DGFT Minutes
In force — no superseding record on file.
Government of India Ministry of Commerce and Industry Department of Commerce DIRECTORATE GENERAL OF FOREIGN TRADE
Index & Agenda KKKKKKKK
Meeting No - NC/7/MEET/April/2022-23/5 Meeting Date — 30/06/2022
Meeting Index of Norms Committee - 7 Plastic/Rubber Items
THE CHAIRMANSHIP OF SHRI HARDEEP SINGH, ADDL. DGFT
Meeting No. 5/87ALC1/2022-23 of NORMS COMMITTEE (NC-7) dealing with ‘Chapter 39 and 40 of ITC (HS) Code’ held on 30/06/2022, under the Chairmanship of Shri HARDEEP SINGH, Addl. DGFT, Directorate General of Foreign Trade, Department of Commerce, Udyog Bhawan, New Delhi-110011. Following attended the Meeting:
-
- Shri Shaish Kumar, Technical Expert (Consultant), DGFT
-
- Shri D.N. Mathur, Technical Expert (Consultant), DGFT 3) Shri Nand Lal, Consultant, DPIIT
-
- Shri O.P. Sharma, Consultant, D/o C&PC 5) ShriS.K. Mohapatra, DDG 6) Smt. Geeta Verma, ASO h
==> picture [43 x 34] intentionally omitted <==
----- Start of picture text -----<br> h<br>yn p /<br>----- End of picture text -----<br>
Following are the decisions of the Norms Committee after deliberation and RA concerned shall take consequential action as per Foreign Trade Policy/Procedures:
Manual Cases
RKKKKKK
The Committee approved the minutes of Norms Committee -VII Meeting No. 5/87 dated 31.06.2022 since uploaded on DGFT website.
|‘Case No. A-273.||Mis. Vishakha<br>Polyfeb P. Ltd|——_—| HQ. F.No 01/87/050/114/AM16|‘Deferred|
|---|---|---|---|
|NC No.5/22-23||RLA F. No. 08/24/040/00043/AM16||
|Dated:30.06.2022||AANo.0810135319Dated20.05.2015||
Subject: Request for Review against Fixation of Input Output Norms.
Decision:- The committee considered the case as per agenda in the presence of Technical Expert and decided to refer the case to technical Expert (Consultant —1) for examination. Hence, the committee decided to call for information D/L defer the case.
-
App.-4E, Annexure to Appendix 4E with all technical details. 2. Details of indigenous input.
-
% Wastage claimed.
-
Manufacture process in detail justifying, wastage at each stage.
==> picture [112 x 45] intentionally omitted <==
----- Start of picture text -----<br> [Aap]<br>*bf. [Chee]<br>a at eat i Sirade<br>----- End of picture text -----<br>
==> picture [502 x 83] intentionally omitted <==
----- Start of picture text -----<br> |<br>Case No. A-274_<br>MIs. Swastik ‘HQ. F.No 01/87/050/0025/AM19<br>Polymers<br>NC No,5/22-23 RLA F. No. 11/24/040/00081/AM09<br>| Dated:30.06.2022 | | AA No. 1110020023 Dated:09.04.2009 |<br>----- End of picture text -----<br>
==> picture [65 x 18] intentionally omitted <==
----- Start of picture text -----<br> “Approved<br>----- End of picture text -----<br>
Subject: Correction in typographical error in adhoc- norms.
Decision: The committee considered the case as per agenda and as per discussion held in the Norms committee, it has been decided to correct the typographical error in the existing norms as under for ratification purpose:
considered the case as per agenda and as per discussion held in the Norms committee, it has been decided to correct the typographical error in the existing norms as under for ratification purpose:
|S.No_||Export Item|Quantity|||Import Item|Import Item|Quantity|
|---|---|---|---|---|---|---|---|
|1.|PVC|Compound - Phthalate|60MT||1.|PVC Resin K. Value 65-|34.80 MT|
||Free|||||68||
||||||2.|DioctylTerephthalate|24.36MT|
RA may take consequential action as per Policy / Procedures.
|Case No. A-275 ||M/s. Flexituff|HQ. F.No 01/87/050/00008/AM10|_| Deferred|
|---|---|---|---|
||International Ltd.|||
|NC No.5/22-23||RLA F. No.||
|||AA No.||
|Dated:30.06.2022|:|-|-|
Subject: Inclusion of Import Item Fuel (Furnace Oil) Consumable.
