17th November, 2025 Approval of Resolution Plan - Positive Electronics Ltd. [IA (IBC) (Plan) No. 17/(KB)/2025 in CP(IB) No. 279/(KB)/2024] (1.59 MB)
In the National Company Law Tribunal Division Bench, (Court-I), Kolkata
IA (IBC) (PLAN) No. 17/ (KB) /2025 In CP(IB) No. 279/( KB) /2024
Application under section 30(6) and section 31 of the Insolvency & Bankruptcy Code, 2016 read with regulation 39(4) of the Insolvency and Bankruptcy Board of India (Insolvency Resolution Process for Corporate Persons) Regulations, 2016 for approval of Resolution Plan;
In the Matter of:
Matribhumi Fincap Limited, having registered office at KC Road, Fancy
Bazar, Guwahati, Assam – 781 001.
…Financial Creditor
And
Positive
Electronics
Limited
(CIN:
L67120WB1981PLC033990)
a
company registered under Companies Act, 1956, having its registered address
at 8, Strand Road, the Lords, PS-Hare Street, Kolkata – 700 001, 4th Floor,
Unit No. 4C, (previously at Bolai Kutir, 23A/1B, Justice Dwarkanath Road
Bhowanipure, Kolkata, WB – 700 020;
….Corporate Debtor
And
In the matter of:
Udit Agarwal, Resolution Professional of Positive Electronics Limited (in
CIRP) having his office at 11, Old Post Office Street, Let Gate, 1st Floor,
Kolkata – 700 001.
….Applicant / RP
Date of Pronouncement of order: 04.11.2025
Coram:
Smt. Bidisha Banerjee
:
Member (Judicial)
Cmde. Siddharth Mishra
:
Member (Technical)
Page 2 of 31
Counsel appeared physically / through video Conferencing Mr. Shaunak Mitra, Adv.
] for the RP Mr. Avik Chaudhuri, Adv.
] Ms. Shruti Majumdar, Adv.
]
ORDER
Per Siddharth Mishra, Member (Technical):
- The Court convened through hybrid mode.
- Ld. Counsel for the parties were heard at length.
- This application has been preferred by the Resolution Professional of Positive Electronics Limited to seek approval of Resolution Plan in its entirety along with all annexures, Schedule, Appendixes including the claims contained therein as submitted by Quicktouch Technologies Ltd. the Successful Resolution Applicant (SRA in short) along with reliefs and concessions sought for under the Plan.
- The CoC has approved the Resolution Plan of Quicktouch Technologies Ltd. by 100% vote in its Meeting held on 05.06.2025 and Quicktouch Technologies Ltd. was declared as Successful Resolution Applicant (SRA) in respect of the Corporate Debtor.
- Brief facts of the CIRP process are as under:
a. The CIRP of Corporate Debtor commenced on 17.10.2024. In the said order, Mr. Udit Agarwal, having IBBI No. IBBI/IPA-001/IP- P-02799/2023-2024/14290 was appointed as the Interim Resolution Professional and later, the IRP was confirmed as the Resolution Professional of the Corporate Debtor by the
Page 3 of 31
Committee of Creditors in their 1st CoC meeting held on
13.11.2024.
b. Thereafter, Public announcement in “Form A” was made on
19.10.2024 by the RP in two newspapers namely Financial
express (English version) and in Ekdin (Bengali version).
c. The Committee of Creditors was formed on 07.11.2024, which
comprised of the sole member being the Financial Creditor having
voting right of 100%. Ld. Counsel for the RP / Applicant further
states that the RP further received claims of two operational
creditors being National Securities Depository Ltd. and Bombay
Stock Exchange Ltd. both of which were duly verified and
admitted by the RP.
d. The RP / Applicant had published “Form G” on 16.12.2024
wherein the last date for submission of EoI was on 06.01.2025
and for submission of Resolution Plan, the last date was on
07.03.2025.
e. Further, the RP / Applicant had Appointed registered valuers
Mrs. Rachna Anchalia and Mr. Riteek Baheti on 13.11.2024 for
valuation. The Registered valuers have submitted their Valuation
reports received on 14.01.2025 and 15.01.2025 respectively.
f. The Applicant / RP has further appointed a Transaction Auditor
namely Beriwal & Associates on 30.01.2025 was appointed on
29.03.2025 and the said Transaction Auditor had submitted the
report on 05.04.2025.
