SEEPZ SPECIAL ECONOMIC ZONE ANDHERI (EAST), MUMBAI.

AGENDA FOR

MEETING OF THE APPROVAL COMMITTEE FOR SECTOR SPECIFIC SPECIAL ECONOMIC ZONE FOR MANUFACTURING SECTOR OF MIDC-KESURDI, SATARA-SEZ.

DATE : 31.10.2025

TIME : 03.00 P.M.


MEETING OF THE APPROVAL COMMITTEE FOR SECTOR SPECIFIC SPECIAL ECONOMIC ZONE FOR MANUFACTURING AT PUNE, UNDER THE CHAIRMANSHIP OF DEVELOPMENT COMMISSIONER, SEEPZ-SEZ ON 31.10.2025

INDEX

Agenda Item No.

Subject

Agenda Item No. 01 :- Confirmation of the Minutes of the meeting held on 09.05.2025 Agenda Item No. 02 :- Action taken report for the Minutes of the meeting held on 09.05.2025 Agenda Item No. 03:- Application submitted by M/s Datwyler Pharma Packaging India Pvt. Ltd for Broad Banding of Additional items as a part of Authorized Operations without revision in projection.


मेसस एमआईडीसी-केसुरडी-एसईजेड के मैयुफैचरग सेटर के िवश िवशेष आथक े के !लए े ीय िवकास आयु$ सी%ज़-एसईजेड, मुंबई क) अ+यता म- 09.05.2025 को आयो/जत अनुमोदन सिम2त क) 56 व3 बैठक के कायवृ6। 1 सेज़ का नाम मेसस एमआईडीसी-केसुरडी-एसईजेड 2 सेटर मैयुफैचरग सेटर 3 बैठक 8 56व3 4 तारीख 09.05.2025 उप<=थत सद=य: 8. नाम और पदनाम (एस/?ी.)
िवभाग 1 ?ीमती िमतल िहरेमठ संयु$ िवकास आयु$ पुणे C=टर एसईजेड, पुणे 2 ?ी. िदनेश होनमाने उप आयु$, आयकर िवभाग आयकर िवभाग से नािमत 3 ?ी संजीव पािटल, उDोग अ2धकारी महाराF सरकार से नािमत 4 ?ी. मंचक जाधव, उप-े ीय अ2धकारी महाराF Gदूषण िनयं ण बोड से नािमत 5 ?ीमती पुIपा गंगावणे, एफटीडीओ पुणे डीजीएफटी िवभाग से नािमत 6 ?ी धवल एस शकK , अधीक सीमा शुLक िवभाग पुणे नािमत िवशेष आमंि त सद=य: 8. नाम और पदनाम (?ी.)
िवभाग 1 ?ी. शNभू दयाल मीना िविनOद अ2धकारी सी%ज़-एसईज़ेड, पुणे C=टर एज-डा आइटम नंबर 01: िदनांक 21.02.2025 को आयो/जत 55व3 बैठक के कायवृ6 क) पुि िवचार-िवमश के बाद, सिम2त ने 21.02.2025 को आयो/जत 55व3 अनुमोदन सिम2त क) बैठक के कायवृ6 क) पुि क)। एज-डा आइटम नंबर 02: िदनांक 21.02.2025 को आयो/जत बैठक के संदभ मे क) गयी कायवाई क) Qरपोट । िवचार-िवमश के बाद, सिम2त ने 21.02.2025 को आयो/जत अनुमोदन सिम2त क) 55 व3 बैठक के संदभ मे क) गयी कायवाई क) Qरपोट को नोट िकया। एज-डा आइटम नंबर 03: मेसस ए<वGो इंजीिनयरग Gाइवेट !लिमटेड के Gदशन क) िनगरानी । िवचार-िवमश के बाद, सिम2त ने एसईजेड िनयम, 2006 के िनयम 54 के अनुसार, पहली Rलॉक अव2ध के 5 वषT के !लए यानी िव6 वष 2019-20 से िव6 वष 2023-24 तक क) इकाई के Gदशन को नोट िकया। जैसा िक नीचे िव=तृत Uप से बताया गया है: इकाई ने Gथम Rलॉक अव2ध के 5व- वष यानी िव6 वष 2023-24 म- संचयी आधार पर 60.21 करोड़ Wपये के अनुमािनत िनयात के मुकाबले 0.42 करोड़ Wपये का िनयात राज=व हा/सल िकया है। इकाई ने िव6 वष 2023-24 म- संचयी आधार पर 0.42 करोड़ Wपये यानी 100% का सकाराXमक एनएफई हा/सल िकया है। इकाई ने 33 (पुWष-33, मिहला-0) को रोजगार िदया है। यह देखा गया है िक एपीआर दा!खल करने म- देरी हुई थी, जैसा िक नीचे िव=तार से बताया गया है: वष के !लए एपीआर दा!खल करने क) िनयत 2तथ वष के !लए एपीआर दा!खल करने क) िनयत 2तथ एसईजेड ऑनलाइन म- दा!खल करने क) वा=तिवक 2तथ

