Agenda for Approval Committee meeting for EOU and SEZ under Pune Cluster scheduled on 31 October 2025. — 04-10-midc
SEEPZ SPECIAL ECONOMIC ZONE ANDHERI (EAST), MUMBAI.
AGENDA FOR
MEETING OF THE APPROVAL COMMITTEE FOR SECTOR SPECIFIC SPECIAL ECONOMIC ZONE FOR IT/ITES AT PUNE OF MIDC-SEZ
DATE : 31.10.2025
TIME : 03.00 P.M.
MEETING OF THE APPROVAL COMMITTEE FOR SECTOR SPECIFIC SPECIAL ECONOMIC ZONE FOR IT/ITES AT PUNE, UNDER THE CHAIRMANSHIP OF DEVELOPMENT COMMISSIONER, SEEPZ-SEZ ON 31.10.2025 INDEX
Agenda Item No.
Subject
Agenda Item No. 01: - Confirmation of the Minutes of the meeting held on 12.09.2025 Agenda Item No. 02:- Action taken report for the Minutes of the meeting held on 12.09.2025 Agenda Item No. 03:- Monitoring of Performance by M/s. Tata Consultancy Services Ltd., (LOA No. 05/2007-08
मैसस एमआईडीसी-एसईजेड, पुणे, के आईटी/आईटीईएस के लए सेटर िवश िवशेष आथक े , के लए े ीय िवकास आयु! सी"झ एसईजेड, क$ अ&य ता म( 12.09.2025 को आयोजत 143 वी अनुमोदन सिम-त क$ बैठक का कायवृ1। 1 एसईजेड का नाम एमआईडीसी-एसईजेड 2 सेटर आय टी – आय टी ई एस 3 बैठक 3मांक 143 वी 4 तारीख 12.09.2025 उप78थत सद8य 3. नाम एवं पदनाम (9ी/ 9ीमती) िवभाग 1 9ीमती िमतल िहरेमठ संयु! िवकास आयु! पुणे =8टर एसईजेड, पुणे 2 9ी अभनव राठी उप आयु!, आयकर िवभाग आयकर िवभाग से नािमत 3 9ीमती पु>पा गंगावणे, एफटीडीओ पुणे डीजीएफटी िवभाग से नािमत 4 9ी. धवल शकB , अधी क सीमा शुCक िवभाग पुणे नािमत 5 9ीमती सुषमा कुंभार, फ$Cड ऑिफसर महाराE Fदूषण िनयं ण बोड के नािमत िवशेष आमंि त 3. नाम एवं पदनाम (9ी/ 9ीमती) िवभाग 1 9ी. शHभू दयाल मीना, िविनIद अ-धकारी सी"ज़-एसईज़ेड, पुणे =8टर एज(डा िवषय 3 01 : िदनांक 29.07.2025 को आयोजत 142 वK बैठक के कायवृ1 क$ पुि िवचार-िवमश के बाद, सिम-त ने 29.07.2025 को आयोजत 142वK अनुमोदन सिम-त क$ बैठक के कायवृ1 क$ पुि क$। एज(डा िवषय 3. 02:- िदनांक 29.07.2025 को आयोजत बैठक के कायवृ1 क$ कारवाई Mरपोट िवचार-िवमश के बाद, सिम-त ने 29.07.2025 को हुए बैठक के लए क$ गई कारवाई क$ Mरपोट को नोट िकया है। एज(डा आइटम 3.03: अनुमानO म( संशोधन के लए आवेदन - मेसस हेसवेयर टेनोलॉजीज लिमटेड (एलओए नंबर 61): इकाई का F8ताव िवचार के लए अनुमोदन सिम-त के सामने रखा गया। िवचार -िवमश के बाद, सिम-त ने मेसस हेसवेयर टेनोलॉजीज लिमटेड (एलओए नंबर 61), के F8ताव को मंजूरी दी। एसईजेड, 2006 िनयमO के िनयम 19(2) के अनुसार अनुमानO म( संशोधन के लए, यूिनट के उप3म के अधीन: िनवेश अनुमान: (करोड़O म( Rपये) 3म संSया िववरण वतमान Tलॉक अव-ध के लए मंजूर क$ गई पूवानुमान 05 वष क$ है (िव1ीय वष 2024-25 से िव1ीय वष 2028-29) वतमान Tलॉक अव-ध के लए F ेपण म( संशोधन (िव1ीय वष 2025-26 से िव1ीय वष 2028-29) 03 8वदेशी सेवाएँ 21.06 110.00
कुल 21.06 110.00 वतमान Tलॉक अव-ध के लए मौजूदा अनुमोिदत F ेपण 05 वष (िव1ीय वष 2024-25 से 2028-29) : (R. करोड़ म()
2024-25 2025-26 2026-27 2027-28 2028-29 कुल INR कुल म( USD म( ‘000)
01 FOB मूCय िनयात का 89.62 98.58 108.44 119.28 131.21 547.12 63,878 02 FE आउटगो 2.49 2.70 1.85 1.55 1.55 10.14 1,184 03 NFE 87.13 95.88 106.59 117.73 129.65 536.98 62,694 F ेपण म( F8तािवत संशोधन – (R. करोड़ म()
