कार्यालय ज्ञापन (11-06-2025) – वैज्ञानिकों के संबंध में स्पैरो पोर्टल के ऑनलाइन एपीएआर वर्कफ़्लो का निर्माण न होना।
वैज्ञानिकों के संबंध में स्पैरो पोर्टल के ऑनलाइन एपीएआर वर्कफ़्लो का निर्माण न होना।
No. ADMIN/78/2024-P-I (E-248315) R EMIN DER Government of India ~~
Ministry of Environment, Forest and Climate Change
Indira Paryavaran Bhawan, 1% Floor, Prithvi Block, Jor Bagh Road, Aliganj, New Delhi 110003 Dated: 11.06.2025
Office Memorandum
Subject: Non-generation of online APAR workflow in SPARROW Portal in respect of Scientists — reg.
The undersigned is to refer to the O.M. of even No. dated 28.05.2025 (copy enclosed) on the above mentioned subject, wherein, Senior Consultant (IT) was requested to furnish his response regarding non-generation of APAR workflows in the SPARROW Portal in respect of the following Scientists of this Ministry:
Name of Scientist Designation Physically | 2.ellis|[Dr. Khursid Alam Parvin Khan[scientist[Scientist ‘C’© | 01.04.2022[28.07 toto 20 31.03. . 10.22 0 22 2 022.1 01.04.2021 to 31.10.2021, 3 Dr. M. Rajeshwar veg ess [01.11.2021 to 31.03.2022, Prasad Scientist 'C’ Io4 04.2022 to 30.06.2022 and 01.07.2022 to 31.03.2023 _ 2. In this regard, it is stated that response is yet to be received from Sr. Consultant . (IT). Accordingly, Senior Consultant (IT) is again requested to furnish his response regarding non-generation of APAR workflows in the SPARROW Portal in respect of the above-mentioned Scientists, so that the issue could be examined further. The reply in the matter may please be furnished immediately. :
Encl: As above.
me_ ayy (Sanjay~Y Kumart] (Oe peas Under Secretary to the Government of India
To
Shri S. Annadurai, Sr. Consultant (IT) MoEF&CC, New Delhi
,
No. ADMIN/78/2024-P-} (E-248319) Government of India Ministry of Environment, Forest and Climate Change
;
indira Paryavaran Bhawan, 4% Floor, Prithvi Block, Jor Bagh Road, Aliganj, . New Delhi 110003
.
.
Office Memorandum
—
Subject: Non-gensration of online APAR workflow in SPARROW Portal in respect of Scientists — reg.
==> picture [444 x 258] intentionally omitted <==
----- Start of picture text -----<br> The undersigned is to refer to the physical copies of Annual Performance<br>Appraisal Reports (APARs) received in the APAR Cell in respect of the following<br>Scientists of this Ministry:<br>Si. Name of Scientist_ a | PeriodofPhysicallyAPAR Submitted |<br>he Shahida Parvin scien =f for.04.2022 to 20.10.2022<br>2_[Dr.. waziKhursid Alem Khan; [Scientist ‘C’. |[28.07.202110 31.03.2022<br>Dr. [ot-o4 200 to 31.10.2021,<br>3 M, Rajesnwar «arp eer 104.114.2021 to 31.03.2022,<br>Prasad Scientist ‘C’ I94 94.2022 to 30.06.2022 and<br> _. 01.07.2022 lo 34.03.2023<br>2. in this regard, clarification was sought from ail the thee Scientists for submitting<br>their APARs in physical/ offline mode. in response, the Scientists have submitted as<br>under:<br>----- End of picture text -----<br>
(i) Dr. Shahida Parvin Quazi, Scientist ‘E’:
She has submitted that the SPARROW form contained incorrect entries regarding her grade and designation. The issue was brought to the notice of the Senior Consultant (iT) and the then Section Officer, and an email dated 28.08.2023 was also sent in this regard. As the issue remained unresolved, the self-appraisal was submitted physically on 24.11.2023.
(ii) Dr. Khursid Alam Khan, Scientist °C’:
Dr. Khan submitted that although the APAR for the period 28.07.2021 to 31.03.2022 was due, the online workflow was not generated. Several emails were reporiediy sent to the [T Cell highlighting the issue, but in the absence of any resolution, a physical copy of the APAR was submitied. .
(iii) Dr. M. Rajeshwar Prasad, Scientist 6G’
The officer has supmiited that for the APAKs peria ining to periods 2021-22 and 2022-23, the workflows were not generated. He has sudmitied ernail correspondence addressed io the P-I Section and the IT Celi explaining that repeated
.
follow-ups were made for generation of workflows. For 2021-22 and 2022-23, physical copies were submitted.
- in this regard, repeated requesis were made to the Senior Consultant (IT) to clarify the reasons for non-generation of the workflow in respect of Dr. M. Raieshwar Prasad, Scientist ‘C’. However, response is stil! awaited, 4, ln view of the above, Senior Consultant (IT), is requested to furnish his response regarding non-generation of APAR workflows in the SPARROW Portal in respect of the above-mentioned officers, so that the issue could be examined further. The reply in the matter may please be furnished immediately.
ao” ' - dt
(Sanjay Kumar) ! Under Secretary to the Governmeni of India
To -* Shri S. Annadurai, Sr. Consultant (1) . MoEF&CC, New Delhi h qA
Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.
No analysis has been generated for this document yet.