Page 4 of 31
g. RP further states that the CoC vide email dated 03.03.2025 upon
the request of PRAs had further extended the time for submission
of resolution plan from 07.03.2025 to 17.03.2025.
h. The RP / Applicant had published a provisional list of PRAs on
16.01.2025. The Final list of PRAs was circulated on 31.01.2025.
i. Thereafter, the RP / circulated the Information Memorandum,
See pg. no. 149-198 (Vol.1 and 2) of Application] Evaluation
Matrix and Request for Resolution Plan See pg. no. 199-280 (Vol.
2) of Application] along with access to Virtual Data Room on
05.02.205 to all the PRAs.
j. The RP/Applicant had further submitted that out of the 11 final
PRAs only 2 entities submitted their resolution plan and one of
them emerged as the Successful Resolution Applicant i.e.,
Quicktouch Technologies Ltd. and another one being Marken
Healthtech Ltd.
k. In the 8th meeting of the CoC held on 07.04.2025, the Committee
of Creditors, by 100% voting, resolved to extend the Corporate
Insolvency Resolution Process period by a further 90 days, to
enable placing the resolution plan before the CoC for its
consideration and voting. See pg. Nos. 106 (Vol.1) of Application)
l. An application was filed for extension of time for 90 days being
I.A (I.B.C)/610(KB)2025 which was allowed by the Hon'ble
Tribunal on 23.04.2025 till 14.07.2025.
Page 5 of 31
m. Pursuant to discussions held on 08.05.2025 in the 10th and 11th
CoC meeting, both the PRAs were requested to submit the revised
Resolution Plan. Quicktouch Technologies Ltd. submitted an
addendum to the resolution plan on 12.05.2025 and thereafter a
revised resolution plan on 19.05.2025 whereas, Marken
Healthtech.
n. Further, it is submitted by the applicant that in terms of RFRP,
all the PRAs were required to furnish an Earnest Money Deposit
for an amount of Rs. 50,00,000/- (Rupees Fifty Lakhs) along with
their plan.
o. It is further submitted that out of the 11 Final PRAs, only 2
entities submitted their resolution plan and one of them emerged
as the SRA i.e. Quicktouch Technologies Ltd. and another one
being Marken Healthtech Ltd. (Marken Healthtech Pvt. Ltd.).
p. Thereafter, the Ld. Counsel for the Applicant submits that the RP
/ Applicant has placed the resolution for approval of the
Resolution Plan before the CoC in their 12th Meeting held on
30.05.2025 and the CoC in the E-Voting held on and from
01.06.2025 to 05.06.2025 wherein the votes was casted on
05.06.2025 had approved the Resolution Plan of Quicktouch
Technologies Ltd., with 100% votes.
q. It is further submitted that in light of the conditionality, which
introduces uncertainty in the implementation of the plan and
adversely affects the assured recovery to creditors, the CoC
rejected the resolution plan submitted by Marken Healthtech Ltd.
(Marken Healthctech Pvt. Ltd.) vide an email dated 15.06.2025.
Page 6 of 31
r. Further, the Applicant states that the CoC on 05.06.2025 has
approved issuance of Letter of Intent (LoI) to the Successful
Resolution Applicant (SRA) and thereafter, the Resolution
Professional has issued the Letter of Intent (LoI) to SRA on
07.06.2025.
s. Thereafter, the SRA was sent an email on 11.06.2025 and
requested that as per clause 2.14.7 of the RFRP, Performance
Bank Guarantee (PBG) may be adjusted with the Earnest Money
Deposit (EMD) of Rs. 50 Lakhs which was submitted by them
along with Resolution Plan.
t. Further, the Ld. Counsel for the Applicant submits that the CoC
in the 1st Meeting has appointed Registered Valuers on
13.11.2024 and the respective valuers have submitted their
valuation reports on 14.01.2025 and 15.01.2025. Copies of the
same are attached with the Resolution Plan Application as
Annexure ‘V’.
u. The details of the CIRP are as provided in the Form H as under:
Sl.
