IN FORCE SEZ / EOU / FTWZ 2025-10-30

Agenda for Approval Committee meeting for EOU and SEZ under Pune Cluster scheduled on 31 October 2025. — 02-8-wockhardt

Document text

SEEPZ SPECIAL ECONOMIC ZONE ANDHERI (EAST), MUMBAI.

AGENDA FOR

MEETING OF THE APPROVAL COMMITTEE FOR SECTOR SPECIFIC SPECIAL ECONOMIC ZONE FOR PHARMACEUTICAL SECTOR AT AURANGABAD - M/s. WOCKHARDT INFRASTRUCTURE DEVELOPMENT LTD.- SEZ, AURANGABAD.

DATE : 31.10.2025

TIME : 03:00 PM.


MEETING OF THE APPROVAL COMMITTEE FOR SECTOR SPECIFIC SPECIAL ECONOMIC ZONE FOR PHARMACEUTIAL SECTOR AT AURGANGABAD, UNDER THE CHAIRMANSHIP OF DEVELOPMENT COMMISSIONER, SEEPZ-SEZ ON 31.10.2025

INDEX

Agenda Item No.

Subject

Agenda Item No. 01 :- Confirmation of the Minutes of the meeting held on 29.02.2024 Agenda Item No. 02 :- Action taken report for the Minutes of the meeting held on 29.02.2024 Agenda Item No. 03 :- Monitoring of performance of M/s. Wockhardt Ltd. Unit 1


ववकहहार इइफह्रास्ट डडवलपममा लललमाड-एसईजड, औटइगहाहबा कड ललए जजनल डडवलपममा कलमिट ससीप्ज-एसईजड, ममइाई कक अध्यक्षह मम 29.02.2024 कज वसीडड्यकज कवनफमलसइग कड महध्यकम सड आ्यकजजजष अनमजबान सलमलष कक 30 वसीइ ाबैक कह कह्यकरववत् 1 एसईजड कह नहम मबससर ववकहहार इनफह्रास्ट - एसईजड औटइगहाहबा 2 सडासाट फहमहर््यकमडाकल 3 ाबैक सइख््यकह 30 वसीइ
4 षहटरख 29.02.2024

उपज्स्थिष सबा््यक क्रमहइक न. नहम औट पबानहम (एस/शसी.)
ववभहग 1 शसीमषसी लमषल डहटडमै सइ्यकमक ववकहस आ्यकमक पमणड पमणड ासल्ाट एसईजड, पमणड 2 शसीमषसी भहटषसी आहहजह सहह्यकक आ्यकमक, आ्यककट ववभहग आ्यककट ववभहग सड नहलमष

3 डव. डबालसीटहज बाहभजलड, उप लनबाडशक डरजसीएफार, पमणड डरजसीएफार ववभहग सड नहलमष 4 शसीमषसी महलषसी नह्यकट, ससीमह शमल्क अधसी्क ससीमह शमल्क ववभहग पमणड सड नहलमष

ववशडष आमइवत्रिष सबा््यक क्रमहइक न. नहम औट पबानहम (शसी.)
ववभहग 1 शसी बाडवकक नइबान पइष ्पडलसडएएड अफसट ससीप्ज-एसईजड, पपणण क्लस्ट

एजजडड आइसम ननंब्ट 01: 26.08.2022 कक आयकजजत 29 वव बबठक कण कडयरववृत कक पपषष

षवचड्ट-षवमरर कण बडद, सषमषत नण 26.08.2022 कक आयकजजत अनपमकदन सषमषत कक 29 वव बबठक कण कडयरववृत कक पपषष कक। एजेडा आइटम नंबर 2: मेससर वॉकहाटर ललिलमटेड यूननट-2 द्वारा प्रस्तु्रत अनपमडन मे संशोधन के बबना अनतररक्त उतपडद के ब्रॉड बैडडंग के अनु्रमोदन के ललिए आवेदन।

      वव्हट-ववमशर कड ाहबा सलमलष नड पपजजडासशन मम सइशजधन कड वानह अलधकवष सइ्हलन कड रूप मम 

ममौजहबाह एलओए मम अलषरटक उत्पहबादों कक बवडाबडडइग कज मइजहटर बाड बार, जबसह डक नसी्ड ाषह्यकह ग्यकह हब:

