23rd April, 2025 Approval of Resolution Plan - Goodhealth Industries Private Limited [IA (IBC) (Plan) No. - 08/2025 and IA(I.B.C)/PB/121(PB)2025 in Company Petition No. (IB)-628 (PB)/2023] (2.5 MB)
Page 1 IA(IBC)(PLAN) No. 08/2025 and IA(I.B.C)/PB/121/2025 in CP(IB) No.628(PB) of 2023 IN THE NATIONAL COMPANY LAW TRIBUNAL: NEW DELHI PRINCIPAL BENCH
IA (IBC) (PLAN) No. - 08/2025
And
IA(I.B.C)/PB/121(PB)2025
IN
Company Petition No. (IB)-628 (PB)/2023
Interlocutory Application (IBC) (PLAN) No. - 08/2025
Order under Section 30(6) read with Section 31 of Insolvency & Bankruptcy Code, 2016.
IN THE MATTER OF:
Mr. Bihari Lal Chakravarti Resolution professional of M/s. Goodhealth Industries Private Limited
…
Applicant
AND
IA(I.B.C)/PB/121/2025 IN THE MATTER OF:
Mr. Bihari Lal Chakravarti Resolution professional of M/s. Goodhealth Industries Private Limited
…
Applicant Versus Aman Poly Plast Private Limited
… Performa Respondent
IN
IN THE MATTER OF:
M/s Daily Dairy Essentials
… Petitioner /
Operational Creditor
Vs.
M/s Goodhealth Industries Private Limited … Respondent / Corporate Debtor
t
IN
IN THE MATTER OF:
M/s Daily Dairy Essentials
… Petitioner /
Operational Creditor
Vs.
M/s Goodhealth Industries Private Limited … Respondent / Corporate Debtor
Page 2
CORAM:
CHIEF JUSTICE (RETD.) RAMALINGAM SUDHAKAR
HON’BLE PRESIDENT
SHRI RAVINDRA CHATURVEDI HON’BLE MEMBER (TECHNICAL)
PRESENT:
For the Resolution Professional
: Adv. Akash Srivastava, along with the RP, Mr. Bihari Lal Chakravarti
Order pronounced on: 05.03.2025
ORDER 1. Preliminary
1.1.
The present interlocutory application bearing IA (IBC) (Plan) No.
08/2025 was moved on
11.02.2025
by
Mr.
Bihari Lal
Chakravarti, Resolution Professional (RP) of M/s Goodhealth
Industries Private Limited, the Corporate Debtor (CD) under the
provisions of Sections 30(6) read with section 31 of the Insolvency
& Bankruptcy Code, 2016 (the Code or IBC) read with Regulation
39(4) of the Insolvency and Bankruptcy Board of India (Insolvency
Resolution Process for Corporate Persons) Regulations, 2016
(CIRP Regulations) for approval of the Resolution Plan of
Turquoise Metals and Electricals Pvt. Ltd., the Successful
Resolution Applicant (SRA).
1.2. The Corporate Debtor is a company incorporated on 06.12.2018, having registered office at E-13/29. First floor, Harsha Bhavan, Connaught Place, New Delhi - 110001. It was engaged in the business of Manufacturing, processing, preparing, cleaning, washing, packing or otherwise deal in all types of Dairy Products including Desi Ghee, Skimmed Milk powder, Whole Milk Powder,
d in the business of Manufacturing, processing, preparing, cleaning, washing, packing or otherwise deal in all types of Dairy Products including Desi Ghee, Skimmed Milk powder, Whole Milk Powder,
Page 3 Butter, Cream, Dairy Creamer, Dairy Whitener, UHT Milk, UHT Cream etc. The Company had its manufacturing plants located in Softa, Haryana, Punhana, Haryana, and Saharanpur, Uttar Pradesh.
1.3. The underlying Company Petition CP (IB)-628(PB)/2023 was filed by Daily Dairy Essentials (Operational Creditor), against CD under Section 9 of the Code for initiation of Corporate Insolvency Resolution Process (CIRP) of the Corporate Debtor. The Application was admitted by this Adjudicating Authority vide order dated 02.04.2024 (Admission Order) and Mr. Bihari Lal Chakravarti was appointed as the Interim Resolution Professional (IRP) who was later confirmed as Resolution Professional in the 1st COC meeting convened on 01.05.2024 and vide order dated 27.05.2024 of this Adjudicating Authority.
Collation of Claims by RP
2.1. The IRP made public announcement in Form A on 04.04.2024 in Financial Express (English), Jansatta (Hindi) newspapers and Divya Prabhat (Regional, Meerut, Saharanpur), calling upon creditors of the Corporate Debtor to submit their claims along with the proof on or before 16.04.2024. Subsequently, CoC was constituted and Report of constitution of CoC vide IA- 2778/2024 filed was taken on record by this Adjudicating Authority vide order dated 28.05.2024.
2.2.
ore 16.04.2024. Subsequently, CoC was constituted and Report of constitution of CoC vide IA- 2778/2024 filed was taken on record by this Adjudicating Authority vide order dated 28.05.2024.
2.2. List of Claims and voting rights assigned in the CoC, as described in the Plan is as follows:
Page 4
2.3. The RP has submitted that total 8 (Eight) meetings have been held
during the CIRP period, which are as follows:
Particulars
Date of CoC Meeting
1st CoC Meeting
01.05.2024
2nd CoC Meeting
31.05.2024
3rd CoC Meeting
11.07.2024
4th CoC Meeting
16.08.2024
5th CoC Meeting
03.09.2024
6th CoC Meeting
24.09.2024
7th CoC Meeting
18.12.2024
8th CoC Meeting
27.01.2025
2.4. Registered Valuers, namely Jockey Singh and Future Value Advisors India Pvt. Ltd. were appointed, as resolved in the 2nd Meeting of CoC convened on 31.05.2024. It has been submitted
Page 5 that the COC has considered the Resolution Plan, keeping in view the Valuation Reports submitted by the Registered Valuers, named above. Valuations of the Corporate Debtor were considered. The summary of the Fair Value and Liquidation Value of the Corporate Debtor are as under: (Rs in Lacs.)
S.
No.
Name
Assets
Fair Value Liquidation
Value
A.
Jacky Singh
Securities
&
Financial
Asset
248.74
245.79
B.
Future Value
Advisors
India
Pvt.
Ltd.
251.70
244.90
Grand Total
500.44
490.69
Average S&FA Value
250.22
245.34
Copy of the Valuation Reports have been annexed with the Application for approval of Resolution Plan as Annexure 15.
.70
244.90
Grand Total
500.44
490.69
Average S&FA Value
250.22
245.34
Copy of the Valuation Reports have been annexed with the Application for approval of Resolution Plan as Annexure 15.
2.5 Hence, Valuation of the Corporate Debtor as further provided in Form H is as follows:
Fair Value
2,50,22,175
Liquidation Value
2,45,34,502
2.6 The Applicant has filed a Compliance Certificate in prescribed form i.e., Form H along with the Resolution Plan, in compliance with regulation 39(4) of the CIRP Regulations, 2016 and the same have been annexed to Plan application as ANNEXURE A-19.