No.
Particulars
Description
1.
Name of CD
Positive Electronics Ltd.
2.
Date of initiation of CIRP
17.10.2024
3.
Date of appointment of IRP
17.10.2024
4.
Date
of
publication
of
Public Announcement
20.10.2024
5.
Date of Constitution of
COC
07.11.2024
Page 7 of 31
Date of First Meeting of
CoC
13.11.2024
7.
Date of Appointment of RP
13.11.2024
8.
Date of Appointment of
Registered Valuers
13.11.2024
9.
Date of Issue of Invitation
for EoI
16.12.2024
10.
Date of Final List of Eligible
Prospective
Resolution
Applicants
31.01.2025
11.
Date
of
Invitation
of
Resolution Plan
05.02.2025
12.
Last date of Submission
of Resolution Plan
07.03.2025
17.03.2025
(On 03.03.2025 CoC Extended the
time by 10 days)
13.
Date
of
Submission
of
Resolution Plan
17.03.2024
14.
Date
of
placing
the
Resolution Plan before CoC
21.03.2025
15.
Date
of
approval
of
Resolution Plan
05.06.2025
Page 8 of 31
Date of filing of Resolution
Plan by CoC
19.06.2025
17.
Date of Expiry of 180 days
of CIRP
15.04.2025
18.
Date of Order extending the
period of CIRP on request
filed by RP
23.04.2025
19.
Date of Expiry
of the
Extended period of CIRP
14.07.2025
20.
Fair Value
Rs. 1,98,12,437/-
21.
Liquidation Value
Rs. 1,59,49,998/-
22.
Number of Meetings of CoC
held
12
- Further, Ld. Counsel for the Applicant / RP submits that SRA has proposed for adjustment of Performance Security from EMD of Rs. 50,00,000/- as provided in Clause 22 placed at page 42 of the Resolution Plan.
- Given the Fair value and Liquidation value noted above, we find that the Successful Resolution Applicant (SRA) namely Quicktouch Technologies Ltd. under the revised Resolution Plan has provided a overview of the of the Financial summary of the Resolution Plan of the Corporate Debtor of Rs.6,59,50,000/- (including total Plan Value realisable for an amount of Rs. 1,33,30,967.93; CIRP cost of Rs.
Page 9 of 31
25,00,000/- (At actuals) and CAPEX / Business improvement
amount of Rs. 5,01,19,032/-). The amounts claimed, amount
admitted and the amount provided under the Resolution Plan are as
under:
(Amount in Rupees)
Sl.
No.
Category of Creditor
Amount of
Claim
Claim Admitted
Amount provided in the Plan
Secured Financial Creditor -Creditors not having a right to vote under sub-section (2) of section 21
- Dissenting
- Assenting
NA NA NA
Unsecured Financial Creditor -Creditors not having a right to vote under sub-section (2) of section 21
- Dissenting
- Assenting
11874177.60
11874177.60
11874177.60
3.
Operational
Creditors
(Other than workmen &
Page 10 of 31
Sl. No. Category of Creditor Amount of Claim
Claim Admitted
Amount provided in the Plan
employees & Government
/statutory dues)
(i)
Government
NA
NA
NA
(ii)
Workmen
PF dues
Other dues NA NA NA (iii) Employees
PF dues
Other dues NA NA NA (iv) Other Operational creditors 1744415.33 1456790.33 1456790.33
Other Debts and Dues
Shareholders
TOTAL
13618592.93
13330967.93 13330967.93
Page 11 of 31
- Synopsis of mandatory Provisions / Sections / Regulations and their compliance are as under:
Page 12 of 31
Page 13 of 31
Page 14 of 31
- In the course of the hearing, the Learned Counsel for the Resolution Professional would submit that the Resolution Plan complies with all the provisions of the Insolvency and Bankruptcy Code, 2016, read with relevant Regulations of the Insolvency and Bankruptcy Board of India (Insolvency Resolution Process for Corporate Persons) Regulations, 2016 and does not contravene any of the provisions of law for the time being in force.