File No.S-SEZ-MINS0WCK/1/2022-JDCP

स्वीकृ्त अनतररक्त उतपडद • फहमहर््यकहडाकल्स उत्पहबा कह ववलनमहरण जबसड नसल अड इनहडलट डजजडज • महनव इइसमललन • इइसमललन गलहलगरन उपटजक बाजनदों उत्पहबादों कड ललए आईारससी-ए्एस कजड 30043110

उतपडदद कक ससूचच इस प्रकड्ट हब:

क्रम सइख््यकह उत्पहबा एसकड्यकह बहइड Sr. No Product SKU Brands 1 महनव इइसमललन Vial, Cartridge-usable pen, Disposable Pen (assembled with drug filled with cartridges ववलभनन बाडशदों मम उपल्धधषह कड अनमसहट वजसमललन, वजजमललम, न्यकहसमललन, कवनसडगनह, गलहइसजललन, ववइसमललन, ्यकह अन्यक रडमहकर् 2 इइसमललन गलहलगरन Vial, Cartridge, Re-usable pen, Disposable Pen (assembled with drug filled with cartridges ववलभनन बाडशदों मम उपल्धधषह कड अनमसहट गलडरटास, वहल्व, गलहलगरन ्यकह अन्यक रडमहकर्

• उपटजक उत्पहबा उनकड ममौजहबाह एलओए कड अनमजडबाष अनमहनदों मम शहलमल डक्यकह जहएगह्

अध्यक् कज धन्यकवहबा जहपन कड सहस्थि ाबैक समहत हमई्

Minutes of the 30th Meeting of the Approval Committee held under the Chairmanship of Zonal Development Commissioner SEEPZ-SEZ, Mumbai for Wockhardt Infrastructure Development Ltd.-SEZ, Aurangabad held on 29.02.2024 via video conferencing. 1 Name of the SEZ M/s Wockhardt Infrastructure – SEZ, Aurangabad 2 Sector Pharmaceutical 3 Meeting No. 30th 4 Date 29.02.2024

Members present

Sr Name and Designation (S/Shri.) Department 1 Smt. Mital Hiremath Joint Development Commissioner Pune Cluster SEZ, Pune 2 Smt. Bharati Ahuja Asst. Commissioner, IT Nominee of Income Tax, Pune File No.S-SEZ-MINS0WCK/1/2022-JDCP

3 Dr. Dileeraj Dabhole, Dy. DGFT Nominee of DGFT, Pune 4 Smt. Malathi J. Nair Superintendent Nominee of Customs, Pune

Special Invitee

Sr Name

and Designation Department 1 Shri Devki Nandan Pant Specified Officer M/s Wockhardt Infrastructure Development – SEZ Aurangabad, SEZ-Pune Cluster

Agenda Item No.01: Confirmation of the Minutes of the 29th meeting held on 26.08.2022.

After deliberation, the Committee confirmed the minutes of the 29th meeting of Approval Committee held on 26.08.2022.

Agenda Item No. 2: Application for approval for Broad Banding of Additional Services without revision in projection submitted by M/s. Wockhardt Limited Unit-2.

      After  deliberation  the  committee  approved  the  broad  banding  of

additional items in the existing LOA as authorized operations without revision in Projection as detailed below:

Approved additional items

Manufacturing pharmaceuticals product I.e., Nasal and Inhaler dosage Form for Human Usage. Human Insulin Insulin Glargine ITC-HS Code 30043110 For both the above Products

Approved List of products is as below:

Sr. No Product SKU Brands 1 Human Insulin Vial, Cartridge-usable pen, Disposable Pen (assembled with

drug

filled

with cartridges Wosulin,

Wozulim,

Newsulin, Consegna, Glysolin, Winsulin, or other trademarks as per availability in different countries. 2 Insulin Glargine Vial, Cartridge, Re-usable pen,

Disposable

Pen (assembled with drug filled with cartridges Glaritus, Valvey, Glarzen or other trademarks asper availability in different countries.

The aforesaid product shall be covered in their existing approved projections File No.S-SEZ-MINS0WCK/1/2022-JDCP

in their LOA.

