Agenda for Approval Committee meeting for Private SEZs to be held on 29.04.2024 — 03-gigaplex-agenda
SEEPZ SPECIAL ECONOMIC ZONE अंधेरी (पूर्व), मुंबई ANDHERI {EAST), MUMBAI. कार्यसूची के लि/ए AGENDA FOR “ee ott स्टेट आइवेड लि/मि>टेड के आईटी/आईटीईएस के लि/ए da विDशिFष्ट विDशेष आर्थिKLक क्षेत्र के लि/ए गीगाप्लेक्स एस्टेट प्राइवेट लि/मि>टेड के if के लि/ए क्षेत्र विDशिFष्ट विDशेष आर्थिKLक क्षेत्र के लि/ए अनुमोदन समि>तिZ की बैठका MEETING OF THE oer, APPROVAL COMMITTEE FOR SECTOR SPECIFIC COMMITTEE FOR SECTOR SPECIFIC SPECIAL =~ Se ECONOMIC ZONE FOR IT/ITES OF M/s. GIGAPLEX ESTATE ZONE FOR IT/ITES OF M/s. GIGAPLEX ESTATE PRIVATE LIMITED. स्थंल : सम्मेलन कक्ष, दूसरी मंजिjल, विDकास आयुक्त का कार्याnलय, सीप्ज़-सेज़, अंधेरी (पूर्व) मुंबई। VENUE : Conference Hall, 2nd Floor, the Office of the Development Commissioner, SEEPZ-SEZ, Andheri (East), Mumbai. दिनांक : सोमवार, 29 अप्रैल, 2024 DATE : Monday, 29th April, 2024 समय : प्रातः 11:30 बजे TIME
11:30 A.M. RERKERR ERE RE RE
सोमवार, 29 अप्रैल, 2024 को विDकास आयुक्त, SEEPZ-SEZ की अध्यक्षता में मेसर्स गीगाप्लेक्स एस्टेट प्राइवेट लि/मि>टेड - SEZ के आईटी/आईटीईएस के लि/ए सेक्टर विDशिFष्ट विDशेष आर्थिKLक क्षेत्र के लि/ए अनुमोदन समि>तिZ की बैठक। Meeting of the Approval Committee for Sector Specific Special Economic Zone for IT/ITES of M/s. Gigaplex Estate Private Limited - SEZ under the Chairmanship of Development Commissioner, SEEPZ-SEZ on Monday, 3297 April, 2024. सूचकांक / INDEX कार्यसूची मद सं. विDषय Agenda Item No. Subject दिनांक 20.12.2023 को आयोजिjत बैठक के कार्यवृत्त की पुष्टि। कार्यसूची मद सं. 01 Agenda Item No. 01:- | Confirmation of minutes of the meeting held on 20.12.2023. दिनांक 17.04.2024 को आयोजिjत बैठक के कार्यवृत्त की पुष्टि कार्यसूची मद सं. 02 Agenda Item No. 02:- | Confirmation of minutes of the meeting held on 17.04.2024. क्षेत्रीय निदेशक - Feed वर्ली इंडिया प्राइवेट लि/मि>टेड से समामेलन/विDलय के कार्यसूची मद सं. 03 आदेश के माध्यम से उद्यमी के परि¢वर्तन की स्वीकृतिZ। Agenda Item No. 03:- | approval w.r.t. Change of Entrepreneur by way of Order for Amalgamation/Merger from Regional Director - M/s. Worley India Private Limited. Approval w.r.t. for setting up Gymnasium and Recreation Room within their SEZ unit located at Gigaplex-SEZ in terms of Instruction no.95 dated 11th June 2019 - M/s. Accenture Solutions Private Limited कार्यसूची मद सं. 04 Agenda Item No. 04:
Minutes of 724 Meeting of the Approval Committee for Sector Specific Special Economic Zone of M/s. Gigaplex Estate Private Limited - SEZ, at Airoli, under the Chairmanship of Development Commissioner, SEEPZ-SEZ held on 20.12.2023, at Second Floor SEEPZ Service Centre, SEEPZ SEZ, Mumbai.
- Name of the SEZ : M/s. Gigaplex Estate Pvt. Ltd.
- Sector : IT/?TES
- Meeting no | .