2024-25 (वा8तिवक) 2025-26 (संशो-धत) 2026-27 (संशो-धत) 2027-28 (संशो-धत) 2028-29 (संशो-धत) कुल INR कुल म( USD म( ‘000) 1 FOB मूCय िनयात का 213.63 224.31 235.52 247.30 259.66 1180.42 137820 2 FE आउटगो 38.45 40.38 42.39 44.51 46.74 212.47 24808 3 NFE 175.17 183.93 193.13 202.79 212.92 967.95 113012 F8तािवत रोजगार: िववरण 05 साल क$ वतमान Tलॉक अव-ध के लए अनुमोिदत F ेपण वतमान Tलॉक अव-ध के लए संशो-धत अनुमान रोजगार:
885 (पुRष -585, मिहलाएँ -300) 2228 (पुRष-1503, मिहलाएँ -725) एज(डा आइटम नंबर 04: मेसस हेसवेयर टेनोलॉजीज लिमटेड (LOA NO 04) के लए Fदशन क$ िनगरानी। यूिनट का F8ताव िवचार के लए अनुमोदन सिम-त के सामने रखा गया। िवचार-िवमश के बाद, सिम-त ने 2 Tलॉक अव-ध यानी िव1ीय वष 2012-13 से 2021-22 और तीसरे Tलॉक अव-ध यानी 2022-23 से 2026-27 के 02 साल (F.Y 2022-23 & 2023-2024 ) के लए यूिनट के Fदशन को नोट िकया।
यूिनट ने 1st Tलॉक अव-ध यािन िव1ीय वष 2012-13 से 2016-17 के दौरान Rपये 213.95 करोड़ के अपे- त िनयात के मुकाबले Rपये 149.71 करोड़ का िनयात राज8व FाX िकया है और Rपये 148.73 करोड़ का सकाराYमक एनएफई हासल िकया जो िक संचयी आधार पर 99.35% है । यूिनट ने 2nd Tलॉक अव-ध यािन िव1ीय वष 2017-18 से 2021-22 के दौरान Rपये 417.36 करोड़ के अपे- त िनयात के मुकाबले Rपये 342.50 करोड़ का िनयात राज8व FाX िकया है और Rपये 326.76 करोड़ का सकाराYमक एनएफई हासल िकया जो िक संचयी आधार पर 95.40% है । यूिनट ने 3rd Tलॉक अव-ध म( पहले 2 वषZ म( यानी िव1ीय वष 2022-23 से 2023-24 के दौरान Rपये 172.15 करोड़ के अनुमािनत िनयात के मुकाबले Rपये 203.83 करोड़ का िनयात राज8व FाX िकया है और Rपये 175.18 करोड़ का सकाराYमक एनएफई हासल िकया जो िक संचयी आधार पर 85.94 % है। यूिनट ने 238 रोजगार (पुRष-166 एवं मिहला-72) FाX िकया ह[। एज(डा आइटम नंबर 05: मेसस इ\फोसस बीपीएम लिमटेड, (एलओए नंबर 57) के लए Fदशन क$ िनगरानी। यूिनट का F8ताव िवचार के लए अनुमोदन सिम-त के सामने रखा गया। िवचार-िवमश के बाद, सिम-त ने यूिनट क$ कायFणाली को 05 साल के पहले Tलॉक अव-ध (यािन िव1ीय वष 2017-18 से 2021-22) के पाँचवे वष यानी िव1ीय वष 2021-22 के लए और दूसरी Tलॉक अव-ध (िव1ीय वष 2022-23 से 2026-27) के 2 वष यानी िव1ीय वष 2022-23 और 2023-2024 को एसईजेड िनयम, 2006 के िनयम 54 के तहत नोट िकया, जैसा िक नीचे िव8तार से िदया गया है:
यूिनट ने 1st Tलॉक अव-ध के पाँचवे वष यानी िव1ीय वष 2021-22 मे अनुमािनत िनयात Rपये 96.51 करोड़ के मुकाबले Rपये 101.06 करोड़ का िनयात राज8व FाX िकया है और Rपये 283.76 करोड़ का सकाराYमक एनएफई हासल िकया जो िक संचयी आधार पर 95.17% है । यूिनट ने 2nd Tलॉक अव-ध के 2 वषZ मे यानी िव1ीय वष 2022-23 और 2023-2024 मे अनुमािनत िनयात Rपये 205.61 करोड़ के मुकाबले Rपये 207.40 करोड़ का िनयात राज8व FाX िकया है और Rपये 180.35 करोड़ का सकाराYमक एनएफई हासल िकया जो िक संचयी आधार पर 86.96% है ।
एज(डा आइटम संSया 06 : मेसस वेMरटास सॉ]टवेयर टेनोलॉजीज इं-डया Fा.ल. के Fदशन क$ िनगरानी : यूिनट का F8ताव िवचार के लए अनुमोदन सिम-त के सामने रखा गया। िवचार-िवमश के बाद, सिम-त ने 1st Tलॉक अव-ध के 4 वषZ यािन िव1ीय वष 2020-21 से 2023-24 क$ यूिनट के Fदशन को SEZ िनयम, 2006 के िनयम 54 के तहत नोट िकया, जैसा िक नीचे िव8तार से िदया गया है:
यूिनट ने 1st Tलॉक अव-ध के 4 वषZ म( यािन िव1ीय वष 2020-21 से 2023-24 म( Rपये 266.60 करोड़ के अनुमािनत िनयात के मुकाबले Rपये 270.22 करोड़ का िनयात राज8व हासल िकया है । यूिनट ने िव1ीय वष 2023-24 तक Rपये 204.42 करोड़ का सकाराYमक एनएफई FाX िकया है, जो िक संचयी आधार पर 75.65% है। यूिनट ने 0 (पुRष -0, मिहला -0) का रोजगार हासल िकया है। इसलए अपनी िदनांक 09.09.2025 क$ Mरपोट म( इसका कारण िदया गया है - यूिनट ने सू-चत िकया है िक चूंिक NXTRA SEZ एक डेटा स(टर यूिनट होने के नाते एक \यूनतम जनशि! क$ आव^यकता है, और NXTRA SEZ यूिनट म( डेटा स(टर क$ ग-तिव-धयO को एक तीसरे प को आउटसोस िकया जाता है और इसलए NXTRA SEZ म( कोई कमचारी शािमल नहK है, और जो Fबंधन कंपनी के सम_ Fबंधन का &यान रखता है उसीमे एसटीपी, गैर एसटीपी और एसईजेड इकाइयां शािमल ह[। उ! Fबंधन पहले से ही एसटीपी पंजीकरण म( टैग िकया गया है और इसलए एसईजेड म( वतमान रोजगार शू\य है। यह देखा गया है िक यूिनट ने एक वष को छोड़कर िनधाMरत समय के भीतर APRs दायर नहK िकया है। फाइaलग म( उनक$ देरी का िववरण जैसा िक नीचे बताया गया है:
वष फाइaलग क$ अं-तम -तथ SEZ ऑनलाइन म( दाखल करने क$ वा8तिवक -तथ फाइaलग म( देरी (िदनO क$ संSया) 2020-21 31.12.2021 (िव8ताMरत) 31.12.2021 कोई देरी नहK 2021-22 30.09.2022 05.01.2023 97 िदन (3 महीने 5 िदन) 2022-23 30.09.2023 19.01.2024 111 िदन (3 महीने 19 िदन) 2023-24 30.09.2024 10.03.2025 161 िदन (5 महीने 10 िदन) चूंिक इकाई ने िनधाMरत समय म( APR दाखल करने म( असफल रही, *जसके पMरणाम8वbप हर साल APR दाखल करने म( देरी हुई, सिम-त ने इकाई को कारण बताओ नोिटस जारी करने के लए िनदBशत िकया। अ&य को ध\यवाद cापन के साथ बैठक समाX हुई।
Minutes of the 143 rd Meeting of the Approval Committee held under the Chairmanship of Zonal
Development Commissioner SEEPZ-SEZ, Mumbai for Sector Specific Special Economic Zone for
IT/ITES of M/s. MIDC - SEZ, Hinjewadi, Phase III, Pune held on 12.09.2025.
1
Name of the SEZ
M/s. MIDC-SEZ, Phase III
2
Sector
IT/ITES
3
Meeting No.
143rd
4
Date
12.09.2025
Members present: Sr No Name and Designation (S/Shri.) Department 1 Smt. Mital Hiremath Jt. Development Commissioner Pune Cluster SEZ, Pune 2 Shri. Abhinav Rathi Dy. Commissioner, IT Nominee of Income Tax, Pune
3 Smt. Pushpa Gangawane. FTDO Nominee of DGFT, Pune 4 Shri. Dhaval Shirke, Superintendent Nominee of Customs, Pune 5 Smt. Sushma Kumbhar, Field Officer Nominee of Maharashtra Pollution Control Board
Special Invitee: Sr Name and Designation Department 1 Shri. Shambu Dayal Meena, Specified Officer SEEPZ-SEZ, Pune Cluster
Agenda Item No.01: Confirmation of the Minutes of the 142nd meeting held on 29.07.2025 After deliberation, the Committee confirmed the minutes of the 142 nd meeting of Approval Committee held on 29.07.2025
Agenda Item No.02: Action taken report for the minutes of the meeting held on 29.07.2025 After deliberation, the Committee has noted the Action taken report for the meeting held on 29.07.2025.