              Meeting ended with a vote of thanks to the Chair.


          
      
                                                               (Rajesh Kumar Mishra, IRS) 
                                                                Chairman-cum- Development 
                                                                           Commissioner

File No.S-SEZ-MINS0WCK/1/2022-JDCP

Action Taken for Approval Committee held on 29.02.2024

Name of the Unit Subject Action Taken M/s. Wockhardt Ltd. Unit 2 Approval for Broad banding of products
Approval Letter issued to the unit on 03.04.2024

Year Export F.E. OUTGO

Projected

Actual Raw Material (Goods/Services) C.G. import Other outflow Projected(for the Block) Actual Projected(for the Block) Actual Actual 2021-22 736.04 6.72 277.19 9.78 23.50 11.93 0.00 Year Cumulative NFE Achieved Cumulative % NFE Achieved 2021-22 -97.42 -80.22 % GOVERNMENT OF INDIA, OFFICE OF THE DEVELOPMENT COMMISSIONER, SEEPZ SPECIAL ECONOMIC ZONE, GOVT. OF INDIA, ANDHERI (EAST), MUMBAI


AGENDA NOTE FOR CONSIDERATION OF APPROVAL COMMITTEE


a. Proposal : Monitoring of the performance of M/s. Wockhardt Ltd. Unit 1, a pharmaceutical products-manufacturing unit located in Wockhardt Infrastructure Development Ltd.-SEZ, MIDC-Aurangabad, for last year FY 2021-22 of the 2nd block period and first 3 years of 3rd block period FY 2022-23 to FY 2024-25. b. Specific Issue on which decision of AC is required: -
Monitoring of the performance of the unit for last year (FY 2021-22) of 2 nd block period and first 3 years of 3rd block period FY 2022-23 to FY 2024-25 in terms of Rule 54 of SEZ Rules, 2006. c. Relevant provisions of SEZ Act, 2005 & Rules, 2006/Instruction/
Notification :- As per Rule 54 of SEZ Rules, 2006 : “Performance of the Unit shall be monitored by the Approval Committee as per the guidelines given in Annexure appended to these rules”. d. Other Information: - Performance as compared to projections for last year of 2nd Block period (FY 2017-18 to FY 2021-22) : Approved Projections (Rs. In Crores)

2017-18 2018-19 2019-20 2020-21 2021-22 Total FOB Value of Exports 115.33 121.65 133.90 374.95 736.04 1481.87 FE Outgo 13.13 13.69 15.06 42.18 78.00 162.06 NFE 102.20 107.96 118.84 332.77 658.04 1319.81 Performance as compared to projections: (Rs. In Crores)

Cumulative NFE achieved: FY 2021-22 (Rs. in Crores)

Year Export F.E. OUTGO

Projected

Actual Raw Material (Goods/Services) C.G. import Other outflow Projected(for the Block) Actual Projected(for the Block) Actual Actual 2022-23 52.80 3.09 367.58 5.35

168.04 4.82 0.00 2023-24 150.30 4.66 0.91 3.37 0.00 2024-25 200.50 6.23 11.86 1.30 0.00 TOTAL 403.6 13.98 367.58

168.04 9.49 0.00 Year Cumulative NFE Achieved Cumulative % NFE Achieved 2022-23 -48.92 -1584.69% 2023-24 -92.16 -1189.67% 2024-25 -152.97 -1094.77% Performance as compared to projections for years of 3rd Block period FY 2022- 23 to FY 2024-25

2022-23 2023-24 2024-25 2025-26 2026-27 Total FOB Value of Exports 52.80 150.30 200.50 250.40 350.40 1004.40 FE Outgo 32.83 95.61 136.95 185.19 249.57 700.15 NFE 19.97 54.69 63.55 65.21 100.83 304.25 Performance as compared to projections: (Rs. In Crores)

Cumulative NFE achieved: (Rs. in Crore)

Employment Achievement (Direct):