- Evaluation and Voting
3.1 The Applicant submits that in terms of regulation 36A(1) of the CIRP Regulations, 2016 read with section 25(2)(h) of the Code, invitation in Form G for Expressions of Interest (EoI) from Potential Resolution
Page 6 Applicants (PRAs) was issued on 01.06.2024. Pursuant to this first round of Form G, 8 EOIs were received and one Resolution Plan was received. However, it has been submitted that the COC in its commercial wisdom decided in 5th CoC meeting convened on 03.09.2024 that in order to maximize the value of the assets of the Corporate Debtor, it would be in the interest of the stakeholders to republish the Form-G and seek more prospective resolution applicants for the resolution of the Corporate Debtor. Thus accordingly, Form G was re-published on 04.09.2024. Form G was also published on the website of the Insolvency and Bankruptcy Board of India (IBBI).
or the resolution of the Corporate Debtor. Thus
accordingly, Form G was re-published on 04.09.2024. Form G was
also published on the website of the Insolvency and Bankruptcy
Board of India (IBBI). As per the latest Form G dated 04.09.2024,
EOI was to be submitted by 19.09.2024 and Plan by 18.11.2024.
Pursuant to 2nd round of publication of Form G, 5 (Five) additional
EOIs were received, as detailed in 7th meeting of the CoC convened
on 18.12.2024.
3.2 In the meanwhile, since CIRP period of 180 days were expiring on 29.09.2024, Application bearing IA-4967/2024 was filed by the RP for extension of CIRP period by 90 days w.e.f from 29.09.2024 and the same was allowed vide order dated 08.10.2024.
3.3 The Applicant submits that after conducting due diligence with respect to eligibility in accordance with section 25(2)(h), section 29A, and other requirements specified in the invitation for expression of interest, total 12 (twelve) PRAs were declared to be eligible, as enlisted in paragraph 13 of the Plan Application, for the submission of the Resolution Plan. Final list of PRAs was issued on 14.10.2024.
3.4 In terms of Regulation 36B of CIRP Regulations 2016, the RP had issued Request for Resolution Plan (RFRP), Information Memorandum (IM), and Evaluation Matrix were issued to all eligible Applicants in provisional list vide google drive link on 19.10.2024.
issued Request for Resolution Plan (RFRP), Information Memorandum (IM), and Evaluation Matrix were issued to all eligible Applicants in provisional list vide google drive link on 19.10.2024.
Page 7
3.5 The Applicant submits that the Resolution Plan was received from the only PRA namely M/s Turquoise Metals and Electricals Pvt. Ltd. by the last date for submission of the Plan and the same in hard copy was placed before the CoC in the 7th meeting convened on 18.12.2024.
3.6 In the meanwhile, since 270 days from admission were expiring on 06.01.2025 Application bearing IA-213/2025 was filed by the RP for extension of CIRP period by 60 days w.e.f from 06.01.2025 and the same was allowed vide order dated 20.01.2025.
3.7 RP in the 8th meeting convened on 27.01.2025 apprised that the RP had sought certain queries and discrepancies with respect to the Plan originally submitted by the SRA, which were duly replied with the explanations. The SRA submitted a modified plan, which was stated to have been in compliance with all the necessary provisions of IBC, 2016 read with relevant rules and regulations made there under, specifically, Section 30(2) read with Regulations 37, 38 and 39 of the IBBI (CIRP) Regulations, 2016. Accordingly, the modified plan of M/s Turquoise Metals was placed before the CoC, which was taken up for discussion in the 8th meeting itself. Mr. Sachin Gupta representing M/s Turquoise Metals and Electricals Private Limited joined the meeting through Video Conferencing.
CoC, which was taken up for discussion in the 8th meeting itself. Mr. Sachin Gupta representing M/s Turquoise Metals and Electricals Private Limited joined the meeting through Video Conferencing. He explained the key aspects of the resolution plan for reviving the company, their financial capability, and their proposed repayment schedule for creditors. He further explained the financial aspects of the plan as well.
3.8 Therefore, the resolution Plan of of M/s Turquoise Metals and Electricals Pvt. Ltd. was approved with 100% vote in favor in the 8th meeting of the CoC convened on 27.01.2025 and the same is
Page 8 summarized in following manner: Particulars Voting Share % Voting for resolution Plan Secured Financial Creditor- JFC Finance India Pvt. Ltd. 100%
Voted for
Total 100% Plan Approved
The Resolution passed is extracted herein below:
“RESOLVED THAT, pursuant to Section 30(3)&(4) of
Insolvency Bankruptcy Code, 2016, and Regulations 39 of
the Insolvency and Bankruptcy Board of India (Insolvency
Resolution Process for Corporate Persons) Regulations,
2016, and other applicable provisions, of the Insolvency and
Bankruptcy Code, 2016 and in accordance with rules and
regulations made thereunder, the Resolution Plan dated
18.11.2024
submitted
by
Resolution
Applicant,
M/s
Turquoise Metals and Electricals Private Limited, be and is
hereby approved by the CoC."
“RESOLVED FURTHER THAT pursuant to Section 30(6) of
Insolvency
Bankruptcy
Code,
2016,
the
Resolution
Turquoise Metals and Electricals Private Limited, be and is
hereby approved by the CoC."
“RESOLVED FURTHER THAT pursuant to Section 30(6) of
Insolvency
Bankruptcy
Code,
2016,
the
Resolution
Professional shall submit the resolution plan as approved by
the committee of creditors to the Adjudicating Authority.”
“RESOLVED FURTHER THAT Resolution Professional be and
is hereby authorized to do all such acts, deeds and things
as may be required necessary or incidental thereto.”
Turquoise Metals and Electricals Private Limited was declared as Successful Resolution Applicant (SRA) and accordingly, Letter of Intent dated 30.01.2025 was issued to the SRA.
Page 9 3.9 The Applicant submits that the value of Plan is INR 222.47 Lacs plus CIRP cost on actuals. The SRA has deposited a bid bond of INR 22,24,772/- towards performance Guarantee on 06.02.2025, which is available at page no. 385 of the Plan Application.
4 Details of Resolution Plan / Payment Schedule
4.1 The SRA, specializes in mining of non-ferrous metal ores, excluding uranium and thorium ores. The sector plays vital role in supplying raw materials for various industries.
4.2 The SRA in the plan has ascertained the cause of default and mentioned that the CD ran into financial crunch after the onset of COVID - 19 in F.Y. 2020. Since, the pandemic period the company could not meet with accumulating expenses and losses, leading to financial constraints and resultantly had defaulted payments of various vendors and creditors.
nce, the pandemic period the company could not meet with accumulating expenses and losses, leading to financial constraints and resultantly had defaulted payments of various vendors and creditors. Due to this CD had to sell off its assets such as plant & machinery. Despite this, the CD could not sustain in the competing market and this led to vacating various factory premises of the Corporate Debtor.