A bare perusal of the extracts / excerpts from the Plan establishes
that the revised Resolution Plan submitted by SRA has been
approved with 100% voting share. As per the CoC, the plan meets the
requirement of being viable and feasible for revival of the Corporate
Debtor. By and large, all the compliances have been done by the RP and
the Resolution Applicant for making the plan effective after its approval.
11.
On perusal of the documents on record, supported by an affidavit
of the Resolution Professional, we accord our satisfaction that the
Resolution Plan as approved by the CoC, is in accordance with sections
30 and 31 of the IBC and also comply with regulations 38 and 39 of the
IBBI (Insolvency Resolution Process for Corporate Persons) Regulations,
2016, as enumerated supra.
12.
We have perused the reliefs, waivers and concessions as sought
for in the application. It is evident that some of the reliefs, waivers and
concessions sought by the Resolution Applicant come within the ambit
of the I&B Code and the Companies Act 2013, while many others fall
under
the
power
and
jurisdiction
of
different
government
Page 15 of 31
authorities/departments. This Adjudicating Authority has the power to
grant reliefs, waivers and concessions only concerning the reliefs,
waivers and concessions that are directly with the I&B Code and the
Companies Act (within the powers of the NCLT). The reliefs, waivers and
concessions
that
pertain
to
other
governmental
authorities/departments may be dealt with by the respective competent
authorities/forums/offices, Government or Semi-Government of the
State or Central Government concerning the respective reliefs, waivers
and concession, whenever sought for. The competent authorities
including the Appellate authorities may consider granting such reliefs,
waivers and concessions keeping in view the spirit of the I&B Code,
2016 and the Companies Act, 2013.
13.
As far as the question of granting time to comply with the
statutory obligations or seeking approvals from authorities is
concerned, the Resolution Applicant is directed to do so within one year
from the date of this order, as prescribed under section 31(4) of the I&B
Code.
14.
It is almost trite and fairly well settled that the Resolution Plan
must be consistent with the extant law. The Resolution Applicant shall
make necessary applications to the concerned regulatory or statutory
authorities for renewal of business permits and supply of essential
services, if required, and all necessary forms along with filing fees etc.
and such authority shall also consider the same keeping in mind the
Page 16 of 31
objectives of the Code, which is essentially the resolving of the
insolvency of the Corporate Debtor.
15.
In this context, we would rely upon the judgment in Embassy
Property Developments Pvt. Ltd. vs. State of Karnataka reported
at MANU/SC/1661/2019: (2020) 13 SCC 308, wherein, the Hon’ble
Apex Court has laid down that:
“39. If NCLT has been conferred with jurisdiction to decide
all types of claims to property, of the corporate debtor,
Section 18(f)(vi) would not have made the task of the
interim resolution professional in taking control and
custody of an asset over which the corporate debtor has
ownership rights, subject to the determination of
ownership by a court or other authority. In fact an asset
owned by a third party, but which is in the possession of
the corporate debtor under contractual arrangements, is
specifically kept out of the definition of the term "assets"
under the Explanation to Section 18. This assumes
significance in view of the language used in Sections 18
and 25 in contrast to the language employed in Section 20.
Section 18 speaks about the duties of the interim
resolution professional and Section 25 speaks about the
duties of resolution professional. These two provisions use
the word "assets", while Section 20(1) uses the word
"property" together with the word "value". Sections 18 and
Page 17 of 31
25 do not use the expression "property". Another important
aspect is that Under Section 25(2)(b) of IBC, 2016, the
resolution professional is obliged to represent and act on
behalf of the corporate debtor with third parties and
exercise rights for the benefit of the corporate debtor in
judicial, quasi-judicial
and
arbitration proceedings.
Section 25(1) and 25(2)(b) reads as follows:
25. Duties of resolution professional -
(1) It shall be the duty of the resolution professional to
preserve and protect the assets of the corporate debtor,
including the continued business operations of the
corporate debtor.
(2) For the purposes of Sub-section (1), the resolution
professional shall undertake the following actions:
(a).............