Projected Achieved Men 450 327 Women 50 Total 500 327

Name of the Unit M/s. Wockhardt Ltd. Unit 1 LOA No. & Date SEEPZ-SEZ/NEWSEZ/WOCKDT- AURBD/01/2007-08 dated 20.07.2007 Location of Unit Plot No. E1/1, Wockhardt Infrastructure Development Ltd.-SEZ, Five Star Shendra MIDC, Aurangabad Validity of LOA 22.05.2027 Item(s) of manufacture/ Services Manufacturing of pharmaceuticals products for human consumption Date of commencement of production 23.05.2012 Execution of BLUT 408.37 Crores Outstanding Rent dues NA Labour Dues NA

Validity of Lease Agreement NA Pending CRA Objection, if any OBS -1343330 dated 23.05.2024 regarding short levy of penalty for shortfall in achieving NFE Pending Show Cause Notice/ Eviction Order/Recovery Notice/ Recovery Order issued, if any NA No. of employees as on 31.03.2025 Employees - 327 Area allotted (in sq. ft.) 31840 Sq. mts. Area available for each employee per sq. ft. basis (area / no. of employees) 97.37 Sq. mtr. Investment till date Building Rs. 28.88 Crores Plant & Machinery Rs. 351.85 Crores Quantity and value of goods exported under Rule 34 (unutilized goods) NA Value Addition during the monitoring period NA Whether all the APRs being considered now has been filed well within the time limit, or otherwise.

If no, details of the Year along with no of days delayed to be given. Yes The Specified Officer vide his report dated 27.10.2025 and 30.10.2025 has reported the following: Export: (For the period 2021-22 to 2024-25) (In Crores) Year/ Period Figures reported in APR (FOB Value) Figures as Customs Records Difference, if any Remarks 2021-22 6.72 6.72 NO NA 2022-23 3.09 3.09 NO NA 2023-24 4.66 4.66 NO NA 2024-25 6.23 6.23 NO NA Details of year-wise import (Capital Goods) including procurement done on IUT basis Year/ Period Figures as per APR Figures as per SEZ Online / Customs Records Difference, if any Reason for Difference / Remarks 2021-22 5.62 5.62 NO NA 2022-23 4.43 4.43 NO NA 2023-24 0.05 0.05 NO NA 2024-25 0.52 0.52 NO NA Details of year-wise import (Raw materials) including procurement done in IUT basis

Year/ Period Figures as per APR Figures as per SEZ Online / Customs Records Difference, if any Reason for Difference / Remarks 2021-22 9.78 9.78 NO NA 2022-23 5.35 5.35 NO NA 2023-24 0.91 0.91 NO NA 2024-25 11.86 11.86 NO NA BLUT (Rs. in Crores) 1 Value of BLUT Executed (Duty foregone) (including for CG / Raw Material / Services) Value of Additional BLUT executed Year: Date of acceptance BLUT amount:

TOTAL vlue of BLUT Executed Particulars Acceptance Date Value (Rs) BLUT executed 03/09/2007 90 Additional BLUT executed 14/07/2014 61 Additional BLUT executed 21/08/2020 60.4 Additional BLUT executed 02/11/2022 196.97 Total 408.37 2 Total Duty Foregone on goods & services procured (Category-wise BLUT value utilized separately for imported and indigenous goods and services) This should be based on BLUT worksheet which provides for estimated value and duty foregone separately for each category of procurement. Year Duty Forgone(Rs in Cr.) 2021-22 15.68 2022-23 12.89 2023-24 12.14 2024-25 18.23 3 Balance in BLUT at the end of each F.Y. 1st Year in each category and overall basis 5th Year 10th Year, as the case may be Year Balance(Rs. in Cr.) 2021-22 41.29 2022-23 225.37 2023-24 213.22 2024-25 194.99 4 Has the Unit procured goods and or services without having sufficient balance in their BLUT. If yes, Month & Year when the BLUT was exhausted Details of the consignments and Total value of Goods procured without having sufficient or nil balance in BLUT NO

5 Employment made as on date (as on end of block period / year up to which monitoring is being done) 327 6 Details of pending Foreign Remittance beyond Permissible period, if any (as on 31.03.2025) To cross-check the same and verify whether necessary permission from AD Bank / RBI has been obtained. NO 7 In case of IT/ITES units, Whether all softex has been filed for the said period. If no, details thereof.