7gnd 4. Date
20.12.2023 Members Present: i IName of Members Designation Organization. Shri. C. P.S. t. Development| EE 4 ‘Chauhan ‘commissioner, SEEPZ-SEZ. 2 Shri. Leider joint Commissioner|Nominee of Commissioner of Income IPanicker income Tax ; ‘ax office, Mumbai. 3 bri. Himanshul. है Nominee of the Additional DGFT, 3 Dhar Pandey Deputy Director DGFT Mumbai. 4 Smt. Kirti peputy Director(Nominee of DC Industries, Deshmukh dustries overnment of Maharashtra. विD Superintendent af[Neminee of Commissioner of 5 Smt, Sunita Jagtap Customs ‘ustoms, General, Air Cargo, Sahar. Special Invitee:-
- Dr. Prasad Varwantkar =: Dy. Development Commissioner, SEEPZ SEZ
- Shri. RK. Jain : Specified Officer, Gigaplex-SEZ. Shri. Hanish Rathi, ADC (New-SEZ}, Shri. Palash Shankar, ADC (New-SEZ), Manish Kumar, ADC (New-SEZ), Smt. Rekha Nair, Assistant, Shri. Ravindra Kumar, Assistant and also attended for assistance and smooth functioning of the meeting. Agenda item No. 01: Confirmation of Minutes ) the 715 meeting held on 01.11.2023. The Minutes of the 715t Meeting held on 01.11.2023 were confirmed with consensus.
Agenda Item No. 02: Approval w.r.t. creation and sharing of common infrastructure facilities with their other SEZ units ie. STPL, SEZ and DTA units of M/s. UBS Business Solutions (India) Pvt. Led. The Unit requested for approval for creation and sharing of common infrastructure facilities with their other units ic. STPI, SEZ and DTA units. The Specified Officer, Mindspace-SEZ vide letter dated 26.10.2023 had submitted the comments on the [proposal. During the discussion, the Unit representative has informed that their proposal is for Software Development not for the IT/ITES. It is brought to the notice of the Committee, in the past similar proposal was rejected in the UAC, The Committee observed that the Rules 27(5) of SEZ Rules, 2006 provides that “A unit may import or procure from Domestic Tariff Area, all types of goods and services, without payment of duty, taxes or cess for creating a central facility for use by Units in Special Economic Zone and where such facility is created for software development, the same may also be accessed by software exporters of Domestic Tariff Area” therefore this facility is for the Units SEZ and not for SEZs. Decision:~ After deliberation, the Committee has directed that the unit should make a representation to Development Commissioner with clear facts for IT/ITES units and the same shall be forwarded to Ministry for seeking guidelines/clearance on the issue of common infrastructure for units other than SEZ. Agenda Item No. 03: Approval w.r.t. Surrender of the area at the entire fifth floor office premises on level six admeasuring 48,456 and entire sixth floor office premises on level seven admeasuring 42,356 sq.ft. totally aggregating to 90,812 sq.it. of Building No. 06 to the developer M/s. Gigaplex Estate Pvt. Ltd. - SEZ without revision of projection and transfer of Fitout Assets/Capital Goods to SEZ Developer at Gigaplex -SEZ of M/s. Accenture Solutions Private Limited. The unit M/s. Accenture Solutions Private Limited located at M/s. Gigaplex- SEZ has requested for surrender of the area at the entire fifth floor office premises on level six admeasuring 48,456 and entire sixth floor office premises on level seven admeasuring 42,356 sq.ft. totally aggregating to 90,812 sq.ft. of Building No. 06 to the developer M/s. Gigaplex Estate Pvt. Ltd. - SEZ without revision of projection and transfer of Fitout Assets/Capital Goods to SEZ Developer at Gigaplex -SEZ. . During the meeting committee discussed the Rule position, with regards to the following :- * Whether a unit can avail the depreciation on capital goods under the provision of Rule 49 of SEZ Rules 2006 only when goods are not removed into DTA and the
