No. K-43022/107/2021-SEZ Government of India Ministry of Commerce and Industry Department of Commerce (SEZ Section) DatedUdyog the re|&*NovembNias N e r,w Delhi 2021

OFFICE MEMORANDUM

Subject: 107" Meeting of the Board of Approval (BoA) for Special Economic Zones (SEZs) scheduled to be held on 25'" November, 2021 at 4.00 P.M in Room no. 141, Udyog Bhawan, New Delhi - Agenda regarding. on In continuation to this Department’s O.M. of even number dated 9" November, 2021 the above mentioned subject, the undersigned is directed to enclose herewith the Agenda for the 107" meeting of the BoA for SEZs scheduled to be held on 25" November, 2021 at 4:00 P.M. in Room no. 141, Udyog Bhawan, New Delhi for information and necessary action. The agenda has also been hosted on the website: www.sezindia.gov.in.

| | |

  1. The local addressees may kindly make it convenient to attend the meeting at the above venue and time. Other participants may attend the meeting through Video Conference. A weblink for the same will be shared by this department shortly. | (Sumit Kumar Sachan)a "t y | Under Secretary to the Government of India Tel: 2306 2496 Email: sumit.sachan@nic.in

To

  1. Central Board of Excise and Customs, Member (Customs), Department of Revenue, North Block, New Delhi. (Fax: 23092628).

  2. Central Board of Direct Taxes, Member (IT), Department of Revenue, North Block, New Delhi. (Telefax: 23092107).

  3. Joint Secretary, Ministry of Finance, Department of Financial Services, Banking Division, Jeevan Deep Building, New Delhi (Fax: 23344462/23366797).

  4. Shri Anil Agarwal, Additional Secretary, Department of Promotion of Industry and Internal Trade (DPIIT), Udyog Bhawan, New Delhi.

ion, Jeevan Deep Building, New Delhi (Fax: 23344462/23366797).

  1. Shri Anil Agarwal, Additional Secretary, Department of Promotion of Industry and Internal Trade (DPIIT), Udyog Bhawan, New Delhi.

  2. Joint Secretary, Ministry of Shipping, Transport Bhawan, New Delhi.

  3. Joint Secretary (E), Ministry of Petroleum and Natural Gas, Shastri Bhawan, New Delhi

  4. Joint Secretary, Ministry of Agriculture, Plant Protection, Krishi Bhawan, New Delhi. 8. Ministry of Science and Technology, Sc ‘G’ & Head (TDT), Technology Bhavan, Mehrauli Road, New Delhi. (Telefax: 26862512)

  5. Joint Secretary, Department of Biotechnology, Ministry of Science and Technology, 7 Floor, Block 2, CGO Complex, Lodhi Road, New Delhi - 110 003.

  6. AdditionalEnterprises SecretaryScale Industry),and DevelopmentRoom CommissionerNo. 701, NirmanBhavan,(Micro, Small andNewMediumDelhi (Fax: 23062315).

  7. Secretary, Department of Electronics & Information Technology, Electronics Niketan, 6, CGO Complex, New Delhi. (Fax: 24363101)

  8. Joint Secretary (IS-I), Ministry of Home Affairs, North Block, New Delhi (Fax: 23092569)

  9. JointDelhi.Secretary (C&W), Ministry of Defence, Fax: 23015444, South Block, New 14. Joint Secretary, Ministry of Environment and Forests, PariyavaranBhavan, CGO 15. Complex, New Delhi — 110003 (Fax: 24363577) Joint Secretary & Legislative Counsel, Legislative Department, M/o Law & Justice, A-Wing, ShastriBhavan, New Delhi. (Tel: 23387095).

varanBhavan, CGO 15. Complex, New Delhi — 110003 (Fax: 24363577) Joint Secretary & Legislative Counsel, Legislative Department, M/o Law & Justice, A-Wing, ShastriBhavan, New Delhi. (Tel: 23387095).

  1. Department of Legal Affairs (Shri Hemant Kumar, Assistant Legal Adviser), M/o 17. Law & Justice, New Delhi. Secretary, Department of Chemicals & Petrochemicals,Shastri Bhawan, New Delhi

  2. Joint Secretary, Ministry of Overseas Indian Affairs, Akbar Bhawan, Chanakyapuri, 19. New Delhi. (Fax: 24674140) Chief Planner, Department of Urban Affairs, Town Country Planning Organisation,

VikasBhavan (E-Block), I.P. Estate, New Delhi. (Fax: 23073678/23379197)

  1. Director General, Director General of Foreign Trade, Department of Commerce, 21. UdyogBhavan, New Delhi. Director General, Export Promotion Council for EOUs/SEZs, 8G, ha Floor,

  2. Hansalaya Building, 15, Barakhamba Road, New Delhi — 110 001 (Fax: 223329770) Dr.RupaChanda, Professor, Indian Institute of Management, Bangalore, Bennerghata

  3. Road, Bangalore, Karnataka Development Commissioner, Noida Special Economic Zone, Noida.

  4. Development Commissioner, Kandla Special Economic Zone, Gandhidham.

  5. Development Commissioner, Falta Special Economic Zone, Kolkata. 26. Development Commissioner, SEEPZ Special Economic Zone, Mumbai.

| | | | | | | | | | | | | |

  1. Development Commissioner, Madras Special Economic Zone, Chennai 28. Development Commissioner, Visakhapatnam Special Economic Zone, Visakhapatnam

  2. Development Commissioner, Cochin Special Economic Zone, Cochin.

ssioner, Madras Special Economic Zone, Chennai 28. Development Commissioner, Visakhapatnam Special Economic Zone, Visakhapatnam

  1. Development Commissioner, Cochin Special Economic Zone, Cochin.

  2. Development Commissioner, Indore Special Economic Zone, Indore.

  3. Development Commissioner, Mundra Special Economic Zone, 4" Floor, C Wing, Port Users Building, Mundra (Kutch) Gujarat.

  4. Development Commissioner, Dahej Special Economic Zone, Fadia Chambers, Ashram Road, Ahmedabad, Gujarat

  5. Development Commissioner, Navi Mumbai Special Economic Zone, SEEPZ Service Center, Central Road, Andheri (East), Mumbai — 400 096

  6. Development Commissioner, Sterling Special Economic Zone, Sandesara Estate, AtladraPadra Road, Vadodara - 390012

  7. Development Commissioner, Andhra Pradesh Special Economic Zone, UdyogBhawan, 9" Floor, Siripuram, Visakhapatnam — 3

  8. Development Commissioner, Reliance Jamnagar Special Economic Zone, Jamnagar, Gujarat

  9. Development Commissioner, Surat Special Economic Zone, Surat, Gujarat 38. Development Commissioner, Mihan Special Economic Zone, Nagpur, Maharashtra 39, Development Commissioner, Sricity Special Economic Zone, Andhra Pradesh.

|

  1. Development Commissioner, Mangalore Special Economic Zone, Mangalore. 41. Government of Andhra Pradesh, Principal Secretary and CIP, Industries and Commerce Department, A.P. Secretariat, Hyderabad — 500022. (Fax: 040-23452895).

  2. Government of Telangana, Special Chief Secretary, Industries and Commerce Department, Telangana Secretariat Khairatabad, Hyderabad, Telangana.

tariat, Hyderabad — 500022. (Fax: 040-23452895).

