29th December, 2023 Approval of Resolution Plan - Supriya Pharmaceuticals Limited [IA(IBC)No. 644-JPR-2023 in CP No. (IB)-74-9-JPR-2021] (6.62 MB)

Reliability

In force — no superseding record on file.

Document text

IN THE NATIONAL COMPANY LAW TRIBUNAL JAIPUR BENCH

CORAM: SHRI DEEP CHANDRA JOSHI, HON’BLE JUDICIAL MEMBER

SHRI RAJEEV MEHROTRA HON’ BLE TECHNICAL MEMBER

LA(IBC) No. 644/JPR/2023 In CP No. (IB)- 74/9/JPR/2021

IN THE MATTER OF:

APOLLO INTERNATIONAL LIMITED

...Operational Creditor/Applicant Versus

M/S SUPRIYA PHARMACEUTICALS LIMITED

...Corporate Debtor/Respondent

IA (IBC) No. 644/JPR/2023:

MR. SANJEET KUMAR SHARMA

Resolution Professional Supriya Pharmaceuticals Limited BE-149, Street No. 5, Hari Nagar, New Delhi-110064.

.. Applicant

For the Resolution Professional

: Vaibhav Tyagi, Adv. Sanjeet Kumar Sharma, RP

Order Pronounced On: 22.12.2023

==> picture [54 x 23] intentionally omitted <==

----- Start of picture text -----<br> eae<br>----- End of picture text -----<br>

==> picture [41 x 23] intentionally omitted <==

----- Start of picture text -----<br> ie<br>----- End of picture text -----<br>

IA No. 644/JPR/2023

In

CP No. (IB) 74/9/JPR/2021

2

Per: Shri Deep Chandra Joshi, Judicial Member

  1. This Interim Application (‘Resolution Application’) is filed by Mr. Sanjeet, Resolution Professional (‘RP’ / ‘Applicant’) of M/s Supriya Pharmaceuticals Limited (‘Corporate Debtor’) under Sections 30(6) of the Insolvency and Bankruptcy Code, 2016 (‘IBC’ / ‘Code’) read with Regulation 39(4) of the Insolvency and Bankruptcy Board of India (Insolvency Process of Corporate Persons) Regulations, 2016 (‘CIRP Regulations’) seeking approval of resolution plan.

  2. The Insolvency application was filed by the Operational Creditor M/s Apollo International Limited under Section 9 of the Code for initiation of Corporate Insolvency Resolution Process (‘CIRP’) against the Corporate Debtor and the same was admitted by this Adjudicating Authority vide Order dated 22.03.2023. The Applicant was appointed as the Interim Resolution Professional (‘IRP’) and on 29.03.2023, the IRP issued a public announcement as per Regulation 6 of the Regulations read with Sections 13 and 15 of the Code in Form A in two newspapers i.e., Prabhat Abhinandan, Behror (Regional Newspaper), Economic Times, Jaipur edition (English) at the location of the registered office of the Corporate Debtor and in DelhiNCR edition & Jansatta (Hindi) at the Corporate Office of the Corporate Debtor for inviting claims from the creditors of the Corporate Debtor as

==> picture [85 x 33] intentionally omitted <==

----- Start of picture text -----<br> ad<br>----- End of picture text -----<br>

==> picture [53 x 33] intentionally omitted <==

s

==> picture [85 x 33] intentionally omitted <==

----- Start of picture text -----<br> ad<br>----- End of picture text -----<br>

==> picture [53 x 33] intentionally omitted <==

----- Start of picture text -----<br> eae<br>----- End of picture text -----<br>

IA No. 644/JPR/2023

In

3

envisaged in the Code. A copy of the Public Announcement dated

29.03.2023 is annexed Annexure A — 5(Colly) of the Application.

  1. Subsequent to the said public announcement, the Applicant has received two claims from the creditors i.e., Apollo International Limited (‘Operational Creditor’) and another is from M/s Samridhi Mega Structure Limited. The claims were duly collated and verified by the Applicant and a Committee of the Creditors (‘CoC’) was duly constituted in terms of the Regulation 16 of the CIRP Regulation on 10.04.2023. A report under Regulation 17(1) of the CIRP Regulation was filed and the same was taken on record vide order dated 16.05.2023 in IA No. 269/JPR/2023.

