Agenda for Approval Committee meeting for EOU and SEZ for Pune Cluster scheduled on 15 October 2024. — 00-1-eou-agenda
In force — no superseding record on file.
SEEPZ SPECIAL ECONOMIC ZONE ANDHERI (EAST), MUMBAI.
AGENDA FOR
MEETING OF THE APPROVAL COMMITTEE FOR EXPORT ORIENTED UNITS UNDER THE JURISDICTION OF DEVELOPMENT COMMISSIONER, SEEPZ-SEZ
DATE : 15.10.2024
TIME : 11:00 A.M.
MEETING OF THE APPROVAL COMMITTEE FOR
EXPORT ORIENTED UNITS UNDER THE JURISDICTION
OF DEVELOPMENT COMMISSIONER, SEEPZ-SEZ ON
15.10.2024
INDEX
Agenda Item No.
Subject Agenda Item No. 01: - Confirmation of the Minutes of the meeting held on 30.05.2024 Agenda Item No. 02: - Action taken report for the Minutes of the meeting held on 30.05.2024 Agenda Item No. 03: - Application for Approval of Setting up of New unit as 100% EOU submitted by Tata Autocomp Hendrickson Suspensions Pvt Ltd.
30.05.2024 कको SEZ भवन ककारकारलर, पपुणण मुम कुणतत्र यवककाि करपुय SEEPZ-SEZ, मुपुमुंबई ककी
अध्रकुतका मुम नननरकारत न्मममुपु इकककाइकरयो कण ननलएकम अनपुमुको न िननमुननत ककी पललत् बैठकक कका ककाररववत्त
उपससस्थित सदस्
क. नाम एवं पदनाम
(श्री/ श्रीमती)
ववभाग
1
शत्मुतत् ननमुतल हलरणमुठक
िमुंरपुय यवककाि करपुय
पपुणण क्लस्र एकमिईजणड, पपुणण
2
डड. ह लत्रकाज काभकोलण,
नप ननन णशक डडीजत्एकमफ्डी,
पपुणण डडीजत्एकमफ्डी यवभकाग िण नकाननमुत
3
शत्मुतत् अररनका परब
िलकारक करपुय, करकर यवभकाग
करकर यवभकाग िण नकाननमुत
4
शत्मुतत् मुकालतत् जण.
णड, पपुणण 2 डड. ह लत्रकाज काभकोलण, नप ननन णशक डडीजत्एकमफ्डी, पपुणण डडीजत्एकमफ्डी यवभकाग िण नकाननमुत 3 शत्मुतत् अररनका परब िलकारक करपुय, करकर यवभकाग करकर यवभकाग िण नकाननमुत 4 शत्मुतत् मुकालतत् जण. नकारर, अधत्कुक ित्मुका शपुल्क यवभकाग पपुणण िण नकाननमुत 5 शत् जवकान मुधपुकर भकोई्ण, अधत्कुक ित्मुका शपुल्क ित्एकमफकर कण नकामुकामुंहकत ्रयय
एजेडा ववष् क 01 : मैससर कोपलैड इंडड्ा पाइवइव टलटमवइड दवारा नई नन्ारत उामुख इकाई की सस्थिापना कइ टलए आवइदन प्र
इकककाई कण पसतकाव कको अनपुमुको न िननमुननत कण िमुकु यवरकारकाार कण ननलएकम र का गरका्त
यवरकार-यवमुशर कण बका िननमुननत नण 278/एकम/7(पत्), 278/एकम/8(पत्), 278/एकम/9(पत्), 278/एकम/10(पत्), गकामु मुकान, तकालपुकका मुपुलशत् पपुणण-411057 पर मुणििर ककोपललड इकमुंहडरका पकाइकवण् ननलननमु्णड कको, एकमफ्डीपत् 2023 कण पैरका 6.05(एकम) और ललडबपुक कण पैरका 6.01 कण िमुं भर मुम एकमक नई इकककाई ककी साकापनका कण पसतकाव कको अनपुमुकोह त हकरका लै्त अनपुमुकोह त पसतकाव कका यववरण नत्रण ह रका गरका लै; (रकाननश करकोड़ मुम) साकान278/A/7(P), 278/A/8(P), 278/A/9(P), 278/A/10(P), Village Mann, Taluka Mulshi Pune-411057 प्लड् कका कुणतफ 38,410 sq.f. File No.EOU-11/7/2024-JDCP-SEEPZ-MUMBAI I/4397/2024 16
काननश करकोड़ मुम) साकान278/A/7(P), 278/A/8(P), 278/A/9(P), 278/A/10(P), Village Mann, Taluka Mulshi Pune-411057 प्लड् कका कुणतफ 38,410 sq.f. File No.EOU-11/7/2024-JDCP-SEEPZ-MUMBAI I/4397/2024 16
ल
नननननमुर
त
हकरका
जकानण
वकालका
नत्पका
/ िणवका
प कान
ककी
जकानत्
लै.