  1. Government of Telangana, Special Chief Secretary, Industries and Commerce Department, Telangana Secretariat Khairatabad, Hyderabad, Telangana.

  2. Government of Karnataka, Principal Secretary, Commerce and Industry Department, VikasSaudha, Bangalore — 560001. (Fax: 080-22259870)

  3. Government of Maharashtra, Principal Secretary (Industries), Energy and Labour Department, Mumbai — 400 032.

  4. Government of Gujarat, Principal Secretary, Industries and Mines Department Sardar Patel Bhawan, Block No. 5, 3rd Floor, Gandhinagar — 382010 (Fax: 079-23250844).

  5. Government of West Bengal, Principal Secretary, (Commerce and Industry), IP Branch (4 Floor), SEZ Section, 4, Abanindranath Tagore Sarani (Camac Street)

  6. Kolkata — 700 016 Government of Tamil Nadu, Principal Secretary (Industries), Fort St. George, Chennai — 600009 (Fax: 044-25370822).

  7. Government of Kerala, Principal Secretary (Industries), Government Secretariat, Trivandrum — 695001 (Fax: 0471-2333017).

  8. Government of Haryana, Financial Commissioner and Principal Secretary), Department of Industries, Haryana Civil Secretariat, | Chandigarh (Fax: 0172-2740526).

  9. Government of Rajasthan, Principal Secretary (Industries), Secretariat Campus, Bhagwan Das Road, Jaipur — 302005 (0141-2227788).

  10. Government of Uttar Pradesh, Principal Secretary, (Industries), Lal Bahadur Shastri Bhawan, Lucknow — 226001 (Fax: 0522-2238255).

iat Campus, Bhagwan Das Road, Jaipur — 302005 (0141-2227788).

  1. Government of Uttar Pradesh, Principal Secretary, (Industries), Lal Bahadur Shastri Bhawan, Lucknow — 226001 (Fax: 0522-2238255).

  2. Government of Punjab, Principal Secretary Department of Industry & Commerce 53. Udyog Bhawan), Sector -17, Chandigarh- 160017. Government of Puducherry, Secretary, Department of Industries, Chief Secretariat,

  3. Puducherry. Government of Odisha, Principal Secretary (Industries), Odisha Secretariat,

  4. Bhubaneshwar — 751001 (Fax: 0671-536819/2406299). Government of Madhya Pradesh, Chief Secretary, (Commerce and Industry), VallabhBhavan, Bhopal (Fax: 0755-2559974)

| |

| | | |

  1. Government of Uttarakhand, Principal Secretary, (Industries), No. 4, Subhash Road, Secretariat, Dehradun, Uttarakhand

  2. Government of Jharkhand (Secretary), Department of Industries Nepal House, Doranda, Ranchi — 834002.

  3. Union Territory of Daman and Diu and Dadra Nagar Haveli, Secretary (Industries), Department of Industries, Secretariat, Moti Daman — 396220 (Fax: 0260-2230775).

  4. Government of Nagaland, Principal Secretary, Department of Industries and Commerce), Kohima, Nagaland.

  5. Government of Chattishgarh, Commissioner-cum-Secretary Industries, Directorate of Industries, LIC Building Campus, 2" Floor, Pandri, Raipur, Chhattisgarh (Fax: 0771-2583651).

Copy to: PPS to CS/ PPS to SS (SK) / PPS to JS (VB)/ PPS to Dir (SNS).

Agenda for the 107" meeting of the Board of Approval to be held on 25" November, 2021 at 4.00 P.M. through Video Conferencing

|

107.1 Ratification of the minutes of the 106 meeting of the Board of Approval held on 07.10.2021.

  • 107.2 Request for extension of LoA of the units (five proposals)

  • e Asproposalper Rulefor setting18(1) upof theof UnitSEZin Rules,a SpecialtheEconomic Approval Zone.Committee may approve or reject a e Cases for consideration of extension of Letter of Approval i.r.o units in SEZs are governed by Rule 19(4) of SEZ Rules.

  • e Rule 19(4) states that LoA shall be valid for one year. First Proviso grants power to DCs for extending the LoA for a period not exceeding 2 years. Second Proviso grants further power to DCs for extending the LoA for one more year subject to the condition that two-thirds of activities including construction, relating to the setting up of the Unit is complete and a Chartered Engineer’s certificate to this effect is submitted by the entrepreneur.

  • ¢ Extensions beyond 3” year (in cases where two-third activities are not complete) and onwards are granted by BoA.

  • e BoA can extend the validity for a period of one year at a time.

| | | | |

  • ¢ There is no time limit up to which the Board can extend the validity.

ete) and onwards are granted by BoA.

  • e BoA can extend the validity for a period of one year at a time.

| | | | |

  • ¢ There is no time limit up to which the Board can extend the validity.

  • 107.2(i) Request of M/s Soft Rainbow Color Private Limited in the Plot No Z/71 & Z/72 Dahej SEZ Ltd, Dahej, Village: Luvara, Tal: Vagra, Dist: Bharuch, Gujarat for the extension of the Letter of Approval (LOA) upto 31.10.2022. e LOA issued on (Date) : 01.11.2018 e Nature of business of the unit ; Manufacturing of items under Chapter 32 of ITC HS (Azo Dyes (Including DTP Dyes, Synthetic food color, Textile dyes color, inject dyes, solvent dyes, cosmetic dyes and etc.)

  • e No. of Extensions : 1 by DC Dahej SEZ (for 2 years) e LoA valid upto : 31.10.2021

| | |

|

|

==> picture [467 x 157] intentionally omitted <==

----- Start of picture text -----<br> e Request : For further extension for one year upto 31.10.2022.<br>Present Progress:<br>a. Details of Business Plan:<br>!________—| SrNo_ |—TypeofCost_———|- Proposed Investment (Rs in Crores<br>2 Procurement ofMachinery and Equipment [1000SCSCS~SC~*”<br>Bo R&DHumanResourees CSO C—~“~S~™~S~SCSCSY<br>| otalC“‘éiSC“‘C”NSNCNC#N#C(#C#C#CSd00<br>----- End of picture text -----<br>

|

| | | | | | |

| | | | | | | |

b. Incremental Investment made so far and incremental investment since last extension:

==> picture [478 x 671] intentionally omitted <==

-----**<br>

|

| | | | | | |

| | | | | | | |

b. Incremental Investment made so far and incremental investment since last extension:

==> picture [478 x 671] intentionally omitted <==

----- Start of picture text -----<br>

|||||||||
|---|---|---|---|---|---|---|---|
|Sr No|Type of Cost|Total Investment|made}|Incremental Investment|since|
|Rell|ere|
|||dt|Costofland8|
|Environmental|clearances|
|3|Consultancy work for Architecture,|0.05|0.10|
|||
|||65|GST(loanConsultantsChargeConsultantCharge|||CO|DCOD—«|
|C) Details of|the physical progress till date:|
|Sr|Activities|“Yotage completion||“tage completion|Deadline|for the|
|LoA extension|Balance work|
|=|SS|S|]|
|Ground clearances,|boundary|
|all &|Land|filling|
|environmental clearances|
|Bftand|CT|100%|oT|tSCC“(CdTt “(‘“SCCCC*”|
|6__|SiteCleaningWork4S___|SEZOnlineregistration[Possession||__—[|_—100% 100%|~~[|||100%"10% —S—“i«ié*drsi‘(<‘(<C;é;SCSC*”' ~S—iCsT||CS|
|7__|Landfillingwork|||50%|||80%|iTS|January,|2022_—CY|
|8|||TC|SC*dSs Marc|2022|
|[Application|forLUT|||100%|||10%@|Cid|Csr|
|A|exemption/Eligibility|Certificate}|
|Green belt Development as per|
|12|crepoms|||
|PP|[Pemaionottutdngtan]|13|{Application|Appointmentforof BuildingArchitect Plan for||100%100%|fe100%100%|
|Pia|||
|aterials|
|15|{Appointment|of Civil|50%|30%|December,|2021|
|a|a|Dn|
|18__|WaterConnection67||CivilWork|Blectricityne,November,20222021|
|19||=|TS|S*dSCNNovermber, 2021|
|P|Givenchy{Procurement|and installation| of||20%|February,ee 2022|

----- End of picture text -----<br>

2

20 [Commercial Production

,November,20222021| |19||=|TS|S*dSCNNovermber, 2021| |P|Givenchy{Procurement|and installation| of||20%|February,ee 2022|


**----- End of picture text -----**<br>


2 

20 [Commercial Production 

| 

| 

| End ofMarch, 2022 | 

Detailed Reasons for Delay: They could not start the physical development due to impact of Covid-19 and other requisite approval like GPCB and plan approval. As they have got both the approval recently, they are in a position to start the physical work of the project and shall complete the project at the earliest.

## Recommendation by DC, Dahej SEZ: 

case In view of the above development activities carried out by the applicant unit, the is recommended to the Board of Approval, for extension in validity of LOA dated 01.11.2018 (extended upto 31.10.2021) for the further period of one year i.e. upto 31.10.2022. 

107.2(ii) Request of M/s. Algolog Systems Pvt. Ltd. in Ansal IT City & Parks Ltd., IT/ITES SEZ at Plot No. TZ-06, Tech Zone, Greater Noida (U.P.) for extension of Letter of Approval (LOA) for a further period of one year i.e., upto 25.10.2022. e Name of Unit : Algolog Systems Pvt. Ltd. 

- ¢ LOA issued on ¢ Nature of Business of of Business of Business of of the unit unit 

   - 26.10.2015 

- ¢ Nature of Business of of Business of Business of of the unit unit : Software Development e No. of Extensions i Unit had been granted two extensions by BoA 1* 2016-20 & 2" 2020-21) 

- e LOA valid upto ; e Request :

## 25.10.2021 

Unit has requested for one year extension i.e. upto 25.10.2022.

## (a) Details of business plan:- 

**==> picture [402 x 116] intentionally omitted <==**

**----- Start of picture text -----**<br>
S. No. Type of Cost Proposed Investment<br>1,18,20,000/-<br>| 2,76,00,000/- (approx.)<br>| 34 — [PlantlOther & Overheads Machiner 1,89,00,000/- (approx.)1,11,868/-<br>7 5,84,31,868/-<br>**----- End of picture text -----**<br>


| | | | | [ | | | | | | | | | | | | | | | |

## (b) Investment made so far & incremental investment since last extension: 

**==> picture [460 x 103] intentionally omitted <==**

**----- Start of picture text -----**<br>
S. ‘Hoteh havea Incremental investment since last extensi<br>No. Type of Cost made so far ves i . sseaaaiiiaiaibiai<br>(Rs.) ;<br>1,18,20,000- |<br>1,05,88,394/- 27,89,740/-<br>| 4 |Other Overheads O111g68/-29,57,000/- | 05,07,000/-56.275/- Cid<br>**----- End of picture text -----**<br>


3 

| 

(Total: 

| 2,54,77,262 

| 

33,53,015/- 

| 

| 

| | |

## (c) Details of Physical progress till date :- 

**==> picture [459 x 675] intentionally omitted <==**

**----- Start of picture text -----**<br>
S.No. | Authorised activity }% completion ason| % completion Deadline for completion<br>date during last one year of balance work<br>1 Land taken on lease Done Done Within 5 years of date of<br>and registration issue of sanction by Gr.<br>Noida, dt. 03.01.2019<br>aarchitect<br>a a<br>onstruction agenc<br>oe5 approvalCompletion drawings9 i of 1. Raft 1.andFront Within 5 years of date of<br>construction Foundation retention issue of sanction by Gr.<br>(100%) wall 80% oida, dt. 03.01.2019.<br>2. Front completed.<br>retention 2. Two side<br>wall 80% retention<br>completed. walls 70%<br>3. Two side. completed.<br>retention 3. Rear<br>walls 70% retention<br>completed. wall 20%<br>4. completed.<br>Rear<br>retention 4. Walls of<br>wall 20% Electric<br>completed. Panel room,<br>fire tank<br>5. Walls of room, Pump<br>Electric room and lift<br>Panel room, roo Tas<br>fire tank 7<br>room, Pump<br>room and lift come<br>room has 5. Levelling<br>been and filling of<br>completed. the pits<br>6. ; around the<br>Levelling retention<br>and filling of walls is done,<br>the pits<br>around the<br>retention<br>walls is<br>done.<br>Installation The project building} The projection<br>lof Machineries is under building is under<br>construction. construction.<br>Commercial<br>orders<br>[9 [exportProduction & export<br>**----- End of picture text -----**<br>


4 

Project Implementation schedule. 

**==> picture [448 x 154] intentionally omitted <==**

on.<br>Commercial<br>orders<br>[9 [exportProduction & export<br>**----- End of picture text -----**<br>


4 

Project Implementation schedule. 