  2. Inthe 1% CoC meeting held on 01.05.2023 wherein the Applicant/Interim Resolution Professional confirmed as Resolution Professional (‘RP’) the said appointment was also ratified by this Adjudicating Authority vide order

    • dated 08.06.2023.

n the Applicant/Interim Resolution Professional confirmed as Resolution Professional (‘RP’) the said appointment was also ratified by this Adjudicating Authority vide order

  • dated 08.06.2023.
  1. In the 2 CoC, a meeting convened on 05.07.2023, the Applicant has proposed the name of the four (4) registered valuers for the purpose of the valuation of each category of assets i.e., plant, machinery, land, building, securities and financial assets. In accordance with Regulation 27 and 35 of IBBI (CIRP) Regulation, 2016 two (2) registered valuers have been appointed. The details of the said registered valuer along with the proposed

fees are as follows:

==> picture [81 x 21] intentionally omitted <==

----- Start of picture text -----<br> |<br>SaA=<br>----- End of picture text -----<br>

==> picture [90 x 40] intentionally omitted <==

----- Start of picture text -----<br> Sihoo 0<br>----- End of picture text -----<br>

IA No. 644/JPR/2023

In

4

==> picture [407 x 202] intentionally omitted <==

ly omitted <==**

----- Start of picture text -----<br> Sihoo 0<br>----- End of picture text -----<br>

IA No. 644/JPR/2023

In

4

==> picture [407 x 202] intentionally omitted <==

----- Start of picture text -----<br>

||||||||||
|---|---|---|---|---|---|---|---|---|
|Name|ofRegistered|Valuer|Proposed Fees|
|Dhiraj|Jaiswal|(Land|and||Rs.|56,300|plus|applicable|taxes|
|Building),|Sanjeev|Kumar|Gupta | plus|out of|[pocket]|[expenses]|
|(Plan|and|Machinery)|and|CA|
|Vaneet|Bhatia|(Securities|and|
|Financial Assets)|
|Yatendra|Paliwal|(Land|and||Rs.|57,000|plus|applicable|taxes|
|Building),|Manish|Chandra ||out of|[pocket]|[expenses]|
|(Securities|and|Financial|Assets)|
|and|Mahesh|Kumar|Teotia|(Plant|
|and Machinery)|

----- End of picture text -----<br>

In the 2" CoC meeting the CoC also deliberated and approved the eligibility criteria in terms of Section 25(2)(h) of the Code for the Prospective Resolution Applicant (‘PRA’) to submit their Resolution Plans with the Applicant.

  1. Pursuant to that in terms of the Regulation 36A of the CIRP Regulation the Applicant has published Form G in Prabhat Abhinandan (Regional Newspaper), Pioneer Delhi (English & Hindi) and Economic Times (English) on 14.07.2023 for inviting the PRAs to submit Expression of Interest (‘EOI’) on or before 29.07.2023. Copy of the Form-G dated 14.07.2023 annexed as Annxeure-A-10 (Colly).

Economic Times (English) on 14.07.2023 for inviting the PRAs to submit Expression of Interest (‘EOI’) on or before 29.07.2023. Copy of the Form-G dated 14.07.2023 annexed as Annxeure-A-10 (Colly).

  1. The 3 meeting of CoC held on 01.09.2023 meanwhile the period of CIRP was expiring on 18.09.2023, in such circumstances the Applicant has filed an Application under section 12 of the Code, 2016 since the CoC has passed a resolution for the extension of the CIRP for further 90 days. The period of

==> picture [71 x 14] intentionally omitted <==

----- Start of picture text -----<br> ai<br>4 4 5<br>----- End of picture text -----<br>

==> picture [1 x 2] intentionally omitted <==

----- Start of picture text -----<br> :<br>----- End of picture text -----<br>

IA No. 644/JPR/2023 In

5

the CIRP had been extended for further 90 days i.e., till 16.12.2023 vide

order dated 04.10.2023.

  1. It is stated in the 4" CoC meeting dated 25.10.2023 a request has been received to extend the timeline for submission of the resolution plan. The Applicant has extended the timelines by 7 days i.e., 19.10.2023. Thereafter the Applicant has received two resolution plans from PRAs i.e., Sunrise Industries in consortium with Garg Builders and R Net Intelligent Systems Private Limited. The Applicant has carried out preliminary due diligence in the said Resolution Plans and the same were placed before the CoC in the 5th Meeting of the CoC held on 06.11.2023.

stems Private Limited. The Applicant has carried out preliminary due diligence in the said Resolution Plans and the same were placed before the CoC in the 5th Meeting of the CoC held on 06.11.2023.