Agenda Item No.03: Application for Revision in Projections – M/s Hexaware Technologies Ltd. :
The proposal of the unit was placed before the Approval Committee for consideration.
After deliberation, Committee approved the proposal of M/s. Hexaware Technologies Ltd., (LOA No. 61 for
Revision in Projection in terms of Rule 19(2) of SEZ Rules, 2006 subject to the undertaking of the unit:
Investment Projections:
(Rs. In Crores)
Sr.
No.
Particulars
Approved projection for
current Block Period of
05 Years (FY 2024-25 to
2028-29)
Revision in Projections for
the Balance 4 years of
current Block Period (FY
2025-26 to 2028-29)
03
Indigenous Services
21.06
110.00
Total
21.06
110.00
Existing Approved Projection for the current Block Period of 05 Years (FY 2024-25 to FY 2028-29)
(Rs. In Crores)
2024-25
2025-26
2026-27
2027-28
2028-29
Total
INR
Total
In USD in
‘000)
01
FOB value
Of Exports
89.62
98.58
108.44
119.28
131.21
547.12
63,878
02
FE Outgo
2.49
2.70
1.85
1.55
1.55
10.14
1,184
03
NFE
87.13
95.88
106.59
117.73
129.65
536.98
62,694
Proposed Revision in Projection –
(Rs. In Crores)
2024-25 (Actual) 2025-26 (Revised) 2026-27 (Revised) 2027-28 (Revised) 2028-29 (Revised) Total INR Total In USD in ‘000) 01 FOB value Of Exports 213.63 224.31 235.52 247.30 259.66 1180.42 137820 02 FE Outgo 38.45 40.38 42.39 44.51 46.74 212.47 24808 03 NFE 175.17 183.93 193.13 202.79 212.92 967.95 113012 Proposed Employment:
Particulars Approved projection for current block period of 05 years Revised Projections for the current block period Employment 885 (Male-585, Women-300) 2228 (Male-1503, Women- 725) Agenda Item No. 4 : Monitoring of Performance for M/s. Hexaware Technologies Ltd., (LOA No 04) : The proposal of the unit was placed before the Approval Committee for consideration. After deliberation, the committee noted the performance of the unit for 2 Block Periods i.e. FY 2012-13 to FY 2021-22 & 02 Years (F.Y 2022-23 & F.Y. 2023-24) of 3 rd Block period i.e. 2022-23 to 2026-27 in terms of Rule 54 of SEZ Rules, 2006, as detailed below: The Unit has achieved export revenue of Rs. 149.71 Crores as against the projected export of Rs. 213.95 Crores and achieved positive NFE of Rs. 148.73 Crores which is 99.35 % on cumulative basis in 1st Block Period i.e. FY 2012-13 To 2016-17. The Unit has achieved export revenue of Rs. 342.50 Crores as against the projected export of Rs. 417.36 Crores and achieved positive NFE of Rs. 326.76 Crores which is 95.40 % on cumulative basis in 2nd Block Period i.e. FY 2017-18 To 2021-22. The Unit has achieved export revenue of Rs.203.83 Crores as against the projected export of Rs. 172.15 Crores and achieved positive NFE of Rs. 175.18 Crores which is 85.94 % on cumulative basis in first 2 years in 3rd Block Period i.e. FY 2022-23 to 2023-24. As per SO report the unit has achieved employment of 238 employees (Men-166, Women-72) Agenda Item No. 05 : Monitoring of Performance for M/s. Infosys BPM Ltd., (LOA No. 57) : The proposal of the unit was placed before the Approval Committee for consideration. After deliberation, the committee noted the performance of the unit for 01 year i.e. FY 2021-22 out of 1 st block period of 5 years (i.e. 2017-18 to 2021-22) & 02 Years i.e. FY 2022-23 & FY 2023-2024 of 2 nd Block Period (FY 2022-23 to FY 2026-27) in terms of Rule 54 of SEZ Rules, 2006, as detailed below: The unit has achieved export revenue of Rs. 101.06 Crores as against projected export of Rs. 96.51 Crores & NFE achieved Rs. 283.76 Crores i.e. 95.17 % in fifth year of first block period. The unit has achieved export revenue of Rs. 207.40 Crores as against projected export of Rs. 205.61 Crores & NFE achieved Rs. 180.35 Crores i.e. 86.96 % in Two years of Second block period.
