Standard Operating procedure for Processing of Bonds and Bank Guarantees in BBM-regarding
In force — no superseding record on file.
F.NO. S/22-GEN- 150 /2015-16 AM (I)
सीमाशुल्क आयुक्त (एन एस –III) का कायाालय
OFFICE OF THE COMMISSIONER OF CUSTOMS, NS-III
जवाहरलाल नेहरू सीमाशुल्क भवन, न्हावा शेवा,
JAWAHAR LAL NEHRU CUSTOM HOUSE, NHAVA- SHEVA
ता. उरण,, TAL-URAN, जजला रायगड /RAIGAD – 400707,
महाराष्ट्र MAHARASHTRA
F.NO. S/22-GEN- 150 /2015-16 AM (I) Date: 06.10.2017
STANDING ORDER NO : 32/2017
Subject: Standard Operating procedure for Processing of Bonds and Bank
Guarantees in BBM-regarding
A new Bond & Bank Guarantee Module (BBM) is being introduced with effect from 10.10.2017 for monitoring & management of Bonds & Bank Guarantees (BGs) required to be furnished by importers / exporters / any other person in compliance to various provisions of Customs Act, 1962. The following Standard Operating Procedure (SOP) is hereby prescribed for Departmental Officers for dealing with such Bonds & BGs in the newly launched BBM Module for effective monitoring of Bonds & BGs.
- Vetting of Bond /BG by Group AO: On being approached by the Importer / Customs Broker, the import group will decide the type and amount of Bond & BG to be submitted and contents thereof. The Bond and BG so submitted will be vetted by the Appraiser (Group), among other things, for verification that the BG contains an auto- renewal clause and does not contain a nullifying clause that limits its validity.
Registration of Bond & BG both in EDI & BBM: Further Bond and BG will be registered on both systems i.e. EDI system and on BBM. The hard copy of the information (Bond/BG/Check List etc.) duly checked & verified by the Appraiser(Group) will be submitted to AC/DC(Group) for their approval/acceptance, in the concerned file. Simultaneously, a job will be generated by STA/Inspector(Group) on EDI System. The job no. so generated will be sent to AC/DC(Group) for approval.
their approval/acceptance, in the concerned file.
Simultaneously, a job will be generated by STA/Inspector(Group) on EDI System. The
job no. so generated will be sent to AC/DC(Group) for approval. After acceptance of
Bond/BG in file and also in the EDI System, the details will be entered in the BBM
Module by STA(Group) and same will be submitted to AC/DC(Group) on BBM module
for approval. Print out from the BBM Module will be retained in Group for record.
3.
Role & Responsibility of BG Cell (BBM Unit):
(i) The original file along with original BG & Bond with other details will be sent to
Bank Guarantee Cell (to be called as “BBM Unit”) for safe custody. PO (BBM Unit), after
checking / verifying the details/data already entered in the Module, will receive the
original BG & Bond from the group and acknowledge receipt of the same online on the
BBM Module. If the data entered in the module is found to be as per the documents,
the Superintendent (BBM Unit) will approve the same and generate BBM Number.
Otherwise, the same will be returned back to the concerned group for taking necessary
corrective action.
(ii).
An auto-generated letter will be issued by PO (BBM Unit) to the respective Bank
for verifying the genuineness of the BG.
back to the concerned group for taking necessary corrective action. (ii). An auto-generated letter will be issued by PO (BBM Unit) to the respective Bank for verifying the genuineness of the BG.
F.NO. S/22-GEN- 150 /2015-16 AM (I)
(iii) Thereafter, the Bond and BG received from the group will be scanned and
uploaded by PO (BBM Unit) into the module.
(iv)
After the BBM Number is generated, the file will be returned to group through
DC/AC (BBM Unit) with due endorsement with a Xerox copy of Bond/BG placed duly in
the file. On getting the file so endorsed the AC/DC(Group) will allow debit and
assessment of the concerned Bill of Entry by the concerned group.
(v) The BG & Bond will be stored properly in the lockers of the BBM Unit, thereby, the
practice of sending BGs’ to Cash Section shall be discontinued.
(vi) In addition to that, all the old BGs’ in custody of Cash Section shall be received by
BBM Unit under proper handover and takeover note for regularization and for uploading
in the BBM by the BBM Unit.
(vii) It will be the responsibility of the PO of BBM Unit to regularly monitor the Bonds
and BGs for expiry and renewal. He/She will put up cases slated for expiry in the next
month for perusal of the Superintendent (BBM Unit) and AC/DC (BBM Unit).
(viii) Superintendent (BBM Unit) will be responsible for proper upkeep, safety, validity
and cancellation of Bonds and BGs in time, whereas DC/AC(BBM Unit) has been made
responsible for the purpose of monitoring the above work in terms of the Departmental
Instructions.
afety, validity
and cancellation of Bonds and BGs in time, whereas DC/AC(BBM Unit) has been made
responsible for the purpose of monitoring the above work in terms of the Departmental
Instructions.
(ix) In case of BGs & Bonds which are due to expire by the end of next month, the
Superintendent (BBM unit) will issue a letter to the party/Bank with a copy to the
concerned group for renewal.
4.
If any request is received by BBM Unit from the group to return the original BG &
Bond for the purpose of finalization/enforcement/cancellation, Superintendent / PO
(BBM Unit) will forward the original copy of BGs & Bonds for Finalization/Enforcement of
BGs/Cancellation by Group.
5.
Difficulties, if any, in implementation of the aforesaid guidelines may be brought
to the notice of DC/AC in charge of Appraising Main (Import) NS-III (email address:
appraisingmain.jnch@gov.in).
.
-sd-
(SUBASH AGRAWAL)
COMMISSIONER OF CUSTOMS, NS-III
Copy to: 1. The Chief Commissioner of Customs, Mumbai Zone-II, JNCH for information. 2. The Commissioner of Customs, NS-Gen, I, II,III,IV,V, JNCH. 3. The Addl./Jt. Commissioner of Customs, NS-Gen, I, II,III,IV,V JNCH. 4. All Dy. / Asstt. Commissioner of Customs, NS-Gen, I, II,III,IV,V JNCH. 5. The DC/AC, EDI for uploading on JNCH Website immediately. 6. Notice Board.
Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.
No analysis generated for this document yet (analysis runs over brief docs + on-demand). Run build_analysis.py --ids 2167 --apply.