(b) represent and act on behalf of the corporate debtor with
third parties, exercise rights for the benefit of the
corporate debtor in judicial, quasi judicial and
arbitration proceedings.
This shows that wherever the corporate debtor has
to
exercise
rights
in
judicial,
quasi-judicial
proceedings, the resolution professional cannot
short-circuit the same and bring a claim before NCLT
taking advantage of Section 60(5).
Page 18 of 31
- Therefore in the light of the statutory scheme as culled
out from various provisions of the IBC, 2016 it is clear that
wherever the corporate debtor has to exercise a right that
falls outside the purview of the IBC, 2016 especially in the
realm of the public law, they cannot, through the
resolution professional, take a bypass and go before NCLT
for the enforcement of such a right.”
(Emphasis Added)
The reliefs sought for subsisting contracts/agreements can be
granted, and no blanket orders can be granted in the absence of the
parties to the contracts and agreements.
17.
Concerning the waivers with regard to the extinguishment of
claims which arose prior to the initiation of the CIR Process and which
have not been claimed are granted in terms of the law laid down by the
Hon’ble Apex Court in Ghanashyam Mishra and Sons Private Limited
vs. Edelweiss Asset Reconstruction Company Limited reported in
MANU/SC/0273/2021: (2021)9SCC657: [2021]13SCR737, wherein
the Hon’ble Apex Court has held that
“once a resolution plan is duly approved by the Adjudicating
Authority under sub-section (1) of section 31, the claims as
provided in the resolution plan shall stand frozen and will be
binding on the Corporate Debtor and its employees, members,
creditors, including the Central Govt., any State Govt. or any local
authority, guarantors and other stakeholders.”
Page 19 of 31
(Emphasis Added)
18.
Further, the relevant part of the Ghanshyam Mishra judgment
(supra) in this regard is reproduced below:
“61. All these details are required to be contained in the
information memorandum so that the resolution applicant is
aware, as to what are the liabilities, that he may have to face
and provide for a plan, which apart from satisfying a part of
such liabilities would also ensure, that the Corporate Debtor is
revived and made a running establishment. The legislative
intent of making the resolution plan binding on all the stake-
holders after it gets the seal of approval from the Adjudicating
Authority upon its satisfaction, that the resolution plan
approved by CoC meets the requirement as referred to in Sub-
section (2) of Section 30 is, that after the approval of the
resolution plan, no surprise claims should be flung on the
successful resolution applicant. The dominant purpose is, that
he should start with fresh slate on the basis of the resolution
plan approved.’
“62. This aspect has been aptly explained by this Court in the
case of Committee of Creditors of Essar Steel India Limited
through Authorised Signatory (supra).’
“107. For the same reason, the impugned NCLAT judgment
[Standard Chartered Bank v. Satish Kumar Gupta] in holding
Page 20 of 31
that claims that may exist apart from those decided on merits by the resolution professional and by the Adjudicating Authority/Appellate Tribunal can now be decided by an appropriate forum in terms of Section 60(6) of the Code, also militates against the rationale of Section 31 of the Code. A successful resolution applicant cannot suddenly be faced with "undecided" claims after the resolution plan submitted by him has been accepted as this would amount to a hydra head popping up which would throw into uncertainty amounts payable by a prospective resolution applicant who would successfully take over the business of the corporate debtor. All claims must be submitted to and decided by the resolution professional so that a prospective resolution applicant knows exactly what has to be paid in order that it may then take over and run the business of the corporate debtor. This the successful resolution applicant does on a fresh slate, as has been pointed out by us hereinabove. For these reasons, NCLAT judgment must also be set aside on this count.” 19. In this regard, we would also rely on the judgement of Hon’ble High Court of Rajasthan in the matter of EMC v. State of Rajasthan, Civil Writ Petition No. 6048/2020 with 6204/2020 reported in (2023) ibclaw.in 42 HC wherein it has been inter-alia held that
Page 21 of 31
“Law is well-settled that with the finalization of insolvency
resolution plan and the approval thereof by the NCLT, all dues of
creditors, Corporate, Statutory and others stand extinguished and
no demand can be raised for the period prior to the specified date.”