ररिरर एकममुंड डणवलपमुम्, पकोडक्् इकमुंजत्नननरररमुंग, पको्को्डीयपमुंग, िलपननलमुंग, ्णसस्मुंग एकममुंड
पकोवकाइकहडमुंग ्णसक्नकल ियवरिणज.
अनुमान नन वेश नव वर ण:
औ र नव त का स्रो त A. ननवइश वववरणव:-
Particulars Rs. In Cr. (a) Leased Premises- Lease Payout for 5 years 44.76 (b) Building (Interior and Fitouts) 33.58 (c) Plant and Machinery (Rs. In Crores)
(i) Indigenous 74.59
(ii) Import CIF Value 80.40
(iii) Total (i + ii) 154.99
TOTAL COST (a) + (b) + (c) 233.33 (d) Details of source(s) of finance:
Equity Shares 0
Internal Accruals 233.33
TOTAL 233.33
(बी) पूंजीगत वसतुओं और कच्इ माल और अा् इनपुव की सवदइशी I/4397/2024 17
आवश्कता (Rs. In Crores)
(a) Capital Goods
74.59 (b ) Raw Material Components, Consumables, packing material, fuels etc, during the period of 5 years 4.68
Total 79.27
(सी) कुल रोजगार
Supervisory Non-Supervisory Men 403
Women 97
(डी) ववदइशी मुदा बैलेस शीव:
Rs.
onsumables, packing material, fuels etc, during the period of 5 years 4.68
Total 79.27
(सी) कुल रोजगार
Supervisory Non-Supervisory Men 403
Women 97
(डी) ववदइशी मुदा बैलेस शीव:
Rs. in Crores
1st Year 2nd Year 3rd Year 4th Year 5th Year Total
FOB Value of Export 88.86 171.57 195.23 221.32 251.14 928.13 Foreign Exchange outgo on 34.97 32.20 28.30 24.78 25.29 145.54 Net Foreign Exchange 53.89 139.38 166.93 196.54 225.85 782.59 NFE % 61% 81% 86% 89% 90% 84%
एजेडा ववष् क 02 : मैससर गरवारइ हइलस्थिकइ्र इंडड्ा पाइवइव टलटमवइड दवारा मौजूदा डीवएए ्ूननव को ईओ्ू ्ूननव मे बदलनइ कइ टलए आवइदन
इकककाई कण पसतकाव कको अनपुमुको न िननमुननत कण िमुकु यवरकारकाार कण ननलएकम र का गरका्त
यवरकार-यवमुशर कण बका िननमुननत नण प्लड् नमुंबर बत्-137, गकानमुंड फलकोर, गकारवणरर ्णसक्नकल फकाइकबिर ननलननमु्णड कण िकामुनण, डब्ल्रयूएकमकई एकममुकईडडीित्, ितकारका - 412803 पर ससात मुणििर गरवकारण लणल्ाकणरर इकमुंहडरका पकाइकवण् ननलननमु्णड कको, एकमफ्डीपत् 2023 कण पैरका 6.05(एकम) और ललडबपुक कण पैरका 6.01 कण िमुं भर मुम मुणििर गरवकारण लणल्ाकणरर इकमुंहडरका पकाइकवण् ननलननमु्णड कण पसतकाव कको मुमौजयू का डडी्डीएकम रयूननन् कको नननरकारत न्मममुपु त् रयूननन् मुम पररवननतरत करनण कण ननलएकम मुमुंजयूरडी ण डी्त अनपुमुकोह त पसतकाव कका यववरण नत्रण ह रका गरका लै: (रकाननश करकोड़ मुम) I/4397/2024 18