Decision:- The committee considered the case as per agenda in the presence of Technical Expert and decided to refer the case to technical Expert (C&PC) for examination. Hence, the committee decided to defer the case. y) pps
==> picture [541 x 85] intentionally omitted <==
----- Start of picture text -----<br> ‘Case No. A-276 M/s. Wacker Metroark | [HQ.] [F.No] [01/87/50/08/AM18] Deferred<br>Chemicals Pvt. Ltd.<br>NC No.5/22-23 RLA F. Noo2/24/40/253/AM17<br>Dated:30.06.2022 AA No. 0210207475 dated 17.03.2017 -<br>----- End of picture text -----<br>
Sub: - Request for fixation of norms in respect of Advance Authorization No.0210207475 dated 17.03.2017 - M/s. Wacker Metroark Chemicals Pvt. Ltd., Kolkata.
*----- End of picture text -----**<br>
Sub: - Request for fixation of norms in respect of Advance Authorization No.0210207475 dated 17.03.2017 - M/s. Wacker Metroark Chemicals Pvt. Ltd., Kolkata.
Decision:- The committee considered the case as per agenda in the presence of Technical Expert and decided to refer the case to technical Expert (C&PC) for examination. Hence, the committee decided to defer the case.
|Case No. A-277__||MIs. KeyExports|HQ. F.No 01/87/50/1124/AM19/DES-ViI|Deferred|
|---|---|---|
|NC No.5/22-23||RLA F. No. 03/94/40/01001/AM19|
|Dated:30.06.2022||AANo.0310827208Dated21.02.2019|
Sub: - Request for fixation of norms review in respect of Advance Authorization No. 0310827208 Dated 21.02.2019. Decision:- The committee considered the case as per agenda in the presence of Technical Expert and decided to refer the case to technical Expert (C&PC) for examination. Hence, the committee decided to defer the case.
==> picture [99 x 112] intentionally omitted <==
----- Start of picture text -----<br> jbefe.“NAA ap<br>yore? ,<br>----- End of picture text -----<br>
==> picture [560 x 91] intentionally omitted <==
----- Start of picture text -----<br> Case No. A-278 | M/s. Zahonero india. |HQ. F.No o1/ev/so/124/aui0 -| Approved<br>Pvt. Ltd.<br>NC |<br>No.5/22-23 RLA F. No. 08/24/40/118/AM12<br>|<br>Dated:30.06.2022 |A No. 0510295759 dated 05.07.2011<br>[.<br>----- End of picture text -----<br>
o/124/aui0 -| Approved<br>Pvt. Ltd.<br>NC |<br>No.5/22-23 RLA F. No. 08/24/40/118/AM12<br>|<br>Dated:30.06.2022 |A No. 0510295759 dated 05.07.2011<br>[.<br>----- End of picture text -----<br>
Sub: - Request for fixation of norms in respect of Advance Authorization No.0510295759 dated 05.07.2011 - M/s. Zahonero India Pvt. Ltd., New Delhi
Decision: The committee considered the case as per agenda and decided to ratify the norms with 12% wastage as under:-
|_|||
|---|---|---|
|S.No<br>Description of Export|Quantity<br>ImportItem<br>| Quantity||
|L<br>| <br>1;<br>POLYFOAM SHEETS (30CMX40<br>CM)|a<br>15000NOS(1250KG)<br>1. POLYOLCOMPONENTA| 1005.0KG<br>2.<br>PIOLYOLCOMPONENT<br>B (ISO)<br>284.0KG||
|2 fo<br>~<br>POLYFOAM (WIDTH 0.92<br>METER)||18905METERS (9454 | 1.POLYOLCOMPONENTA | 7600.0KG<br>KGS)<br>2.PIOLYOLCOMPONENTB<br>2150.4KG||
|ISO<br>3,<br>NOTEXPORTED<br>LATEX<br>NOT<br>LATEX FOAM||||
||IMPORTED||
NOTE:- NO REPEAT LIC MAY BE ISSUED ON THE ABOVE NORMS, ONLY FOR Ot INIVIS, =— COVINEY FOR REGULATRLISATION PURPOSES.