4.3 The SRA proposes to address the causes of default with the “Debt Settlement”; “Operational Restructuring”, which may involve refurbishment or replacement of machinery, overhaul of support systems and upgrades to meet the latest industry requirements; “Financial Restructuring”, involving necessary working capital and obtaining necessary funding if required; and “Business Expansion and Development” involving exploring new market opportunities to diversify revenue streams.
4.4 The SRA has put forth the financial proposal to be distributed/ appropriated in the following manner:
Development” involving exploring new market opportunities to diversify revenue streams.
4.4 The SRA has put forth the financial proposal to be distributed/ appropriated in the following manner:
Page 10
4.5 In view of the above, total value of Financial Proposal stands to the tune of INR 2,22,47,720/- plus CIRP Cost at actuals.
4.6 Additionally, the SRA has undertaken to incur additional Capital Expenditure and Working Capital to the tune of INR 30 Lacs, which is inclusive within the Resolution Plan value.
4.7 The Resolution Plan defines the Effective Date to be date the 30th Day from the date on which this Resolution Plan is approved by the Adjudicating Authority.
5 Compliance of the Resolution Plan with various provisions:
Details of various compliances as envisaged under section 30 of the
Code and Regulation 37 and 38 of the CIRP Regulations 2016,
which is reproduced hereunder:
Relevant
Provision
Provisions of
Section 30 of the
Code / Regulation
Reference
Whether
complied
Sec.
30(2)(a) of
the Code
Provides
for
the
payment
of
insolvency resolution
process costs in a
manners
specified
The Resolution Plan provides for
payment of unpaid resolution
process cost on “Actual” basis
within
30
days
from
NCLT
approval date.
Yes
solution
process costs in a
manners
specified
The Resolution Plan provides for
payment of unpaid resolution
process cost on “Actual” basis
within
30
days
from
NCLT
approval date.
Yes
Page 11 by the Board in priority to the repayment of other debts of the Corporate Debtor
The same has been dealt with in clause 6.2 i.e., Treatment of the CIRP Cost under the Resolution Plan. Sec. 30(2)(b) of the Code I. Provides for the repayments of the debts of operational creditors in such manner as may be specified by the Board which shall not be less than the amount to be paid to the operational creditors in the event of liquidation of the corporate debtor or under section 53 Workmen & Employees As per information Memorandum no claims have been received from operational creditors in the category of workmen and employees. Even otherwise, as per evaluation carried out by the SRA, the liquidation value is not sufficient to repay the debt of even secured financial creditor, hence nil amount is proposed to the workmen and employee, if any. However, if any amount is legally due to the above- mentioned operational creditors under the IBC or CIRP regulations, exceeding the proposed nil amount, the same will be adjusted from the Resolution Amount proposed for Secured Financial Creditors (SFCs) and distributed to the operational creditors according to the priority order established by this provision.
EPFO Dues RP has admitted claims of INR 34,297 /- (Damages + Interest).
rs (SFCs) and distributed to the operational creditors according to the priority order established by this provision.
EPFO Dues RP has admitted claims of INR 34,297 /- (Damages + Interest). Hence SRA proposes to pay INR 34,297 /- towards claims of EPFO Department in accordance with this provision. It may be noted here that as per the Information Memorandum and information/ data provided by the Resolution Professional, EPFO's claims of INR 19,53,129/-, consists of INR 19,18,832/- in provident fund dues for September 2023 to March 2024, INR 10,364/- in
Yes
Page 12 damages, and INR 23,933/- in interest has not been admitted. The Resolution Professional asserts no employees existed from September 2023, providing PF challans for April 2023 to March 2024, indicating no PF dues.
clause 6.6 i.e., Proposal for Operational Creditors under the Resolution Plan.
Sec.
30(2)(b) of
the Code
II. And provides for
payment of debts
of
financial
creditors who do
not vote in favour
of the resolution
plan, in such a
manner as may be
specified by the
board, which shall
not be less than
the amount to be
paid
to
such
creditors
in
accordance
with
sub section (1) of
section 53 in the
event
of
liquidation of the
Corporate Debtor
The SRA has undertaken to
provide the sum to a dissenting
financial creditor in accordance
with the provision.
However, there is no dissenting
Financial
Creditor.
Hence
no
payment has been demarcated
for
the
dissenting
financial
creditor in the financial outlay.
in accordance
with the provision.
However, there is no dissenting
Financial
Creditor.
Hence
no
payment has been demarcated
for
the
dissenting
financial
creditor in the financial outlay.
clause 6.5 i.e., Proposal for Dissenting Financial Creditors under the Resolution Plan.
Yes
Sec
30(2)(c)
Provides
for
the
management of the
affairs
of
the
corporate
debtor
after approval of the
resolution plan
During Implementation
Monitoring Committee will come
into force on the date of approval
of Resolution Plan by Hon'ble
NCLT. Monitoring Committee will
comprise of:
a. Resolution Professional,
b. Representative of the SRA (1),
and
c. Representative of the Secured
Financial Creditor (1)
The Monitoring Committee shall
supervise the implementation of
Yes
Page 13 the Resolution Plan and shall be required and entitled to do all such acts, deeds, matters and things as may be necessary, desirable or expedient in order to implement and give effect to this Resolution Plan. The Monitoring Committee shall be vested with the powers of the Board of Directors as prescribed under the Companies Act, 2013 till the control and management of the CD is handed over to the SRA on or before Effective Date. The Cost of the Monitoring Committee would be paid by the SRA on actual basis as may be negotiated / settled by mutual consent.
the CD is handed over to the SRA on or before Effective Date. The Cost of the Monitoring Committee would be paid by the SRA on actual basis as may be negotiated / settled by mutual consent. Upon complete payment of proposed settlement amounts to the financial creditors of the CD the Monitoring Committee shall issue a Completion Certificate to the CD/ RA, and this certificate shall be final in terms of discharge of duties of SRA in relation to implementation of the Resolution Plan. Further, upon issuance of the Completion Certificate, the Monitoring Committee shall stand dissolved.
Post Effective Date Resolution Applicant shall appoint two directors on the Board of Directors of CD ("Reconstituted Board of Directors of CD" or “Reconstituted BoD") which would consist of two nominees of SRA and accordingly, the business of CD shall be carried on by the new management. On dissolution of monitoring committee, the BoD of the SRA shall assume their powers as per
nominees of SRA and accordingly, the business of CD shall be carried on by the new management. On dissolution of monitoring committee, the BoD of the SRA shall assume their powers as per
Page 14 the provisions of the Companies Act, 2013.
clause 8 i.e., Supervision and Implementation of the Resolution Plan, under the Resolution Plan.
Sec
30(2)(d) &
Regulation
38(2)(c)
Term of the plan,
implementation
schedule
and
supervision
of
the
resolution plan
Term and schedule of the Plan
provided is extracted hereinafter
this table, from the Resolution
Plan.
Supervision
of
the
implementation
of
Resolution
Plan will be carried out by the
Monitoring Committee.
clause 8 i.e., Supervision and Implementation of the Resolution Plan, under the Resolution Plan.