goods are goods are surrendered to Developer after payment of applicable duty /Tax. Decision :- After deliberations, the Committee asked the unit representative to submit a request to allow them to transfer the capital goods on depreciated value based on which reference to be made to MOC&I for clarification /directions in the matter. Meeting ended with the vote of thanks to the Chair. (Rajesh Kumar Mishra, IRS} Chairperson-cum- Development Commissioner Signed by Chanderpaisingh Chauhan : Date: 06-02-2024 15:10:02 Reason: Approved
CG NULOERA I-14 1 11८1८.७८-<८"पत्च॒ विDकास area, सीष्ज-सेज़ की अध्यक्षता में ऐरोली में मेसर्स मि>गराप्लेक्स' एस्टेट प्राइवेट लि/मि>टेड' - सेज़ के सेक्टर विDशिFष्ट विDशेष आर्थिKLक क्षेत्र के लि/ए अनुमोदन समि>तिZ की 73 वीं बैठक का कार्यवृत्त, 17.04.2024 aT दूविDतीय तल सीप्ज' सेवा केंद्र में आयोजिjत' किÅया गया।, vdieo सेंज़, मुंबई। Minutes of 73 Meeting of the Approval Committee for Sector Specific Special Economic Zone of M/s. Gigaplex Estate Private Limited - SEZ, at Airoli, under the Chairmanship of Development Commissioner, SEEPZ-SEZ held on 17.04.2024, at Second Floor SEEPZ Service Centre, SEEPZ SEZ, Mumbai. 1. : सेज़ का नाम : मैसर्स गीगाप्लेक्स sete प्रा. लि/मि>टेड 2. सेक्टर : आईटी/आईटीईएस 3. सीटिÇंग नंबर 73र्बी 4. दिनांक : 17.04.2024 उपस्थिÍत सदस्य : क्रिÏमांक | सिÑदस्यों का नाम पद का नाम संगन____._..़Õ़ Õ'हक 1 भरी सीपीएस चौहान age. विDकास आयुक्त, सीप्ज़-सेज़ 2 शभ्रीलीडर पणिÛक्षर धसिÑंयुक्त आयुक्त आयकर आयकर आयुक्त कार्याnलय, मुंबई के नाभिÞती 3 श्री हिáमांशु धार पांडे उप निदेशक डीजीएफटी अतिZरि¢क्त डीजीएफटी, मुंबई के नामि>त 4 भश्रीमती पूनम दराडे. उिäपनिदेशक उद्योग डीसी इंडस्ट्रीज, महाराष्ट्र सरकार के नामि>ती 5 श्रीमती सुनीता जगताप सीमा शुल्क अधीक्षक सीमा शुल्क आयुक्त, जनरल, एयर कार्गोé, सहार के नामि>ती विDशेष आमंत्रिëत सदस्य:- श्री . आर के जैन : “विDनिर्दिLष्ट अधिðकारी, एलटीआईमाइंडट्री -सेज़ रेखा नायर, एडीसी (न्यू सेज़); श्री. पलाश शंकर , एडीसी (aw), श्रीमती श्री . जी.एस. भंडारी, सहायक और श्री जनेश जिjपाठी , एलडीसी (न्यू सेज़) बैठक में सहायता और सुचारू संचालन के लि/ए भी शामि>ल हुए। समयाभाव के कारण उक्त बैठक दिनांक Due to paucity of time, it was decided to 29.04.2024 को आहूत करने का निर्णय fear convene the said meeting on 29.04.2024. गया | (राजेश कुमार मि>श्रा , आईआरएस)
TORN AWA PL OI अध्यक्ष-सह-विDकास आयुक्त, सीप्ज़-सेज़
Action taken for the UAC Meeting heid on 20.12.2023 Name of | Name of Unit Subject Action Taken M/s. UBS Approval w.r.t. Creation and Business sharing of common infrastructure | Letter issued to unit Solutions (India) [facilities with their other SEZ units on 28.02.2024 Pvt. Ltd. ie. STPL, SEZ and DTA units Approval w.r.t. Surrender of the हिá area at the entire fifth floor office Gigaplex- premises on level six admeasuring SEZ 48,456 and entire sixth floor office है premises on level seven M/s. Accenture |admeasuring 42, 356 sq. ft. totally Letter issued to unit Solutions Private
- | Limited aggregating to 90,812 sq. ft. of Building No. 06 to the Devekloper Mfs. Gigaplex estate Pvt. Ltd.-SEZ without revision of projection and transfer of Fitout Assets/Capital Goods to SEZ Developer at Gigaplex-SEZ on 23.02.2024
Action taken for the UAC Meeting held on 17.04.2024 Name of Name of Unit Subject Action Taken SEZ Approval w.r.t. Change of M/s. Worley India | Entrepreneur by way of Order for Private Limited. Amalgamation/ Merger from Regional Director Due to paucity of . time it was decided. Gigaplex - t : SEZ 0 convene the said M/s. Accenture Solutions Private Limited. Approval w.r.t. for setting up Gymnasium and Recreation Room within their SEZ unit located at Gigaplex-SEZ in terms of Instruction no.95 dated 11th June 2019 - M/s. Accenture Solutions Private Limited meeting on 29.04.2024