RA may take consequential action as per Policy / Procedures.
|Case No. A-279||MIs. Rathna|| HQ. F.No 01/87/50/934/AM19|Deferred|
|---|---|---|---|
||Packaging India Pvt.|||
|NC No.5/22-23|Ltd.|RLA F. No. 07/24/40/161/AM17||
|Dated:30.06.2022||AANo.0710110389dated08.09.2016||
Sub: -Request for rectification of Import item Description in respect of Advance Authorization No.0710110389 dated 08.09.2016 - M/s. Rathna Packaging India Pvt. Ltd., Bangalore.
08.09.2016||
Sub: -Request for rectification of Import item Description in respect of Advance Authorization No.0710110389 dated 08.09.2016 - M/s. Rathna Packaging India Pvt. Ltd., Bangalore.
Decision:- The committee considered the case as per agenda in the presence of Technical Expert and decided to refer the case to technical Expert -1 for examination. Hence, the committee decided to defer the case.
## 1. CATALOUGE OF METALLOCENE.
**==> picture [536 x 87] intentionally omitted <==**
**----- Start of picture text -----**<br>
Case No. A-280 | MIs. Plastic Products |HQ. F.No 01/87/050/513/AM-20/DES. __| Deferred<br>Engineering Vil<br>NC No.5/22-23 Company, RLA F. No. 08/24/040/284/AM20<br>Ahmadabad<br>Dated:30.06.2022 AA No. 0810146828 dated 23.12.2019<br>**----- End of picture text -----**<br>
## Sub: - Request to re-open the case by submitting required information.
Decision:- The committee considered the case as per agenda in the presence of Technical Expert and decided to call for PH with sample and defer the case.
Case No. A-281 | M/s. Plastic Products |[HQ.][F.No][018705000762AM21] Deferred Engineering NC No.5/22-23 Company, RLA F. No. 082404000073AM21 Ahmedabad Dated: 30.06.2022 A No. 0810148008 dated 25.06..2020
. Sub: - Request to re-open the case by submitting required information
Decision:- The committee considered the case as per agenda in the presence of Technical Expert and decided to call for PH with sample and defer the case.
/Case No. A-282 | Mis. Plastic Products | HQ. F.No HQRNORMAPPLY 00060588| Deferred Engineering NC No.5/22-23 Company, RLA F. No. 08AA04006505AM21 Ahmadabad Dated:30.06.2022 AA No. 0811000376 dated 12/01/2021 | |
Sub: - Request to re-open the case by submitting required information.
Decision:- The committee considered the case as per agenda in the presence of Technical Expert and decided to call for PH with sample and defer the case.
**==> picture [561 x 79] intentionally omitted <==**
**----- Start of picture text -----**<br>
‘Case No. A-283 M/s. Zenith HQ.F.NoHQRNORMAPPLY00394321AM22 | Approved<br>Industrial Rubber |<br>NC No.5/22-23 Products Pvt.Ltd | RLA F. No. 03AX04001660AM22<br>Dated:30.06.2022 AA No. 0311013149 Dated 21.03.2022<br>**----- End of picture text -----**<br>
Sub: - Correction in typographical error in adhoc- norms.
s Pvt.Ltd | RLA F. No. 03AX04001660AM22<br>Dated:30.06.2022 AA No. 0311013149 Dated 21.03.2022<br>**----- End of picture text -----**<br>
Sub: - Correction in typographical error in adhoc- norms.
Decision: The committee considered the case as per agenda and as per discussion held in the Norms committee, it has been decided to correct the typographical error in the existing norms as under for ratification purposes::-
**==> picture [470 x 57] intentionally omitted <==**
**----- Start of picture text -----**<br>
Import Item No. Existing Norms Corrected Norms : _|<br>7 GUM RESIN GUM ROSIN |<br>**----- End of picture text -----**<br>
RA may take consequential action as per Policy / Procedures
**==> picture [138 x 95] intentionally omitted <==**
**----- Start of picture text -----**<br>
bs a cet an<br>m ans, non reGcad®<br>¢@<br>= <oer<br>**----- End of picture text -----**<br>
Verbatim extracted text (OCR/PDF). Older scans and tables may show extraction artifacts — verify against the original for anything you act on.
No analysis generated for this document yet (analysis runs over brief docs + on-demand). Run build_analysis.py --ids 10214 --apply.