Table of Contents S/No. Particular Page No. 1 View map of eco-sensitive zone 2 2 Location of proposed site under eco-sensitive zone 2 3 Work proposed under different programmes 3 4 Cost analysis of water supply scheme under National Rural Drinking Water Programme 5 5 Cost analysis of individual house hold toilets 6
2 1. View Map of Eco Sensitive Zone
Location of proposed sites under Eco-Sensitive Zone
3
3.
Work proposed under different programmes
HHL (Household latrine) construction in all villages and solid & Liquid
waste management work in Bandrani & Raithal Gram Panchyat under
Swachh Bharat Mission (SBM) (G) Programme.
Community Toilet and Solid & Liquid waste management work Namami
Gange programme.
Proposed works under SBM (G)
Sl. No
Work
Cost
(in
Lac)
Work Category notify in
Gazette
Remarks
Regulated Permitted
Non
Permitted
01
Mukhwa
Water
Supply
30.27
Permitted -
No explosive will be
used in digging of
trenches. Muck will be
used filling of trenches
and
no
Muck
be
remain. In futures same
works can be done as
per the public demand
in Eco-Sensitive Zone
as per laid norms.
02
Dwari Water
Supply
17.72
Permitted -
Proposed works under SBM (G)
Sl. No
Work
Cost
(in
Lac)
Work Category notify in
Gazette
Remarks
Regulated Permitted
Non
Permitted
01
IHHL (855)
100.02
Permitted
To make villages
ODF
02
Solid & Liquid waste management (Drainages/Soak Pit/Garbage Pit)
1- Bandrani
7.00
Regulated
Contaminated water will be discharge on ground/ rivulet after proper treatment. In futures same works can be done as per the public demand in Eco-Sensitive Zone as per laid norms .
2- Raithal
12.00
Regulated
4
Proposed works under Namami Gange Programm
Sl. No
Work
Cost
(in
Lac)
Work Category notify in
Gazette
Remarks
Regulated Permitted
Non
Permitted
1
Bagori
12.00 Regulated
Contaminated water
will be discharge on
ground/rivulet
after
proper treatment. In
futures same works
can be done as per
the public demand in
Eco-Sensitive
Zone
as per laid norms .
2
Bhatwari
12.00 Regulated
3
Bhela Tipri
7.00
Regulated
4
Dhrali
12.00 Regulated
5
Didsari
7.00
Regulated
6
Harsil
7.00
Regulated
7
Jhala
12.00 Regulated
8
Joshiyara
15.00 Regulated
9
Kansain
15.00 Regulated
10
Ladari
20.00 Regulated
11
Malla
12.00 Regulated
12
Mandow
7.00
Regulated
13
Siror
12.00 Regulated
14
Tiloth
15.00 Regulated
5
4.
Cost analysis for water supply scheme under National Rural Drinking
Water Programme
Under national rural drinking water programme the water supply schemes will be
constructed in two gram panchayats as mukba and dwari
Mukhba- In Mukhba water supply cost estimated as 30.27 Lakhs for a population of
687 .
Per capita cost is estimated Rs. 4406.11for the project.
About 55 lpcd water will be provided at stand post and 75 lpcd water will be provided
at individual house hold level connection.
As the water is an important component of sanitation so the water supply scheme is
designed to connect 75 % of Households by private connection at base year, and
100% households upto designed year.
In the water supply scheme the most of construction material is non local and
provided by open market purchasing. The local materials as sand, stone & Grits are
provided by the locally available sources, for construction of water supply reservoir
for safe storage of water, roughening filter for filtration of drinking water, and source
work for collection of water.
Dwari- In Dwari water supply scheme cost is estimated as 17.42 Lakhs for a
population of 432.
Per capita cost is estimate as RS. 4032.00 for the project.
Same the 55 lpcd water will be provide at stand post and 75 lpcd for individual house
hold connection.
Scheme is designed to connect 75 % of Households by private connection at base
year, and 100% households upto designed year.
In the water supply scheme the most of construction material is non local and
provided by open market purchasing. The local materials as sand, stone & Grits are
provided by the locally available sources, for construction of water supply reservoir
for safe storage of water, roughening filter for filtration of drinking water, and source
work for collection of water.
As the water is an important need for drinking and other day to day activites.
6
5.
Cost analysis of Individual House Hold Toilets
The toilets of individual house hold has been constructing under “Swatch Bharat
Mission” and Swajal project is working just as a facilitator by giving as a amount of
12000.00 to a house hold after constructing new toilet.
The above programme is set to achieve a mindset of 100% sanitation and made total
open defecation free community at gram panchayat level.
Swajal project is not constructing toilets itself but just giving a motivation for total
sanitation. In eco sensitive zone the above program should boosted on priority basis
so that not a single house hold will open defecate.
The solid and liquid waste management project is running under Swatch Bharat
Mission guidelines for the scientific management of the solid and liquid waste at gram
panchayat level. The project has consist of components as compost pit for the
composting of cow dung, soak pit for safe drainage and disposal of domestic waste
water, drains for safe drainage of waste water/ rain water.
In the above project the overall cost the estimate is limited on household basis as per
guideline of Ministry of Drinking Water & Sanitation Govt. of India.
upto 150 household the overall cost of estimate limited upto Rs. 7.00 lacs
upto 300 household the overall cost of estimate limited upto Rs. 12.00 lacs
upto 500 household the overall cost of estimate limited upto Rs. 15.00 lacs
and above 500 household cost can exceed upto Rs. 20.00 lacs in above analysis, the
expenditure in per household comes around Rs. 5000.00, which includes compost pit
for composting cow dung, soak pit for safe disposal of house hold drainage sludge
water, and garbage bins for non biodegradable disposal of solid waste
Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.
No analysis has been generated for this document yet.