फाइZलग म- देरी (िदन[ क) सं\या) 2019-20 31.12.2021 29.01.2022 1 month 2020-21 31.12.2021 29.01.2022 1 month 2021-22 30.09.2022 13.02.2025 29 months 2022-23 30.09.2023 16.08.2023 Within time 2023-24 30.09.2024 13.02.2025 5 months

चूंिक इकाई िनधाQरत समय म- एपीआर दा!खल करने म- िवफल रही है, /जसके पQरणाम=वUप हर साल एपीआर दा!खल करने म- देरी होती है, इस!लए सिम2त ने इकाई को कारण बताओ नोिटस जारी करने का िनदKश िदया। यूिनट को अनुमेय सीमा से अ2धक लंिबत िवदेशी मु]ा Gेषण का िववरण G=तुत करना आव^यक है।

एज-डा आइटम नंबर 04: मेसस =टीम इ<व%म-_स !लिमटेड के Gदशन क) िनगरानी । िवचार-िवमश के बाद, सिम2त ने एसईजेड िनयम, 2006 के िनयम 54 के अनुसार, पहली Rलॉक अव2ध के 5 वषT के !लए यानी िव6 वष 2019-20 से िव6 वष 2023-24 तक क) इकाई के Gदशन को नोट िकया। जैसा िक नीचे िव=तृत Uप से बताया गया है: इकाई ने Gथम Rलॉक अव2ध के 5व- वष यानी िव6 वष 2023-24 म- संचयी आधार पर 108.25 करोड़ Wपये के अनुमािनत िनयात के मुकाबले 17.25 करोड़ Wपये का िनयात हा/सल िकया है। इकाई ने िव6 वष 2023-24 म- 2.94 करोड़ Wपये यानी 17.01% का सकाराXमक एनएफई हा/सल िकया है इकाई ने 48 (पुWष-43, मिहला-05) को रोजगार िदया है। यह देखा गया है िक इकाई ने िनधाQरत समय के भीतर कोई एपीआर दा!खल नह3 िकया है। दा!खल करने म- उनक) देरी का िववरण नीचे िदया गया है: वष के !लए एपीआर दा!खल करने क) िनयत 2तथ वष के !लए एपीआर दा!खल करने क) िनयत 2तथ एसईजेड ऑनलाइन म- दा!खल करने क) वा=तिवक 2तथ

फाइZलग म- देरी (िदन[ क) सं\या) 2019-20 31.12.2021 27.03.2025 1181 Days 2020-21 31.12.2021 27.03.2025 1181 Days 2021-22 30.09.2022 27.03.2025 908 Days 2022-23 30.09.2023 27.03.2025 543 Days 2023-24 30.09.2024 27.03.2025 177 Days

चूंिक इकाई िनधाQरत समय म- एपीआर दा!खल करने म- िवफल रही है, /जसके पQरणाम=वUप हर साल एपीआर दा!खल करने म- देरी होती है, इस!लए सिम2त ने इकाई को कारण बताओ नोिटस जारी करने का िनदKश िदया। अ+य को धयवाद `ापन के साथ बैठक समाa हुई