£4 GOVT. OF INDIA, OFFICE OF THE DEVELOPMENT COMMISSIONER, MINISTRY OF COMMERCE & INDUSTRY, SEEPZ (SPECIAL ECONOMIC ZONE} MUMBAI अमर आओ रे कैफ गे मे कै के हे AGENDA NOTE FOR CONSIDERATION OF APPROVAL COMMITTEE 8. Proposal: - Approval for Change of Entrepreneur by way of -Order for Amalgamation/ Merger from Regional Director (Ministry of Corporate Affairs) of Worley India Private Limited (Transferor Company- with Worley Services India Private Limited as going concern basis b. Specific issue on which decision of Approval Committee is required:- Approval for change in Entrepreneur by way of Order for Amalgamation/ Merger from Regional Director. ९, Relevant provisions of SEZ Act, 2005 & Rules, 2006/ Instruction/ Notification: MOC&lI Instruction No. 109 dated 18** October, 2021 - “In supersession of Instruction No. 89 dated 17.05.2018 and Instruction No. 90 dated 03.08.2018 of this Department on the subject cited above and in exercise of provisions of Section 10(10) of the SEZ Act, 2005, it is hereby conveyed that the guidelines for approval in the cases of reorganization including change of name, change of shareholding pattern, business transfer arrangements, court approved mergers and demergers, change of constitution, change of Directors, etc. of SEZ Developers / Co-developers as weil as SEZ Units shall be as follows. (i) Reorganization including change of shareholding pattern, business transfer arrangements, court approved, mergers and demergers, change of constitution, change of Directors ete. may be undertaken by the Unit Approval Committee (UAC) concerned subject to the condition that the Developer / Co-Developer / Unit shall not opt out or exit out of the SEZ and continues to operate as a going concern. All liabilities of the Developer / Co-Developer / Unit shall remain unchanged on such reorganization. d. Gther Information: - 1. LOP No. & Date SEEPZ-SEZ/NEW-SEZ/GIGAPLEX-THANE/ JEIPL/07/2016-17/38274 Dated 21.12.2016 Original LOA) 4/16/2024, 3:54]
Item(s) of manufacture/|Information Technology Enabled Services ie. Company services है Spectrum of. engineering designing Services Including Iproject management process engineering detailed] lenginéering, procurement assistance and construction] management with intensive use of Computers & CAD/ ‘CAM Services, Human Resource Services, Revenue Accounting Services, Payroll. Services, Back office} Operations, Support Centres, Professional Services| (such as Legal Services without representation) and] Other Business Services Date of commencement of]06.03.2017 production LOA Valid upto 05.03.2027 SEZ location Unit No. 701 & 702 at 7 to 107 Floor, Building No. 02, Plot No. IT-5, Gigaplex Estate Private Limited. — SEZ, TTC Industrial Area, Airoli Knowledge Park, Airoli, Navi] Mumbai-400708. Following are the points:
- The unit vide letter dated 08.04.2024 has stated as under: I, Background of the case:
- M/s. Worley India Private Limited (Hereinafter referred to as Transferor Company 1) (WIPL) was incorporated in 1969, and it is the Subsidiary of the Worley Services India Private Limited and it is approved SEZ unit for Information Technology Enabled Services 1.6. Company Spectrum of engineering designing Services Including project management process engineering detailed engineering, procurement assistance and construction management with intensive use of Computers & CAD/CAM Services, Human Resource Services, Revenue Accounting Services, Payroll Services, Back office Operations, Support Centres, Professional Services {such as Legal Services without representation) and Other Business Services at Gigaplex Estate Private Limited- SEZ, Plot No. IT 5, Airoli Knowledge Park, TTC Industrial Area, Thane Maharashtra, India-400708. ; 2.As a part of restructuring plan and to streamline operations, their management has decided to Amalgamate Worley India Private Limited ie. Transferor Company 1, Intecsea Engineering India Private Limited (IEIPL) (Transferor Company 2) Worley Engineering Private Limited (WEPL) (Transferor Company 3) with Worley Services India. Private Limited i.e. Transferee Co. along with assets and liabilities relating thereto including ali license, contracts and personnel as per the provision of Rule 19(2) of SEZ Rules, 2006, section 233 of the Companies Act, 2013 and Section 2 (1B) of het Income Tax Act, 1961 and Instruction No. 109 of MOC&lI. 3.In this regard, they have received an order of scheme of Merger or Amalgamation vide order No. RD/WR/Sec.233/Worley/AA6971504/2024/2573 Dated 28.03.2024 from Regional Director, Western Region, Ministry of Corporate Affairs, Mumbai.