  1. Thereafter the CoC had requested the PRAs to give a brief about their Resolution Plans. The said Resolution Plans were considered in the CoC meeting and compliance reports of the said resolution plans in terms of the Regulation 39(3) of the CIRP Regulation were taken on record. Both the Resolution Plans put forth for the voting before CoC in 5. meeting. After considering the feasibility and viability of the Resolution Plan submitted by the Resolution Applicant, in the 5" CoC meeting held on 06.11.2023, the Resolution Plan of M/s R Intelligent System Pvt. Ltd. was approved by CoC with a 100% voting share. Copy of the 5" CoC meeting dated 06.11.2023 annexed as Annexure A-2 (Colly) of the Application.

  2. In pursuance to the above the Applicant has issued a Letter of Intent dated 10.11.2023 (‘LOI’) to M/s R Intelligent System Pvt. Ltd./Successful Se ee IA No. 644/7PR/2023 In CP No. No. (IB) 74/9/JPR/2021

Intelligent System Pvt. Ltd./Successful | ace In CP No. No. (IB) 74/9/JPR/2021

6

Resolution Applicant (‘SRA’) to submit a performance bank guarantee of Rs. 10,00,0000/- (Rupees Ten Lakh Only) on or before 16.11.2023. Copy of the LOI dated 10.11.2023 is annexed as Annexure A-19 of the Application. The SRA in lieu of the Bank Guarantee has deposited an amount of Rs. 10,00,000/- (Rupees Ten Lakh Only) in the account of the Corporate Debtor.

.2023 is annexed as Annexure A-19 of the Application. The SRA in lieu of the Bank Guarantee has deposited an amount of Rs. 10,00,000/- (Rupees Ten Lakh Only) in the account of the Corporate Debtor.

  1. We have carefully considered the submissions of the learned Counsel for the RP and have perused the record. The Corporate Debtor was incorporated on 24.07.1985, and the CIRP proceedings were initiated under Section 9 of the Code against the Corporate Debtor vide order dated 22.03.2023. The present Application is filed for approval of the resolution plan submitted by R Net Intelligent Systems Private Limited (Successful Resolution Applicant). The permission has been sought under the provisions of Section 31 (1) of the Code.

==> picture [468 x 337] intentionally omitted <==

----- Start of picture text -----<br> 12. We may state that after receipt, verification and collation of claims as<br>discussed above, the IRP constituted the CoC as per the provisions of<br>Section 21 of the Code. The details of the operational creditor, the<br>distribution of voting share among them and the position of voting for<br>the resolution plan is as under (Para-No.5 of Form H) —<br>‘Sl | NameofCreditor ~—~—~—~_|Voting Vesting fot Resolution |<br>No. Share | Plan (Voted for /<br>(%) Dissented / Abstained) |<br>Ls Apollo International Limited 100% Voted For Resolution |<br>Plan of R Net<br>PvIn t elligent. Ltd. Systems: ||<br>- _<br>IA No. 644/JPR/2023 In CP No. (IB) 74/9/JPR/2021<br>----- End of picture text -----<br>

7

l Limited 100% Voted For Resolution |<br>Plan of R Net<br>PvIn t elligent. Ltd. Systems: ||<br>- _<br>IA No. 644/JPR/2023 In CP No. (IB) 74/9/JPR/2021<br>----- End of picture text -----<br>

7

  1. The details of stakeholders under the resolution plan are given in Para 7 of

Form H:

|S.<br>No.|||Category of |Sub-Category<br> Stakeholder*|Category of |Sub-Category<br> Stakeholder*|Sub-Category<br>of<br>Stakeholder|Amount<br>Claimed|Amount<br>Admitted|Amount<br>Provided<br>under the|Amount<br>provided<br>to the|
|---|---|---|---|---|---|---|---|---|
||||||||Plan|Amount|
|||||||||Claimed|
|1||Secured||(a)<br>Creditors|||||
|||Financial||not<br>having<br>a|||||
|||Creditors||right<br>to<br>vote|||||
|||||under<br>sub-|||||
|||(intemal<br>Fg,||section (2) of|||||
|||No. 12 GE|the|section 21|||||
|||Resolution|||||||
|||Plan and page|||(b) Other than|||||
|||no. 25 of <br>Resolution|the||(a) above:<br>(i)who didnot|There isno Secured||Financial Creditor||
|||Application) | vote in favour|||||||
|||||ofthe|||||
|||||resolution Plan|||||
|||||(ii) who voted|||||
|||||in favour ofthe|||||
|||||resolution plan|||||
|||||||||Nit|
|2||Unsecured||(a)<br>Creditors|||||
|||Financial||not<br>having<br>a|||||
|||Creditors||right<br>to<br>vote|||||
|||||under<br>sub-|||||
|||(Internal<br>No. 12 of|Pg.<br> the|section. @) of<br>ceetionZi|||||
|||Resolution|||||||