ो मुमौजयू का डडी्डीएकम रयूननन् कको नननरकारत न्मममुपु त् रयूननन् मुम पररवननतरत करनण कण ननलएकम मुमुंजयूरडी ण डी्त अनपुमुकोह त पसतकाव कका यववरण नत्रण ह रका गरका लै: (रकाननश करकोड़ मुम) I/4397/2024 18
साकान
प्लड् नमुंबर बत्-137, गकानमुंड फलकोर, गकारवणरर ्णसक्नकल फकाइकबिर ननलननमु्णड कण
िकामुनण, डब्ल्रयूएकमकई एकममुकईडडीित्, ितकारका - 412803
प्लड् कका
कुणतफल
6500 sq.ft Built-up area and the plot area
नननननमुरत हकरका
जकानण वकालका
नत्पका / िणवका
प कान ककी
जकानत् लै..
नननओनण्ल अरमुबकोडर, इक्ममफम् अरमुबकोडर, पत्हडरकाहट्रिक अरमुबकोडर, एकमडल्् ववसत अरमुबकोडर,
एकमडल्् एकमकरएकममु अरमुबकोडर, कइकि रकाइक् अरमुबकोडर
अनुमान ननवइश वववरणव:- और ववत्त का ्रोत 7. ननवइश वववरणव:-
Particulars Rs. In Cr. (a) Land
(b) Building
(c) Plant and Machinery (Rs. In Crores)
(i) Indigenous 1.35
(ii) Import CIF Value 1.15
(iii) Total (i + ii) 2.50 (d) Furniture & Fixtures 0.10 (e) Other Assets & Security Desposits 0.10 (f) Net working Capital 1.07
TOTAL COST 3.77 (d) Details of source(s) of finance:
Borrowing from Group Companies 3.50
Internal Accruals 0.27
TOTAL 3.77 Crores
I/4397/2024 19
its 0.10 (f) Net working Capital 1.07
TOTAL COST 3.77 (d) Details of source(s) of finance:
Borrowing from Group Companies 3.50
Internal Accruals 0.27
TOTAL 3.77 Crores
I/4397/2024 19
बत्) पूंजीगत वसतुओं और कच्इ माल और अा् इनपुव की सवदइशी आवश्कता (Rs. In Crores)
(a)Capital Goods
1.35 (b ) Raw Material Components, Consumables, packing material, fuels etc, during the period of 5 years 2.58
Total 3.93
(सी) कुल रोजगार
Supervisory Non-Supervisory Men 6 10 Women 0 42
(डी) ववदइशी मुदा बैलेस शीव
Rs. in Crores
1st Year 2nd Year 3rd Year 4th Year 5th Year Total
FOB Value of Export 5.46 6.37 7.28 8.19 9.10 36.39 Foreign
Exchange outgo on 4.66 4.09 4.68 5.26 5.85 24.54 Net Foreign Exchange 0.80 2.27 2.60 2.93 3.25 11.85
अध्रकु कको ध्ममरवका जकापन कण िकाा बैठकक िमुकाप लपुई्त
Minutes of the 1st Meeting of the Approval Committee for Export Oriented Units Under the Chairmanship of Zonal Development Commissioner SEEPZ-SEZ, Mumbai on 30.05.2024 at SEZ Bhavan office, Pune.