20.
Thus on the date of approval of resolution plan by the
Adjudicating Authority, all such claims, which are not a part of
resolution plan, shall stand extinguished and no person will be entitled
to initiate or continue any proceedings in respect to a claim, which is
not part of the resolution plan as per the law laid down by the Hon’ble
Supreme Court in Ghanashyam Mishra supra. The Hon’ble Supreme
Court also held that all the dues including the statutory dues owed to
the Central Govt, any State Govt or any local authority, if not part of
the resolution plan, shall stand extinguished and no proceedings in
respect of such dues for the period prior to the date on which the
Adjudicating Authority grants its approval under section 31 could be
continued.
21.
With respect to the waivers sought in relation to guarantors, we
seek to place reliance on the judgment of Lalit Kumar Jain v. Union
of India reported in MANU/SC/0352/2021: (2021) 9 SCC 321:
(2021) ibclaw.in 61 SC, wherein the Hon’ble Supreme Court held in
para 133 that sanction of a resolution plan and finality imparted to it
by section 31 does not per se operate as a discharge of the guarantor’s
liability shall apply.
Page 22 of 31
Further, we would rely upon the judgment rendered by the
NCLAT in Roshan Lal Mittal v. Rishabh Jain reported in (2023)
ibclaw.in 803 NCLAT that:
“The Resolution Plan does not absolve the personal guarantors
from their guarantee. The law well settled by the Hon’ble
Supreme Court in the matter of “Lalit Kumar Jain vs. Union of
India & Ors. – (2021) 9 SCC 321), that by approval of resolution
plan the guarantees are not ipso facto discharged.”
(Emphasis Added)
23.
With respect to the reliefs and waivers sought for all inquiries,
litigations, investigations and proceedings shall be granted strictly as
per the section 32A of the Code and the provisions of the law as may be
applicable.
24.
In this context, we would note that upon the approval of the
Resolution Plan, the Corporate Debtor avails the limbs of new
management to revive its business. Thus, all the past liabilities of the
Corporate Debtor including criminal liability prior to the initiation of
the CIR Process shall stand effaced and the new management will step
into the shoes of the company with a fresh or clean slate. Hence, the
old management shall be liable to face all the offences committed prior
to the commencement of the CIR Process. At this juncture, we would
rely upon the judgment rendered by the Hon’ble Apex Court in Ajay
Kumar Radheyshyam Goenka vs. Tourism Finance Corporation of
Page 23 of 31
India Ltd. reported in MANU/SC/0244/2023: (2023) 10 SCC 545
that:
“67. Thus, Section 32A broadly leads to:
a. Extinguishment of the criminal liability of the
corporate debtor, if the control of the corporate debtor
goes in the hands of the new management which is
different from the original old management.
b. The prosecution in relation to "every person who was a
"designated partner" as defined in Clause (j) of Section 2 of the
Limited Liability Partnership Act 2008 (6 of 2009), or an "officer
who is in default", as defined in Clause (60) of Section 2 of the
Companies Act. 2013 (18 of 2013), or was in any manner in
charge of, or responsible to the corporate debtor for the conduct
of its business or associated with the corporate debtor in any
manner and who was directly or indirectly involved in the
commission of such offence" shall be proceeded and the law
will take it’s own course. Only the corporate debtor (with new
management) as held in Para 42 of P. Mohanraj will be
safeguarded.
c. If the old management takes over the corporate debtor (for
MSME Section 29A does not apply (see 240A), hence for MSME
old management can takeover) the corporate debtor itself is
also not safeguarded from prosecution Under Section 138 or
any other offences.”
Page 24 of 31
(Emphasis added)
25.
Further, would also rely on the judgment of Hon’ble High Court
of Madras in the matter of Vasan Healthcare Pvt. Ltd. vs. The Deputy
Director of Income Tax (Investigation), Unit 3(2) reported in
MANU/TN/0243/2024: (2024) ibclaw.in 80 HC, wherein it was held
that:
“9. In the above judgement, the Apex Court after dealing
with the provision in detail, came to a categoric conclusion
that insofar as the criminal prosecution is concerned, the
criminal liability of the corporate debtor viz., company gets
completely wiped off and the new management is allowed
to take over the company on a clean slate. However, the
Apex Court also made it clear that the persons who are
involved in the day today affairs of the company and were
incharge and responsible for running of the company, will
be liable to face all the offence committed prior to the
commencement
of
the
Corporate
Insolvency
Resolution Process. There is no escape for those
persons from criminal liability even though the
corporate debtor is given a clean slate and is handed
over to the new Management.