- Whereas, Worley Services India Private Limited (Hereinafter referred to as Transferee Co.) was 4/16/2024, 3:54 |
incorporated in year 2006 which is engaged into Infermation Technology and Information Technology Enabled Services. II. Reasons for amalgamation: The unit has intimated that जाए, (Transferor Company 1) has decided to Amalgamate with WSIPL (Transferee Co.) for the purpose of following reasons:
- Consolidation of the respective operations of GFS Tech and GFS India thereby leveraging the Capability of the merged entity;
- Ensuring a streamlined group structure by reducing the number of legal entities in the group and thereby reducing the administrative costs of maintaining separate Companies;
- Operational efficiency and cost optimization by integration or consolidation of various similar functions in the Transferor/Transferee entities; and Pooling of personnel, assets, proprietary information, financial, managerial and Technical resources of the Companies thereby contributing to the future growth and expansion of the merged entity. टी Ill, Documents/details submitted by the unit: Copy of application submitted online. . Copy of Order of Regional Director for Scheme of Merger or Amalgamation. . Copy of Board resolution for Approval of Amalgamation and in favor of Authorized Signatory of WSIPL india -(Transferee Company).
- Copy of Board resolution for Amalgamation and in favor of Authorized Signatory of GFS Tech WN eS fs (Transferor Company). . Undertaking for transfer of Assets and Liabilities. List of Directors of WIFL (Transferor Company). . Shareholding Pattern of WIPL (Transferor Company). , List of Shareholders of WSIPL {Transferee Company. . List of Directors of WSIPL (Transferee Company.
- Copy of Certificate of Incorporation and MOA and AOA in the name of buyer 4.०. WSIPL (Transferee Company}.
- Copy of all Letter of Approval of the WIPL (Transferor Company}.
- Undertaking as per instruction no. 109. 13, Copy of Amended PAN from Worley India Private Limited to Worley India Private Limited to Worley Services India Private Limited.
- Change in IEC and GST will be applied post receipt of approval of Change of Entrepreneur. ७ 00 53 0 छा Detail of Directors of the company is as under: Be Be No. [Name of Directors pr Ne No. |Name of Directors {Post change in (Pre change in Entrepreneur) Entzeprencur} . 1 Mr. Dinesh Pissurlenkar 1 Mr. Ashish Modani Ms. Raj Ajit Mankar
|Ms. Vidya Tukaram Desai 3 Mr. Kamal Gobind Chatlani 3 Mr. Neelesh Vaman Borkar *It is seen that there is change in Director of the company. jl. Detail of Shareholding pattern of the company is as under: Pre change in Entrepreneur of the Company £4 4/16/2024, 3:54}
£4 Sr. |Name of Shareholder Total Number ofjTotal Share|% of share’ No. Shares ‘Capital held Capital heid 1 Worley Services India/42,10,173 ‘|4,21,01,730 100% Private Limited (WSIPL} 2 Nominee Shareholders o WSIPL* Post change in Entrepreneur of the Company (GFSIPL} er | Name of Shareholder Total Number of/Total Share|% of share} No. Shares Capital held Capital held 1 Worley Engineering Pty Ltd [51,651 25,82,550 100% 2 [Nominee Shareholder ०: ; Worley Engineering P Lid.*
- 1 Share of Worley Services India Private Limited is held by Worley SPV 1 Pty Ltd as a nominee shareholder for Worley Engineering Pty Lid. *It is seen that there is change in shareholding pattern of the company. It is to mention that on amalgamation there is no change in projected export/ import, investment and number of employees i.e. they would continue in the same projection covered in the LOA no. Letter of Approval No. SEEPZ-SEZ/NEW-SEZ/ GIGAPLEX-THANE/JEIPL/07/2016-17/38274 dated 21.12.2016 in the block period of 2022-23 to 2026-27. The existing LOA is valid upto 05.03.2027. On amalgamation the Unit would be named as M/s. Worley India Services India Pvt. Ltd. (Unit 1) It is te also niention that they have another Unit M/s. Worley India Services ‘India Pvt. Ltd. (Unit-I]), covered under LOA no. SEEPZ-SEZ/NEW-SEZ/GIGA- THANE/01/2019-20/12228 dt. 12.06.2019 which is valid upto 22.12.2024.
