unit has achieved positive NFE of Rs.63.13 Cr.
he unit in 1 st year i.e. FY 2024-25 of 2 nd block period has achieved export revenue of Rs.78.44 Cr. against the projected export of Rs. 93.90 Cr.. The unit has achieved positive NFE of Rs.63.13 Cr. i.e., 80.49 % in FY 2024-25. As per SO report the unit has achieved employment of 161 employees (Men-128, Women-33) The unit submitted APR for FY 2023-24 on 17.01.2025 in SEZOnline after a delay of 109 days from the due date of 30.09.2024. Approval committee may kindly monitor the performance of the Unit for 2 years from FY 2023-24 to FY 2024-25 in terms of Rule 54 of SEZ Rules, 2006.
Year Export F.E. OUTGO Projected Actual Raw Material (Goods/Services) C.G. import Other outflow Projected Actual Projected Actual Actual 2021-22 116.63 105.63 0.00 0.00 7.10 0.00 0.00 Total 116.63 105.63 0.00 0.00 7.10 0.00 0.00 Year Cumulative NFE Achieved Cumulative % NFE Achieved 2021-22 278.51 99.78% GOVERNMENT OF INDIA, OFFICE OF THE DEVELOPMENT COMMISSIONER, SEEPZ SPECIAL ECONOMIC ZONE, GOVT. OF INDIA, ANDHERI (EAST), MUMBAI
AGENDA NOTE FOR CONSIDERATION OF APPROVAL COMMITTEE
a. Proposal : Monitoring of the performance of M/s. ConnectWise LLP., located in M/s. Embassy Pune TechZone Pvt. Ltd.-SEZ, for 5 th year i.e FY 2021-22 of first block period and first 3 years of 2 nd Block period from FY 2022-23 to FY 2024-25. b.
M/s. ConnectWise LLP., located in M/s. Embassy Pune TechZone Pvt. Ltd.-SEZ, for 5 th
year i.e FY 2021-22 of first block period and first 3 years of 2 nd Block period from FY 2022-23 to FY 2024-25.
b. Specific Issue on which decision of AC is required: -
Monitoring of performance for 5th year i.e FY 2021-22 of 1 st Block period and 3 years of 2 nd Block period from FY 2022-23
to FY 2024-25., in terms of Rule 54 of SEZ Rules, 2006
c. Relevant provisions of SEZ Act, 2005 & Rules, 2006/Instruction/
Notification :-
As per Rule 54 of SEZ Rules, 2006
“Performance of the Unit shall be monitored by the Approval Committee as per the guidelines given in Annexure appended
to these rules”.
d. Other Information: -
Performance as compared to projections: (Rs. In Cr)
Approved Projections for 1 st Block period from 2017-18 to 2020-21:
2017-
18
2018-
19
2019-20 2020-21 2021-22 Total
FOB Export
23.06
37.81
51.24
69.14
116.63
297.88
FE Outgo
0.55
0.61
0.66
0.73
0.82
3.37
NFE
22.51
37.20
50.58
68.41
115.81
294.51
Performance as compared to projections: (Rs. In Cr.)
Cumulative NFE achieved: (Rs. in Cr)
116.63 297.88 FE Outgo 0.55 0.61 0.66 0.73 0.82 3.37 NFE 22.51 37.20 50.58 68.41 115.81 294.51 Performance as compared to projections: (Rs. In Cr.)
Cumulative NFE achieved: (Rs. in Cr)
2022-23 2023-24 2024-25 2025-26 2026-27 Total FOB Export 115.15 124.83 135.14 143.18 156.46 674.76 FE Outgo 7.48 7.16 43.59 15.53 15.57 89.33 NFE 107.67 117.67 91.55 127.65 140.88 585.43 Year Export F.E. OUTGO Projected Actual Raw Material (Goods/Services) C.G. import Other outflow Projected Actual Projected Actual Actual 2022-23 115.15 102.36 0.00 0.00 1.00 0.00 7.00 2023-24 124.83 90.87
0.00 6.90 2024-25 135.14 88.85 0.00 40.00 Total 375.12 282.08 0.00 0.00 1.00 0.00 53.90 Year Cumulative NFE Achieved Cumulative % NFE Achieved 2022-23 95.22 93.03% 2023-24 179.05 92.66% 2024-25 227.77 80.75%
Approved Projections for 2 nd Block period from FY 2022-23 to FY 2026-27:
Performance as compared to projections: (Rs. In Cr.)
Cumulative NFE achieved: (Rs. in Cr)
Employment: As per APR 2020-21, till 31.03.2021
Approved Projection Achieved Men 472 250 Women 128 72 Total 600 322 Other Information: LOA No. & Date SEEPZ/PEPPLSEZ/CMSPL/22/2017-18/10644 dated 02.06.2017 Location of Unit Block 1.5(Rhine), 5th Floor, Wing-A, Embassy Pune TechZone Pvt.
0 Women 128 72 Total 600 322 Other Information: LOA No. & Date SEEPZ/PEPPLSEZ/CMSPL/22/2017-18/10644 dated 02.06.2017 Location of Unit Block 1.5(Rhine), 5th Floor, Wing-A, Embassy Pune TechZone Pvt. Ltd.-SEZ, Plot No.03, Embassy Tech Zone, RGIP, Phase-II, Hinjewadi, Pune-411057
Validity of LOA 31.07.2027 Item(s) of manufacture/ Services IT & ITES Date of commencement of production 01.08.2017 Execution of BLUT Rs.13.78 Cr. Outstanding Rent dues NA Labour Dues NA Validity of Lease Agreement Nov 2028 Pending CRA Objection, if any NA Pending Show Cause Notice/ Eviction Order/Recovery Notice/ Recovery Order issued, if any NA
Projected employment for the block period No. of employees as on 31.03.2025 600 (Men-472 Women-128)
322(Men- 250,Women-72) Area allotted (in sq.ft.) 27302 Sq.Ft Area available for each employee per sq.ft. basis (area / no. of employees) 85 Sq. Ft. Investment till date
Building 0.00 Plant & Machinery 16.97 Cr Quantity and value of goods exported under Rule 34 (unutilized goods) NA Value Addition during the monitoring period NA Whether all the APRs being considered now has been filed well within the time limit, or otherwise.
If no, details of the Year along with no of days delayed to be given. Yes e. Recommendation: The unit in last year i.e., FY 2021-22 of 1 st block period has achieved export revenue of Rs. 105.63 cr against the projected export of Rs 116.63 Cr. The unit has achieved positive NFE of Rs. 278.51 Cr.
unit in last year i.e., FY 2021-22 of 1 st block period has achieved export revenue of Rs. 105.63 cr against the projected export of Rs 116.63 Cr. The unit has achieved positive NFE of Rs. 278.51 Cr. i.e., 99.78 % on cumulative basis for the 1 st Block period. The unit in first 3 year i.e.,FY 2022-23 to FY 2024-25 of 2 nd block period has achieved export revenue of Rs. 282.08 Cr against the projected export of Rs 375.12 Cr. The unit has achieved positive NFE of Rs. 227.77 Cr. i.e 80.75 % in FY 2024-25 on cumulative basis. As per SO report the unit has achieved employment of 322 (Men-250, Women-72) Approval committee may kindly monitoring performance of the Unit from FY 2021-22 to FY 2024-25 in terms of Rule 54 of SEZ Rules, 2006.
Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.
No analysis generated for this document yet (analysis runs over brief docs + on-demand). Run build_analysis.py --ids 34795 --apply.