MEETING OF THE APPROVAL COMMITTEE FOR SECTOR SPECIFIC SPECIAL ECONOMIC ZONE FOR IT/ITES AT PUNE OF M/S. INFOSYS LTD.-SEZ, PHASE I Via Video Conferencing DATE : 25.04.2023 TIME : 03.30 P.M. BREAKER ERRERERERE

= Item No. Subject Agenda Item No. 01 :- Confirmation of the Minutes of the meeting held on 21.02.2023 Agenda Item No. 02 :- Application for List of Material required for Authorized Operations submitted by M/s. Infosys Technologies Ltd. (Developer ना) #मे कम मे मे हे ४ के के के की के के के हे के के फै EK

1 | Smt. Mital Hiremath Pune Cluster SEZ, Pune Joint Development Commissioner 2 | Smt. Pradnya R. Gholap, Nominee of Income Tax, Pune DCIT (TDS) Pune 3 | Dr. Dileeraj Dabhole Nominee of DGFT, Pune Dy. DGFT 4 | Smt, Sunita Jagtap Nominee of Customs, Pune Superintendent Special Invitee S | Name and Designation Department r 1 | Shri B. Ajay Kumar M/s. Infosys Ltd.-SEZ, Hinjewadi Specified Officer Agenda Item No.O1: Confirmation of Minutes of the 12" meeting held on 28.11.2022 After deliberation, the Committee confirmed the minutes of the 12" UAC meeting held on 28.11.2022 Agenda Item No.02: Application for approval of list of material by M/s. Infosys Ltd. (Developer) During the UAC meeting the developer has placed proposal requesting approval of List of Material required for authorized operations amounting to Rs. 159.35 lakhs. The List of materials requested for authorized operations is as detailed below;

Centre with inter connectivity During the course of the UAC, the Chairman has directed to submit verification report from the Specified Officer regarding whether the video conferencing equipment is part of authorized SpeedtipShfoStgammon data centre or not, Jagannathan Date: 28-02-2023 07:33:01 Accordingly, the Specified Officer has Bedsonitkeprovetification report vide letter dated 27.02.2023. The Specified Officer has informed that he has sought clarification from the Developer. The developer vide letter dated 24.02.2023 has clarified as follows: “Video Conference/bridge equipment and their accessories mentioned at Sr. No. 2,5,6 of LOM are required for common data center with inter- connectivity for conducting online meetings with stakeholder- clients, project team etc. for conducting authorized operation of business. These video conference systems are used to conduct online/ virtual meetings to connect with various stakeholders at various geographical locations to render the quality services” The Specified Officer further informed that in view of the above clarification and as certified by the Chartered Engineer, the request of the Developer may please be considered. Verification Report of the specified Officer regarding Video Conferencing Equipment is taken on record. After deliberation, Committee accepted the request of the approval of List of Material of Developer, in terms of Rule 12(2) of SEZ Rules, 2006. Meeting ended with a vote of thanks to the Chair. (Shyam Jagannathan, IAS) Chairman-cum- Development Commissioner E-Mail- dcseepz-mah@nic.in

pi

Approval for List of material required for authorized operations totally valued at Rs. 85.57 lakhs c) Relevant Provisions: -

As per Rule 12 (2) of SEZ Rules, 2006 “The Developer shall make : an application, after obtaining approval for the authorized operation under rule 9, to the Development Commissioner, along with the list of goods and services, including machinery, equipments and construction material required for the authorized operations, duly certified by a Chartered Engineer for approval by the Approval Committee”. d) List of Materials for Authorized Operations : Sr. List of materials | Estimated Estimated Estimated No. required for the below | value for | value for | Total Value of mentioned Authorized | Goods Goods Goods operations purchased purchased (Rs. in Lakhs from DTA (Rs. | from Import in Lakhs Rs. in Lakhs 1. 11.Security offices, Police Posts, etc at entry, exit and other 0.76 = 0.76 points within and along the periphery of the site 2. 13

Common Data Centre with inter 84.05 0.00 84.05 connectivi 3. 23-Air conditioning of 0.76 | 0.00 | 0.76 processing area TOTAL 85.57| 0.00 | 85.57 e) Other Information: -

M/s. Infosys Limited has been granted Letter of Approval No. F.1/9/2019-SEZ dated 06.12.2019

The developer has submitted List of Materials duly certified by the Chartered Engineer Ashish Deshmukh, AM _ 100232-8 dtd. 10.03.2023 for the authorized operation for development of their SEZ located at M/s. Infosys Limited.-SEZ, Plot NO. 1, Rajiv Gandhi Infotech Park, Phase-I, Mann Village, Mulshi Pune 411 057.

list of material as per Rule 12(2) of SEZ Rules, 2006 KRRRERHRERHKE जे “के EE