==> picture [49 x 21] intentionally omitted <==

----- Start of picture text -----<br> ASie<br>----- End of picture text -----<br>

==> picture [45 x 21] intentionally omitted <==

----- Start of picture text -----<br> Sef—<br>----- End of picture text -----<br>

IA No. 644/JPR/2023

In

picture text -----**<br>

==> picture [45 x 21] intentionally omitted <==

----- Start of picture text -----<br> Sef—<br>----- End of picture text -----<br>

IA No. 644/JPR/2023

In

|||||8|||||
|---|---|---|---|---|---|---|---|---|
|S.<br>No. |Stakeholder*|Category of | Sub-Category<br>Stakeholder*<br>of<br>Stakeholder|||Amount<br>Claimed|Amount<br>Admitted<br>;|Amount<br>Provided<br>under the|Amount<br>provided<br>to the||
|||||||Plan|Amount||
||||||||Claimed||
||Plan and page |||(b) Other than |There isnoUnsecured Financial|||Creditor Claim.|||
||no. 25 of|the||(a) above:||||||
||Resolution<br>Application)||;<br>(i) who did not<br>vote<br>in favour||||||
||||of<br>the||||;||
||||resolution Plan||||||
||||(ii) who voted||||||
||||in favour ofthe||||||
||||resolution plan||||||
|3|Operational<br>Creditors||(a)<br>Related<br>Party<br>of||There is no|Claim.|||
||(Internal<br>no,<br>12-13.|Pg. <br> of|Pebtor||Corporate<br>|Pebtor||||||
||the Resolution| (b) Other than||||||||
||Plan and page| (a) above:||||||||
||no.<br>25-27|of|||||||
||a Resolution<br>Application)||(i)Government | <br>(ii)Workmen|There isnogovernment<br>There isnoWorkmen|governmentClaim.<br>WorkmenClaim.||||
||||(iii)/Employees |There|There is noEmployee|Employee Claim.||||
||||(iv)Sundry||||||
||||Creditors||||||
||||(1)<br>Apollo<br>ee|3548.00|1925.27|1925.27||of<br>100%|
||||Limited||||||
||||(2)<br>Central<br>Depository|0.78|0.78|0.78||100%|
||||Services||||||
||||(India)||||||
||||Limited||||||
|Pf Total[(a)+(b)] |3548.78|||||1926.05|1926.05|100%||
|||||||Sa}||—|

imited|||||| ||||(2)<br>Central<br>Depository|0.78|0.78|0.78||100%| ||||Services|||||| ||||(India)|||||| ||||Limited|||||| |Pf Total[(a)+(b)] |3548.78|||||1926.05|1926.05|100%|| |||||||Sa}||—|