Agenda Item No. 06 : Monitoring of Performance for Veritas Software Technologies India Pvt Ltd : The proposal of the unit was placed before the Approval Committee for consideration. After deliberation, the committee noted the performance of the unit for 4 years of 1st Block (FY 2020-21 to FY 2023-24) in terms of Rule 54 of SEZ Rules, 2006, as detailed below: The unit has achieved export revenue of Rs. 270.22 Cr. against the projected export of Rs 266.60 Cr during 4 years of 1st Block period i.e FY 2020-21 to 2023-24. The unit has achieved positive NFE of Rs. 204.42 Cr. i.e. 75.65 % in FY 2023-24 on cumulative basis. The unit has achieved employment of 0 (Men-0, Women-0). SO in his report dated 09.09.2025 has given the reason - The unit has informed that since Nxtra SEZ being a data center unit there is a minimum manpower requirement, and the data center activities at Nxtra SEZ unit are outsourced to a third party and hence there are no employees tagged at Nxtra SEZ location and that broadly the management who takes care of overall management of the company includes STP, Non STP and SEZ units. The said management is already tagged in STP registration and hence current employment in SEZ is zero.
It has been observed that Unit has not filed APRs within stipulated time except one year. Details of their delay in filing is as mentioned below:
Year Due Date of Filing Actual Date Of Filing in SEZ Online Delay in Filing (No Of Days) 2020-21 31.12.2021 (extended) 31.12.2021 No Delay 2021-22 30.09.2022 05.01.2023 97 days (3 months 5 days)
2022-23 30.09.2023 19.01.2024 111 days (3 months 19 days) 2023-24 30.09.2024 10.03.2025 161 Days (5 months 10 days) Since the unit has failed to file APR in stipulated time which resulted in the delay in filing of APR every year, t he Committee directed to issue Show Cause Notice to the Unit. Meeting ended with a vote of thanks to the Chair.
(cानेdर बी. पाटील, आईएएस) (Dnyaneshwar B. Patil, IAS) अ&य एवं िवकास आयु! Chairman-cum- Development Commissioner
signaturerectangle-1-186 Mr. Dnyaneshwar B Patil Development Commissioner PUNE- SEZ Digitally signed by Dnyaneshwar Bhalchandra Patil Date: 2025.10.01 12:36:33 IST % DSUnknown q 1 G 1 g 0.1 0 0 0.1 9 0 cm 0 J 0 j 4 M []0 d 1 i 0 g 313 292 m 313 404 325 453 432 529 c 478 561 504 597 504 645 c 504 736 440 760 391 760 c 286 760 271 681 265 626 c 265 625 l 100 625 l 100 828 253 898 381 898 c 451 898 679 878 679 650 c 679 555 628 499 538 435 c 488 399 467 376 467 292 c 313 292 l h 308 214 170 -164 re f 0.44 G 1.2 w 1 1 0.4 rg 287 318 m 287 430 299 479 406 555 c 451 587 478 623 478 671 c 478 762 414 786 365 786 c 260 786 245 707 239 652 c 239 651 l 74 651 l 74 854 227 924 355 924 c 425 924 653 904 653 676 c 653 581 602 525 512 461 c 462 425 441 402 441 318 c 287 318 l h 282 240 170 -164 re B Q
Action Taken for Approval Committee held on 12-09-2025 Agenda Item No. Subject Remarks Agenda Item No. 01 Confirmation of the Minutes of the 142nd Meeting held on 29-07-2025 After deliberation, the Committee confirms the minutes of the meeting held on 29.07.2025 Agenda Item No. 02 Application for Monitoring of Performance(M/s. Hexaware Technologies Ltd) Approval letter is issued to the Unit on 03.10.2025 Agenda Item No. 03 Application for Monitoring of Performance(M/s. Infosys BPM Ltd) Approval letter is issued to the Unit on 03.10.2025 Agenda Item No. 04 Application for Monitoring of Performance(M/s Veritas Software Technologies India Pvt Ltd ) Approval letter is issued to the Unit on 03.10.2025 and SCN issued to the Unit. Agenda Item No. 05 Application for Mid Term Revision(M/s. Hexaware Technologies Ltd) Approval letter is issued to the Unit on 03.10.2025
GOVERNMENT OF INDIA, OFFICE OF THE DEVELOPMENT COMMISSIONER, SEEPZ SPECIAL ECONOMIC ZONE, GOVT. OF INDIA, ANDHERI (EAST), MUMBAI
AGENDA NOTE FOR CONSIDERATION OF APPROVAL COMMITTEE
a. Proposal :
Monitoring of the performance of M/s. Tata Consultancy Services Ltd., for the Fifth year i.e. FY 2020-21 of 2 nd
Block Period (FY 2016-17 to FY 2020-21) & 04 Years i.e. from FY 2021-22 to FY 2024-25 of 3 rd Block Period
(i.e. From FY 2021-22 to 2025-26).