Members present
Sr. No. Name and Designation (S/Shri.) Department 1 Smt. Mital Hiremath Joint Development Commissioner Pune Cluster SEZ, Pune 2 Dr. Dileeraj Dabhole, Dy. DGFT Nominee of DGFT, Pune I/4397/2024 20
Sr. No. Name and Designation (S/Shri.) Department 1 Smt. Mital Hiremath Joint Development Commissioner Pune Cluster SEZ, Pune 2 Dr. Dileeraj Dabhole, Dy. DGFT Nominee of DGFT, Pune I/4397/2024 20
3 Smt. Archana Parab Asst. Commissioner, IT Nominee of Income Tax, Pune 4 Smt. Malathi J. Nair Superintendent Nominee of Customs, Pune 5 Shri Jawan Madhukar Bhoite, Superintendent Nominee of Customs CFR
Agenda Item No. 1 : Application for setting up of New Unit submitted by M/s. Copeland India Private Limited
The proposal of the unit was placed before the Approval Committee for
consideration.
After deliberation, Committee approved the proposal of M/s. Copeland India
Private Limited for setting up of a new unit at 278/A/7(P), 278/A/8(P), 278/A/9(P), 278/A/10(P), Village Mann, Taluka Mulshi Pune-411057 in terms of Para 6.05(a) of FTP 2023 read with Para 6.01 of Hand book of Procedure. The details of the approved proposal as detailed below:
(Amount in Rs. Cr.) Location 278/A/7(P), 278/A/8(P), 278/A/9(P), 278/A/10(P), Village Mann, Taluka Mulshi Pune-411057 Area of the Plot 38,410 sq.f. Product to be manufactured /Service to be rendered. Research and Development, Product Engineering, Prototyping, Sampling, Testing and providing Technical services.
PROJECTIONS Investment Details:- & Source of Finance B. Investment Details:-
Particulars Rs. In Cr. (a) Leased Premises- Lease Payout for 5 years 44.76 (b) Building (Interior and Fitouts) 33.58 (c) Plant and Machinery (Rs.
& Source of Finance B. Investment Details:-
Particulars Rs. In Cr. (a) Leased Premises- Lease Payout for 5 years 44.76 (b) Building (Interior and Fitouts) 33.58 (c) Plant and Machinery (Rs. In Crores)
(i) Indigenous 74.59
(ii) Import CIF Value 80.40
(iii) Total (i + ii) 154.99
TOTAL COST (a) + (b) + (c) 233.33 (d) Details of source(s) of finance:
Equity Shares 0 I/4397/2024 21
Internal Accruals 233.33
TOTAL 233.33
C. Indigenous requirement of capital goods & raw Material
and other input (Rs. In Crores)
(a ) Capital Goods
74.59 (b ) Raw Material Components, Consumables, packing material, fuels etc, during the period of 5 years 4.68
Total 79.27
D.Total Employment
:-
Supervisory Non-Supervisory Men 403
Women 97
E. Foreign Exchange Balance Sheet :
Rs. in Crores
1st Year 2nd Year 3rd Year 4th Year 5th Year Total
FOB Value of Export 88.86 171.57 195.23 221.32 251.14 928.13 Foreign Exchange outgo on 34.97 32.20 28.30 24.78 25.29 145.54 Net
Foreign Exchange 53.89 139.38 166.93 196.54 225.85 782.59 NFE % 61% 81% 86% 89% 90% 84%
Agenda Item No.02: Application submitted by M/s. Garware Healthcare India Private Limited for Conversion of existing DTA Unit into EOU Unit
I/4397/2024 22
61% 81% 86% 89% 90% 84%
Agenda Item No.02: Application submitted by M/s. Garware Healthcare India Private Limited for Conversion of existing DTA Unit into EOU Unit
I/4397/2024 22
The proposal of the unit was placed before the Approval Committee for consideration.