**==> picture [64 x 21] intentionally omitted <==**

**----- Start of picture text -----**<br>
nea<br>**----- End of picture text -----**<br>


IA No. 644/JPR/2023 

In 


**==> picture [492 x 314] intentionally omitted <==**

**----- Start of picture text -----**<br>
```text
|||||||||
|---|---|---|---|---|---|---|---|
|9|
|S.|Category|of|| Sub-Category|Amount|Amount|Amount|Amount|
|No.|| Stakeholder*|of|Claimed|Admitted|Provided|provided|
|Stakeholder|under|the|to|the|
|Plan|Amount|
|Claimed|
|4|Other|debts|| Related|
|and|dues|Parties:|
|Samridhi|Mega|
|Structure|122.16|122.16|122.16|100%|
|Limited|
|R|Net|
|Intelligence|1.00|1.00|0%|
|System Limited|0|
|Grand Total|Oo|3671.94|2049.21|2048.21|100.00%|

----- End of picture text -----<br>

  • +If there are sub-categories in a category, please add rows for each sub-category. # Amount provided overtime under the Resolution Plan and includes an estimated value of non-cash components. It is not NPV.]
  1. The abovementioned claim amount of payable to the Apollo will be satisfied
  • by way of issuance of Equity or Optionally Convertible Debentures. The

  • claim amount of Central Depository Services (India) Limited shall be satisfied by way of cash payment within 90 days from the effective date as

per the Resolution Plan.

  1. The compliance aspect of the resolution plan has been given in Para No. 9

imited shall be satisfied by way of cash payment within 90 days from the effective date as

per the Resolution Plan.

  1. The compliance aspect of the resolution plan has been given in Para No. 9

of Form H, which is as follows:

==> picture [448 x 155] intentionally omitted <==

----- Start of picture text -----<br> Section of the | Requirement with respect | Clause of |Compliance<br>Code/Regulation | to Resolution Plan Resolution Plan (Yes/No)<br>No.<br>25(2)(h) Whether the Resolution Yes<br>Applicant meets the criteria<br>approved by the CoC having<br>regard to the complexity and<br>Ste eee<br>----- End of picture text -----<br>

IA No. 644/JPR/2023

In CP No. (IB) 74/9/JPR/2021

10

||scale<br>of<br>operations<br>of|||||||
|---|---|---|---|---|---|---|---|
||business ofthe CD?|||||||
|Section 29A|Whether<br>the<br>Resolution |Affidavit|||||Yes||
||Applicant<br>is<br>eligible<br>to |Submitted|||||||
||submit resolution plan as per|||||||
||final<br>list<br>of<br>Resolution|||||||
||Professional or Order, ifany,|||||||
||of<br>the<br>Adjudicating|||||||
||Authority?|||||||
|Section30(1)|Whether<br>the<br>Resolution |Submitted|||||Yes||
||Applicant has submitted an|||||||
||affidavit<br>stating<br>that<br>it<br>is|||||||
||eligible?|||||||
|Section 30(2)|Whether theResolutionPlan- | Part-II], Clause<br>(a) Provides for the payment| (A) atPage no.

s submitted an|||||||
||affidavit<br>stating<br>that<br>it<br>is|||||||
||eligible?|||||||
|Section 30(2)|Whether theResolutionPlan- | Part-II], Clause<br>(a) Provides for the payment| (A) atPage no. 12 <br>of<br>insolvency — resolution||||1<br> ||Yes||
||process costs?|||||||
||(b) provides for the payment| <br>to the operational creditors? ||Part-III, Clause<br>1 | <br> (C, D) at Page No.<br>12 to 15||||Yes||
||(c) provides for the payment<br>to the financial creditors who||Part-III, Clause||1|(B}|Yes||
||did not vote in favour of the |Page No.|Page No. 12||||||
||resolution plan?|||||||
||(d)<br>provides<br>for<br>the| <br>management ofthe affairs of |at|Clause-9,<br>Part-II]<br>atPage No. 26||||Yes||
||the corporate debtor?|||||||
||(e)<br>provides<br>for — the |Clause-9, Part-II<br>implementation<br>and| atPageNo. 26|||||Yes||
||supervision of the resolution|||||||
||plan?|||||||
||(f) contravenes any of the |Clause-5,<br>provisions ofthe law for the ||Clause-5, Part-III<br> atPageNo. 23||||Yes||
||time being in force?|||||||
|Section 30(4)|Whether the Resolution Plan | Yes,<br>(a)<br>is feasible and viable, |approved<br>according to the CoC?<br>100%Voting||COC| Yes<br>with|||||
||(b) has been approved by the|||||||
||CoC with 66% voting share?|||||||
|Section 31(1)|Whether the Resolution Plan|Clause-IV, Part-II |Yes|||||||
||has<br>provisions<br>for<br>its|||||||
||effective<br>implementation|||||||
||plan,accordingtotheCoC||||||_|

IA No. 644/JPR/2023

In

11

==> picture [375 x 687] intentionally omitted <==

br>provisions<br>for<br>its||||||| ||effective<br>implementation||||||| ||plan,accordingtotheCoC||||||_|




IA No. 644/JPR/2023 

In 


11 

**==> picture [375 x 687] intentionally omitted <==**

**----- Start of picture text -----**<br>
Regulation38 (1) | Whether the amount due to | Part-II], Clause 1 | Yes<br>the operational creditor under | (C, D) at page No.<br>the Resolution Plan has been | 12 to 15<br>given priority in payment<br>over financial creditors?<br>Regulation Whether the resolution plan | Part 3 (Pg.71 of<br>38(1A) includes a statement as to | Application of | Yes<br>how it has dealt with the | Resolution Plan<br>interests of all stakeholders? | and internal page<br>no. 45 of the<br>resolution plan<br>Regulation i. Whether the Resolution | Clause 6, Part-II<br>38(1B) Applicant or any of its | at page No. 23 No<br>related parties has failed to<br>implement or contributed to<br>the failure of<br>implementation of any<br>resolution plan approved<br>under the Code.<br>i. If so, whether _ the<br>Resolution Applicant has<br>submitted the statement<br>giving details of such non-<br>implementation?<br>Regulation 38(2) | Whether the Resolution Plan | Clause-9, Part-II. | Yes<br>provides: At Page No.

lution Applicant has<br>submitted the statement<br>giving details of such non-<br>implementation?<br>Regulation 38(2) | Whether the Resolution Plan | Clause-9, Part-II. | Yes<br>provides: At Page No. 26<br>(a) the term of the plan and<br>its implementation<br>schedule?<br>(b) for the management and<br>control of the business of<br>the corporate debtor<br>during its term?<br>(c) adequate means for<br>supervising its<br>implementation?<br>Regulation 38(3) | Whether the resolution plan | Part-II], | Clause- | Yes<br>demonstrates that - 2,3,4,9,10 and<br>(a) it addresses the cause of rae<br>default?<br>(b) it is feasible and viable?<br>(c) it has provisions for its<br>effective<br>implementation?<br>(d) it has provisions for<br>approvals required and<br>**----- End of picture text -----**<br>


IA No. 644/JPR/2023 

In 


12 