- ADC’s Recommendation: - The proposal of the unit approval for Change of Entrepreneur by way of Order for Amalgamation/Merger from Regional Director (Ministry of Corporate Affairs) of Worley India Private Limited (Transferor Company- with Worley Services India Private Limited in terms of Rule 199] of SEZ Rules, 2006, section 233 of the Companies Act, 2013 and Section 2(1B) of the Income Tax Act, 1961 and Instruction No. 109 of MOC&I. 4/16/2024, 3:54 1
भारत सरकार, विDकास आयुक्त कार्याnलय, वाणिÛज्य एवं उद्योग मंत्रालय, सीप्ज़ (विDशेष आर्थिKLक क्षेत्र) मुंबई और फेक कफ ४ के रे मई से रे अनुमोदन समि>तिZ के विDचार हेतु एजेंडा नोट a. प्रस्ताव: - अनुमोदन के लि/ए मेसर्स एक्सेंचर सॉल्यूशंस प्राइवेट लि/मि>टेड का आवेदन wrt. निर्देċश 95 दिनांक 11 जून 2019 के अनुसार गीमाप्लेक्स-एसईजेड स्थिÍत उनकी एसईजेड इकाई के भीतर व्यायामशाला और मनोरंजन कक्ष स्थापिĎत करने की अनुमतिZ। ७. विDशिFष्ट मुद्दे जिjस पर अनुमोदन समि>तिZ का निर्णय आवश्यक है: एक अनुमोदन लेख . निर्देċश 95 दिनांक 1! जून 2019 के अनुसार गीगाप्लेक्स -एसईजेड स्थिÍते उनकी एसईजेड इकाई के भीतर व्यायामशाला और मनोरंजन कक्ष स्थापिĎत करने की अनुमतिZ इस प्रकार है: क्रमांक। सुविDधा Sekar फर्श विDवरण क्षेत्रफल (वर्ग फुट) 1 बिĖल्डिĘंग 06 few, INS फ्लोर व्यायामशाला 1139 स्टिěÇल्ट, ग्राउंड फ्लोर मनोर॑जन 520 04 वँकार्याnलय स्तर- | व्यायामशाला | | 2 भवन 04 इकाई 601 03 व कार्याnलय स्तर- [मनोरंजन एस.एस.एस 510 यूनिट 501 ० प्रासंगिġक नियम एवं निर्देċश:- एसईजेड नियम, 2006 के नियम 11 (58! में कहा गया है किÅ - "डेवलपर, अनुमोदन समि>तिZ की पूर्व मंजूरी के साथ, कैंटीन, सार्वजनिक टेलीफोन ge णैसी सुविDधाएँ बनाने के लि/ए ue की fe या निर्मि>Lत स्थान पर अनुदान दे सकता है।" सहायता केंद्र, क्रेच और ऐसी अन्य सुविDधाएँ जो इकाई के उपयोग के लि/ए आवश्यक हो सकती हैं 2 एमओसीएंडआई के Rae 04.10.2023 के बाद के स्पष्टीकरण में कहा गया है किÅ एसईजेड नियम 2006 के उक्त नियम 11 (5) को 15.03.9010 के निर्देċश संख्या 50 के साथ साम॑जस्यपूर्ण रूप से पढ़ा जाए ते डेवलपर /सह-डेव्लपर gre विDकसिÑत सुविDधा का उपयोग ज़ोन की सभी इकाइयों के लि/ए किÅया जा सकता है। यह किÅसी विDशेष इकाई के लि/ए डुविDधा के उपयोग को प्रतिZबंधिðत नहीं करता है, जिjयसे ऐसी सुविDधाएं अव्यवहारि¢क हो जाएँगी।
वाणिÛज्य एवं उद्योग मंत्रालय के निर्देċश संख्या 95 दिनांक 11.06.2019, मद संख्या 3 (ए) जिjसमें यह निर्धाnरि¢त किÅया गया है किÅ - «easels नियमों के नियय 117(5) के ग्रावधान के तहत परि¢कल्पिĬĎत सुविDक्षएं भी एक इकाई द्वारा जपने विDशेष उपयोग के लि/ए बनाई जा सकती हैं. Tad डेवलपर से एनओसी के सा4-साथ संबंधिðत वैधानिक प्राधिðकरणों से आवश्यक एनओसी/ मंजूरी/ अनुमोदन प्राप्त किÅया जाए। ५. अन्य सूचना:- सीप्ज़/न्यूसेज़/गीगाप्लेक्स/ठाणे/एएसपीएल/
- अनुमोदन पत्र संख्या और तारीख 04/2015-16/15507 दिनांक 29.09.2015 (मूल एलओए) यथा संशोधिðत।
विDनिर्माnण/सेवाओं की वस्तुएँ सॉफ्टवेयर विDकास और सूचना प्रौद्योगिġकी सक्षम सेवाएँ। बिĖल्डिĘंग नंबर 04, 4 मे , 5 Tar 6 ग॑ ऑफिijस पलोर, बिĖल्डिĘंग नंबर 06, गीगाप्लेक्स wee प्राइवेट। लि/मि>टेड- 3. adam स्थान wages, आईटी/आईटीईएस प्लॉट नंबर आईटी5, ऐरोली नॉलेज पार्क, टीटीसी औद्योगिġक क्षेत्र, दीचे, जिjला-ठाणे, नवी| मुंबई, महाराष्ट्र भारत-400708 4. उत्पादन प्रारंभ होने की तिZथिK 04.04.2016 5. एलओए तक वैध 03.04.2026 oly ERI प्रस्तुत दस्तावेज़/विDवरप Ps | he . व्यायामशाला Ud मनोरंजन a. डेवलपर से अनापत्तिĻ (एनओसी); , e इकाई ने निम्नानुसार बताया है;