Minutes of the 56th Meeting of the Approval Committee held under the Chairmanship of Zonal Development Commissioner SEEPZ-SEZ, Mumbai for Sector Specific Special Economic Zone for Manufacturing Sector of MIDC-Kesurdi-SEZ, held on 09.05.2025. 1 Name of the SEZ MIDC-Kesurdi-SEZ 2 Sector Manufacturing 3 Meeting No. 56th 4 Date 09.05.2025 Members present: Sr No. Name and Designation(S/Shri.) Department 1 Smt. Mital Hiremath Joint Development Commissioner Pune Cluster SEZ, Pune 2 Shri. Dinesh Honmane Dy. Commissioner, IT Nominee of Income Tax, Pune 3 Shri. Sanjeev Patil, Industries Officer Nominee of Govt. of Maharashtra 4 Shri. Manchak Jadhav Sub-Regional Officer Nominee of Maharashtra Pollution Control Board 5 Smt. Pushpa Gangawane. FTDO Nominee of DGFT, Pune 6 Shri. Dhaval Shirke, Superintendent Nominee of Customs, Pune Special Invitee Sr. No. Name and Designation Department 1 Shri. Shambhu Dayal Meena SEEPZ-SEZ, Pune Cluster Agenda Item No. 01: Confirmation of the Minutes of the 55th meeting held on 21.02.2025 After deliberation, the Committee confirmed the minutes of the 55th meeting of Approval Committee held on

21.02.2025 Agenda Item No.02: Action taken report for the Minutes of the meeting held on 21.02.2025 After deliberation, the Committee noted the action taken report for the meeting held on 21.02.2025 Agenda Item No. 03: Monitoring of performance for M/s. Envipro Engineering Pvt Ltd. After deliberation, the committee noted the performance of the unit for 5 years i.e from FY 2019-20 to FY 2023-24 of 1st Block period, in terms of Rule 54 of SEZ Rules, 2006. As detailed below: The unit in 5th year i.e., FY 2023-24 of 1 st block period has achieved export revenue of Rs. 0.42 Cr. against the projected export of Rs. 60.21Cr on cumulative basis. The unit has achieved positive NFE of Rs. 0.42 Cr. in FY 2023-24 on cumulative basis. As per SO report the unit has achieved employment of 33 (Men-33, Women-0) It has been observed that there was a delay in filing of APR, as detailed below: APR for the Year Due Date of Filing Actual Date Of Filing in SEZ Online Delay in months 2019-20 31.12.2021 29.01.2022 1 month 2020-21 31.12.2021 29.01.2022 1 month 2021-22 30.09.2022 13.02.2025 29 months 2022-23 30.09.2023 16.08.2023 Within time 2023-24 30.09.2024 13.02.2025 5 months

Since the unit has failed to file APR in stipulated time which resulted in the delay in filing of APR every year, the Committee directed to issue Show Cause Notice to the Unit. The Unit is required to submit details of pending foreign exchange remittance beyond permissible limit. Agenda Item No. 04: Monitoring of performance for M/s. Steam Equipments Ltd. After deliberation, the committee noted the performance of the unit for 05 years i.e. F.Y 2019-20 to FY 2023-24 of 1st block period, in terms of Rule 54 of SEZ Rules, 2006. As detailed below: The unit has achieved Export of Rs. 17.25Cr. against the projected export of Rs. 108.25 Cr. during the monitoring period i.e FY 2019-20 to FY 2023-24. The unit has achieved Positive NFE of Rs. 2.94 Cr. i.e, 17.01% in FY. 2023-24 The unit has achieved employment of 48 (Men- 43, Women- 05) It has been observed that Unit has not filed any APR within stipulated time. Details of their delay in filing is as mentioned below: Year Due Date of Filing Actual Date Of Filing in SEZ Online Delay in Filing (No Of Days) 2019-20 31.12.2021 (extended) 27.03.2025 1181 Days 2020-21 31.12.2021 (extended) 27.03.2025 1181 Days 2021-22 30.09.2022 27.03.2025 908 Days 2022-23 30.09.2023 27.03.2025 543 Days 2023-24 30.09.2024 27.03.2025 177 Days

Since the unit has failed to file APR in stipulated time which resulted in the delay in filing of APR every year, t he Committee directed to issue Show Cause Notice to the Unit. The meeting ended with vote of thanks to the Chair.