YES Sec. 30(2)(e) Does not contravene any of the provisions of the law for the time being in force The SRA has declared under paragraph 7.3 that the Resolution Plan does not contravene any provisions of Applicable Law.
Further, RP has confirmed in Form H that the Resolution Plan does not contravene any of the provisions of the Law for the time being in force.
YES
Sec.
30(2)(f)
Plan
conforms
to
such
other
requirements as may
be specified by the
Board
The SRA has submitted that the
resolution
plan
has
been
prepared taking every aspect in
to consideration to conform to
such other requirements.
equirements as may
be specified by the
Board
The SRA has submitted that the
resolution
plan
has
been
prepared taking every aspect in
to consideration to conform to
such other requirements.
YES Regulation 37(a) & (b) Transfer of all or part of the assets of the corporate debtor to one or more persons; sale of all or part of The SRA proposes to identify the non-core assets (If any) after the Effective Date, and proposes to sell them only after the approval of Monitoring Committee.
YES
Page 15 the assets whether subject to any security interest or not
We further note that the SRA in
Paragraph 6.18 has proposed to
fund payments to creditor as per the financial outlay inter alia from sale of assets of the CD including non-core plant and machineries, existing cash and cash equivalents and realization including Fixed Deposits. Regulation 37(ba) and (c) Restructuring of the CD by the way of Merger & Amalgamation.
The substantial acquisition of shares of the corporate debtor, or the merger or consolidation of the corporate debtor The SRA has reserved the option of merger & amalgamation with IBC Compliant entities.
YES
Regulation
37(ca)
Cancellation
and
delisting
of
any
shares
of
the
Corporate Debtor
The SRA proposes that the entire
Issued Share Capital shall be
reduced
to
Nil
without
any
consideration
paid
to
the
Shareholders.
The Resolution Applicant/ or its
Nominees
shall
subscribe
to
fresh equity of Corporate Debtor
against the amount contributed
towards the Resolution Plan as
may be considered prudent by
the Resolution Applicant.
clause 6.17 i.e., Capital Restructuring under the Resolution Plan.
The Corporate Debtor is not listed on stock exchange and therefore de-listing is not applicable.
YES
Regulation
37(d)
Satisfaction
or
modification of any
security interest
Charge created will be satisfied
after making complete payment
to SFC who have created charge
YES
icable.
YES
Regulation
37(d)
Satisfaction
or
modification of any
security interest
Charge created will be satisfied
after making complete payment
to SFC who have created charge
YES
Page 16 as per the Resolution Plan. The financial creditors shall clear the NPA status of the CD after the effective date and update the data of the RBI and various agencies wherever they have stated the CD as defaulter.
clause 6.7 i.e., Treatment of Security and Corporate / Personal Guarantee provided by the CD/ Promoters/ Their Nominees under the Resolution Plan.
Regulation
37(e)
Curing or waiving of
any breach of the
terms of any debt
due
from
the
corporate debtor
Post the settling the debts of
Financial Creditors (FCs) as per
this
Resolution
Plan,
any
remaining debt exceeding the
Resolution Amount, owed to FCs,
Operational Creditors (OCs), or
others, are proposed to be settled
/ restructured.
We record that the SRA shall carry out all the necessary compliance in this regard.
YES Regulation 37(f) Reduction in the amount payable to the creditors As per Financial outlay given in
Paragraph 6.1 and 6.18 of the
Resolution Plan;
YES Regulation 37(g) Extension of a maturity date or a change in interest rate or other terms of a debt due from the corporate debtor
N/A
YES Regulation 37(h) Amendment of the constitutional documents of the corporate debtor On account of cancellation of existing shares and infusion of funds into equity shares by the SRA, the SRA may make certain changes in MOA and AOA of the CD.
YES Regulation 37(i) Issuance of securities of the The SRA does not propose any issuance of securities of the
YES
Page 17 corporate debtor, for cash, property, securities, or in exchange for claims or interests or other appropriate purpose. Corporate Debtor at this point, however if it requires any change at any stage, it will be done as per law.
The same has been provided for in clause 6.17 i.e., Capital Restructuring under the Resolution Plan.
Regulation 37(j) Change in portfolio of goods or services produced or rendered by the corporate debtor The SRA does not propose any change in portfolio of goods or services at this point, however if it requires any change at any stage, it will be done as per law.
YES Regulation 37(k) Change in technology used by the Corporate Debtor The SRA does not propose any change in the technology at this point however if it requires any change at any stage, it will be done as per law.
ange in technology used by the Corporate Debtor The SRA does not propose any change in the technology at this point however if it requires any change at any stage, it will be done as per law.
YES Regulation 37(l) Obtaining necessary approvals from the Central and State governments and other authorities. The SRA undertakes to seek necessary approvals, if required within 12 months from the NCLT approval date.
clause 7.9 i.e., Regulatory Approvals under the Resolution Plan.
YES Regulation 37(m) Sale of one or more assets of corporate debtor to one or more successful resolution applicants submitting resolution plans for such assets; and manner of dealing with remaining assets
N/A
YES Regulation 38(1) The amount due to the operational creditors under a resolution plan shall In terms of financial layout, as discussed above.
YES
Page 18
be given priority in
payment
over
financial creditors
in clause 6.6 i.e., Proposal for
the
Operational
Creditors
under the Resolution Plan.
Regulation
38(1A)
Dealing
with
interests of all stake
holders
including
financial
creditors
and
operational
creditors
The SRA has declared that it has
dealt with the interest of all the
stakeholders.
The SRA proposes the payment to the tune of INR 1,62,13,423/- to the sole secured financial creditor. in clause 6.3 i.e., Settlement of Financial Debt under the Resolution Plan.
A sum of INR 34,297/- is proposed to be paid to EPFO, which is 100% of the admitted claim.
ancial creditor. in clause 6.3 i.e., Settlement of Financial Debt under the Resolution Plan.
A sum of INR 34,297/- is proposed to be paid to EPFO, which is 100% of the admitted claim. It has been specified that a sum of INR 19.5 lacs as claimed by the EPFO has not been admitted by the RP. in clause 6.6.1 i.e., Claims related to EPFO under the Resolution Plan.
So
far
as
workmen
and
Employees are concerned, no
claims have been received in
this category. Nevertheless, the
SRA has declared that as per its
assessment liquidation value of
the CD is not sufficient to even
repay the entire debt of the
financial creditor and thus nil
amount
is
proposed
to
the
workmen and employee, if any.
in clause 6.6.2 i.e., Claims of
Workmen and Employees under
the Resolution Plan.
YES
Page 19
The SRA proposes to pay INR 30.00 lakh to other Operational Creditors (other than statutory dues) and any other operational creditors whose claims gets admitted post CoC approval of this Resolution Plan and this amount shall be distributed in proportion to their admitted claims in full and final settlement of their admitted claims. However, if any amount is attributable / payable as per the terms of the IBC towards Operational Creditors more than INR 30.00 lakh provided for, such amount shall be adjustable from the Resolution Amount proposed to Secured Financial Creditor.
the terms of the IBC towards Operational Creditors more than INR 30.00 lakh provided for, such amount shall be adjustable from the Resolution Amount proposed to Secured Financial Creditor. in clause 6.6.3 i.e., Proposal towards Operational Creditors (other than government dues and employees and workmen) under the Resolution Plan.