- वे एक आईटी/आईटीईएस कंपनी हैं, जो अलग-अलग समय क्षेत्रों के साथ विDभिÞन्न भौगोलि/क क्षेत्रों में फैले अपने विDविDध ग्राहकों का समर्थन करने के लि/ए 2457 परि¢चालन करती है। 24/7 संचालन को ध्यान में रखते हुए अपने कर्मचारि¢यों की भलाई की जरूरतों को पूरा करने के लि/ए परि¢सर के भीतर व्यायामशाला और मनोरंजन क्षेत्र का होना आवश्यक है।
- तदनुसार, उनके परि¢सर के भीतर का क्षेत्र नीचे दी गई तालि/का के अनुसार व्यायामशाला और मनोरंजन क्षेत्र के लि/ए निर्धाnरि¢त किÅया गया है; | क्रमांक। | सुविDधा कैफेटेरि¢या फर्श विDवरण क्षेत्रफल (वर्ग फुट) 1 बिĖल्डिĘंग 06 स्टिěÇल्ट, ग्राउंड फ्लोर । व्यायामशाला - 1139 Reed, ग्राउंड फ्लोर मनोरंजन 520 04 वा कार्याnलय स्तर- व्यायामशाला | 2 भवन 04 . इकाई 601 03 व कार्याnलय saz. [मनोरंजन एस.एस.एस 510 यूनिट 501
- ape ने यह भी कहा किÅ एक्सेंचर जिjमनैजिjयम और मनोरंजन क्षेत्र के लि/ए आवश्यक सामग्री /या सेवाओं पर किÅसी भी कर या शुल्क छूट का लाभ नहीं उठाएगा।
» निर्दिLष्ठ अधिðकारी, मीमाप्लेक्स -एसईजेड से जिjम्नेजिjयम और मनोरंजन क्षेत्र के फ्लोर प्लान लेआउट के साथ परि¢सर का निरीक्षण करने और विDधिðवत निर्धाnरि¢त रि¢पोर्ट और प्लान लेआउट प्रस्तुत करने का अनुरोध किÅया गया है। «. एडीसी की सिÑफ़ारि¢श:- निर्दिLष|्ńठ अधिðकारी की निरीक्षण रि¢पोर्ट के अधीन, दिनांक 11 जून 2019 के निर्देċश संख्या 955 के अनुसार गीगाप्लेक्स-एसईजेड में स्थिÍत उनकी एसईजेड इकाई के भीतर जिjम्नेजिjयम और मनोरंजन कक्ष स्थापिĎत करने के लि/ए मेसर्स एक्सेंचर सॉल्यूशंस प्राइवेट लि/मि>टेड का प्रस्ताव प्रस्तुत किÅया गया है। विDचारार्थ अनुमोदन समि>तिZ
GOVERNMENT OF INDIA, OFFICE OF THE DEVELOPMENT COMMISSIONER, MINISTRY OF COMMERCE & INDUSTRY, SEEPZ (SPECIAL ECONOMIC ZONE) MUMBAI RAKE के की के के के EK AGENDA NOTE FOR CONSIDERATION OF APPROVAL COMMITTEE a. Proposal: - Application of M/s. Accenture Solutions Private Limited for setting up Gymnasium and Recreation Room within their SEZ unit located at Gigaplex-SEZ as per Instruction 95 dated 1 i June 2019. 9. Specific Issue on which decision of Approval Commitiee is required: Approval for setting up Gymnasium and Recreation Room within their SEZ unit located at Gigaplex -SEZ as per Instruction 95 dated 11 June 2019 is as under: | Sx. No. | No. Facility Cafeteria Floor Detail Area (Sq. Ft} 1 Building 06 Stilt, Ground Gymnasium 1139 Floor Stilt, Ground Recreation 520 Floor 047 Office Level-| Gymnasium an 2 Building 04 Unit 601 0375 Office Level-| Recreation sss 510 Unit 501 c. Relevant Rule and Instruction:- Rule 11 (5) of the SEZ Rules, 2006 which stipulates that- “lhe Developer may, with the prior approval of the Approval Committee, grant on lease land or built up space, for creating facilities such as canteen, public telephone booths, first aid centres, créche and such other facilities as may be required use of the unit ” Subsequent clarification of MOC&I dt. 04.10.2023 stipulates that the said
