← Archive
IN FORCE RoDTEP / Drawback / Remission

Frequency of application and time period for claiming TED / Drawback

Reliability

In force — no superseding record on file.

Document text

7.05 — Frequency of application and time period for claiming TED / Drawback

(a) In respect of supplies covered in Paragraphs 7.02 (a) to (c) of FTP, application for TED refund / drawback (whichever applicable) may be filed within 12 months from the date of realisation of 100% payment against such supplies. In cases where payment is received in advance and supply is made subsequently, in such cases application can be filed within

12 months from the last date of such supplies. Claim can be filed ‘Invalidation Letter / ARO wise’ against individual Authorisation within the time limit as specified above.

(b) In respect of supplies covered in Paragraphs 7.02 (d) to (g) of FTP, claim may be filed either on the basis of proof of supplies effected or payment received. Claims should be filed within a period of twelve months from date of receipt of supplies by project authority or from date of receipt of the payment by supplier as per the option of applicant, either against a particular project or all the projects. Claims may also be filed where part payments have been received. Deemed export benefits may be allowed after 100% supplies have been made. However, benefit will be limited to the extent of payment received.

(c) An application under ANF 7A shall pertain to only one category of supply as specified in Para 7.02 of the FTP. Filing a single application for multiple categories of supplies under Para 7.02 of FTP is not permissible.

pg. 160

Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.

Analysis

No analysis generated for this document yet (analysis runs over brief docs + on-demand). Run build_analysis.py --ids 15852 --apply.

Citation copied