```text
|||the<br>timeline<br>for||the||||
|---|---|---|---|---|---|---|---|
|||same?||||||
|||(e) the resolution applicant||||||
|||has<br>the<br>capability||to||||
|||implement the resolution||||||
|||plan?||||||
|Regulation|39(2)||Whether the RP has|filed||No||Yes|
|||applications<br>in<br>respect||of||||
|||transactions observed,|found|||||
|||or determined by<br>him?||||||
|Regulation|39(4)|| Provide<br>details<br>of |RA <br>performance<br>security |Rs.|||has <br>10|deposited<br>lakhs<br>as|Yes|
|||received,<br>as<br>referred|to|in |Performance||||
|||sub-regulation<br>(4A)|—|of| Deposit||as||
|||regulation36B.||approved||byCoC||
  1. The approval of the resolution plan has been sought under Section 31(1) of

erred|to|in |Performance|||| |||sub-regulation<br>(4A)|—|of| Deposit||as|| |||regulation36B.||approved||byCoC||




16. The approval of the resolution plan has been sought under Section 31(1) of 

the Code, which reads as follows: 

“If the Adjudicating Authority is satisfied that the resolution plan as approved by the committee of creditors under sub-section (4) of section 30 meets the requirements as referred to in sub-section (2) of section 30, it shall by order approve the resolution plan which shall be binding on the corporate debtor and its employees, members, creditors, including the Central Government, any State Government or any local authority to whom a debt in respect of the payment of dues arising under any law for the time being in force such as authorities to whom statutory dues are owed, guarantors and other stakeholders involved in the resolution plan. 

Provided that the Adjudicating Authority shall, before passing an order for approval of resolution plan under this sub-section, satisfy that the resolution plan has provisions for its effective implementation. ” 

17. The conditions provided in Section 31(1) of the Code for approval of the 

resolution plan are as follows: 

**==> picture [422 x 56] intentionally omitted <==**

**----- Start of picture text -----**<br>
(a) The Resolution Plan is approved by the CoC under Section 30(4) of<br>the Code; a<br>**----- End of picture text -----**<br>


IA No. 644/JPR/2023 

In 


13 

- (b) The Resolution Plan so approved meets the requirements as referred to in Section 30(2) of the Code;

r>the Code; a<br>**----- End of picture text -----**<br>


IA No. 644/JPR/2023 

In 


13 

- (b) The Resolution Plan so approved meets the requirements as referred to in Section 30(2) of the Code; 

- (c) The Resolution Plan has provisions for its effective implementation. 

The satisfaction of the conditions is discussed below. 

18. It is submitted by the RP that the resolution plan has been approved by a vote of 100% of the voting share of the Operational Creditors and therefore, the conditions provided for by Section 30(4) of the Code are satisfied. 