10. Useful reference can also be made to the judgement of
the Calcutta High Court in [Tantia Constructions
Limited Vs. Krishna Hi-Tech Infrastructure P Ltd] in
Page 25 of 31
CRP No. 172 of 2022. The relevant portions in the order
are extracted hereunder :-
4. For the application of Section 32A of IBC, 2016 and
in light of the present matter, it is pertinent to determine the
following two issues, i.e.,
i. Whether the offence as complained in the impugned
criminal proceedings has been alleged to be committed
before the initiation of corporate insolvency resolution
process or during such process?
ii. Whether the resolution plan has resulted in change in
the management or corporate debtor in consonance
with the provisions of Section 32A(1) of IBC, 2016?
5. With respect to Issue No. 1, it is pertinent to note that the
corporate insolvency resolution process as against the
Petitioner/Corporate Debtor was initiated on 13.03.2019
when the application was accepted and the Order of
Moratorium under Section 14 of the IBC, 2016 was imposed
by NCLT, Kolkata in the aforementioned case. The complaint
that commenced the impugned criminal proceedings was
filed on 22.07.2019 before the concerned court by the
opposite
party.
Whereby,
said
alleged
offence
so
complained, took place before or during the corporate
insolvency resolution process and is covered under the ambit
of Section 32A of IBC, 2016.
Page 26 of 31
-
With respect to Issue No. 2, it is observed that the petitioner has not made specific submission in this regard. However, it is the submission of the opposite party that the impugned complaint case does not concern itself with the new directors that were appointed after takeover by the Resolution Applicant in line with the Resolution Plan so approved by NCLT dated 24.02.2022. It is their submission that they are primarily aggrieved by the actions of petitioner when it was in control of erstwhile Directors.
-
The above judgement clearly lays down the law on the subject. The moment the Corporate Insolvency Resolution Process is initiated against the corporate debtor and the application is accepted by the NCLT, the moratorium comes into operation. Once the resolution plan is accepted by the NCLT and orders are passed and the Corporate debtor gets into hands of the new management, all the past liabilities including the criminal liability of the Corporate debtor gets wiped off and the new Management takes over the company with clean slate.”
(Emphasis Added)
Very recently, the Hon’ble Madras High Court in M/s. Vasan Healthcare Pvt Ltd v. M/s. India Infoline Finance Ltd, Crl O.P. No.
Page 27 of 31
1772 of 2024, reported in (2024) ibclaw.in 700 HC, (hereinafter
referred to as ‘Vasan Healthcare Pvt. Ltd. II’) has observed that:
“13. As a result of the above discussion and the law laid in Ajay
Kumar Radheshyam Goenka case, it is clear that the
corporate debtor cannot be prosecuted for the prior liability after
the approval of the Resolution Plan. At the same time, it is to be
bear in mind the protection under Section 32-A of
Insolvency & Bankruptcy Code, 2016 is restricted only to
the Corporate debtor and not to its Directors who were in-
charge of the affairs of the Company when the offence
committed or the signatory of the cheque.”
(Emphasis Added)
Further, the Hon’ble Apex Court in Jaypee Kensington
Boulevard Apartments Welfare Association and Ors. vs. NBCC
(India)
Ltd.
and
Ors.
reported
in
(2022)
1
SCC
401:
MANU/SC/0206/2021 at Para 216, has laid down that:
“The
Adjudicating
Authority
has
limited
jurisdiction in the matter of approval of a
resolution plan, which is well-defined and
circumscribed by Sections 30(2) and 31 of the
Code. In the adjudicatory process concerning a
resolution plan under IBC, there is no scope for
interference with the commercial aspects of the
Page 28 of 31
decision of the CoC; and there is no scope for
substituting
any
commercial
term
of
the
resolution
plan
approved
by
Committee
of
Creditors. … .”