After deliberation, Committee approved the proposal of M/s. Garware
Healthcare India Private Limited for Conversion of existing DTA Unit into EOU Unit to be located at Plot No. B-137, Ground Floor, Opp. Garware Technical Fibres Ltd., WAI MIDC, Satara – 412803 in terms of Para 6.05(a) of FTP 2023 read with Para 6.01 of Hand book of Procedure. The details of the approved proposal as detailed below : (Amount in Rs. Cr.) Location Plot No. B-137, Ground Floor, Opp. Garware Technical Fibres Ltd., WAI MIDC, Satara – 412803 Area of the Plot 6500 sq.ft Built-up area and the plot area Product to be manufactured /Service to be rendered. Neonatal Armboard, Infant Armboard, Pediatric Armboard, Adult Wrist Armboard, Adult Arm Armboard, Ice Right Armboard
PROJECTIONS
Investment Details:- & Source of Finance A. Investment Details:-
Particulars Rs. In Cr. (a) Land
(b) Building
(c) Plant and Machinery (Rs. In lakhs)
(i) Indigenous 1.35
(ii) Import CIF Value 1.15
(iii) Total (i + ii) 2.50 (d) Furniture & Fixtures 0.10 (e) Other Assets & Security Desposits 0.10 (f) Net working Capital 1.07
TOTAL COST 3.77 (d) Details of source(s) of fnancee
Borrowing from Group Companies 3.50
Internal Accruals 0.27
TOTAL 3.77 Crores
B.
ecurity Desposits 0.10 (f) Net working Capital 1.07
TOTAL COST 3.77 (d) Details of source(s) of fnancee
Borrowing from Group Companies 3.50
Internal Accruals 0.27
TOTAL 3.77 Crores
B. Indigenous requirement of capital goods & raw Material and
other input (Rs. In Crores)
I/4397/2024 23
(a)Capital Goods
1.35 (b ) Raw Material Components, Consumables, packing material, fuels etc, during the period of 5 years 2.58
Total 3.93
C. Total Employment
:-
Supervisory Non-Supervisory Men 6 10 Women 0 42
D. Foreign Exchange Balance Sheet :
Rs. in Crores
1st Year 2nd Year 3rd Year 4th Year 5th Year Total
FOB
Value
of Export 5.46 6.37 7.28 8.19 9.10 36.39 Foreign
Exchange outgo on 4.66 4.09 4.68 5.26 5.85 24.54 Net
Foreign Exchange 0.80 2.27 2.60 2.93 3.25 11.85
Meeting ended with a vote of thanks to the Chair.
(जज्ञाननश्वरान बब. पज्ञाटबल, आईएएस) (Dnyaneshwar B. Patil, IAS) अधयक ए्वराव व्वराकज्ञास आययक Chairman-cum- Development Commissioner
I/4397/2024 24
ACTION TAKEN REPORT FOR THE APPROVAL COMMITTEE MEETING HELD ON 30.05.2024 IN RESPECT OF EXPORT ORIENTED UNITS.
Name of the unit
Subject Action Taken M/s. Copeland India Private Limited Application for Approval of Setting up of New unit as 100% EOU
Approved
and
LOP
issued to the unit on
06.06.2024
M/s. Garware
Healthcare India
Pvt Ltd
Application
for
Approval
of
Conversion of DTA
unit
into
100%
EOU submitted by
Approved
and
LOP
issued to the unit on
06.06.2024
n
06.06.2024
M/s. Garware
Healthcare India
Pvt Ltd
Application
for
Approval
of
Conversion of DTA
unit
into
100%
EOU submitted by
Approved
and
LOP
issued to the unit on
06.06.2024
OFFICE OF THE DEVELOPMENT COMMISSIONER, SEEPZ SPECIAL ECONOMIC ZONE, GOVT. OF INDIA, ANDHERI (EAST), MUMBAI
AGENDA NOTE FOR CONSIDERATION OF APPROVAL COMMITTEE FOR EXPORT ORIENTED UNITS
I COMPANY/UNIT PROFILE (a) Name and address, telepho ne/ fax/ email id M/s. Tata AutoComp Hendrickson Suspensio ns Pvt Ltd Plot No D-236/5, MIDC Chakan Industrial Ar ea, Phase II, Village- Warale, Khed, Chakan, Pune, Maharashtra-401501 Tel No: 9922445052 E-mail: finance@tacohendrickson.com Website: www.tacohendrickson.com (b) Status of the company i.e. Proprietorship/ partners hip/ Individual and statute under which registered wit h registration no. & year of registration Private Limited Company (c) Financial capability of M/s. Copeland India Private Limi ted. The total cost of the project includes Rs. 105 .19 Crores.