For Other Statutory / Government dues, nil amount is proposed. Further, SRA has explained that the Corporate Debtor has been issued a show cause notice for tax dues of approximately INR 1,600.00 lakh by the Income Tax Department for the period before the commencement of the Corporate Insolvency Resolution Process (CIRP). The said notice is under appeal by the Resolution Professional. It has been submitted that since this demand predates the initiation of CIRP, the SRA bears no liability for these claims or disputes.
Page 20
Under
Section
32A
of
the
Insolvency and Bankruptcy Code,
2016, both the RA.
We find it appropriate to mention
that we have recorded in the
findings below w.r.t statutory
liability of the SRA to pursue the
matter
independently
with
respective
department
/
Authority in case any of these
claims
and
liabilities
are
determined in future.
Regulation
38(1B)
Whether
the
Resolution Applicant
or any of its related
parties has failed to
implement
or
contribute to failure
of an implementation
of
any
resolution
plan approved under
the Code.
(1B)
Whether
the
Resolution Applicant
or any of its related
parties has failed to
implement
or
contribute to failure
of an implementation
of
any
resolution
plan approved under
the Code.
If so, whether the
Resolution Applicant
has submitted the
statement
giving
details of such non-
implementation
SRA has declared in paragraph
7.4 that neither the SRA nor any
of its related parties has failed or
contributed
to
failure
of
implementation of the Resolution
Plan.
YES
Regulation
38(2)(a)
Term of the Plan and
its
implementation
schedule
Term of the Resolution Plan is 30
days.
Term and Schedule is extracted
hereinafter this table.
in clause 8 i.e., Supervision
and
Implementation
of
the
Resolution
Plan,
under
the
Resolution Plan.
YES Regulation 38(2)(b) Management and control of the business of corporate debtor during term of resolution Plan The SRA has declared that the Monitoring Committee as discussed above will be vested with the powers of Board of Directors to manage the affairs of CD until completion of implantation of the Plan. Term of the Resolution Plan is 30 days.
YES
discussed above will be vested with the powers of Board of Directors to manage the affairs of CD until completion of implantation of the Plan. Term of the Resolution Plan is 30 days.
YES
Page 21
in clause 8 i.e., Supervision and Implementation of the Resolution Plan, under the Resolution Plan.
Regulation
38(2)(c)
Adequate means for
supervising
its
implementation
Entire Clause 8 of this Resolution
Plan caters to the supervision
and
implementation
of
the
Resolution Plan.
YES Regulation 38(2)(d) Proceedings in respect of avoidance transactions, if any, under Chapter III or fraudulent or wrongful trading under Chapter VI of Part II of the Code, will be pursued after the approval of the resolution plan and the manner in which the proceeds, if any, from such proceedings shall be distributed. RP has not filed any application for avoidance of any transactions covered under section.
Nevertheless, the SRA has submitted that the in the event, any application filed by the Resolution Professional under Section 43 to 51 or 66 of the IBC, continues even after NCLT Approval Date, the Corporate Debtor/Resolution Applicants shall move application to substitute Resolution Professional in the application and pursue the application to its logical conclusion. Any recovery made as outcome of these applications shall be distributed to SFC after deducting expenses of litigation (if any).
ication and pursue the application to its logical conclusion. Any recovery made as outcome of these applications shall be distributed to SFC after deducting expenses of litigation (if any).
in clause 6.14 i.e., Distribution of Proceeds from Avoidance Transaction, under the Resolution Plan.
YES
Regulation
38(3),
(4)
and (5)
A
resolution
plan
shall
demonstrate
that-
(a) It addresses the
cause of default;
(b) It is feasible and
viable;
The cause of default has been
addressed under clause 5.1 of
the Resolution Plan, as also
discussed above.
On feasibility and viability, as discussed in 8th CoC meeting
YES
Page 22
(c) It has provisions
for
its
effective
implementation;
(d) It has provisions
for
approvals
required
and
the
timelines
for
the
same; and
(e) The
resolution
applicant
has
the
capability
to
implement
the
resolution plan
convened on 27.01.2025, plan is
in compliance with IBC and its
associated
regulations.
The
Resolution
Applicant
has
proposed the payment to the
stakeholders which has been
discussed in Financial Proposal
part. The Resolution Applicant
and its technical team, are quite
experienced
and
technically
capable to revive and turnaround
the CD in the best interest of all
the stakeholders. The plan also
states
the
process
of
its
implementation and management
to make it feasible and Viable.
The same is addressed under
clause 5.3 of the Resolution Plan.
of all the stakeholders. The plan also states the process of its implementation and management to make it feasible and Viable. The same is addressed under clause 5.3 of the Resolution Plan.
For effective implementation, Monitoring Committee as discussed above will be appointed to supervise the implementation. The same is addressed under clause 8 of the Resolution Plan.
The SRA undertakes to obtain the regulatory approval, if any required within 12 months of the approval of the Resolution Plan. The same is addressed under clause 7.9 of the Resolution Plan.
The SRA has declared the source of funds: Sale / Realization of assets of the CD including Fixed Deposits / Fresh Equity / Unsecured Debt / Quasi Equity to be brought in by the SRA / its nominees. Funds shall be brought in by the SRA or its nominees by way of their internal sources, sale of non-core plant and machineries, existing cash/ cash equivalents of the CD and
/ its nominees. Funds shall be brought in by the SRA or its nominees by way of their internal sources, sale of non-core plant and machineries, existing cash/ cash equivalents of the CD and
Page 23 business operation of the CD based on capital structure and requirement as and when required.
Indicative Timeline of implementation of schedule as provided in the Resolution Plan is given below:
6
The Applicant submits that the SRA has submitted an affidavit
with respect to its eligibility under section 29A of the Code as
required by Regulation 39(1)(a) and also complies with the
requirements under Regulation 39(1)(c) of the CIRP Regulations,
which is available at page 271 of this Application.
7
Details On Fraudulent and Avoidance Transaction
7.1 No Application for adjudication of Preferential, Undervalued, Fraudulent and Extortionate Transactions has been filed so far. It is relevant to note the extracts from minutes of the 8th CoC meeting
o Application for adjudication of Preferential, Undervalued, Fraudulent and Extortionate Transactions has been filed so far. It is relevant to note the extracts from minutes of the 8th CoC meeting
Page 24
convened on 27.01.2025 with respect to adverse transaction, which
is extracted hereinbelow:
Update on Transaction Audit Report
The RP apprised the committee that M/s AKAS & Associates LLP,
Chartered Accountants, the Transaction Auditor has submitted the
Transaction Audit Report. The findings of the report were
discussed in detail with the members in the meeting for way
forward and necessary actions. The RP has shared the transaction
audit report with the CoC members via email dated 20.01.2025 for
their reference and necessary comments, if any.