SO to also check whether unit has obtained Softex condonation from DC office / RBI and if approved, whether they have filed such pending Softex. NA 8 In case of IT/ITES Units Whether all Softex has been certified, if so till which month has the same been certified. If not, provide details of the Softex and reasons for pendency. NA 9 In case of IT/ITEs Units Whether unit has filed any request for Cancellation of Softex NA 10 Whether any Services provided in DTA / SEZ/EOU/STPI etc. against payment in INR in r/o IT/ITES Unit during the period. If yes, details thereof (year wise details to be provided) (Applicable only for IT/ITES Units) NA 11 SO to verify and certify whether the unit has updated the BLUT ledger Module in SEZ Online. YES 12 Has the unit cleared any Capital Goods procured duty free in DTA against payment of Duty, or otherwise? Full details to be provided along with value of assets and duty discharged Year Assessable Value Duty discharged 2021-22 0 0 2022-23 0 0 2023-24 0 0 2024-25 0.14 0.02

13 Is the unit sharing any of their infrastructure with other units or are utilizing infrastructure of another unit in the same or other SEZ. If so, details thereof, including the details of the unit with whom the sharing is being made, and the payment terms If approval for sharing of common infrastructure has been obtained from UAC / DC office, the date of UAC / Approval letter to be indicated NO 14 Whether all DSPF for services procured during the said monitoring period under consideration has been filed by the unit and whether the same has been processed for approval by the SO Office. YES 15 Whether unit has filed all DTA procurement w.r.t. the goods procured by them during the monitoring period for the relevant period. If no, details thereof YES 16 Details of the request IDs pending for OOC in respect of DTA procurement on the date of submission of monitoring report NO 17 Has the unit set up any cafeteria / canteen / food court in unit premises. If yes, whether permission from UAC / DC office has been issued, or otherwise office has been issued, or otherwise Whether unit has availed any duty paid goods / services for setting up such facility? If yes, whether unit has discharged such duty / tax benefit availed? details to be given including amount of duty / tax recovered or yet to be recovered NO 18 Whether any violation of any of the provisions of law has been noticed / observed by the Specified Officer during the period under monitoring NO

e. Recommendation:

  1. The Unit has achieved export revenue of Rs. 6.72 Crores as against projected export of Rs. 736.04 Crores in 5th year (FY 2021-22) of the 2nd block period (FY 2017-18 to FY 2021-22)
  2. The unit has recorded a Negative NFE of Rs. 97.42 Crores on Cumulative basis i.e. -80.22% at the end of the 2nd Block period (FY 2017-18 to FY 2021-22).
  3. The Unit has achieved export revenue of Rs. 13.98 Crores as against projected export of Rs. 403.6 Crores in

3 years (FY 2022-23 to 2024-25) of the 3rd block period (FY 2022-23 to FY 2026-27) 4. The unit has recorded a Negative NFE of Rs. 152.97 Crores on Cumulative basis i.e. -1094.77% at the end of 3rd year (FY 2024-25) of the 3rd block period (FY 2022-23 to FY 2026-27) 5. As per the SO Report the unit has achieved employment of 327 employees in FY 2024-25 against projected employment of 500 employees. 6. Past Performance of the Unit (Based on the Monitoring conducted by the UAC in meeting dated 26.07.2022) : Block Period NFE recorded (In Crores) Action Taken Remarks 1st Block (2012-13 to 2016-17) – 5 years -52.805 Order in Original dated 30.06.2023 was issued for reporting Negative NFE of Rs. 107.85 Crores for 9 years and imposed a Penalty of Rs. 1,07,85,000/- Unit has paid the penalty amount of Rs. 1,07,85,000/- levied on them vide Demand Draft No. 504220 dated 13.07.2023 drawn on ICICI Bank, Bandra Kurla Complex Branch 2nd Block Period (2017-18 to 2020-21) – 4 years -55.046 TOTAL -107.85 Crores

  1. Unit may be requested to revise the APRs with correct amortised value of capital goods. Approval Committee may like to monitor the performance of the Unit for the 5 th year of 2nd Block period i.e. FY 2021-22 and 3 years of 3rd block period FY 2022-23 to FY 2024-25 in terms of Rule 54 of SEZ Rules, 2006

Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.

Analysis

No analysis has been generated for this document yet.

Citation copied