ed wit h registration no. & year of registration Private Limited Company (c) Financial capability of M/s. Copeland India Private Limi ted. The total cost of the project includes Rs. 105 .19 Crores. The cost of the projects will be b orne and funded out of its internal accruals.
Cash and Cash Equivalents as per year (Rs.in Cr.)
2021-22 2022-23 2023-2 4 5.9 7.8 2.93
Reserves and surplus 2021-22 2022-23 2023-2 4 116.5 163.87 216.58
(d) IEC No / date/ issued by
IEC No.: 3106009471 Date : 29.06.2024. Issued By: O/o Joint DGFT, Pune.
(e) Whether manufacturer / tra der/ company warehouse/ Service provider. Manufacturer
II PROJECT PROFILE (i) Product to be manufacture d/ service to be rendered Anti Roll Bar/ Stabilizer Bar
SEEPZM-EOU0PROF/35/2024-O/o ADCP-SEEPZ SEZ I/71375/2024
ITC HS Code 87088000.
(ii)
Brief detail of the project
TATA AutoComp Hendrickson Suspensions Private Limited (THSL) is a Private Limited Company is 50: 50 Joint Venture Between T ATA AutoComp Systems Limited and Hendr ickson International, USA.
THSL was formed in year 2006 under the C ompanies Act, 1956 with the intent to prov ide advanced suspension systems and comp onents to commercial vehicles including bu ses. Currently THSL design, develop and m anufacture Auxiliary axle suspension, Tand em Bogie Suspension, Rubber Metal Suspe nsions, Steerable & Non – Steerable Axles, Bus Air Suspension catering to Indian Mark et.
THSL has product technology which is mar ketable in India and abroad.
Bogie Suspension, Rubber Metal Suspe nsions, Steerable & Non – Steerable Axles, Bus Air Suspension catering to Indian Mark et.
THSL has product technology which is mar ketable in India and abroad. THSL provides advanced technology suspension products a nd services to Indian Automotive OEM as w ell as Tier 1 Suppliers. THSL in investing in developing technologies that is unique to In dia.
THSL is in process of expanding its new pro ducts portfolio & bringing the new technolo gy products called “Anti Roll Bar Products” also knows as Stabilizer Bar or Sway Bar w hich is essential components in a vehicle’s s uspension system. Its primary function is t o reduce body roll during cornering helping to improve handling and stability. This is going to be new product line which i s very different from the existing products.
For the ARB project, dedicated machinery,
equipment’s and tools will be set up for ma
nufacturing. THSL is acquiring the assets
of JV partner (Hendrickson) and importing t
hese assets for manufacturing of the Anti-R
oll Bar (ARB) Products.
It consists major equipment like Induction
Heaters, Press Machines, Furnaces, Bendin
g Presses, Quench Tanks, Tempering Furna
ces, Shop Peen Machines, PTCED and Powd
er Coating Plant, Machining equipements,
I/71375/2024
ment like Induction Heaters, Press Machines, Furnaces, Bendin g Presses, Quench Tanks, Tempering Furna ces, Shop Peen Machines, PTCED and Powd er Coating Plant, Machining equipements, I/71375/2024
Particulars Rs. In C r. (a) Leased Premises- Lease Pa yout for 5 years 6.16 (b) Building (Interior and Fitouts) 26.40 (c) Plant and Machinery (Rs. In Crores)
(i) Indigenous 10.54
(ii) Import CIF Value 41.88
iii) Other direct expenses 20.21
TOTAL COST (a) + (b) + (c) 105.19 (d) Details of source(s) of fi nance:
Equity Shares 0
Internal Accruals 105.19
TOTAL 105.19 welding robots, test machines, tooling and f ixtures. For ARB Project, THSL has plann ed the investment from the internal accrual s, profits or reserve funds of the company.