The RP requested the CoC to deliberate upon the same and
suggest the way forward. In response thereto, the CoC member
requested the RP go ahead as per the transaction audit report
submitted by the transaction auditor. Hence, as the transaction
auditor determined no adverse transaction in the report, therefore,
there would not be any requirement for filing of application before
Hon’ble NCLT.
7.2
In view of the discussion in CoC meeting, as extracted above we
note that Transaction audit report, which has not been filed
before this Adjudicating Authority, has been duly discussed in
the CoC meeting and has consciously decided to not file any
application for avoidance of Preferential / undervalued /
Fraudulent / Extortionate Transaction.
g Authority, has been duly discussed in the CoC meeting and has consciously decided to not file any application for avoidance of Preferential / undervalued / Fraudulent / Extortionate Transaction. Hence, if any such adverse transaction is unravelled or discovered in future with respect to CD, CoC has waived its right.
Page 25 8 Declaration by RP, w.r.t compliance of the Resolution Plan
8.1
RP has declared that he has examined the Resolution Plan
received from Resolution Applicant M/s Turquoise Metals and
Electricals Private Limited and approved and has certified as
follows:
(i)
the said Resolution Plan complies with all the provisions of
the Insolvency and Bankruptcy Code 2016 (Code), the
Insolvency and Bankruptcy Board of India (Insolvency
Resolution Process for Corporate Persons) Regulations, 2016
(CIRP Regulations) and does not contravene any of the
provisions of the law for the time being in force.
(ii)
the Resolution Applicant M/s Turquoise Metals and
Electricals Private Limited has submitted an affidavit
pursuant to section 30(1) of the Code confirming its eligibility
under section 29A of the Code to submit resolution plan. The
contents of the said affidavit are in order.
(iii)
the said Resolution Plan has been approved by the CoC in
accordance with the provisions of the Code and the CIRP
Regulations made thereunder. The Resolution Plan has been
approved by 100 % of voting share of financial creditors
after considering its feasibility and viability and other
requirements specified by the CIRP Regulations.
der. The Resolution Plan has been
approved by 100 % of voting share of financial creditors
after considering its feasibility and viability and other
requirements specified by the CIRP Regulations.
(iv)
The voting was held in the meeting of the CoC on
27.01.2025 where all the members of the CoC were present.
8.2 Further, relevant part as to satisfaction recorded by the RP w.r.t compliance of Plan with the provisions of IBC and CIRP regulations is extracted herein below:
Page 26
Page 27
8.3 Further, RP has specifically recorded the amount admitted for EPFO as against its claim and treatment of the same in the Plan, in the following manner:
From record of the matter, we find that the RP has provided also an explanation for not admitting the substantial portion of the claim of the EPFO in the 2nd CoC meeting convened on 31.05.2024, and the same is extracted herein below:
Page 28
Be that as it may, we record that if any liability of the CD accrues in favour of EPFO in future, the SRA shall be solely responsible to either settled the same or pursue the matter in accordance with the law. This order approving the Resolution Plan of the SRA shall not be interpreted in any manner to assure the validity or endorse legality upon the act of non-admission of the claim of EPFO by the RP.
8.4 RP has recorded the compliance of Resolution Plan in the following manner:
Page 29
Page 30
e validity or endorse legality upon the act of non-admission of the claim of EPFO by the RP.
8.4 RP has recorded the compliance of Resolution Plan in the following manner:
Page 29
Page 30
Page 31
9
Infusion of funds
The SRA has proposed an amount of INR 2,22,47,720/-, including
working capital / capex of INR 30,00,000/- plus CIRP cost at
actuals.
10 IA-121/2025
10.1 This is an application filed by the RP seeking the following relief: “a) Allow the present Application;
b) To condone the delay of 119 days on part of Aman Poly Plast Private Limited (Respondent) in submission of claim form B dated 12.11.2024 in accordance with Regulation 13(1C) of the IBBI (Insolvency Resolution Process for Corporate Persons) Regulations, 2016.
c) Pass such other order(s) as this Hon'ble Tribunal may deem fit in the facts and circumstances of this case.”
10.2 Ld. Counsel for the RP appeared and relied upon paragraph 11 and 12 of the application. The same reads as follows: “11. That on 19.11.2024, the Respondent replied to the email of Applicant/ RP and stated the reason for delay in submission of the claim before the Applicant/ RP is that the Respondent was not aware of the about the CIRP of the Corporate Debtor. It is submitted that the Respondent came to know about the CIRP only on 10.11.2024 and soon thereafter, the Respondent had filed its on 12.11.2024 before the Applicant/ RP to the tune of Rs. 7,08,085/-.
submitted that the Respondent came to know about the CIRP only on 10.11.2024 and soon thereafter, the Respondent had filed its on 12.11.2024 before the Applicant/ RP to the tune of Rs. 7,08,085/-. It is further submitted that the Applicant/ RP sent an email dated 20.11.2024 wherein the Applicant/ RP informed that received that reason for delay in filing the claim and the same shall be kept for the before the COC for recommendations and comments. Thereafter the Applicant/ RP shall inform the Respondent on any update regarding the claim. Copy of the emails dated 19.11.2024 and 20.11.2024 is annexed herewith and marked as ANNEXURE A-9 (COLLY). 12. That in the 7th COC meeting dated 18.12.2024, the Applicant/ RP apprised the COC about the receipt of the claim from Respondent under Form-B for an amount of Rs. 7,08,085/- vide email dated 12.11.2024. The Applicant RP also apprised the COC member that reason for delay in filing the claim as per provisions of Regulation 14 of IBBI (CIRP) Regulations, 2016 submitted by the Respondent vide email dated 19.11.2024. It is submitted that the in terms of Regulation 131(C) of the IBBI (CIRP) Regulations, 2016, the
ation 14 of IBBI (CIRP) Regulations, 2016 submitted by the Respondent vide email dated 19.11.2024. It is submitted that the in terms of Regulation 131(C) of the IBBI (CIRP) Regulations, 2016, the
Page 32 Applicant/ RP is duty bound to file an application for seeking condonation of delay in filing the claim. Thereafter, after due deliberations and discussions the COC members directed the Applicant/ RP to file an application before this Hon'ble Tribunal seeking condonation of delay in filing of the claim of the Respondent. Copy of the minutes of the 7th CoC meeting dated 18.12.2024, are annexed herewith and marked as ANNEXURE A-10. ”
10.3 The Ld. counsel for the RP submits that the plan under paragraph 6.6.3 provides for accommodation of any additional claim admitted post approval of CoC in the category of operational creditor (other than Statutory dues and workmen dues). The Relevant portion is extracted below:
Page 33
10.4 In view of the submission made by the Ld. Counsel, we are inclined to condone the delay of 119 days on the part of Aman Poly Plast Private Limited in accordance with Regulation 13(1C) of the IBBI (Insolvency Resolution Process for Corporate Persons) Regulations, 2016. 10.5 IA-121/2025 is allowed and stands disposed of.
