← Archive
IN FORCE

Compounding order under Section 441 of the Companies Act, 2013 for violation of Section 96 of the Companies Act, 2013 in the matter of M/s. Fev India Private Limited

Reliability

In force — no superseding record on file.

Document text

BEFORE THE REGIONAL DIRECTOR (NORTHERN REGION)

Company Application No. RDNR/FEV/COMP/441/2025/N31334139 In the matter of theCompanies Act, 2013 - Section 441 And

In the Matter of FEV INDIA PRIVATE LIMITED having Registered office at B-260, Greater Kailash-I, South Delhi, New Delhi, Delhi, India-110048.

In the matter of:

  1. Fev India Private Limited.

  2. Mr. Chetan Moreshwar Joshi, (Director).

  3. Mr. Navneet Ojha, (Director).

.--Applicant(s)

Present:

Mr. Sanjay Chugh, Ld. PCS. Ms. Aruna M, Assistant Director.

....For Applicant(s) ....Presenting Officer

Date of Hearing: 17.12.2025

INTERIM ORDER

  • |. An application under section 441 of the Companies Act, 2013, for compounding of default committed u/s 96 of the Companies Act, 2013 was filed by the aforesaid Applicants vide Form GNL-! through SRN N31334139.

2. Facts presented by the Presenting Officer:

Factors to be Considered

(1) The gravity of offence: The Company has failed to hold the Annual General Meeting (AGM) within the stipulated time period pursuant to the provision of section 96 of the Act. The AGMofthe company for the financial year ended 31.03.2023 was required to be held on or before 31.12.2023 (extended date of AGM, extension applied vide SRN F64593924 dated 19.09.2023) but the same was held on 22.03.2024 (82 days delay), hence default.

(ii) The act is intentional or | Unintentional. unintentional: (iil) The maximum punishment | Section 99 of The Companies Act, 2013: prescribed for such offences, such as fine or | "If any default is made in holding a meeting of the company imprisonment or both fine | in accordance with the section 96 or section 97 or section and imprisonment: 98 or in complying with any directions of the Tribunal, the company and every officer of the company who is in default shall be punishable with fine which may extend to one lakh rupees and in the case ofa continuing default, with a further fine which may extend to five thousand rupees for every day during which such default continues"

==> picture [205 x 100] intentionally omitted <==

----- Start of picture text -----<br> ee; ata FS ~<br>Page 1 of 3 ie(KS RESIGH.The FDot ll,<br>tow GS TA.<br>= Wa a<br>\Ke . are 5 rf j<br>\2 a ee EN ‘<br>----- End of picture text -----<br>

---- Start of picture text -----<br> ee; ata FS ~<br>Page 1 of 3 ie(KS RESIGH.The FDot ll,<br>tow GS TA.<br>= Wa a<br>\Ke . are 5 rf j<br>\2 a ee EN ‘<br>----- End of picture text -----**<br>

||Fine reported/recommended by theROC, is as follows:|||
|---|---|---|---|
||Name<br>of| Fine<br>Additional | Total Fine<br>applicants<br>(in Rs.)<br>Fine<br>(in Rs.)<br>in Rs.)<br>*|||
||Fev<br>India | 1,00,000/- | 4,05,000/- | 5,05,000/-|||
||Private|||
||Limited.<br>Mr.<br>Chetan| 1,00,000/-<br>|4,05,000/-<br>| 5,05,000/-<br>lean<br>Joshi.|||
||Ojha.|||
||*Forthepurpose ofadditional fine:|||
||Rs. 5000/-X 81 days= Rs. 4,05,000/-|||
|Companies:<br>(v)<br>The period ofdefault:<br>FinancialYear2022-23. (82days delay)<br>——<<br>(vi)<br>Whether<br>petition _for |Suo-Moto application filed bytheApplicants.||||
||compounding<br>is suo-moto|||
||before or after notice from|||
||the Registrar ofCompanies|||
||or after imposition of the|||
||punishment or during the|||
|pendency<br>of a proceeding:<br>(vii)<br>Whether<br>defaulter<br>has |The Petitioner Company has made its default good in<br>madegood ofthedefault: | respect of the contravention of Section 96(1) of the<br>Companies Act, 2013 by holding the AGM for the F.Y.<br>2022-23 on 22.03.2024 and has also filed AOC-4 e-form<br>videSRNF96359294dat**e**d 22.06.2024 andMGT-7vide<br>To<br>e e<br>approved.<br>(viii) | Financial Condition ofthe<br>During the course ofhearing Ld.

3 on 22.03.2024 and has also filed AOC-4 e-form<br>videSRNF96359294dat**e**d 22.06.2024 andMGT-7vide<br>To<br>e e<br>approved.<br>(viii) | Financial Condition ofthe<br>During the course ofhearing Ld. PCS confirms that the<br>Company<br>and<br>other|turnover<br>of<br>the<br>Company<br>is<br>Rs.<br>336<br>Crores<br>defaulter:<br>(Approximately) andProfitofRs.47Lacs(Approximately)<br>for the FY 2022-23.||||
|(ix)<br>Similar<br>_<br>offence |No.<br>cee<br>ears:<br>(x)<br>The act of defaulters<br>is |No.<br>Kiesdeni<br>prejudicialtothe interestof<br>[FSa “G8<br>themember(s) orcompany<br>ee €ee 42\<br>or public interestornot:<br>fe<br>ety<br>al||||
||company,<br>etc:<br>\<br>im<br>poaetd|ial|J|

Page 2 of 3

(xiii) | Any other factor relevant to | Ld. PCS prays for leniency as the default was on account of the case: delay in financial statements due to accounting sofiwarerelated glitches faced in this duration.

  1. Compounding Fee levied for the default committed under Section 96 of the Companies Act, 2013 for F.Y. 2022-23 is as follows:

S. No. Applicant Name Default period Compounding fee payable by the applicant (in INR) Fev India Private Limited. FY 2022-23. Rs. 3,00,000/Mr. Chetan Moreshwar Joshi. FY 2022-23. Rs. 1,50,000/Mr. Navneet Ojha. FY 2022-23. Rs. 1,50,000/-

  1. Payment to be made within 15 days.
  • 5, Any other details: Nothing as such.

Signed on the __ day of January 2026 at New Delhi.

09 JAN 2026 (VINOD SHARMA) REGIONAL DIRECTOR (NR)

Entd. . RDNR/FEV/COMP/441/2025/N31334139 |2.2°81254

==> picture [123 x 23] intentionally omitted <==

----- Start of picture text -----<br> tea 09 JAN 2026<br>----- End of picture text -----<br>

  1. Fev India Private Limited. B-260, Greater Kailash-I, South Delhi, New Delhi, Delhi, India-110048.

  2. Mr. Chetan Moreshwar Joshi. 54, Amitdeep Tulshibagwale Colony, Shraddha Hospital, Sahkar Nagar, Parvati, Pune City, Pune, Maharashtra-41 1009.

  3. Mr. Navneet Ojha.

  • H. No. 13/65, Nahar Mohalla, Ajmer, Rajasthan-306001.
  1. Registrar of Companies, NCT of Delhi & Haryana.

==> picture [105 x 41] intentionally omitted <==

----- Start of picture text -----<br> SAE y® May EN<br>Fe Gae Wa<br>----- End of picture text -----<br>

Page 3 of 3

Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.

Analysis

No analysis generated for this document yet (analysis runs over brief docs + on-demand). Run build_analysis.py --ids 24275 --apply.

Citation copied