**==> picture [448 x 154] intentionally omitted <==**

**----- Start of picture text -----**<br>
```text
|||||||||
|---|---|---|---|---|---|---|---|
|e|Infrastructure for parking roof|and two|floors of|the building likely to be completed in Jun-July|
|2022.|
|e|Soon after the completion|of|the second|floor installation of|the machinery will be carried out|
|and work|is|likely to be|started|in|Oct.|2022.|
|e|Simultaneously|construction|of|the other|floors|will|continue.|
|e|Likely trial production Oct. 2022.|
|e|Likely commercial|production|Oct.|2022.|
|e|Likely export orders|Oct.|2022.|

----- End of picture text -----<br>

Details reasons for delay:-

  • ¢ The unit has stated that their company could not start set-up as promised earlier due to forces majeure, like:

  • e Lockdown restrictions imposed by central/state govt. due to Covid-19.

  • © e Labour was not available during the lockdown period. e Unavailability of vendors/suppliers, due to which materials required for construction could not be procured.

==> picture [3 x 210] intentionally omitted <==

----- Start of picture text -----<br> ||<br>|<br>|<br>|<br>----- End of picture text -----<br>

  • e Lastly, due to the rainy season the RMC could not be done. e This time the entire raft area is flooded with water.

  • e However, considerable amount of construction have been achieved despite of all bottlenecks.

Rule Position: Proviso (ii) & (iii) to Rule 19(4) of SEZ Rules, 2006, “Development Commissioner may grant 4th year extension subject to the condition that two-thirds of activities including construction, relating to the setting up of the unit is complete and a chartered engineer’s certificate to this effect is submitted by the entrepreneur.

and Provided also that the Board of approval may, upon a request in writing by the entrepreneur, after being satisfied that it is necessary and expedient so to do grant further extension for a further period not exceeding one year, at a time."

Recommendation by DC:

upto[25.10.2022.] DC, Noida SEZ has recommended the extension of LOA for a further period of one year i.e.

5

| | | | | | | | | | | |

107.2(iii) Request of M/s Wockhardt Limited Unit 3 at Shendre, Aurangabad, Maharashtra for extension of the validity period of LoA for a period of one year from 25.10.2021 to 25.10.2022.

| | | |

  • e LoA issued on : 25.10.2013
|e<br>Natureofbusiness|: Manufacturing ofOral soliddosage forhumanusage|
|---|---|
|e<br>Numberofextensions|:<br>: Sevenextensions upto24.10.2021 (3byDC&4byBoA)|
|Present progress:||
|Details ofBusiness plan:||
|S.No.<br>[Typeofcost____ [ProposedInvestment<br>(Rs. Incrores<br>| 1 __—Plant & Machinery<br>a<br>>:<br>| 2<br>“(BuildingCivilWork pO<br>1<br>80.78||
|Investment: Position ofcapital|investmentbyWockhardtLtd.|
||1.<br>[Up toSeptember2020|‘Totalinvestmentmadesofar (Rs.Incrores<br>80.78|
|2<br>October 2020 to September 9,<br>NIL (Increment)<br>2021<br>3<br>otal capital investment up to<br>80.78||
|September9,2021||

Details of physical progress till date:

Physical progress: The unit has submitted that there is no change with regards to physical progress as the construction activities of the unit have already been completed and the plant and machinery has been fully installed to its capacity. The unit is only not operational in absence of necessary approval from regulatory bodies.

==> picture [473 x 82] intentionally omitted <==

----- Start of picture text -----<br> S. No. Activity Total area (Deadline for completion<br>| ofwork<br>[|Areaconstructedsofar]<br>|[31 [2] lApprovedarealC«*2382= 2382 8g. sq. mirsmts Theproject constructionis activityalread of<br>|4[Incremental|% wise progressarea si si nce l as tt extension extension NL ompleted.<br>----- End of picture text -----<br>

|

Detailed reasons for delay:

  • a. The construction activities along with installation of necessary plant and machinaries required for smooth operation has been completed by the Unit. Also, they have applied to USFDA for product approval with a renewal fee up to 31.12.2021. However, due to the global COVID-19 pandemic, the inspection got delayed and they are expecting the surprise inspection anytime shortly. They are hopeful that after COVID-19 pandemic, the Regulatory Authority will visit their plant and accordingly, they will start their commercial production

6

in due course. Furthermore, they are also in process for statutory licenses and approvals of the respective countries.

  • b. On scrutiny of the application, it is observed that the construction work has been completed in the year 2019 itself and the commercial production is pending only for want of approval of the Regulatory Authorities. As such, there is no change in the status as compared to last two years.

Details from CE’s Certificate:

  • a. Approved area as per the approved plan : 22382 sq.mtr. b. Constructed area so far : 22382 :sq.mtr. c. Incremental area constructed since last extension of LoA : Nil

  • d. Area of difference in % - Nil (Construction completed in last extension of LoA)

  • e. Materials used are of approved quality

  • f. All structural work including brick walls, roofing plastering etc. are being implemented to satisfaction.

Specified Officer’s Report:

The Specified Officer in his report dated 04.12.2018 had already stated that on physical inspection of the site it was observed that the construction work (22382 sq. mtr) is already complete and the unit has installed the machinery procured through import and DTA procurement.

The construction work has already been completed and the delay in starting of operation is on account of site inspection pending by US-FDA.

Recommendation by DC:

| | | | | |

to DC, SEEPZ has recommended the request for extension of LoA for a period of one year up 24.10.2022 as per Rule 19(4) of SEZ Rules, 2006.

107.2(iv) Request of M/s Vidya Herbs Private Limited in the KIADB (Pharmaceutical) SEZ, Hassan, Karnataka for extension of Letter of /approval (LOA) beyond 26.10.2021 for a period of one year up to 26.10.2022.

  • e LoA issued on (date) i 27.10.2016 e Nature of business of the Unit : Manufacturing and export of 1. Coffee bean extract Pa Turmeric extract 3. Arnia extract and 4. Holy basil extract tulsi

7

| | | | | | | | | | | | | | | | | |

e No of Extensions : Four extensions (5" year) e LOA valid upto (date) : 26.10.2021 e Request i For further extension for one year, up to 26.10.2022. Present Progress: SL. a. Details ofBusiness plan: No. Type of Cost Proposed Investment (Rs. é in crores) Pp Total 8S b. Incremental Investment made so far and incremental Investment made so far and incremental made so far and incremental so far and incremental far and incremental and incremental incremental investment since since last extension: SI. No [Type of Cost 'Totalinvestment |Incremental Investment fo (Rs in Crores) since last extension 2. land 8S [Material Procurement [| 0Ss—idEC“(‘$)S$NSW‘OsS~—SC Pp Total 43.910A 26.29 CC rores

b. Incremental Investment made so far and incremental Investment made so far and incremental made so far and incremental so far and incremental far and incremental and incremental incremental investment since since last extension:

far and incremental Investment made so far and incremental made so far and incremental so far and incremental far and incremental and incremental incremental investment since since last extension:

  • c. Details of physical progress till date:-

==> picture [429 x 143] intentionally omitted <==

----- Start of picture text -----<br> Sl.No |Activity % completion |% completion|/Deadline fo<br>during last onelcompletion 0<br>— ae of Built up March, 2022<br>Area<br>a year balance work<br>4 Development of other 30% 25%<br>infrastructure<br>Detailed reasons for delay: -<br>----- End of picture text -----<br>

  • e There was a delay in handing over the possession of the two plots allotted by KIADB. The lease deed for the first plot was executed on 24.08.2018, and the second was on 04.10.2018.

  • e They faced stiff resistance from local landowners claiming that KIADB did not suitably compensate them. This issue was settled through negotiation. The Building Plan got approved by KIADB in May 2019, and the construction activity commenced in July 2019.

  • ¢ The most sensible portion of machinery for their plant is required to be imported from China. The import of this machinery requires attestation by the Chinese Embassy, and the unit got the attestation by the end of February 2021. They are expecting the delivery of machinery in November 2021. The installation of the machinery will be complete by April/May 2022. 8

| | | | | | | | | | | | |

Recommendation by DC, CSEZ:

DC, CSEZ has recommended the proposal.

.

  • 107.2(v) Request of M/s Wipro Enterprises Private Limited (Unit-IT) in the KIADB(Aerospace) SEZ, Bangalore, Karnataka for extension of Letter of Approval (LOA) beyond 19.11.2021 for a period of one year up to 20.11.2022. e LoA issued on (date) : 20.11.2017 e Nature of business of the Unit: Manufacturing and export of under carriage parts, other parts of aircraft, Air Craft Structures, other Parts, Launching gear, deck-arrestor or similar gear

  • e No of Extensions : Three extensions * LOA valid upto (date) 19.11.2021 e Request ; For further extension for one year, up to 19.11.2022 Present Progress:

  • a. Details of Business plan:

==> picture [476 x 62] intentionally omitted <==

----- Start of picture text -----<br>

||||||
|---|---|---|---|---|
|||1.|flandCoss|dTProposed InvestmentC“‘i|LO(Rs. in crores)SCSC~*Y|
|(2.|[Construction|ost|id|SSCS|
|||ffotal|RIS|C—“‘CSN™C‘*S|

----- End of picture text -----<br>

b. Incremental Investment made so far and incremental investment since last extension:

==> picture [475 x 104] intentionally omitted <==

----- Start of picture text -----<br>

|||||||||||
|---|---|---|---|---|---|---|---|---|---|
|Sl.No.||Type|of Cost|otal|Investment|made|soIncremental|investment|(Rs.|in|
|far25th(Rs.Oct|21In|crores)|up|tolcrores)|since last extension|
||||1.|[Land26.25cost|Cr|
|2.|[Machinery and Others|||9.26 Cr|9.26 Cr|
|13.79 Cr|
|||[otal][ 752.]|12.1|Cr|4.53 Cr|

----- End of picture text -----<br>

|up|tolcrores)|since last extension| ||||1.|[Land26.25cost|Cr| |2.|[Machinery and Others|||9.26 Cr|9.26 Cr| |13.79 Cr| |||[otal][ 752.]|12.1|Cr|4.53 Cr|


**----- End of picture text -----**<br>


c. Details of physical progress till date:- 

**==> picture [428 x 126] intentionally omitted <==**

**----- Start of picture text -----**<br>
```text
||||||||
|---|---|---|---|---|---|---|
|SI. No.|Authorised|%|Completion||%|Completion|Deadline|fo|
|activity|during|last|onecompletion|0|
|year|balance work|
|1,|Building|98%|5%|6|Months|
|Construction|
|2.|Machines|70%|80%|6|Months|
|Installation|and|
|Commissioning|
|9|