(`ानेbर भा. पाटील, आईएएस) (Dnyaneshwar B. Patil, IAS)

अ+य एवं िवकास आयु$ Chairman-cum- Development Commissioner

signaturerectangle-1-186 Digitally signed by Dnyaneshwar Bhalchandra Patil Date: 2025.05.20 17:56:36 IST % DSUnknown q 1 G 1 g 0.1 0 0 0.1 9 0 cm 0 J 0 j 4 M []0 d 1 i 0 g 313 292 m 313 404 325 453 432 529 c 478 561 504 597 504 645 c 504 736 440 760 391 760 c 286 760 271 681 265 626 c 265 625 l 100 625 l 100 828 253 898 381 898 c 451 898 679 878 679 650 c 679 555 628 499 538 435 c 488 399 467 376 467 292 c 313 292 l h 308 214 170 -164 re f 0.44 G 1.2 w 1 1 0.4 rg 287 318 m 287 430 299 479 406 555 c 451 587 478 623 478 671 c 478 762 414 786 365 786 c 260 786 245 707 239 652 c 239 651 l 74 651 l 74 854 227 924 355 924 c 425 924 653 904 653 676 c 653 581 602 525 512 461 c 462 425 441 402 441 318 c 287 318 l h 282 240 170 -164 re B Q

Action Taken for Approval Committee held on 09-05-2025 Agenda Item No. Subject Remarks Agenda Item No. 02 Application for Monitoring of Performace(M/s. Steam Equipments Ltd ) Approval letter is issued to the Unit on 27.05.2025. SCN issued to the Unit on 18.06.2025 Agenda Item No. 03 Application for Monitoring of Performace(M/s. Envipro Engineering Pvt Ltd ) Approval letter is issued to the Unit on 27.05.2025. SCN issued to the Unit on 18.06.2025.

GOVERNMENT OF INDIA, OFFICE OF THE DEVELOPMENT COMMISSIONER, SEEPZ SPECIAL ECONOMIC ZONE, GOVT. OF INDIA, ANDHERI (EAST), MUMBAI


AGENDA NOTE FOR CONSIDERATION OF APPROVAL COMMITTEE


a. Proposal : Proposal dated 30.09.2025 submitted by M/s. Datwyler Pharma Packaging India Pvt. Ltd., SEZ Unit located at MIDC Kesurdi.-SEZ, for approval for Broad Banding of Additional items for manufacture as a part of Authorized Operations without revision in projection. b. Specific Issue on which decision of AC is required: -
Approval of the Unit Approval Committee for Broad Banding of additional items in the existing LOA without revision in projections. c. Relevant provisions of SEZ Act, 2005 & Rules, 2006/Instruction/
Notification :- As per 1st proviso to Rule No. 19(2) of SEZ Rules, 2006 “Provided that the Approval Committee may also approve proposals for broadbanding, diversification, enhancement of capacity of production, change in the items of manufacturing or service capacity, if it meets the requirements of rule 18”. d. Other Information: - Proposal of the unit: Broad banding of additional items of manufacture in existing LOA as details below: ITC/HSN Existing Items of Manufacture ITC/HSN Proposed Items of Manufacture 400690 392350

40169980 Rubber Closure, Plastic Closure and Aluminium Closure

Rubber Closure, Plastic Closure and Aluminium Closure 40169990 Others- Needle Shield Information: - M/s. Datwyler Pharma Packaging India Pvt. Ltd. granted LOA NO. SEEPZ-SEZ/NEWSEZ/MIDC- Satara/02/10-11/5253 dated 21.05.2010. Location: Plot no.1,3,4 and 5 MIDC, Village Kesurdi,Taluka Khandala, Dist. Satara -412801. DCP of the unit is 01.10.2012 LOA Validity up to 30.09.2027 The unit has provided below documents along with the Broadbanding Application:

  1. Copy of SEZ online Form F-3- Application for Broad-Banding

  2. Copy of all letter of Approval.

  3. Process Flow chart for additional item.

  4. List of Existing clients

  5. Approved projection at the time of Renewal of LOA. Reason for Broad Banding : The unit has submitted that, in view of future business prospects and client inquiries , their management has decided to seek an amendment to their LOA to include additional item in Authorized Operation to be undertaken from the SEZ Unit. Further the unit has provided that the additional item, Needle Shield (HS Code: 40169990) does not fall under the Prohibited or restricted category for exports as per current policy. Reason for No Changes in Projections on account of inclusion of additional item of manufacture: The unit has informed that their proposed activities will not result into change in the existing projections of Imports and Investment submitted by them and is well within the proposed limits. The proposed item manufacturing activity will be undertaken using their existing plant and machinery, raw material and no additional Capital investment or manpower is required for the same. Further, they have stated that there will be no Revision in Projections for Exports, Investments and Employment etc. e. Recommendation: Approval Committee may consider the proposal of the unit for Broad Banding of Additional item without revision in projections, in terms of Rule 19(2) of SEZ Rules, 2006.