b. Specific Issue on which decision of AC is required: -
Monitoring of the performance of the unit for for the Fifth year i.e. FY 2020-21 of 2nd Block Period (FY 2016-17 to
FY 2020-21) & 04 Years i.e. from FY 2021-22 to FY 2024-25 of 3 rd Block Period (i.e. From FY 2021-22 to 2025-
26), in terms of Rule 54 of SEZ Rules, 2006.
c. Relevant provisions of SEZ Act, 2005 & Rules, 2006/Instruction/
Notification :-
As per Rule 54 of SEZ Rules, 2006
“Performance of the Unit shall be monitored by the Approval Committee as per
the guidelines given in Annexure appended to these rules"
d. Other Information: -
Original Approved Projections: (2nd block Period)
(Rs. In Cr.)
Year 2016-17 2017-18 2018-19 2019-20 2020-21 Total FOB Value of Exports 37.80 42.40 47.50 53.20 59.60 240.50 FE Outgo 30.01 29.62 28.76 36.47 35.67 160.53 NFE achieved 7.79 12.78 18.74 16.73 23.93 79.97
Performance as compared to projections: FY 2016-17 to 2020-21
(Rs. In Cr.)
Year
Export
F.E. OUTGO
Projected
Actual Raw Material (Goods/Services) C.G. import Other outflow Projected Actual Projected Actual Actual 2020-21 59.60 10876.97
21.88 2291.28 Total 59.60 10876.97 0.00 0.00 392.80 21.88 2291.28
Cumulative NFE achieved: (Rs. in Cr.)
Year
Cumulative NFE
Achieved
Cumulative % NFE
Achieved
2020-21
31519.65
70.24 %
Original Approved Projections: (3rd block Period)
(Rs. In Cr.)
Year 2021-22 2022-23 2023-24 2024-25 2025-26 Total FOB Value of Exports 11509.61 12430.38 13424.81 14498.79 15658.70 67522.29 FE Outgo 3903.68 4333.08 4809.72 5338.79 5926.05 24311.32 NFE achieved 7605.93 8097.30 8615.09 9160.00 9732.65 43210.97
Performance as compared to projections: FY 2021-22 to 2024-25
(Rs. In Cr.)
Year
Export
F.E. OUTGO
Projected
Actual Raw Material (Goods/Services) C.G. import Other outflow Projected Actual Projected Actual Actual 2021-22 11509.61 12220.27 0.00 0.00
122.00 14.29 3677.98 2022-23 12430.38 13846.32 0.81 4307.87 2023-24 13424.81 15526.06
27.20 4580.03 2024-25 14498.79 16281.65
63.77 1509.34 Total 51863.59 57874.30 0.00 0.00 122.00 106.07 14075.22
Cumulative NFE achieved: (Rs. In Cr.) Year Cumulative NFE Achieved Cumulative % NFE Achieved 2021-22 8500.87 69.56 % 2022-23 18002.41 69.06 % 2023-24 28917.37 69.53 % 2024-25 43660.9 75.44 % Other Information: LOA No. & Date LOA No SEZ/PUNE/05/2007-08/17 DATED 05.02.2008 (As Amended) Location of Unit Plot No. 2 & 3, Sahyadri Park, RGIP, MIDC- SEZ, Phase III, Hinjewadi, Pune- 411057. Validity of LOA 15.05.2026 Item(s) of manufacture/ Services IT & ITES Date of commencement of production 16.05.2011 Execution of BLUT Rs 299.25 Cr.
Outstanding Rent dues NA Labour Dues NA Validity of Lease Agreement Long Lease of 99 Years Pending CRA Objection, if any NA Pending Show Cause Notice/ Eviction Order/Recovery Notice/ Recovery Order issued, if any NA Projected employment for the block period
No. of employees as on 31.03.2025 26898(Men – 16210 & Women – 10688)
35099(Men – 21385, Women – 13714) Area allotted (in sq. ft.) 3138922 Sq. Ft. Area available for each employee per sq.ft. basis (area / no. of employees) 89.43 Sq. Ft. Investment till date
Building 764.89 Plant & Machinery 1163.48 Crore Quantity and value of goods exported under Rule 34 (unutilized goods) NA Value Addition during the monitoring period NA Whether all the APRs being considered now has been filed well within the time limit, or otherwise.