----- End of picture text -----<br>

Detailed reasons for delay: -

Due to intermittent Covid-19 lockdowns the following activities have got delayed e inordinately:

  • The delivery of Capital goods like machines, cranes, Electrical goods etc.

  • e The necessary statutory clearances like Pollution Control Board Clearance, Fire Safety, Inspector of Factories, Power Sanction, Water connection etc., are in the process and clearance awaited.

  • ¢ The Customer visit and their approval and certification delayed due to international Covid19 travel restrictions. They are expecting to complete the construction of the plant by February, 2022 and

  • requested for extension of LOA for a further period of one year. The unit has submitted the CE certificate stating overall, 98% work has been completed. A copy of the letter received from the unit is forwarded herewith.

Recommendation by DC, CSEZ:

DC, CSEZ has recommended the proposal

107.3 Requests for co-developer (three proposals)

107.3(i) Request of M/s. Pluto Fin Tech Private Limited for co-developer status in Cessna Business Park SEZ for Property management and other infrastructure Services. hectare Cessna Business Park SEZ, Bangalore has been notified on 06.10.2009 over an area 17.99 and became operational on 01.05.2007. the M/s. Pluto Fin Tech Private Limited has submitted a proposal for becoming co-developer in aforesaid SEZ for Property management and other infrastructure Services (viz. Engineering Maintenance including electrical and mechanical work etc. as per schedule-2 of the agreement) in the entire area of the SEZ (17.99 hectares). The Co-developer agreement dated 9" September, 2021 entered with the developer has been submitted. They have proposed investment of Rs.3.20 as co-developer in the SEZ.

| | | | | | | | | | | | | | | | | | | |

Recommendation by DC:

DC, CSEZ has recommended the proposal.

107.3(ii) Proposal of M/s. Xenosoft Technologies (India) Private Limited for approval of Co-Developer Status in M/s. APIIC limited 'TATES SEZ, Hill No. 3, Madhurwada, Visakahaptnam.

10

  • M/s. APIIC Limited, Developer was granted Formal approval dated 07.05.2006 for setting

  • up of a Sector Specific SEZ at Hill No. 3, Madhurawada, Rushikonda, Visakhaptnam in the State of Andhra Pradesh. M/s. Xenosoft Technologies (India) Private Limited has submitted a proposal for approval

  • as a Co-developer for undertaking following infrastructure facilities and authorised operations in M/s. APIIC Limited in an area of 3,10,000 sft. with proposed investment of Rs.10.00 crores. e To provide infrastructural facilities; leasing of space to units, all operational and maintenance facilities will be provided (Office building with a built-up area of 3,10,000 sft. with 4 cellars and 4 floors for the authorized operations of Information Technology and Information Technology enabled services).

  • LimitedAs per the proposal M/s. APIIC Limited and M/s. Xenosoft Technologies (India) Private deed have executed Co-Developer Agreement dated 21" October, 2021 and lease Agreement/ for the proposed activity in the SEZ. The Investment in the Project is Rs. 70.00 crores.

ogies (India) Private deed have executed Co-Developer Agreement dated 21" October, 2021 and lease Agreement/ for the proposed activity in the SEZ. The Investment in the Project is Rs. 70.00 crores.

M/s. Xenosoft Technologies (India) Private Limited has submitted an application in the prescribed form (Form-A1) along with copies of the Co-Developer Agreement, lease deed, etc., for approval as Co-Developer in M/s. APIIC Limited SEZ for development of complete IT infrastructure for the part of the above namely 2.00 Acres for this purpose in M/s. APIIC Limited SEZ as per the agreement entered.

Recommendation by DC, VSEZ: DC, VSEZ has recommended the proposal. 107.3 (iii) Request of M/s State Industries Promotion Corporation of Tamil Nadu Limited for co-developer status in the IT/ITES Electronic components and Hardware manufacturing and related services SEZ developed by M/s. Flextronics Technologies India Taluk,Pvt. Ltd.Kancheepuramat SIPCOT IndustrialDistrict. Park, Phase II, Sandavellur “C” Village, Sriperumbudur

| | | | | | | | | | | | | | |

SEZ developed by M/s. Flextronics Technologies India Taluk,Pvt. Ltd.Kancheepuramat SIPCOT IndustrialDistrict. Park, Phase II, Sandavellur “C” Village, Sriperumbudur

| | | | | | | | | | | | | | |

M/s Flextronics Technologies India Private Limited SEZ stands notified on 25.04.2006 and presently spreads over an area of 76.14 ha. M/s State Industries Promotion Corporation of Tamil Nadu Limited has submitted an application for co-developer status in the said SEZ to undertake basic infrastructure facilities in the 60.73 ha of notified area out of total notified area of 76.14 ha viz. roads, storm water drains, street lights, water supply distribution lines, avenue plants etc. for facilitating the industrial units proposed to be set up within the said 60.73 ha of notified area. The proposed co-developer intends to invest Rs.8.50 cr.

been submitted.The Co-developer agreement dated 16" September, 2021 entered into with the developer has The developer vide their letter dated 24.12.2020 has given their consent to include SIPCOT as co-developer to develop and maintain 60.73 ha (150 acres) of the SEZ land and allot the land to other industries. The proposed amount of investment by the Co-developer in the SEZ is Rs. 8.50 Crore.

The proposal was deferred in the 103" BoA meeting held on 18 March, 2021 due to legislative assembly elections in the State of Tamil Nadu.

11

|

| | | | |

Recommendation of DC, MEPZ:

Development Commissioner, MEPZ has recommended the proposal. The request is placed before BOA for its consideration.