Rule 11 (5) of SEZ Rules 2006 read harmoniously with Instructions no. 50 dt., 15.03.2010, provides the facility developed by Developer/Co-Developer for use of all Units of the Zone. It does not restrict use of facility for any particular unit only which would render such facilities unviable. MoC&I Instruction No. 95 dated 11.06.2019, item No. 3 (a} which stipulates that - “The facilities as envisaged under the proviso to Rule 11(5) of the SEZ _ Rules could also be created by a unit for its exclusive use subject to obtaining a NOC from the Developer as well as necessary NOCs / clearances / approvals from the relevant statutory authorities. d. Other Information:- SEEPZ / NEWSEZ/GIGAPLEX/THANE/ASPL/ 1, [Letter of Approval No. and [oy 79915-16/15507 Dated 29.09.2015 (Original] Date LOA) as amended. 2, [Iter(s) of manufacture/ Software Development and Information| services Technology Enabled Services. Building No. 04, 4%, 5% & 6 Office Floors, Building No. 06, Gigaplex Estate Pvt. Ltd.- Present location SEZ, IT/ITES Plot No. ITS, Airoli Knowledge| Park, TTC Industrial Area, DIGHE, Dist-Thane, Navi Mumbai, Maharashtra, India-400708 4, |Date of commencement of production 04.04.2016 3. ILOA Valid upto 03.04.2026 Documents/details © fe submitted by the unit w.r.t. Gymnasium and Recreation Area, a.No Objection (NOC) from Developer; » The unit has stated as under: They are an IT/ITES company with 24x7 operations to support their diversified clients spread across different geographies with varying time zones. Considering 24/7 operation it is essential to have Gymnasium and Recreation Area within the premises to cater to the needs of their employees well-being. 2.Accordingly, the area within their premises are earmarked for Gymnasium and Recreation Area as per below table | Sr. No. | No. Facility Cafeteria Floor Detail Area (Sq. Ft) 1 Building 06 Stilt, Ground Gymnasium 1139 Floor Stilt, Ground Recreation 520 Floor
04th Office Level-| Gymnasium 690 2 Building 04 Unit 601 _ 0379 Office Level- | Recreation sss 510 Unit 501 3. The unit also stated that Accenture will not availing any tax or duty exemptions on material and/or services required for Gymnasium and Recreation Area.
- The Specified Officer, Gigaplex-SEZ has been requested to inspect the premises alongwith the floor plan layout of Gymnasium and Recreation Area and furnish the report and the plan layout duly earmarked. e. ADC Recommendation:- The proposal of M/s. Accenture Solutions Private Limited for setting up Gymnasium and Recreation Room within their SEZ unit located at Gigaplex- SEZ in terms of Instruction no.95 dated 11th June 2019, subject to inspection report of the Specified Officer is- submitted to the Approval Committee for consideration. reek
Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.
No analysis has been generated for this document yet.