ARB Products manufactured from the above machinery would be exported through Hen drickson to cater their existing Automotive Customers base in Europe, USA and UK.
THSL is investing Rs. 105.19 Crores and e xpecting Export of Rs. 438.72 Crores and NFE of Rs. 334.76 Crores which 76.30% .
(iii)
Projections
A. Investment Details:-
i. Indigenous requirement of capital goods & raw Material and other input (Rs. In Crores)
(a) Capital Goods
10.54 305,664 (b) Raw Material Components, 25.90 6,019,9 27 I/71375/2024
tails:-
i. Indigenous requirement of capital goods & raw Material and other input (Rs. In Crores)
(a) Capital Goods
10.54 305,664 (b) Raw Material Components, 25.90 6,019,9 27 I/71375/2024
Consumables, packing mater ial, fuels etc, during the per iod of 5 years
Total 36.44 6,325,5 91
ii. Total Employment:-
Supervisory Non-Supervisory Men 25 114 Wome n 0 10
iii. Foreign Exchange Balance Sheet :
Rs. in C rores
1st Year 2nd Year 3rd Year 4th Yea r 5th Yea r Total
FOB V alue of Export 45.2 2 83.5 0 98.0 0 106 .00 106 .00 438. 72 Foreig n Exch ange o utgo o n 66.9 4 11.3 6 8.06 8.8 0 8.8 0 103. 96 (i) Impo rt of Ma chinery 41.8 8
41.8 8 (ii) Imp ort of R aw Mat erials a nd Com ponents 5.86 10.8 6 7.81 8.5 5 8.5 5 41.6 4 (iii) Imp ort of S pares a nd Consum ables 1.40
1.40 (iv) Rep atriatio n of divi I/71375/2024
dends a nd profi ts to for eign col laborat es
--
--
-- (v) Roy alty
--
--
-- (vi) Lu mpsum Know h ow fee
--
--
-- (vii) De sign & Drawin g fees
--
--
-- (viii) Pa yment o f foreig n technici ans
--
--
-- (ix) Pay ment on train ing of I ndian t ech. ab road
--
--
-- (x) Com mission on expo rt
--
--
-- (xi) For eign Tr avel 2.50 0.50 0.25 0.2 5 0.2 5 3.75 (xii) Am ount of interest to be paid on externa l comm ercial b orrowin g / defe rred pa yment c redit (s pecify d etails)
--
--
-- (xiii) An y other paymen 15.2 15.2 I/71375/2024
3.75 (xii) Am ount of interest to be paid on externa l comm ercial b orrowin g / defe rred pa yment c redit (s pecify d etails)
--
--
-- (xiii) An y other paymen 15.2 15.2 I/71375/2024
ts (spec ify details) 9
9 Total ( i) to (x iii) 66. 94 11. 36 8.06 8.8 0 8.8 0 103. 96 Net Fo reign Exchan ge -21. 71 72. 14 89.9 4 97. 20 97. 20 334. 76 NFE % 48 % 86. 36 % 91.7 7% 91. 70 % 91. 70 % 76.3 0%
iv. Whether Foreign Technology Agreement is
envisaged- NO
III Request of the company Setting up New Unit. IV Relevant provision of FTP/ HBP
Para 6.05(a) of FTP 2023 read with Para 6.01
of Hand book of Procedure V Decision required for UAC Setting up of a new unit for manufacturing of Anti Roll Bar(“ARB”)/ Stabilizer Bar for mediu m and heavy commercial vehicles.