107.4 Miscellaneous cases (two proposals)

107.4(i)

Request of M/s. T&V Holdings Pvt. Ltd. - Request for cancellation of LOA issued to them as Co-Developer of M/s. Estancia IT Park Pvt. Ltd., Chennai.

Tamil M/s. T&V Holdings Private Limited, Co-Developer of M/s. Estancia IT Park Limited SEZ, Nadu was issued LOA dated 26/09/2014 for providing infrastructure facilities in the sector specific SEZ for IT/ITES at Vallancherry Village, Guduvanchery, Chengalpattu Taluk & District, Tamil Nadu. The Present request of the Co-Developer is for Cancellation of LOA issued to them and to surrender the space of 3.56 Hectares back to the Developer of the SEZ.

The present request of the Co-Developer, M/s. T&V Holdings Private Limited is for cancellation of LOA and to surrender the SEZ area back to the Developer.

The Co-Developer M/s. T&V Holdings Private Limited was allotted 5.27 Hectares of Land by the Developer M/s. Estancia IT Park Pvt. Limited SEZ. The Co-Developer had surrendered 1.71 Hectares of land and the proposal for surrender of space was considered in the Board of Approval meeting held on 03/07/2017. Accordingly, approval for surrender of SEZ area to the extent of 1.71 hectares and to retain the remaining area of 3.56 Hectares, was issued vide letter dated 19/07/2017 by MOC&I, New Delhi.

/2017. Accordingly, approval for surrender of SEZ area to the extent of 1.71 hectares and to retain the remaining area of 3.56 Hectares, was issued vide letter dated 19/07/2017 by MOC&I, New Delhi.

remainingNow,spacethe ofCo-Developer 3.56 Hectares toM/s.the DeveloperT&V Holdings vide cancellationPrivate Limitedof Co-Developerintend to Agreemsurrend e rntthe & cancellation ofLease Deed on 01/10/2019. Consequent upon the surrender of area to the Developer, the surrendered portion will remain as SEZ area and Developer M/s. Estancia IT Park Pvt. Limited SEZ will develop the infrastructural facilities.

| | | | |

The proposal for cancellation of LOA issued to the Co-Developer is submitted for consideration.

In accordance with the request of the Co-Developer, the Developer M/s. Estancia IT Park Private Limited has confirmed that the Lease agreement shall stand cancelled w.e.f. 01/10/2019. stating Authorisedthat the Co-Developerofficer of thehave SEZneither submittedprocured a letternor datedimported 30/08/2021any goodsthroughfor Specified Officertheir authorised operations. Coloured Map showing 3.56 Hectares of Land surrendered back to the Developer is submitted.

12

Recommendation by DC, MEPZ:

The request of the Co-Developer, M/s. T&V Holdings Private Limited for cancellation of the LOA issued to them and to surrender the space admeasuring of 3.56 Hectares back to the Developer M/s. Estancia IT Park Pvt. Ltd. is recommended for consideration by Board of Approval. 107.4(ii) Request of M/s. Mariapps Marine Solutions (1) Pvt Ltd., Co-Developer for acquiring additional land 0.04047Ha (10 cents), on lease basis, from the Developer, M/s Smartcity (Kochi) Infrastructure Pvt Ltd. M/s. Mariapps Marine Solutions (I) Pvt. Ltd, has stated that the their Group Company M/s Bernhard Schulte Ship management (India) Pvt. Ltd, which is also a unit in the premises of CoDeveloper, has now started operations on 13 August 2021. The unit has two main operations, i.e. Maritime Training Centre (MTC) & Crew Service Centre (CSC). M/s. Mariapps Marine Solutions (I) Pvt. Ltd, further stated that considering the employment potential of the skill developed trainees of M/s Bernhard Schulte Ship Management (India) Pvt. Ltd and it's capacity to generate additional foreign exchange, MTC requires a mooring station, to perform training functions properly. For creation of additional infrastructure, M/s. Mariapps Marine Solutions (I) Pvt. Ltd requires additional extent of land measuring 0.04047 Ha (10 cents), which is contiguous to the Co- Developer's existing allotted land, for which M/s Smartcity (Kochi), has given No objection to sub lease land to Co- Developer.

land measuring 0.04047 Ha (10 cents), which is contiguous to the Co- Developer's existing allotted land, for which M/s Smartcity (Kochi), has given No objection to sub lease land to Co- Developer.

6A The power to grant increase in area vests with the Board ofApproval as per proviso of Rule (ii) of SEZ Rules, 2006. Considering the proposal of Co-Developer for creation of additional infrastructure, the request made by them for increase in their land area may be favourably considered.

| |

|

Recommendation by DC, CSEZ:

DC, CSEZ has recommended the proposal.

107.5 Industrial License (Two proposals)

107.5(i) Proposal of M/s RJT Tobaccos Pvt. Ltd. for setting up of SEZ unit at Visakhapatnam SEZ, Duvvada, Andhra Pradesh for manufacture of Cigarettes, Cigars, Cheroots and other tobacco products under IDR Act, 1951.

As per DPIIT’s Press Note 3 (2019 series) dated 11.09.2019 , Cigars and Cigarettes of Tobacco and manufactured tobacco substitutes require compulsory license under IDR Act, 1951. Accordingly, vide OM dated 04.11.2019 , the application of the unit was shared with the stakeholder departments for their'comments.

Comments have been received from all the departments as under:

|IS-I<br>Division,<br>(Security<br>Desk),||VideOM dated 21.02.2020 , Security Desk,MHAhad returned theproposal as the<br>[Tobacco/Cigarettemanufacturingarenot covered inthe sensitive sectors.|
|---|---|
|MHA||
|IS-I<br>Division, <br>Arms_ Section),||Vide OM dated 14.09.2019 , Arms Section, MHA had had returned the proposal<br> |stating thatthe subjectmatter is not concernedwiththeArms Section.|
||13|