If no, details of the Year along with no of days delayed to be given. Yes
The Specified Officer’s report vide letter dated 28.10.2025 has reported as detailed below: A. EXPORT- (Rs. in Crores and USD in Millions) Year/ Period Figure as per APR (Offsite + Onsite) Figure as per Softex /SB/Customs Record (INR) Difference if Any Reason for Difference/Remark in INR as conveyed by the unit Reason for Difference/Remark in USD as conveyed by the unit
INR USD INR USD INR USD
1 2 3 4 5 6 = 2-4 7 = 3-5 8 9
2020-21 10876.97 14.91 6117.20 8.39 4,759.77 6.52 Offsite Rs -140.68 Crs (INV + CN ) adjusted during the year, Onsite Rs 4900.46 Crs Offsite USD -0.19 Mn during the year, Onsite USD 6.71 Mn 2021-22 12220.27 16.38 7067.65 9.47 5,152.62 6.91 Offsite Rs -124.86 Crs during the year, Onsite Rs 5277.48 Crs Offsite USD -0.17 Mn during the year, Onsite USD 7.08 Mn
2022-23 13846.32 16.61 7996.00 9.59 5,850.32 7.02 Offsite Rs -117.66 Crs during the year, Onsite Rs 5967.98 Crs Offsite USD -0.14 Mn during the year, Onsite USD 7.16 Mn 2023-24 15526.06 18.62 8262.12 9.91 7,263.94 8.71 Offsite Rs -151.65 Crs during the year, Onsite Rs 7415.59 Crs Offsite USD -0.18 Mn during the year, Onsite USD 8.89 Mn 2024-25 16281.65 19.06 8626.03 10.10 7,655.62 8.96 Offsite Rs -211.37 Crs during the year, Onsite Rs 7866.99 Crs Offsite USD -0.25 Mn during the year, Onsite USD 9.21 Mn
B. IMPORT
(i) Capital Goods including procurement done on IUT (from SEZ, EOU, STPI, EHTP) basis
(Rs. In Crores and USD in Millions)
Year/Period Figures as per
APR
Figures as per
Softex/SB /
Customs Records
(INR)
Difference if any
Reason for
Difference/Remark
in INR as conveyed
by the unit
INR
USD
INR
USD
INR
USD
(1) (2) (3) (4) (5) (6) = (2) –( 4) (7) = (3) – (5) (8) 2020-21 21.88 2.983 21.88 2.983 0 0 NA 2021-22 13.23 1.722 13.23 1.722 0 0 NA 2022-23 28.74 3.434 28.74 3.434 0 0 NA 2023-24 35.22 4.193 35.22 4.193 0 0 NA 2024-25 5.93 0.679 5.93 0.679 0 0 NA
(ii) Raw material (Rs. In Crores and USD in Millions) Year/Period Figures as per APR Figures as per Softex/SB / Customs Records (INR) Difference if any Reason for Difference/Remark in INR as conveyed by the unit INR USD INR USD INR USD
(1) (2) (3) (4) (5) (6) = (2) – (4) (7) = (3) – (5) (8) 2020-21 0.00 0.00 0.00 0.00 0.00 0.00 NA 2021-22 0.00 0.00 0.00 0.00 0.00 0.00 NA 2022-23 0.00 0.00 0.00 0.00 0.00 0.00 NA
2023-24 0.00 0.00 0.00 0.00 0.00 0.00 NA 2024-25 0.00 0.00 0.00 0.00 0.00 0.00 NA
C. BLUT 1 Value of BLUT Executed (Duty foregone) (including CG / Raw Material / Services) Value of Additional BLUT executed
TOTAL value of BLUT Executed: in Crore
F.No. SEEPZ-SEZ/TCSL/07/2011-12/VOL- II/947 Dated 21.10.2021
Rs. NA
Rs.299.25 2 Total Duty Foregone on goods & services procured (Category-wise BLUT value utilized separately for imported and indigenous goods and services) This should be based on BLUT worksheet which provides for estimated value and duty foregone separately for each category of procurement. FY Goods (Imported & Indigenous) [Rs. in Crores] Services [Rs. in Crores] 2020-2021 12.47 0 2021-2022 14.70 0 2022-2023 18.56 1.63 2023-2024 22.89 13.62 2024-2025 12.45 25.62 Total
81.07 40.87 3 Has the Unit procured goods and or services without having sufficient balance in their BLUT? If yes, Month & Year when the BLUT was exhausted Details of the consignments and Total value of Goods procured without having sufficient or nil balance in BLUT No.