11 Findings
11.1 RP has submitted that RP has perused the Resolution Plan and found the same is in compliance with the provisions of the IBC and CIRP Regulations. RP has provided necessary details with respect to compliance under these provisions in Form H (Annexure A-19).
found
the same is in compliance with the provisions of the IBC and CIRP
Regulations. RP has provided necessary details with respect to
compliance under these provisions in Form H (Annexure A-19).
Further, satisfaction as to compliance with section 30 of the Code,
regulation 37 and 38 of the CIRP Regulations have been recorded above
in paragraph 5 above.
11.2 We note that no objection has been raised against the proposed
Resolution Plan and the same has been approved by the CoC
Page 34
comprising of sole secured Financial Creditor with 100% votes in favour
of the Resolution Plan.
11.3 We are satisfied that the Resolution Plan is in accordance with Sections
30 and 31 of the IBC and also complies with regulations 37, 38 and 39
of the CIRP Regulations, 2016.
11.4 We find that the value of the plan is lower than liquidation value of the
Corporate Debtor, assessed by the valuators appointed by the RP in
terms of the provisions of Regulation 27 of CIRP Regulations, 2016 r/w
Regulation 35 thereof. We rely upon the judgment of the Hon’ble
Supreme Court in the matter of Maharashtra Seamless Ltd. Vs
Padmanabhan Venkatesh & Ors. Civil Appeal No. 4242 of 2019
relevant paragraphs of which reads as:-
26. No provision in the Code or Regulations has been
brought to our notice under which the bid of any Resolution
Applicant has to match liquidation value arrived at in the
manner provided in Clause 35 of the Insolvency and Bankruptcy
Board of India (Insolvency Resolution Process for Corporate
Persons) Regulations, 2016…
27.
atch liquidation value arrived at in the
manner provided in Clause 35 of the Insolvency and Bankruptcy
Board of India (Insolvency Resolution Process for Corporate
Persons) Regulations, 2016…
27. It appears to us that the object behind prescribing such
valuation process is to assist the CoC to take decision on a
resolution plan properly. Once, a resolution plan is approved by
the CoC, the statutory mandate on the Adjudicating Authority
under Section 31(1) of the Code is to ascertain that a resolution
plan meets the requirement of sub-sections (2) and (4) of Section 30
thereof.
28. The Appellate Authority has, in our opinion, proceeded on
equitable perception rather than commercial wisdom. On the face
of it, release of assets at a value 20% below its liquidation
value arrived at by the valuers seems inequitable. Here, we
Page 35
feel the Court ought to cede ground to the commercial
wisdom of the creditors rather than assess the resolution
plan on the basis of quantitative analysis. Such is the scheme
of the Code
Section 31(1) of the Code lays down in clear terms that for final
approval of a resolution plan, the Adjudicating Authority has to be
satisfied that the requirement of sub-section (2) of Section 30 of the
Code has been complied with…
In view of the above, we observe that it is not for this Adjudicating
Authority to go into quantitative assessment of valuations at the time of
approval of the resolution plan.
een complied with…
In view of the above, we observe that it is not for this Adjudicating
Authority to go into quantitative assessment of valuations at the time of
approval of the resolution plan.
11.5 Besides, we note that in terms of the judgment of Hon’ble Supreme Court in the case of Committee of Creditors of Essar Steel India Limited Through Authorised Signatory vs. Satish Kumar Gupta & Ors. [Civil Appeal No. 8766-67 of 2019], it is the subject matter of commercial wisdom of CoC to take decision regarding the amount of bid offered by SRA and the scope for this Tribunal to interfere on such issues is negligible. The above view was also reiterated by Hon’ble Supreme Court in Ebix Singapore Private Limited vs. Committee of Creditors of Educomp Solutions Limited & Anr. (Civil Appeal No. 3224 of 2020) wherein the Hon’ble Supreme Court ruled that the scope of examination of the application for approval of Resolution Plan by this Tribunal is confined to the provisions of Section 30(2) of IBC, 2016. Para 153 of the Judgment reads thus: -
“153. Regulation 38(3) mandates that a Resolution Plan be feasible, viable and implementable with specific timelines. A Resolution Plan whose implementation can be withdrawn at the behest of the successful Resolution Applicant, is inherently
ion Plan be feasible, viable and implementable with specific timelines. A Resolution Plan whose implementation can be withdrawn at the behest of the successful Resolution Applicant, is inherently
Page 36 unviable, since open-ended clauses on modifications/withdrawal would mean that the Plan could fail at an undefined stage, be uncertain, including after approval by the Adjudicating Authority. It is inconsistent to postulate, on the one hand, that no withdrawal or modification is permitted after the approval by the Adjudicating Authority under Section 31, irrespective of the terms of the Resolution Plan; and on the other hand, to argue that the terms of the Resolution Plan relating to withdrawal or modification must be respected, in spite of the CoC’s approval, but prior to the approval by the Adjudicating Authority. The former position follows from the intent, object and purpose of the IBC and from Section 31, and the latter is disavowed by the IBC’s structure and objective. The IBC does not envisage a dichotomy in the binding character of the Resolution Plan in relation to a Resolution Applicant between the stage of approval by the CoC and the approval of the Adjudicating Authority. The binding nature of a Resolution Plan on a Resolution Applicant, who is the proponent of the Plan which has been accepted by the CoC cannot remain indeterminate at the discretion of the Resolution Applicant. The negotiations between the Resolution Applicant and the CoC are brought to an end after the CoC’s approval.
by the CoC cannot remain indeterminate at the discretion of the Resolution Applicant. The negotiations between the Resolution Applicant and the CoC are brought to an end after the CoC’s approval. The only conditionality that remains is the approval of the Adjudicating Authority, which has a limited jurisdiction to confirm or deny the legal validity of the Resolution Plan in terms of Section 30 (2) of the IBC. If the requirements of Section 30(2) are satisfied, the Adjudicating Authority shall confirm the Plan approved by the CoC under Section 31(1) of the IBC.” 11.6 As far as the issue of reliefs and concessions which fall in the jurisdiction of different Government Authorities, and/ or are subjected to the provisions of different laws for the time being in force are concerned, it is made clear that the amount payable by the SRA in terms of the plan to different creditors, stakeholders, and to keep the
Page 37 Corporate Debtor as a going concern cannot be subject to any condition, assumptions, relief/ concessions and/ or qualification. It also needs to be underlined that the provisions of Section 31(4) of IBC, 2016 mandates the Resolution Applicant to obtain the necessary approval required under any law for the time being in force within a period of one year from the date of approval of the resolution plan by the Adjudicating Authority under Section 31 of the IBC, 2016.
oval required under any law for the time being in force within a period of one year from the date of approval of the resolution plan by the Adjudicating Authority under Section 31 of the IBC, 2016. In terms of the provisions of Section 14 of the Code even during the period of CIRP, no default in payment of current dues is a precondition for continuation of the License, Permit, Registration and similar rights. Thus, even during the moratorium period, some of the facilities forming part of the reliefs and concessions sought are made available to the CD only when there is no default in payment of the current dues. On approval of the Resolution Plan, the SRA/CD cannot be put on a better footing by exempting it from paying its legitimate dues under the law. 11.7 The SRA/CD would be entitled to no other reliefs/ concessions/waivers except those are available/permissible to it as per the provisions of Section 31(1) and 32A of IBC, 2016. The SRA is at liberty to approach the relevant authorities who would consider these claims as per the provisions of the relevant law in an expeditious manner.
f
Section 31(1) and 32A of IBC, 2016. The SRA is at liberty to approach
the relevant authorities who would consider these claims as per the
provisions of the relevant law in an expeditious manner.