(Emphasis Added)
Further, in Committee of Creditors of Essar Steel India
Limited vs. Satish Kumar Gupta reported at (2020) 8 SCC 531:
MANU/SC/1577/2019, the Hon’ble Apex Court has propounded
that:
“38. This Regulation fleshes out Section 30(4) of the
Code, making it clear that ultimately it is the
commercial wisdom of the Committee of Creditors
which operates to approve what is deemed by a
majority of such creditors to be the best resolution plan,
which is finally accepted after negotiation of its terms
by
such
Committee
with
prospective
resolution
applicants.”
(Emphasis Added)
Hence, we would infer that if there are any personal guarantors of the corporate debtor, the personal guarantees shall be invoked and an appropriate action against them, in accordance with law, be taken.
Page 29 of 31
As far as the question of granting time to comply with the
statutory obligations/seeking sanctions from governmental authorities
is concerned, the Resolution Applicant is directed to do the same within
one year as prescribed under section 31(4) of the Code.
31.
In case of non-compliance of this order or withdrawal of
Resolution Plan, the CoC shall have the right to forfeit the EMD amount
already paid by the Resolution Applicant.
32.
In the light of the enumerations and observations made in this
Order supra, we hereby APPROVE the Resolution Plan submitted on
by M/s Quicktouch Technologies Ltd (Successful Resolution
Applicant).
33.
The Resolution Plan shall form part of this Order and shall be
read along with this order for implementation. The Resolution Plan thus
approved shall be binding on the Corporate Debtor and all other
stakeholders involved in terms of Section 31 of the I&B Code, so that
the revival of the Corporate Debtor Company shall come into force with
immediate effect without any delay.
34.
The Resolution Plan is binding on the Corporate Debtor and other
stakeholders involved so that revival of the Debtor Company shall come
into force with immediate effect.
35.
The Moratorium imposed under section 14 shall cease to have
effect from the date of this order.
36.
The Resolution Professional shall submit the records collected
during the commencement of the proceedings to the Insolvency &
Page 30 of 31
Bankruptcy Board of India for their record and also return to the
Resolution Applicant or New Promoters.
37.
Certified copy of this Order be issued on demand to the concerned
parties, upon due compliance.
38.
Liberty is hereby granted for moving any Application if required
in connection with implementation of this Resolution Plan.
39.
A copy of this Order is to be submitted in the Office of the
Registrar of Companies, West Bengal.
40.
It is not on record that whether the Financial Creditors have
invoked Personal Guarantees or not. It is essential for the purpose of
maximization for wealth of the Corporate Debtor, personal guarantees
need to be invoked. Therefore, we direct the Financial Creditors to
invoke Personal Guarantees, if not already done.
41.
The Resolution Professional may stand discharged from his
duties with effect from the date of this Order, however, he is required to
comply with our direction mentioned in Para 30 of the order subject to
comply the direction, which the creditors should bear in mind.
42.
The Resolution Professional shall stand discharged from his
duties with effect from the date of this Order.
43.
The Resolution Professional is further directed to handover all
records, premises/factories/documents to the Resolution Applicant to
finalise the further line of action required for starting of the operation.
The
Resolution
Applicant
shall
have
access
to
all
the
records/premises/factories/documents
through
the
Resolution
Page 31 of 31
Professional to finalise the further line of action required for starting of
the operation.
44.
The Registry is directed to send e-mail copies of the order
forthwith to all the parties and their Ld. Counsel for information and
for taking necessary steps.
45.
The Interlocutory Application being IA (IB)/(PLAN)/17(KB)2025
along with main Company Petition vide CP(IB) No. 279(KB) /2024
shall stand disposed of accordingly.
46.
Certified copy of this order may be issued, if applied for, upon
compliance of all requisite formalities.
(Siddharth Mishra) Member (Technical) (Bidisha Banerjee) Member (Judicial) Signed on this, the 04th day of November, 2025
M. Jana (P.S.)
Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.
No analysis has been generated for this document yet.