IS-I<br>Division, <br>Arms_ Section),||Vide OM dated 14.09.2019 , Arms Section, MHA had had returned the proposal<br> |stating thatthe subjectmatter is not concernedwiththeArms Section.| ||13|




```text
|MHA||
|---|---|
|DPIIT|DPIIT videOM dated 01.09.2021 has offered theircomments as under:|
||1) The setting up ofan industry for the manufacturing ofcigars, cheroots, cigarillos|
||and cigarettes of tobacco or of tobacco substitute is covered under compulsory<br>licensingundertheIDR Act, 1951. However, no industrial licensehasbeengranted<br>forthe aforesaid activity since 1999ongrounds ofhealth.|
||ii) Industrial License for setting up a unit in SEZ area under IDR Act, 1951 for|
||manufacture of cigars, cheroots, cigarillos and cigarettes, oftobacco or oftobacco|
||substitutes is grantedbyDoC.|
||lil)IntermsofFDIPolicy,foreigndirectinvestmentisprohibitedinmanufacturing|
||ofcigars, cheroots, cigarillos and cigarettes, oftobacco oroftobacco substitutes.|
||iv) Cigarette and Other Tobacco Products (Prohibition of Advertisement and|
||Regulation of Trade and Commerce, Production, Supply and Distribution) Act,|
||2003 (COTPA, 2003) has been enacted to prohibit advertisement ofand to provide|
||fortheregulation oftradeandcommerce in, andproduction, supplyanddistribution|
|___|jofcigarettes and othertobacco product in India.

003) has been enacted to prohibit advertisement ofand to provide|
||fortheregulation oftradeandcommerce in, andproduction, supplyanddistribution|
|___|jofcigarettes and othertobacco product in India. The act aims to reduce exposure of|
||people to tobacco smoke with a view to achieve improvement in public health in<br>general.|
||Vv) There is no explicit ban on export ofTobacco products under COTPA, 2003.|
||However, Ministry of Health has opined that it may not be desirable to act in a|
||manner that directly, or indirectly promote any Tobacco producing manufacturing<br>industry.|
||In view ofabove stated facts, DPIIT has stated that DoC may take appropriate<br>decision for grant ofindustrial license for manufacture and exports only underEoU|
||Scheme provided that<br>(a) No sale under DTA will be allowed for the item|
||Cigarettes in any form including rejects and seconds i.e. entire production will be|
||exported, and (b) the unit will adhere to all the rules and regulations prescribed by<br>Andhra Pradesh StateGovernment formanufacture ofCigarettes.|
|Tobacco<br>Board, |VideOM dated 13.12.2019 , Tobacco Board, DoC has recommended the proposal<br>Department_ of subjecttotheextantpolicyandRules andconditions forthefollowingreasons:<br>Commerce||
||i) Since the firm proposes to export cigarettes, the Indian raw tobacco can be|
||exported to that extent aftervalue addition.|
||ii) Since theproduct isbeingmanufactured for export and not sold in market, it will|
||not haveanyhealth implications inthe country.|
||Thismaybeconsidered subject to following conditions:|

ition.|
||ii) Since theproduct isbeingmanufactured for export and not sold in market, it will|
||not haveanyhealth implications inthe country.|
||Thismaybeconsidered subject to following conditions:|
||i)Theapplicant shalluse 100% indigenous tobacco and shall not import tobacco for|
||anufacturing ofcigarettes.|
||ii) The cigarettes manufactured at SEZ shall not be allowed to sale in domestic|
||market.|

| |

14

!

| |

M/o EF&CC Vide OM dated 05.12.2019 , M/o EF&CC has stated that for development of SEZ, the prior Environment Clearance is required under following provisions of EIA Notification, 2006 (pg 245-289/c) as amended from time to time:

==> picture [452 x 663] intentionally omitted <==

----- Start of picture text -----<br>

||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
|Project|Category|with|threshold|
|a|:imit|i|
|7(c)|Industrial|If|at|least|one||[ndustrial||General|as|
|lEstates/Parks/Complexes/Areas,|industry|in|the||estate|ell|as|
|EPZs,|SEZs,|Biotech|Parks,|proposed|ousing|—_|special|
|eather Complexes|industrial|estate|Jat|—_ least||condition|
|fall|under|the|Jone|shall|apply|
|category|A,|entire|category|
|industrial|area||B|ote:|
|shall|be|treated|as|[industry|
|category|A,|jand|area||l.|Industrial|
|irrespective|of|the||<500|ha.|estate|of|are|
|area.|below|500|
|ha|and|not|
|Industrial|estates|[Industrial|{housing|any|
|with|area|greater|Jestates|of|industry|of|
|han|500|ha|and|jare|>500||category|A|
|housing|at|least|lha.|And|lor|B_|does|
|one|category|B||not|not|require|
|industry.|ousing|__|license.|

ousing|any|
|with|area|greater|Jestates|of|industry|of|
|han|500|ha|and|jare|>500||category|A|
|housing|at|least|lha.|And|lor|B_|does|
|one|category|B||not|not|require|
|industry.|ousing|__|license.|
|any|
|industry|2.|If the|area|
|belonging|fis|less|that|
|)|500|ha|but|
|ategory|contains|
|AorB.|{building|and|
|onstruction|
|projects|
|>2000|sq.|m|
|and/or|
|development|
|area|more|
|han|50|ha|it|
|ill|be|
|treated|=|as|
|activity|
|listed|at|
|serial|no.|
|8(a)|or|8(b)|
|in|the|
|schedule|as|
|the|case|may|
|De.|
|urther|stated|that|in|case|the|proposed|activity|involves|the|diversion|of|forest|
|land,|it|would|require|the|forest|clearance|under|the|Forest|(Conservation)|Act,|
|1980. The project|shall|also|require|clearance under Wildlife|(Protection)|Act,|1972,|
|if|project|passes|through|any|Protected|area,|i.e.|National|Park or|Sanctuary.|
|M/o|Health|&||Vide|letter|dated 27.03.2020|, M/o|Health and|Family Welfare has|stated|that|the IL|
|Family|Welfare|[for manufacturing|subject|items|comes under the|purview|of DPIIT and|according]|

----- End of picture text -----<br>

15

==> picture [453 x 351] intentionally omitted <==

ly|Welfare|[for manufacturing|subject|items|comes under the|purview|of DPIIT and|according]|


**----- End of picture text -----**<br>


15 

**==> picture [453 x 351] intentionally omitted <==**

**----- Start of picture text -----**<br>
```text
||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|offered No|comments.|
|State|govt.|of||Vide|letter|dated|11.11.2021|,|State|Govt.|of Andhra|Pradesh|has|offered|following|
|Andhra|Pradesh|_|remarks|for processing|the|proposal:|
|i)|Necessary|declaration|may|be|obtained|from|the|Directors|of|the|unit|that|the|
|cigarettes/tobacco|products|manufactured|by|the|firm|shall|be|exported|100%|and|
|sale of the same|within|the|country|shall|not be made.|
|ii)|The|promoter|shall|obtain|all|necessary|statutory|approvals/clearances|required|
|for|establishment/operation|of|the|unit|from|the|competent|authorities|of|
|Government|of Andhra|Pradesh.|
|iii)other The Tobacco companyproductsshall|abide(Prohi|b|itiony COTPAof Advertisement Act,|2003|along withand|Regulation the Cigarettesof Trade|and|
|Commerce,|Production,|Supply|and|Distribution)|Rules,|2004|and|its|further|
|examinations.|
|iv)|The company|shall|adhere|to|all|rules/regulations|prescribed|by|govt.|of Andhra|
|Pradesh|from time|to|time|for ensuring public|health.|
|v)|As|Directors|of|the|company|are|residing|outside|the|state|of Andhra|Pradesh,|
|security clearance may be|obtained|from the competent|authority.|
|VSEZ|Vide|letter|dated|27.11.2019|has|informed|that|the|unit|will|procure|all|the|raw|

siding|outside|the|state|of Andhra|Pradesh,|
|security clearance may be|obtained|from the competent|authority.|
|VSEZ|Vide|letter|dated|27.11.2019|has|informed|that|the|unit|will|procure|all|the|raw|
|materials|for the|production|and|packing|of cigarettes|indigenously.|Hence,|there|is|
|zero outflow of|Foreign exchange.|

----- End of picture text -----<br>

| |

|

Relevant provision: As per section 9 (e) of the SEZ Act, 2005 , the Board has powers and functions of granting, notwithstanding anything contained in the Industries (Development and Regulation) Act, 1951, a license to an industrial undertaking referred to in clause (d) of section 3 of that Act, if such undertaking is established, as a whole or part thereof, or proposed to be established, in a Special Economic Zone.

Since clearances have been received from all concerned departments, the proposal of the unit is placed before the Board of Approval for consideration.