19. The provisions of Section 30(2) of the Code are as follows: 

   - “(2) The resolution professional shall examine each resolution plan received by him to confirm that each resolution plan - 

      - (a) provides for the payment of insolvency resolution process costs in a manner specified by the Board in priority to the payment of other debts of the corporate debtor; 

- (b) provides for the payment of debts of operational creditors in such manner as may be specified by the Board which shall not be less than(i) the amount to be paid to such creditors in the event of a liquidation of the corporate debtor under section 53; or 

- (ii) the amount that would have been paid to such creditors, if the amount to be distributed under the resolution plan had been distributed in accordance with the order of priority in sub-section (1) of section 53, 

- whichever is higher, andprovides for the payment ofdebts of

distributed under the resolution plan had been distributed in accordance with the order of priority in sub-section (1) of section 53, 

- whichever is higher, andprovides for the payment ofdebts of 

- financial creditors, who do not vote in favour of the resolution plan, in such manner as may be specified by the Board, which shall not be less than the amount to be paid to such creditors in accordance with sub-section (1) of section 53 in the event ofa liquidation of the corporate debtor. 

- Explanation 1. — For removal of doubts, it is hereby clarified that a distribution in accordance with the provisions of this clause shall be fair and equitable to such creditors. 

- Explanation 2. — For the purpose ofthis clause, it is hereby declared 

- Sal: that on andfrom the date of commencement of the InsolvencySd~and 

- IA No. 644/JPR/2023 In CP No. (IB) 74/9/JPR/2021 

**==> picture [3 x 1] intentionally omitted <==**

**----- Start of picture text -----**<br>
:<br>**----- End of picture text -----**<br>


14 

Bankruptcy Code (Amendment) Act, 2019, the provisions of this clause shall also apply to the corporate insolvency resolution process ofa corporate debtor- 

- (i) where a resolution plan has not been approved or rejected 

- by the Adjudicating Authority; 

- (ii) where an appeal has been preferred under section 61 or 

- section 62 or such an appeal is not time barred under any provision of law for the time being in force; or

djudicating Authority; 

- (ii) where an appeal has been preferred under section 61 or 

- section 62 or such an appeal is not time barred under any provision of law for the time being in force; or 

(iii) where a legal proceeding has been initiated in any court against the decision of the Adjudicating Authority in respect of a resolution plan; 

- (c) providesfor the management ofthe affairs ofthe corporate debtor after approval of the resolution plan; 

(d) The implementation and supervision of the resolution plan, 

- (e) does not contravene any of the provisions of the law for the time being in force 

- (f) confirms to such other requirements as may be specified by the Board. Explanation. — For the purposes of clause (e), if any approval of shareholders is required under the Companies Act, 2013(18 of 2013) or any other law for the time being in force for the implementation ofactions under the resolution plan, such approval shall be deemed to have been given and it shall not be a contravention of that Act or law.” 

20. The compliance of Section 30(2) of the Code is given in Para No. 9 of Form 

H (supra). The same is being further examined as under: 

a. Section 30(2)(a): The resolution plan (Part-II, Clause | (A) at Page 

No. 12 of the Resolution Plan) states that the Insolvency Resolution Process Cost will be paid out in priority over payments to any other 

creditors within 30 days of Effective Date 

**==> picture [97 x 48] intentionally omitted <==**

**----- Start of picture text -----**<br>
|<br>)<br>lem ae<br>**----- End of picture text -----**<br>

editors within 30 days of Effective Date 

**==> picture [97 x 48] intentionally omitted <==**

**----- Start of picture text -----**<br>
|<br>)<br>lem ae<br>**----- End of picture text -----**<br>


**==> picture [90 x 20] intentionally omitted <==**

**----- Start of picture text -----**<br>
oa<br>**----- End of picture text -----**<br>


IA No. 644/JPR/2023 

In 


15

## b. Section 30(2)(b): From the resolution plan (Part-II, Clause 1 (C, D) at 

page no. 12 to 15 of the Resolution Plan) it could be seen that there are no financial creditors and there are no due related to workmen, employees and statutory authorities. The Apollo Green Energy Limited (Formerly known as Apollo International Limited)-Operational Creditor shall be satisfied by issuing 25,27,261 fully paid equity of Rs. 1 each, amounting to Rs. 25,27,261/- (Rupees Twenty-Five Lakh Twenty-Seven Thousand Two Hundred Sixty-One Only) within 90 days from effective date. Further, 5 years 0% Optional Convertible Debenture of Rs. 100 at par will be issued to satisfy the balance amount of Rs. 19,00,00,000/-, within 90 days from effective date. 

c. Section 30(2)(c): From the Resolution Plan (Part-II, Clause 1(B) at page no. 12 of the Resolution Plan) there are no financial creditors as per the Information Memorandum, no provision has been made for payment to financial creditors. 

d. Section 30(2)(d): In Clause-9, Part-III at page no. 26 the Resolution Plan, it is stated validity of the Resolution Plan shall be for the period of 90 days from the date of approval from this Adjudicating Authority, No part of this Resolution Plan shall effective or enforceable until either (i) the Resolution Plan is approved by the CoC and the Adjudicating Authority in its entirely; or (ii) if approved by the Adyjudicating Sel

## Shee 

IA No. 644/JPR/2023 

In 


16 

Authority with any variance, then in the form and substance acceptable 

to the CoC and the Resolution Applicant. 