11.8 Besides, in terms of the provisions of Section 32A, for an offence
committed prior to the commencement of the Corporate Insolvency
Resolution Process, the liability of the CD ceases and the CD is not
liable to be prosecuted from the date of approval of Resolution Plan by
this Adjudicating Authority, if the Resolution Plan results in change of
management or control of the CD to a person who was not promotor or
in the management or control of the CD or a related party of such a
person or a person with regard to whom the concerned Investigating
Agency has reason to believe that he had abated or conspired for the
commission of the offence and has submitted or filed a report or a
complaint to the relevant statutory authority or Court. In such cases,
reason to believe that he had abated or conspired for the commission of the offence and has submitted or filed a report or a complaint to the relevant statutory authority or Court. In such cases,
Page 38 where the prosecution is instituted against the CD, during CIRP, the CD stands discharged qua the same from the date of approval of the Resolution Plan. Nevertheless, every person who was a designated partner as defined in clause (j) of Section 2 of the Limited Liability Partnership Act, 2008, “an officer who is in default” as defined in Clause (60) of Section 2 of Companies Act, 2013 or was in any manner in charge of, or responsible to the CD for the conduct of his business or associated with the CD in any manner and was directly or indirectly involved in the commission of an offence as per the report submitted or complaint filed by Investigating Agency shall continue to be liable to be prosecuted and punished for such an offence committed by the Corporate Debtor notwithstanding the Corporate Debtors’ liability ceases after approval of the plan. 11.9 We find it also appropriate to mention here that from the records of the matter, we have noted that EPFO had filed its claim to the tune of INR 19,53,129/-, however only claim to the tune of INR 34,297/- has been admitted.
e to mention here that from the records of the
matter, we have noted that EPFO had filed its claim to the tune of INR
19,53,129/-, however only claim to the tune of INR 34,297/- has been
admitted. We hereby make it clear and order that if any liability of the
EPFO arise with respect to its claim, in future, the SRA shall be
responsible to take the sole responsibility to pursue the matter
independently in accordance with the law, with the respective
department/ authority having appropriate jurisdiction. Further, from
the records, we notice that the CD has been issued a show cause notice
for the Income tax dues, which we direct to be the sole responsibility of
the SRA to pursue independently.
11.10 Thus, it is ordered that the reliefs, concessions and waivers sought by
the Successful Resolution Applicant will be dealt with strictly as per
the law and shall not be deemed to be granted only by the virtue of this
plan approval order.
11.11 As far as the question of granting time to comply with the statutory
obligations / seeking sanctions from governmental authorities is
granted only by the virtue of this plan approval order. 11.11 As far as the question of granting time to comply with the statutory obligations / seeking sanctions from governmental authorities is
Page 39 concerned, the Resolution Applicant is directed to do the same within one year as prescribed under section 31(4) of the Code. 11.12 In case of non-compliance of this order or withdrawal of Resolution Plan within the stipulated time, in addition to other consequences which follow under law, the CoC shall forfeit the Bid Bond paid by the SRA. 12 Order
12.1 Subject to the observations made in this Order, the Resolution Plan of INR 2,22,47,720/- (Rupees Two Crores, Twenty-Two Lacs, Forty- Seven Thousand, Seven Hundred and Twenty Only) plus CIRP cost on actuals, is hereby approved.
12.2 IA (IBC) (Plan) No. 08/2025 filed for approval of Resolution Plan stands approved.
12.3 The approved Resolution Plan shall become effective from the date of this Order and shall be implemented strictly as per the term of the plan and implementation schedule given in the Plan;
12.4 Following steps shall be taken in terms of the Resolution Plan:
Sr. No. Steps to be taken
Timeline from date of Receipt of
Order
1.
Constitution
of
Monitoring Committee
Monitoring Committee shall come
into force as on the date of receipt
of plan approval order
2.
Intimation to Creditors,
IBBI,
RoC,
other
stakeholders of the CD
Within 15 days
3.
Seek necessary approvals
in terms of section 31(4)
1 year
ate of receipt
of plan approval order
2.
Intimation to Creditors,
IBBI,
RoC,
other
stakeholders of the CD
Within 15 days
3.
Seek necessary approvals
in terms of section 31(4)
1 year
Page 40
4.
Payment of CIRP Cost
30 days
5.
Payment to creditors as
proposed in the Plan
30 days
12.5 The Resolution Plan is binding on the Corporate Debtor and other stakeholders involved so that the revival of the Corporate Debtor shall come into force with the immediate effect.
12.6 The Moratorium imposed under section 14 of the Code shall cease to have effect from the date of this order.
12.7 The Resolution Professional shall submit the records collected during the commencement of the proceedings to the Insolvency & Bankruptcy Board of India for their record and also return to the Resolution Applicant or New Promoters.
12.8 The liberty is hereby granted for moving any appropriate application, if required in connection with the implementation of this Resolution Plan.
12.9 A Certified copy of this Order shall be filed by the Resolution Professional with the Registrar of Companies, NCT of Delhi & Haryana.
12.10 The Resolution Professional shall stand discharged from his duties with effect from the date of this Order, save and except those duties that are enjoined upon him for implementation of the approved Resolution Plan.
fessional shall stand discharged from his duties with effect from the date of this Order, save and except those duties that are enjoined upon him for implementation of the approved Resolution Plan.
12.11 The Resolution Professional is further directed to hand over all the records, premises/factories/documents available with it to the Successful Resolution Applicant to finalise the further line of action required for starting of the operation. The Successful Resolution Applicant shall have access to all the records, premises/factories/ documents through the Resolution Professional to finalise the further course of action required for starting of operations of the Corporate Debtor.
Page 41 12.12 The Monitoring Committee shall file progress report regarding implementation of the Plan before this Tribunal upon completion.
12.13 The Registry is hereby directed to send e-mail copies of the order forthwith to all the parties; CoC, RP and SRA and their Ld. Counsels for information and for taking necessary steps. The Applicant – RP is directed to send a copy of this order to the IBBI and RoC concerned for their record.
12.14 Certified copy of this order may be issued, if applied for, upon compliance of all requisite formalities. Company Petition No. (IB)-628(PB)/2023 is Disposed of, along with all pending IAs, if any. File be consigned to record storage (current).
Sd/- (RAMALINGAM SUDHAKAR) PRESIDENT
Sd/- (RAVINDRA CHATURVEDI) MEMBER (TECHNICAL)