107.5(ii) Proposal of M/s Rockman Advanced Composite Pvt. Ltd. (an SEZ unit under jurisdiction of Surat SEZ) for manufacturing allied items of defence equipment under IDR Act, 1951.

M/s Rockman Advanced Composite Pvt. Ltd. (an SEZ unit under jurisdiction of Surat SEZ) proposes for manufacturing following allied items of defence equipment under IDR Act, 1951 from their factory at plot no. 194, 195 185 SURSEZ, GIDC Sachin, Surat - 394230:

urisdiction of Surat SEZ) proposes for manufacturing following allied items of defence equipment under IDR Act, 1951 from their factory at plot no. 194, 195 185 SURSEZ, GIDC Sachin, Surat - 394230:

a) Armoured of Protective Equipment & b) Body Armour or Protective Garments dated As per Para 2(a) & 2(b) of Sr. No. (iii) ofAnnexure-I of DPIIT’s Press Note 1(2019 series) dated 01.01.2019 , the proposed items require license under IDR Act, 1951. Accordingly, vide OM 29.09.2020 , the application of the unit was shared with the stakeholder departments for their comments.

16

Comments have been received from all the departments as under:

|[Departments <br>IS-I<br>Division, <br>(Security<br>Desk),MHA_|[Departments <br>IS-I<br>Division, <br>(Security<br>Desk),MHA_|[Comments<br>C—“‘CS™SC*CSC“‘(®#SNCN’’CCO(<br> |Vide OM dated 28.12.2020<br>, Security Desk conveyed security clearance in r/o the uni<br>and its directorsnamely S/Shri SumanKantMunjal,UjjwalMunjal,ParagKishoreRajda,<br>|RobertJamesNeumann, IanThomson,ManoramaNagarajanandAmitKumarVijay.|
|---|---|---|
|||he M/o Commerce & Industry should ensure that all security instructions/architecture|
|||prescribed in the Security Manual for Licensed Defence Industries, issued byMoD from|
|IS-I<br>Division, <br>(Arms<br>Section),||imetotimearestrictlyadhereto.<br> |VideOM dated 27.07.2021<br>, Arms Section, MHA offered no comments as the items do<br>not fall under the categoryofsmall arms andammunition asperthe extant provision of<br>Arms act, 1959andtheArms Rules, 2016.|
|MHA|||
|D/o<br>Defence <br>Production|||VideOM dated29.12.2020<br>,DoDP has conveyedNo Objection totheproposed items<br>subjecttoproviding ballisticprotectionoflevel IIIand above(NIJ 0101.06, July2018 or|
|||ational equivalent and above) and specially designed for military application from<br>defence angle, subject to standard terms and conditionunderIDRAct, 1951.|
|||urther, the companymaybe directed to follow the security guidelines forCategory ‘A’|
|||mentioned in the Security Manual available at DDP’s website while undertaking|
|||manufacturing ofitems for defence use.|

e companymaybe directed to follow the security guidelines forCategory ‘A’|
|||mentioned in the Security Manual available at DDP’s website while undertaking|
|||manufacturing ofitems for defence use.|
|a||OM dated 20.11.2021 ,DPIITconveyedNo Objection to theproposal fromFDI<br>and Explosive angle.|
|M/oEF&CC_||{VideOM dated 17.11.2021<br>,M/oEF&CC informed that the proposal ofthe unit has bee<br>examined withref. to the applicability ofthe need of environment clearance (EC)unde<br>EIANotification, 2006<br>. Accordingly, MoEF&CC has informed that theprocess involved|
|||in the project is not apparent. However, it may please be noted that if the process off|
|||manufacturing armoured or protective equipment and boding armour or protective|
|||garments involve any of the activities mentioned in the schedule of EIA Notification,|
|||006, priorEC underEIA 2006 will be applicable.|
|State Govt. of <br>Gujarat|||Vide letter dated 28.10.2021<br>, State govt. ofGujarat has recommended theILproposal as<br>pertheprevailing policyandconsidering the following observations:|
|||nit’s proposed location is at a distance of less than 25 km from the city having more<br>han a million population as per the 2011 census. And located in Surat SEZ. The unit’s|
|||oldname is M/s Moldex Composites Pvt. Ltd. The unit has applied toGPCB for existing|
|||name change.|
|SuratSEZ|SEZ|Vide letter dated 23.10.2021<br>, Surat SEZ has stated that the items for which the unit has|
|||applied for manufacturing falls at Sr. No. 1 of Schedule 1 of Notification No.

change.|
|SuratSEZ|SEZ|Vide letter dated 23.10.2021<br>, Surat SEZ has stated that the items for which the unit has|
|||applied for manufacturing falls at Sr. No. 1 of Schedule 1 of Notification No. 477(E)|
|||dated 25.07.1991 which is reserved for public sector. Whereas the unit falls under the|
|||private sector.|
|||Further, as per para IIA (ii) (b), the industry should be located within industrial area|
|||designatedbythe State govt. before24 "July, 1991. However, the Industrial Area Sachin|
|||District-Surat (SEZ surat falls underthe SachinGIDC area) hasbeennotifiedon 7 "Sep,|
|||1993.|

| | | | i

With respect to comments of Surat SEZ regarding location of the unit, earlier as per DPIIT's Notification No. 477(E) dated 25.7.1991 , the proposed project shall not be located within 25 kms from the periphery of the standard urban area limits of cities having a population of more than 10

17

lakhs according to the 1991 census. However, DPIIT vide their Notification dated 14.8.2008 had omitted the provision regarding location of the unit.

Relevant provision: As per section 9 (e) of the SEZ Act, 2005 , the Board has powers and functions of granting, notwithstanding anything contained in the Industries (Development and Regulation) Act, 1951, a license to an industrial undertaking referred to in clause (d) of section 3 of that Act, if such undertaking is established, as a whole or part thereof, or proposed to be established, in a Special Economic Zone.

industrial undertaking referred to in clause (d) of section 3 of that Act, if such undertaking is established, as a whole or part thereof, or proposed to be established, in a Special Economic Zone.

As per Security Manual for Licensed Defence Industries issued by DoDP, the Indian License Defence Company (ILDC) is required to give an undertaking before commencing production of defence products that it shall comply with the provisions of the Security Manual. Simultaneously, the ILDC shall take steps to create security mechanism and apparatus in its production/manufacturing facilities fully meeting the security standards prescribed in the manual. Implementation of manual is overall responsibility of the CEO/Head of ILDC. It also inter alia provides that —

  • ¢ MoD will be nodal agency for implementation and review of manual. IB/MHA would be responsible for security audit and enforcement ofmanual.

  • ¢ Initially IB would conduct audit of all the ILDCs and based on the experience and feedback MoD would review the manual, if required.

  • e A panel of officers would be drawn from OFB, DPSUs, SHQ who can be nominated as the member of the security audit team of IB/MHA.

  • e Action would be taken against the companies for non-adherence to the manual or any other instructions issued by DDP/DIPP under the relevant Rules/Act.

unit Since clearances have been received from all concerned departments, the proposal of the is placed before the Board ofApproval for consideration.

78 ok

18

Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.

Analysis

No analysis generated for this document yet (analysis runs over brief docs + on-demand). Run build_analysis.py --ids 159 --apply.

Citation copied