   - e. Section 30(2)(e): From the Resolution Plan (Clause 9, Part-[II at page no. 26 provides for the implementation and supervision of the Resolution Plan. 

   - f. Section 30(2)(f): From the Resolution Plan (Clause-5, Part-II at Page No. 23 of the Resolution Plan) the RP has certified that the Resolution Plan does not contravene any of the provisions of the law for the time being in force. 

21. The RP has also certified that M/s R Net Intelligence Systems Private Limited the resolution applicant has submitted an affidavit pursuant to Section 30(1) of the Code confirming its eligibility under Section 29A of the Code to submit the resolution plan and the contents of the said affidavit are

## in order. 

22. As per the requirement of Regulation 39(4) of the Regulations for performance security, it is stated in Form H that Resolution Applicant has deposited Rs. 10,00,000/- (Rupees Ten Lakh Only) as Performance Deposit as approved by the Committee of the Creditor. 

23. With regard to compliance under Regulation 35A, it is stated that there are no transactions that have been identified in respect of the Corporate Debtor which is required to be avoided under Sections 43, 45, 50 or 66 of the Code. 

**==> picture [48 x 30] intentionally omitted <==**

**----- Start of picture text -----**<br>
Sd-<br>**----- End of picture text -----**<br>

## a 

IA No. 644/JPR/2023 

In 


17 

24. A perusal of Regulation 38 would clearly show that by virtue of the mandatory contents of the resolution plan as discussed in the preceding paragraphs in relation to Section 30 and Section 31 of the Code, the requirement of Regulation 38 also stands fulfilled. Thus, the resolution plan fulfils all the requirements of Regulation 38 of the CIRP Regulations. 

25. The Resolution Plan inter-alia entails the following: 

   - a. All claims and dues of the shareholders and members of the Corporate Debtor pertaining to the period prior to the approval of the resolution Plan by the CoC shall stands satisfied and extinguished. 

   - b. The new management shall define organisation structure, policies, procedures, records, and methods of reporting that are necessary to collectively ensure that the financial and non-financial operations of the Corporate Debtor is conducted in an orderly and efficient manner to achieve the Corporate Debtor’s objective. 

   - c. It is proposed that once the Resolution Applicant acquire the Corporate Debtor i.e., after capital reduction in accordance with the Plan, the existing board will be replaced by new board of directors constituted with adequate representation from the Resolution from the Resolution

## Applicant. 

- d. The term of the Plan and its implementation schedule is envisaged to be 

a period of 90 days. 

**==> picture [31 x 26] intentionally omitted <==**

**----- Start of picture text -----**<br>
of<br>**----- End of picture text -----**<br>


**==> picture [5 x 26] intentionally omitted <==**

**----- Start of picture text -----**<br>
:<br>**----- End of picture text -----**<br>


TA No. 644/JPR/2023 

In 


18 

, 

26. In view of the above discussion, the Resolution Plan submitted by M/s R Net Intelligence Systems Private Limited as approved by the CoC under Section 30(4) of the Code is hereby approved. The Resolution Plan so approved shall be binding on the Corporate Debtor and its employees, members, and creditors, including the Central Government, any State Government or any local authority to whoma debt in respect of the payment of dues arising under any law for the time being in force such as authorities to whom statutory dues are owed, guarantors and other stakeholders involved in the Resolution Plan. 

27. Under the provisions of Section 31(3) of the Code, we also direct as under: a. The moratorium order passed by the Adjudicating Authority under Section 14 of the Code on 22.03.2023 shall cease to have effect; and b. The RP shall forward all records relating to the conduct of the CIRP and the Resolution Plan to the Board to be recorded on its database. 28. In view ofthe foregoing, IA No. 644/JPR/2023 is disposed of. 

DEEP CHANDRA JOSHI, JUDICIAL MEMBER

## cee 

RAJEEV MEHROTRA, TECHNICAL MEMBER 

IA No. 644/JPR/2023 

In

Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.

Analysis

No analysis generated for this document yet (analysis runs over brief docs + on-demand). Run build_analysis.py --ids 26445 --apply.

Citation copied