VI Recommendation/ observation of the ADC The proposal of the applicant company for setting up a New Unit 100 % EOU for manufac turing of Anti Roll Bar(“ARB”)/ Stabilizer Bar f or medium and heavy commercial vehicles ter ms of 6.05 (a) of FTP 2023 read with Para 6.01 (b) of Hand book of Procedure.
Further, Assistant Commissioner, Customs Facilitation Division Pune Customs vide letter dated 04.10.2024 has stated that the verification report in the prescribed format is given below:
1
Name & Complete Postal Address of location of factory with Telephone No. and Fax No. M/s Tata Autocomp Hendrickson Suspensions Pvt. Ltd.situated at Plot No. D- 236/5, MIDC Chakan Industrial Area, Phase II, Village-Warle, Khed, Chakan, Pune, Maharashtra, 410501 . Tel No. +919922445052.
2
Item(s) of Manufacture Anti Roll Bar (ARB) for medium and heavy commercial vehicles with item code 87088000 I/71375/2024
Warle, Khed, Chakan, Pune, Maharashtra, 410501 . Tel No. +919922445052.
2
Item(s) of Manufacture Anti Roll Bar (ARB) for medium and heavy commercial vehicles with item code 87088000 I/71375/2024
3 Whether the premises is on ownership basis or on lease basis. In Case of lease basis whether the lease period is for a period of 5 year or less. The Premises is hired on lease from Maharashtra Industrial Development Corporation for period of 99 years. 4 Area of Factory premises showing plot area, built up area separately. Plot Area: - 56156.91 Sq. Mt, Built up Area: - 69729 Sq. Ft.
5
Details of nature of building as concrete construction or asbestos shed a. Concrete Construction and partition between proposed EOU unit and DTA unit is done by fixed MS sheet of approx. 12 meters. b. The manufacturing process of ARB requires a very high temperature and this would generate heat wave and steam, to let out these heat waves and steam and any other gases arising out of the process, a strong mesh of metal sheet is fixed for ventilation purpose above 3 meter of MS sheet at side where machines will be installed.
6
Details of source of power (Generator / Electric connection of industrial type) available 200 KVA DG Set with serial no. 6CTAA8.3G3 and 250 KVA DG Set with serial no 6L8.9TAA-G4(Copy of purchase order attached on RHS)..
7
Whether Separate Entry and Exit is provided for the proposed location and is physically segregated from DTA unit to avoid intermingling of goods There is separate entry & exit gate and boundary wall .
hether Separate Entry and Exit is provided for the proposed location and is physically segregated from DTA unit to avoid intermingling of goods There is separate entry & exit gate and boundary wall . YES it is physically segregated from DTA unit to avoid intermingling of goods
8
Whether the proposed plan of premises /building is suitable for necessary permission under Section 58 & 65 to be issued by Central Excise & Customs authority. Yes. The construction of premises is completed with installation of some cameras and fire fighting equipments. They have submitted an undertaking regarding Installation of more CCTV Cameras & Fire Fighting equipment before import of capital goods.
9 In Case of conversion from DTA to EOU unit, details of own, lease machines separately and approx. value of such machinery after due to deprecation towards age.
The proposal is for setting up new EOU. I/71375/2024
10
The detail report about contiguous land, security status for conversion of DTA, suitability of place and monitoring insurance of goods etc. The Premises is hired on lease from Maharashtra Industrial Development Corporation for period of 99 years.
tatus for conversion of DTA, suitability of place and monitoring insurance of goods etc. The Premises is hired on lease from Maharashtra Industrial Development Corporation for period of 99 years. The Land is contiguous and suitable for setting up new EOU. 11 Additional information, if any. Duty Calculation Sheet for Capital Goods (copy enclosed)
ADC RECOMMENDATION :- The proposal of the applicant company for setting up a New Unit 100% EOU for manufacturing of Anti Roll Bar(“ARB”)/ Stabilizer Bar for medium and heavy commercial vehicles is submitted before the Approval Committee for consideration in terms of 6.05 (a) of FTP 2023 read with Para 6.01 (b) of Hand book of Procedure.