(d) Employment made as on date (As on end of block period / year up to which monitoring is being done) (March 2024) Gender As per the LOA (Form F) As on 31-03- 2025 Men 16210 21385 Women 10688 13714 Total 26898 35099
(e) Details of pending Foreign Remittance beyond Permissible period, if any (As on 31st March, 2025) To cross-check the same and verify whether necessary permission from AD Bank / RBI has been obtained. Annexure attached with APR F.Y 24-25 (Total 2438 Invoices-Mar-25 Softex) Obtained AD bank extension letter for six months. (f) Whether all Softex has been filed for the said period. If no, details thereof. SO, to also check whether unit has obtained Softex condonation from DC office / RBI and if approved, whether they have filed such pending Softex. Yes, all the Softex Bulk Statements are filed upto March 2025. (g) Whether all Softex has been certified, if so till which month has the same been certified. If not, provide details of the Softex and reasons for pendency. Yes, all softex forms are certified upto March 2025. (One Request id :142400253763 of Aug-24 is pending for approval under Special Scrutiny) (h) Whether unit has filed any request for Cancellation of Softex Yes. Softex Request Id 142400079452 Feb- 24 have been cancelled due to duplication of Invoices, against which cancellation Request id 142400295870 was filed and approved by SEZ officer. Email to the NSDL 27042024 and to the Dept. on 31.05.2025. The duplication was due to system glitch and as such the unit filed another request ID whereas, in the meanwhile the earlier stuck up request ID was activated causing duplication. (i) Whether any Services provided in DTA / SEZ/EOU/STPI etc. against payment in INR in r/o IT/ITES Unit during the period. If yes, details thereof (year wise details to be provided) No DTA sale has been made from SEZ unit during the period (j) SO to verify and certify whether the unit has updated the BLUT ledger Module in SEZ Online.
N.A. (k) Has the unit cleared any Capital Goods procured duty free, in DTA against payment of Duty, or otherwise? Full details to be provided along with value of assets and duty discharged
No
(l) Is the unit sharing any of their infrastructures with other units or are utilizing infrastructure of another unit in the same or other SEZ. If so, details thereof, including the details of the unit with whom the sharing is being made, and the payment terms If approval for sharing of common infrastructure has been obtained from UAC / DC office, the date of UAC / Approval letter to be indicated No (m) Whether all DSPF for services procured during the said monitoring period under consideration has been filed by the unit and whether the same has been processed for approval by the SO. All the filed DSPFs have been certified. (n) Whether unit has filed all DTA procurement w.r.t. the goods procured by them during the monitoring period for the relevant period. If no, details thereof Yes (o) Details of the request IDs pending for OOC in respect of DTA procurement on the date of submission of monitoring report Nil (p) Has the unit set up any cafeteria / canteen / food court in unit premises? If yes, whether permission from UAC / DC office has been issued, or otherwise office has been issued, or otherwise
Whether unit has availed any duty paid goods / services for setting up such facility? If yes, whether unit has discharged such duty / tax benefit availed? details to be given including amount of duty / tax recovered or yet to be recovered Yes unit has setup cafeteria / Canteen / food court in the unit premises. Yes Permission issued by the DC Office vide letter No. SEZ/PUNE/7A/20078/463/ dated 26.08.2009.
(q) Whether any violation of any of the provisions of law has been noticed / observed by the Specified Officer during the period under monitoring No e. Recommendation: The unit has achieved export revenue of Rs. 10876.97 Cr. against the projected export of Rs 59.60 Cr during FY 2020-21 i.e. Fifth year of 2nd Block period i.e FY 2016-17 to 2020-21. The unit has achieved positive NFE of Rs. 31519.65 Cr. i.e., 70.24 % in FY 2020-21 on cumulative basis. The unit has achieved export revenue of Rs. 57874.30 Cr. against the projected export of Rs 51863.59 Cr during 04 years i.e. FY 2021-22 to FY 2024-25 of 3rd Block period i.e. FY 2021-22 to 2025-26. The unit has achieved positive NFE of Rs. 43660.9 Cr. i.e., 75.44 % in FY 2024-25 on cumulative basis. The unit has achieved employment of 26898 (Men-16210 Women-10688) During the Approval Committee meeting held on 27.07.2021, the Committee directed the unit to revise the
APR for both the Block period to rectify the wrong amortization value considered and file the same in Hard copy as well as online System. The Unit has not adhered to the Committee’s direction. Further, with regards to higher import of Capital Goods Limit in the 2 nd Block period, the Committee was informed that as on date, the Unit has a balance of Rs. 55.79 Crores in their BLUT. As such, the Committee directed the unit to revise their projection for procurement of Capital goods as has been pointed out during the monitoring performance of the unit. Till date the unit has not adhered the directions of the Committee. Approval committee may kindly monitor the performance of the Unit for Fifth year i.e. FY 2020-21 of 2nd Block Period and 04 Years i.e. from FY 2021-22 to FY 2024-25, of 3rd Block Period (i.e. From FY 2021-22 to 2025-26), in terms of Rule 54 of SEZ Rules, 2006.